Body: Planning Committee Type: Document Meeting: Committee Date: 2019 Collection: Agenda Attachments Municipality: Frontenac County
[View Document (PDF)](/docs/frontenac-county/Item Attachments/Agenda Item/2019/May/2019-048 Planning Advisory Committee Status of Plans of Subdivision and Condominium in Frontenac County/Status of Plans of Subdivision and Condominium in Frontenac County.pdf)
Document Text
Report 2019-048
Information Report To:
Chair and Members of the Planning Advisory Committee
From:
Megan Rueckwald, Manager of Community Planning
Prepared by:
Megan Rueckwald, Manager of Community Planning
Date of meeting:
May 6, 2019
Re:
Planning Advisory Committee – Status of Plans of Subdivision and Condominium in Frontenac County
Recommendation This report is for information purposes only. Background This report outlines at a high level the current plans of subdivision and condominium that are currently active across the County of Frontenac. This report is intended to provide an update for new Planning Advisory Committee members as to the current status of these files and process for development approval. The County of Frontenac is the approval authority for plans of subdivision and condominium across the County. Plans of subdivision or condominium are required when the proposed development requires a comprehensive approach and it is determined that a consent application is not the correct manner to proceed; policy direction for subdividing land is found within the Provincial Policy Statement (2014) and the County and Township Official Plans. Applications are submitted to the County of Frontenac and once deemed complete are circulated to the required agencies for comments and conditions for draft approval and then brought to the Planning Advisory Committee with a recommendation from County planning staff. The status of plans of subdivision and condominium generally fall into one of four categories: Pre-application: In the pre-application stage time is spent with the applicant providing feedback on the proposal, determine study requirements, reviewing draft studies and liaising with the consultants. The County coordinates a minimum of one formal preconsultation meeting with the commenting agencies in attendance (e.g. Township, conservation authority, KFL&A Public Health, etc.) and require that the County peer review hydrogeologist attend the site with the proponent’s hydrogeologist. Complete Application (Application Review): During the complete application stage, the application is under review. The plan is circulated to all required agencies and the
public in accordance with the Planning Act and the required public meeting is held by the Planning Advisory Committee. The County receives recommended conditions from each of the commenting agencies and considers all oral and written comments received by the public. A recommendation report is prepared by County planning staff for the Planning Advisory Committee and forwarded with a recommendation to County Council. Under the Planning Act, the County has 180 days to make a decision on the file; following this time period the developer may appeal a non-decision. Draft Approval: Having considered the application and all comments received, County Council may either draft approve or refuse the plan of subdivision or condominium proposal. The Clerk issues a Notice of Decision reflecting the Council decision and the 20 day appeal period to the Local Planning Appeal Tribunal commences. If no appeals are received, the applicant must satisfy each of the conditions of draft approval. The Township prepares a subdivision/condominium agreement which is required to be entered into by both the owner and the Township. Conditions of draft approval may require the developer to undertake additional studies or apply to the Township for a zoning bylaw amendment. The County typically provides the developer with 3 years to complete draft approval. Under the Planning Act, the owner has the right to apply to the County for an extension of draft plan approval. Final Approval: One the County has received clearance letters from the required letters advising that the conditions of draft approval have been met to their satisfaction, the County issues final approval. The Director of Planning and Economic Development has delegated authority under By-law No. 2016-0006 being a bylaw to establish a Delegation of Authority Policy to authorize the delegation of certain powers and duties under the Municipal Act, the Planning Act and other Acts. Provisions within Bylaw No. 2016-0006 outline circumstances when final approval may be a Council decision. Following the issuance of final approval, the Township and commenting agencies play an active role in ensuring that the proposed development meets legislated requirements and is in compliance with the subdivision or condominium agreement. Attachment 1 of this report outlines the location and status of each subdivision or condominium file across the County. Attachments 2-4, show the status of each development by Township (please note there are no active files within the Township of Central Frontenac). Status of Plans of Subdivision and Condominium in Frontenac County Pre-Application
- Sunbury (Campbell Development) – Storrington District, Sunbury, South Frontenac
- 24 lots proposed along a proposed Township maintained road
- Multiple pre-consultation meetings have occurred over the past 5 years
- County hydrogeologist has attended the site, well testing is underway
- No formal application has been submitted
- Nokomis Lodge – Howe Island, Frontenac Islands
- 4 lots proposed along private lane
- Multiple pre-consultation meetings have occurred over the past 5 years
- Incomplete application submitted Information Planning Advisory Committee Report Status of Plans of Subdivision and Condominium in Frontenac County May 6, 2019
Page 2 of 4
Complete Application (Application Review)
- 10CD-2016/001 (Shield Shores, Campbell) – Wellington Street, Battersea, South Frontenac
- 18 units proposed with common elements condominium roads, communal docking, and park space
- Public meeting held by Township and second meeting held by Planning Advisory Committee in 2017
- Proposed conditions of draft approval submitted by Township, Rideau Waterway Development Review Team and KFL&A Public Health
- County staff preparing recommend report for Planning Advisory Committee
- 10CD-2012/001 (Ardoch Lake) – Ardoch Lake, North Frontenac
- Application re-circulated to commenting agencies with a decrease in the number of waterfront units being proposed
- Outstanding environmental work to be completed in Spring 2019
- Planning Advisory Committee held public meeting in Summer 2017
- 10T-2015-001 (Collins Lake) – Lakefield Drive, South Frontenac
- 51 lots proposed along proposed road network
- Hydrogeological peer review did not support the approval of the application based on private water supply
- Applicant in the process of amending the hydrogeological study and met with Township staff in May 2019
- 10CD-2018/001 (Pine Point) – Pine Point Lane, Carrying Place Road, South Frontenac
- 4 units proposed with common elements road
- Public meeting held by the County Planning Advisory committee in 2018
- Outstanding commenting agency requirements prior to the County receiving proposed conditions of draft approval Draft Approval
- 10T-2011/002 (Oullette) – Storrington District, Battersea, South Frontenac
- 15 lots proposed with approved zoning
- Draft plan extension granted in 2018 (lapses on July 17, 2019)
- Property is currently up for sale
- 10CD-2012/002 (Cranberry Cove) – Carrying Place Road, South Frontenac
- 13 units proposed on private lane
- Draft plan will lapse on July 16, 2019
- 10T-2013/002 (Hartington) – Hartington, South Frontenac
- 13 lots proposed
- Local Planning Appeal Tribunal decision dated November 15, 2018 issued conditions of draft approval and zoning for the proposed development
- 10CD-2014/002 (Johnston Point) – North Shore Road, South Frontenac
- 15 units proposed along common elements road Information Planning Advisory Committee Report Status of Plans of Subdivision and Condominium in Frontenac County May 6, 2019
Page 3 of 4
-
Settlement hearing held on April 4, 2016 – Ontario Municipal Board orders that plan of condominium and zoning be approved with conditions Benefit Permit issued by the Ministry of Natural Resources and Forestry Draft plan approval set to lapse on June 28, 2019
- 10T-2017/001 (McFadden) – McFadden Road, South Frontenac
- 5 lots proposed along Township maintained road
- Developer nearing completion of fulfilling conditions; County awaiting receipt of clearance letters from required agencies Comment Approval through plans of subdivision or condominium ensure that the land is suitable for the proposed new use or intensity of development, that the proposal conforms to the official plans and zoning as well as to Provincial legislation and policies, and ensure that the community is protected from developments which are inappropriate or may put an undue strain on community facilities, services or finances. These developments require the submission of studies and are a more comprehensive process compared to consent applications (severances). Planning staff are working to identify efficiencies in the planning process to ensure that these comprehensive developments are proposed in a timely manner and that applicants are aware of the process and expectations. As such, the County is in the process of updating guidance documents and the planning webpage on the County website. Due to the complex nature of these files, the County is reviewing staffing capacity to ensure that suitable capacity exists to meet legislated timeframes. Sustainability Implications One of the key focus areas of Directions for Our Future, the County’s Sustainability Plan, is Land Use Planning and Management. From a sustainability perspective, this involves an approach that ensures a clean and healthy environment, a strong economy, and long term viability. Plans of subdivision and condominium represent a comprehensive form of development resulting in sustainable community growth; it is important that County staff have adequate resources to process these files and ensure transparency with the public. Directions for Our Future identifies transparency within good governance; this information report serves as a document that the public can review to understand where development is proposed or draft approved across the County. Financial Implications There are no direct financial implications to the County of Frontenac. Organizations, Departments and Individuals Consulted and/or Affected Township Planning Staff
Information Planning Advisory Committee Report Status of Plans of Subdivision and Condominium in Frontenac County May 6, 2019
Page 4 of 4
Active Subdivisions and Condos
± NORTH FRONTENAC
Ardoch Lake
CENTRAL FRONTENAC
SOUTH FRONTENAC
Hartington
McFadden Road
Sunbury (Campbell) Service Layer Credits: Sources: Esri, HERE, Garmin, Intermap, increment P Corp., GEBCO, USGS, FAO, NPS, NRCAN, GeoBase, IGN, Kadaster NL, Ordnance Survey, Esri Japan, METI, Esri China (Hong Kong), (c) OpenStreetMap contributors, and the GIS User Community
Collins Lake
Johnston Point Shield Shores Cranberry Cove
Pine Point
Oullette
Nokomis
Status
Complete
Draft Approval
Pre-Application 0
5
10
FRONTENAC ISLANDS
20
Kilometers Data Source: OGDE, ESRI & The County of Frontenac. Created: March 28th, 2017 Reference: Produced by the County of Frontenac with data supplied under license by members of the Ontario Geospatial Data Exchange. The County of Frontenac disclaims all responsibility for errors, omissions or inaccuracies in this publication.
Active Subdivisions and Condos
Frontenac Islands
±
Service Layer Credits: Sources: Esri, HERE,
Nokomis Garmin, Intermap, increment P Corp.,
GEBCO, USGS, FAO, NPS, NRCAN, GeoBase, IGN, Kadaster NL, Ordnance Survey, Esri Japan, METI, Esri China (Hong Kong), (c) OpenStreetMap contributors, and the GIS User Community
Status
Complete
Draft Approval
Pre-Application 0
0.75
1.5
3
Kilometers Data Source: OGDE, ESRI & The County of Frontenac. Created: March 28th, 2017 Reference: Produced by the County of Frontenac with data supplied under license by members of the Ontario Geospatial Data Exchange. The County of Frontenac disclaims all responsibility for errors, omissions or inaccuracies in this publication.
Active Subdivisions and Condos
South Frontenac
±
Service Layer Credits: Sources: Esri, HERE, Garmin, Intermap, increment P Corp., GEBCO, USGS, FAO, NPS, NRCAN, GeoBase, IGN, Kadaster NL, Ordnance Survey, Esri Japan, METI, Esri China (Hong Kong), (c) OpenStreetMap contributors, and the GIS User Community
McFadden Road
Cranberry cove
Shield Shores Hartington
Status
Draft Approval
4.5
Pine Point
Collins Lake
Pre-Application 2.25
Oullette
Sunbury (Campbell)
Complete
0
Johnston Point
9
Kilometers Data Source: OGDE, ESRI & The County of Frontenac. Created: March 28th, 2017 Reference: Produced by the County of Frontenac with data supplied under license by members of the Ontario Geospatial Data Exchange. The County of Frontenac disclaims all responsibility for errors, omissions or inaccuracies in this publication.
Active Subdivisions and Condos
North Frontenac
±
Ardoch Lake
Status
Complete
Draft Approval
Pre-Application 0
2.25
4.5
9
Service Layer Credits: Sources: Esri, HERE, Garmin, Intermap, increment P Corp., GEBCO, USGS, FAO, NPS, NRCAN, GeoBase, IGN, Kadaster NL, Ordnance Survey, Esri Japan, METI, Esri China (Hong Kong), (c) OpenStreetMap contributors, and the GIS User Community
Kilometers Data Source: OGDE, ESRI & The County of Frontenac. Created: March 28th, 2017 Reference: Produced by the County of Frontenac with data supplied under license by members of the Ontario Geospatial Data Exchange. The County of Frontenac disclaims all responsibility for errors, omissions or inaccuracies in this publication.