Body: Council Type: By-law Meeting: Regular Date: 2020 Collection: By-laws Municipality: South Frontenac
[View Document (PDF)](/docs/south-frontenac/By-laws/2020 By-laws/By-law 2020-66 - Amend 2014-26 to reflect On-Site Sewage System Fees.pdf)
Document Text
TOWNSHIP OF SOUTH FRONTENAC BY-LAW 2020-66 BEING A BY-LAW TO AMEND BY-LAW 2014-26, A BY-LAW TO REGULATE CONSTRUCTION, DEMOLITION, AND CHANGE OF USE PERMITS FOR BUILDINGS, STRUCTURES, AND All OTHER RELATED SERVICESWITHIN THE TOWNSHIPOF SOUTH FRONTENAC
WHEREASpursuant to section 9 ofthe MunicipalAct 2001 SO. 2001, chapter25 a municipality has the capacity, rights powers and privileges of a natural person for the purpose of exercising its authority under this or any other Act;
ANDWHEREASpursuant to section 8. (1) ofthe MunicipalAct, 2001 S.O. 2001 , chapter 25 the powers of a municipality under this or any other Act shall be interpreted broadly so as to confer broad authority on the municipality to enable the municipality to govern its affairs as it considers appropriate to enhance the municipality’s ability to respond to municipal issues;
ANDWHEREASSection 7 ofthe Building Code Act, 1992, S.0. 1992, c.23, as amended, authorizes municipal council to pass By-laws respecting construction, demolition and change of use permits, inspections and related matters including fees; ANDWHEREASnotice wasgiven and a Public meeting held on November 10, 2020 in accordance with the Building Code Act, 1992, S.0. 1992, c. 23, as amended in relation to
proposed amendments to the Building By-law 2014-26, as amended with respect to building related fees;
ANDWHEREASthe Township ofSouth Frontenac is assuming the responsibility for issuing permits and reviewing applications under Part 8 On-site SewageSystems ofthe Ontario Building Code and must establish fees for these services;
NOWTHEREFORE, the Council ofThe Corporation of the Township of South Frontenac enacts as follows:
- Schedule “C” of By-law 2014-26 shall be replaced with the attached Schedule “C”
that includes a numberoffees that relate to the delivery of services under Part 8 of the Ontario Building Code. EFFECTIVE DATE This By-law shall come into force and take effect November 17, 2020
Dated at the Township of South Frontenac this 17th day of November, 2020. Read a first and second time this 17th day of November, 2020. Read a third time and finally passed this 17th day of November, 2020. THE CORPORATIONOF THE TOWNSHIP OF SOUTH FRONTENAC
Ron Vandewal, Mayor
Angela Maddocks, Clerk
SCHEDULE"C" OF BY-LAW2014-26 (The Building By-law)
PERMIT FEES AND ADMINISTRATIVE CHARGES PART 2 - FEE CALCULATIONS GUIDE 2. 1
Minimum Permit Fee Calculation
The minimum feefor any permit application forwork proposed shall be seventy-one dollars ($71 .00). 2. 2
Total Permit Fee Calculations
The summation of all applicable fees found Tables 1 to 3 shall result in the total Permit Fee. PART 3 - 2020 FEE TABLES
Table 1- Permits permit type
Base Fee
Project Type
New Buildings, Structures and Designated
Structures as defined by the Building Code Building
All Additions and Renovations/Alterations
to
buildings or structures. Where compensating construction is required.
Change of Use
$17.00 per thousand dollars of project value
not listed below.
$17. 00 per thousand dollars of project value
$17.00 per thousand dollars of project value
Pursuant to s. 10 of the Building Code Act where no construction is proposed or required.
$71. 00 flat fee
Complete building or structure demolition
$106. 00 per structure
Partial demolition of structure or building
$71. 00 per structure
Occupancy
Applicable to only projects that require occupancy pursuant to the building code.
$29. 00 per unit
Partial Permit
Requested by applicant. Where a permit is issued to allow partial construction of a building.
Demolition
$71.00 per request, plus applicable fees noted in Table 1
$10.00 per fixture trap (minimum $71.00) plus, Plumbing fixtures Plumbing
$35.00 percross connectionsto non-potable water systems as regulated by the building
code, including but not limited to, hydronic heating, sprinkler and irrigation systems. Connection to municipal water system Construction or alteration of a Class 2, 3, 4, or 5 sewage system other than a Class A
See By-law 2009-08, as amended, for related charges.
$950. 00 per sewage system
sewage system Construction or alteration of a Class A
sewage system. ‘(Class A system represents
$1050.00 per sewage system
flows greater than 4500 litres) Installation or replacement of septic tank only
$750. 00 per sewage system
On-Slte
Plans Reviewto confirm location only of Sewage Systems
existing sewage system
$100.00 per sewage system
On-Site Review to confirm location only of existing sewage system
$250.00 per sewage system
Review of Performance Level of
Existing On-Site Sewage System Certificate of Approval renewal
$500.00 per sewage system
$150.00 per sewage system
Reviewfor new lots in a subdivision, condominium, severance or lot addition
On-Site
Sewage Systems
$500. 00 per lot
Review for Minor Variance application or Zoning By-Law amendment
$450. 00 per sewage system
Review for Minor Variance in combination with a Review of Performance Level
$700.00 per sewage system
Review for Minor Variance in combination
with a new Class 2, 3, 4, or 5 sewage system other than a Class A sewage system Sign
All new or replacement signs that require a building permit, as prescribed in the building
$1150.00 per sewage system
$17. 00 per thousand dollars of project value
code. Solar photovoltaic system
As regulated by the building code
$106. 00 per permit
As regulated by the building code
$17.00 per thousand dollars of project value
(private)
See By-law 2014-33, as amended, for related charges.
$17. 00 per thousand dollars of project value
Tents
As regulated by the building code
$106. 00 per tent
As regulated by the building code
$71. 00 per unit
Swimming pools (public) Swimming pools
Wood stove,
Fireplace or new chimney
Table 2 - Clerical & Administrative Fees Function
Detail
Additional Inspections
Fee
$94. 00 per repeat re-inspections ofsame stage of construction, at the Chief Building Officials discretion.
Building Compliance Title Search Compliance Letters to other
$94. 00 each
Government Authorities
$94. 00 per letter
Consent & Zoning By-law Amendment Application Review
$94. 00 per report issued
and comments Clerical
$71. 00 per deferral of revocation of permit Renewal of building permit Review of revised permit
that may be revoked in accordance to the building code.
documents
$71. 00 per hour
Special requests for file research
$71. 00 per hour
Transfer of Permit to new property owner
911 roadside identification sign & installation Construct or Demolish without Permit Issued
$71. 00 per permit
Civic # blade/post = $100. 00 each Double normal permit fee, $17, 686. 00 maximum prior to the issuance of an Order
pursuant to the Building Code Act.
$118.00 per inspection. Investigations To offset additional investigative and administrative costs.
Non Compliance Re-lnspection
Where an Order not complied with, additional
Order registered on title
$590. 00 per Order
Issuance of Summons
$590. 00 a Summons plus legal expense
site inspections to review status of noncompliance.
$94.00 persite inspectionsor meetingsto Subdivision Lot Grading Non-
determine or observe corrective measures
compliance
where grading not installed as per approved subdivision plan.
Third Party Review or Consultation
Where determined by the Chief Building Official that peer review and/or consultation by a third party consultant is required.
The applicant or permit holder shall reimburse the municipality all fees and expenses of the consultant, in addition to the fees noted in this schedule.
Table 3 - Conditional Permits & Agreements Permit type
Agreement Type
Fee
Simple agreement, not listed below
$236. 00, plus applicable fees noted in Table 1, and refundable deposits stipulated in the agreement.
Other agreements, including but Conditional Building Permits
not limited to, remediation of
buildings or structures previously used as illicit marijuana grow-op or
$2, 358. 00, plus applicable fees noted in Table 1 and refundable deposits stipulated in the agreement.
clandestine labs.
Note: Where determined by the Chief Building Official that peer review and/or consultation by a third party consultant is required to process any application. The applicant shall reimburse the
municipality all fees and expenses of the consultant, in addition to the fees noted in this
Retrofit Order from Fire
Department
Applicable fees noted in Table 1
Request to use Alternative Solution
$2, 358. 00, plus applicable fees noted in Table 1
Request for Chief Building Official
$2, 358. 00, plus applicable fees noted in Table
to accept Alternative Material
1
Temporary Two Dwelling
$236. 00 fee, plus a refundable $10, 000. 00
Agreement
deposit.
table.
Temporary Trailer Agreement
$236. 00 fee per unit, plus a refundable $3, 000. 00 deposit per unit.
PART 4 - REFUNDOF PERMITFEES 4. 1
General Provisions:
(1)
Refunds offees collected underthe authority ofTables 1 to 3, shall be provided in accordance
with other provisions of this Part, where the;
o Building Permits have been issued, but no construction has commenced, o Building Permits have not been revoked,
o Building Permit Applications have not expired, 4. 2
Refund Provisions for Permit Fees found in Tables 1 to 3 of this Schedule:
(1)
Requestsforrefundsmust besubmitted to the ChiefBuilding Officialinwritingwhowill
determine the amount of Permit Fees, if any, that may be refunded. (2)
Except as provided in sentence (3), the amount of fees refundable shall be calculated based on
the total of all building permit fees collected under the authority of Tables 1 to 3 of this Schedule, as follows:
o 75 percent refundable if applicant cancels application prior to release of permit for issuance; o 50 percent refundable if ChiefBuilding Official has released the permit for issuance; (3)
Notwithstanding sentence (2), no refund shall be made of an amount less than $35. 50.
