Body: Committee of Adjustment Type: Agenda Meeting: Committee Date: September 8, 2022 Collection: Council Agendas Municipality: South Frontenac
[View Document (PDF)](/docs/south-frontenac/Agendas/Committee of Adjustment/2022/Committee Of Adjustment - 08 Sep 2022 - Agenda.pdf)
Document Text
TOWNSHIP OF SOUTH FRONTENAC Committee Of Adjustment Meeting Agenda TIME: DATE: PLACE:
7:00 PM, Thursday, September 8, 2022 Council Chambers/Virtual via Zoom.
Call to Order
a)
Resolution
Adoption of Agenda
a)
Resolution
Electronic Meeting Information
a)
The meeting will be live streamed at the following link: http://www.facebook.com/SouthFrontenacTwp/ Please visit the Virtual Committee of Adjustment Meetings page on the Township website for the link to register to be a participant in this meeting: https://www.southfrontenac.net/en/open-for-business/virtualcommittee-of-adjustment-meetings.aspx Instructions about participating via Computer, Laptop, Smartphone, Tablet and Telephone can be found at the above noted link as well.
b)
PowerPoint Presentation Staff has prepared a PowerPoint Presentation that will be displayed on the screen of the meeting, you can also follow along with the PDF version that is in the attachment of this agenda item.
Declaration of pecuniary interest
a)
None declared
Approval of Minutes – August 11, 2022
a)
Resolution
Consent Applications from Previous Meetings:
a)
PL-BDJ-2022-0073 (Clark) (Clark & Williams) Property Address: 2937 Campbell Road Purpose and Effect of the Application: Consent for the creation of one new residential lot. The severed parcel would be a minimum of 2.5 acres in area with a minimum of 82 metres of frontage on Campbell Road. The retained parcel would be approximately 12.5 acres in area with 192 metres of road frontage. The retained parcel contains a house.
New Minor Variance Applications:
a)
MV-38-21-B (Corke) Property Address: 147 Space Lane, Godfrey, ON Purpose and Effect of the Proposed Variance:
3 - 61
62 - 80
81 101
Page 1 of 167
The applicant is requesting permission under section 45(2) of the Planning Act to enlarge the dwelling on the property to allow the construction of a basement which accommodate additional living space and a utility room. The dwelling is setback 25 metres (82 feet) from the highwater mark. b)
PL-ZNA-2022-0108 (Piekkola & Dagley) Property Address: 51Meadow Lane Purpose and Effect of the Proposed Variance: The applicants are requesting to enlarge a legal non-conforming building by enclosing a portion of the existing deck located within 30 meters of the highwater mark of Bobs Lake. The applicants are proposing to enclose a 15 square metre portion of the existing deck convert it to a sunroom.
102 120
c)
PL-ZNA-2022-0112 (Lillicrap) (Gervan) Property Address: 2009 McAndrews Lane Purpose and Effect of the Proposed Variance: A new cottage is under construction on the property. The new cottage is more than 30 metres from the highwater mark of Devil Lake. The Owner proposes to convert the original cabin to an accessory storage building. The original cabin is setback 8.6 metres from the highwater mark, and is in the front yard of the new cottage. A minor variance is being requested to recognize the location of the accessory storage building in the front yard of the new cottage (section 5.24.2 of the Zoning By-Law).
121 141
d)
PL-ZNA-2022-0116 (Lloyd) Property Address: 2024 Meredith Lane Purpose and Effect of the Proposed Variance
142 164
The proposal is to construct a 3 car garage near the existing dwelling on the property. The garage will be constructed in front of the dwelling. The application also seeks to acknowledge existing two sheds, which were also constructed in front of the dwelling. The application is requesting to vary section 5.24.2 of the Zoning By-law to permit the construction of the garage being located in the projected front yard and to acknowledge the existing two sheds that are also located in the front yard. 8.
Other Business
a)
Consents Approved by Delegated Authority - Report
Adjournment
a)
Resolution
165 167
Page 2 of 167
Committee of Adjustment Meeting Thursday, September 8, 2022 7:00 p.m. Virtual Meeting from Council Chambers 4432 George Street, Sydenham, ON Page 3 of 167
Welcome to the Virtual Meeting for the Committee of Adjustment This is a hearing of the Committee of Adjustment for the Township of South Frontenac. All members of the public are muted on our end and your cameras will not be turned on. Committee Members
Township Staff
• Randy Ruttan (Chair)
• Christine Woods (Senior Planner)
• Alan Revill
• Anna Geladi (Planner)
• Norm Roberts
• Sarah Cadue (Planner)
• Mike Nolan
• Michelle Hannah (Secretary Treasurer & Planning Assistant)
• Doug Morey • Mike Howe • Tom Bruce Page 4 of 167
• Ken Gee
Adoption of Agenda • Call to Order • Adoption of Agenda • Declaration of Pecuniary Interests • Approval of Minutes of Previous Meeting • Hearings for Applications • Consent Granting Authority Report • Other Business • Adjournment Page 5 of 167
Format for Each Hearing 1. 2. 3. 4. 5. 6.
The Chair will introduce the file The Planner will provide an overview of the application Questions or comments from the Applicant / Agent / Members of the Public The Planner will make a recommendation on the application Committee deliberation and vote The Chair will state whether the vote was carried
Page 6 of 167
Appeal Rights
Page 7 of 167
• Township staff will be in contact with the applicant following the meeting. Where a decision has been made, it will be forwarded to the applicant and anyone who has requested to be notified within 15 days. • If a person or public body does not make oral submissions at the hearing or make written submissions to the Township before a decision is made, the person or public body is not entitled to appeal the decision. • Anyone may appeal the decision to the Ontario Land Tribunal. The appeal must be filed with the Secretary-Treasurer of the Committee of Adjustment within 20 days of the notice of decision. The notice of appeal must set out the reasons for the appeal and be accompanied by the fee required by the Tribunal. • If you have any questions after the meeting, please reach out to staff.
How to Speak to an Application • The Chair of the meeting will open the floor to public comments • Click “Raise Hand” button to request to speak or dial *9 (star nine) when participating by telephone • The Chair will recognize a member of the public, and the Meeting Host will unmute the member of the public • Once the member of the public is done speaking or the Committee has no further questions, the Meeting Host will mute their microphone
Page 8 of 167
In Case of Technical Difficulties • If a Committee member joining virtually disconnects from the meeting, the meeting will proceed if there is still quorum. The Committee member will attempt to reconnect. • If quorum cannot be met within 15 minutes, the meeting will be postponed. • Staff will be in touch with applicants. • A notice will also be posted on the Township’s social media if the meeting is postponed.
Page 9 of 167
Agenda • Call to Order • Adoption of Agenda • Declaration of Pecuniary Interests • Approval of Minutes of Previous Meeting • Hearings for Applications • Consent Granting Authority Report • Other Business • Adjournment Page 10 of 167
Consent Applications
Page 11 of 167
Application PL-BDJ-2022-0073 Consent Applicant: Roland Clark Agent: Leann Clark and Emmett Williams Location: 2937 Campbell Road
Page 12 of 167
Proposal Create one residential lot Severed Parcel 0.8 acres (1 ha) 82 m on Campbell Road Vacant
Page 13 of 167
Retained Parcel 12.5 acres (5 ha) 192 m on Campbell Road Dwelling
Analysis
Page 14 of 167
• Application does not conform to Township Official Plan • A maximum of three severances may be permitted from a lot that existed when the OP was adopted (September 2000) • Rural lots created after September 2000 are not eligible for severances • Property was created in 2019 through consent S-79-18-L • It is not eligible for severance • Severance potential remains with the retained parcel from S-7918-L
Original lot that existed in 2000
Original Lot after S-79-18-L in 2019
PL-BDJ-2022-0073
Proposed Lot New Lot (Severed)
Original Lot
Original Lot (Retained)
2019 Lot not Eligible Original Lot Eligible for up to Two Severances
Page 15 of 167
PL-BDJ-2022-0073 Staff Recommendation: Denial
Page 16 of 167
Public Questions and Comments If you would like to speak: • Use “Raise Hand” feature at the bottom of your screen. • Dial*9 (star nine) for phone. • Please wait to speak until you hear your name and your microphone has been unmuted.
Page 17 of 167
PL-BDJ-2022-0073 Committee Deliberation and Vote
Page 18 of 167
Application MV-38-21-B (Corke) Permission
Applicant: Sheila Corke Property: 147 Space Lane
Page 19 of 167
Property Description • Rural designation • RLSW Zone • 1.86 acres • Steep slope • Existing dwelling
Page 20 of 167
Proposal • Permission under section 45(2) of the Planning Act to enlarge the legal non-conforming the residence on the property within 30 metres of the highwater mark • Construct a basement under the existing dwelling • Basement would include living space and utility room • Slope Stability Study in support of the application. • Site is stable and foundation is supported by bedrock. Page 21 of 167
Page 22 of 167
View from bottom of deck
View from driveway
Page 23 of 167
View of the shoreline
View of the cement blocks under house
Page 24 of 167
View from shoreline to house
Department, Agency and Public Comments Rideau Valley Conservation Authority – no objection • Reviewed slope stability study – no concerns • Permit will be required
Public Comments – none received
Page 25 of 167
Planning Analysis - Permission
Page 26 of 167
• Dwelling is legal non-conforming • Proposed basement would result in increase in gross floor area and addition of living space below • Basement will be on the same footprint as the dwelling • No increase in height • Increase will not aggravate the situation, is not anticipated to have any negative impacts on vegetation than what currently exists and will not result in land use incompatibility not anticipated to have any adverse impacts on the neighboring properties • No concerns with respect to natural hazards • The enlargement allows for a more functional, accessible building for the owners
Recommendation • Approval • Pending any comments received • Subject to conditions • The application is approved in accordance with submitted plans • Development Agreement • Building permit is required for ALL demolition and construction on the property Page 27 of 167
Public Questions and Comments If you would like to speak: • Use “Raise Hand” feature at the bottom of your screen. • Dial*9 (star nine) for phone. • Please wait to speak until you hear your name and your microphone has been unmuted.
Page 28 of 167
MV-38-21-B (Corke) Committee Deliberation and Vote
Page 29 of 167
Application PL-ZNA-2022-0108 Permission
Applicant: Darcine Dagley & Grant Piekkola Property: 51 Meadow Lane, District of Bedford
Page 30 of 167
Property Description • Rural designation • RLSW Zone • 0.88 acres • Slopes down to the water • Developed with dwelling, garage and boathouse Page 31 of 167
Proposal • Permission under section 45(2) of the Planning Act to enlarge the legal nonconforming the residence on the property within 30 metres of the highwater mark • Build an enclosed sunroom on a portion of the existing deck • The enclosed sunroom will be located on the north side • Ground Floor Area: 15 square metres (161.5 square feet) • Setback 27 metres from highwater mark Page 32 of 167
Page 33 of 167
View of proposed sunroom
Page 34 of 167
View from Edge of the Deck
View from shoreline
Department, Agency and Public Comments Rideau Valley Conservation Authority – no objection • No permit required
Public Comments – none received
Page 35 of 167
Planning Analysis - Permission • Dwelling is legal non-conforming • The footprint of the dwelling and deck will not increase nor will lot coverage • No increase in height • The sunroom would be no closer to the highwater mark of than the deck that currently exists. The existing deck extends further out, closer to the highwater mark than where the sunroom is being proposed • Increase will not aggravate the situation, is not anticipated to have any negative impacts on vegetation than what currently exists and will not result in land use incompatibility not anticipated to have any adverse impacts on the neighboring properties Page 36 of 167
• No concerns with respect to natural hazards • The enlargement allows for a more functional, accessible building for the owners
Recommendation • Approval • Pending any comments received • Subject to conditions • The application is approved in accordance with submitted plans • Building permit is required for ALL demolition and construction on the property
Page 37 of 167
Public Questions and Comments If you would like to speak: • Use “Raise Hand” feature at the bottom of your screen. • Dial*9 (star nine) for phone. • Please wait to speak until you hear your name and your microphone has been unmuted.
Page 38 of 167
PL-ZNA-2022-0108 Committee Deliberation and Vote
Page 39 of 167
Application PL-ZNA-2022-0112 Minor Variance
Applicant: Timothy Lillicrap Agent: Mac Gervan Property: 2009 McAndrews Lane
Page 40 of 167
Property Description
Page 41 of 167
• Rural designation • RLSW zone • Devil Lake • 0.84 ha (2 acre) • Seasonal dwelling under construction • Cabin • Two sheds
Proposal • Convert cabin to accessory storage building • 494 square feet • 8.6m from highwater mark • In front yard (between dwelling and shoreline)
Page 42 of 167
Source: Gervan and Associates
Page 43 of 167
Seasonal dwelling under construction
Cabin with new dwelling in background
Shoreline in front of cabin
Page 44 of 167
Department, Agency and Public Comments • Cataraqui Conservation – no objection • Public Comments – supportive comments received from two nearby landowners
Page 45 of 167
Planning Analysis Variance meets four tests of a minor variance
- Maintains the general intent and purpose of the Township of South Frontenac Official Plan
- Maintains the general intent and purpose of Zoning By-law No. 2003-75
- Is desirable for the appropriate development of the lands in question
- Is minor Page 46 of 167
Recommendation • Approval • Pending any comments received • Subject to conditions • The application is approved in accordance with submitted plans • Building permit is required for ALL demolition and construction on the property Page 47 of 167
Public Questions and Comments If you would like to speak: • Use “Raise Hand” feature at the bottom of your screen. • Dial*9 (star nine) for phone. • Please wait to speak until you hear your name and your microphone has been unmuted.
Page 48 of 167
PL-ZNA-2022-0112 Committee Deliberation and Vote
Page 49 of 167
Application PL-ZNA-2022-0116 Minor Variance
Applicant: Timothy & Stasia Lloyd Property: 2024 Meredith Lane
Page 50 of 167
Property Description
Page 51 of 167
• Rural designation • Residential Zone • 11.39 acres • Has frontage on Meredith Lane and Bauder Drive • Bauder Drive is the Front Yard • Buffy Lake • Developed with a dwelling and sheds
Proposal • Locate three accessory buildings (one detached garage and two sheds) in the front yard of the dwelling • The proposed detached garage is: • 7.3 metres by 14.6 metres (24 feet by 48 feet) • Single storey • Height of 5.1 metres (17 feet) • Located between the dwelling and Meredith Lane • 246 metres from Bauder Drive • 95 metres from Buffy Lake Page 52 of 167
• Sheds are also located in the front yard
Page 53 of 167
Page 54 of 167
Department, Agency and Public Comments • Public Services – No objections • Quinte Conservation – No objections • Public – none received
Page 55 of 167
Planning Analysis Variance meets four tests of a minor variance
- Maintains the general intent and purpose of the Township of South Frontenac Official Plan
- Maintains the general intent and purpose of Zoning By-law No. 2003-75
- Is desirable for the appropriate development of the lands in question
- Is minor Page 56 of 167
Recommendation • Approval • Pending any comments received • Subject to conditions • The application is approved in accordance with submitted plans • Building permit is required for ALL demolition and construction on the property Page 57 of 167
Public Questions and Comments If you would like to speak: • Use “Raise Hand” feature at the bottom of your screen. • Dial*9 (star nine) for phone. • Please wait to speak until you hear your name and your microphone has been unmuted.
Page 58 of 167
PL-ZNA-2022-0116 Committee Deliberation and Vote
Page 59 of 167
Consent Granting Authority
Page 60 of 167
• S-36-21-B – Pintea – New Lot • PL-BDJ-2022-0053 – 2599432 Ontario Inc. (Fotenn) – New lot • PL-BDJ-2022-0054 – 2599432 Ontario Inc. (Fotenn) – New lot • PL-BDJ-2022-0080 – Noordhof – Lot addition • PL-BDJ-2022-0082 – Noordhof – New lot • PL-BDJ-2022-0085 – Rodenburg – Lot addition • PL-BDJ-2022-0091 – Ogilvie – New lot • PL-BDJ-2022-0094 – Berry (Fraser) – New lot • PL-BDJ-2022-0106 – RD Equipment & Rentals – Easement • PL-BDJ-2022-0110 – 11188615 Canada Inc. (Cooke) – Easement • PL-BDJ-2022-0111 – 11188615 Canada Inc. (Cooke) – Lot Addition
Conclusion/Adjournment Committee of Adjustment Meeting
Page 61 of 167
m. SOUTH ;=£\-
Consent Application
F RONTENAC
Application Requirements
The following items must be submitted with your application. Any application which does not include the below required information may not be aocepted or will not be considered compiete
D 1. A preconsultation
meeting is a requirement
prior to submission of the appiocatiort.
Pre—consultationmeeting fee
$105.01.‘
D 2. One hard copy of this completed application form signed and commissoonec U3. A Sketch of your proposal (see Question 25 for details on what to inciuoe. ‘?e skew: mes: as drawn with accurate dimensions and measurements. it is recommended mat you are your true to carefully assemble the data and crate the sketch. You may wish to sense ‘36 asssxanoe o‘ a person who specializes in the dra?ing of sketches.
D4. The applicable non-refundable
application fee, payable to the Township of Soc?‘ =*:n:era:
Application Type: i Consent Application
-‘krchange of conditions i
Change of conditions requinng re—
circulation
Planning Fee:
Building Fee:
§$927.00
$97.00
__Jl $209.99
Nil $97.00
7
| $365.00 i
U5. Agency Review Fees (as applicable). A separate cheque,
7
-7
payable to the appiicaoie
Conservation Authority, is to be submitted to the Township with the completed aooecaxr ’“e on-site sewage disposal review fee may be included in the payment of the apolvcatior €e-.- .the Township.
Wtgency:
TOTAL: Township of South Frontenac onsite sewage disposal review (per new lot) S5‘ 5 Cataraqui Conservation (per new lot or lot addition) S425 Quinte Conservation (per new lot or lot addition) S358 Rideau Valley Conservation Authority (per new lot or lot addition) 5490 Please Note: These fees are for consultation on this application only; agencies rnay “esc re additional fees if permit applications are required prior to any construction. T
WV“
7
V
D6. Required studies & Supporting lnfonnation identi?ed at pre-consultation (it D7. Deed or transfer, or authorization for Township Sta? to acquire title documents if aoo-.:2:>ie/ app«a<2:«ie-
Updated January 2022 Planning Act. R.S.O. 1990, c. P.13 as amended
Page 62 of 167
TOWNSHIP OF SOUTH FRONTENAC CONSENT APPLICATION Collection of Personal Information: Personal information requested on the application form is required under the Planning Act. This information will be used by the Township for the purpose of reviewing the application. It may be made available to those boards, Commissions, Authorities, Agencies and Persons having an interest in this matter. Any questions regarding the collection of this infonnation should be directed to the Secretary Treasurer of the Committee of Adjustment (PO. Box 100, Sydenham, Ont., KDH2T0, Phone 613-3763027 ext. 2224). What is considered
when reviewing an application?
in considering an application. the decision making approval authority. shall have regard. among other matters, to the health, safety. convenience and welfare of the present and future inhabitants of the municipality and to: o
The effect of development on matters of provincial interest as referred to in Section 2 of the Planning Act. Whether the proposed severed lot is premature or in the public interest. Whether the consent conforms to the intent of the Of?cial Plan and adjacent plans of subdivision (it any) The suitability of the land for the purposes for which it is being severed it affordable housing units are being proposed, the suitability of the proposed un.ts for affordable housing The number, width, location and proposed grades and elevations of roadways and their adequacy in relation to any proposed roadway linking the proposed severed area with the established roadway system. The dimensions and shape of the proposed lot Any restrictions on the subject land (or on the buildings and stmctures to be erected on it) and any restrictions on abutting lands. Conservation of natural resources and ?ood control. The adequacy of utilities and municipal services. The adequacy of schools. The area of land, it any, exclusive of roadways, that is to be conveyed or dedicated for public purposes (such as for parks). The physical con?guration of the new lot having regard to energy conservation. Site Plan Control County of Frontenac Of?cial Plan Township of South Frontenac Of?cial Plan Township of South Frontenac Zoning By-Law Provincial Policy Statement
'
Page 63 of 167
TOWNSHIP OF SOUTH FRONTENAC CONSENT APPLICATION For Of?ce Use Only Date Received:
File Number
(‘ tar )1
- Name of Owner(s):
Full Mailing Address of Owner(s):
Phone number of Owner(s): Email Address of Owner(s): 2. if the applicant is NOT the owner of the subject land. the written authorization of the owner that the applicant is authorized to make the application. be provided below. Name of Authorized App|icantlAgent:
Full Mailing Address
[?an
(XBFIL, 5 \mm3
of Authorized App|icantlAgent:
A
Phone number of Authorized Applicant/Agent: Email Address of Authorized Applicant/Agent: Agent as named above is hereby authorized to act on behalf of the owners for purposes of processing this application (please ?ll out the last page).
‘iSignature(s) of Owner(s) Communications are to be sent to:
d
Owner(s)
MAgent
Permission
to Enter Subject Lands: Permission is hereby granted to the relevant staff. committee and necessary commenting agencies to enter the premises (subject lands) subject to this development application for the purposes of making inspections associated with this application members,
golgllalulc
a.
me
p-upeuy
uwnz-:1;
(Signature of the property owner)
2+ /73. 43;.)(Date;
Page 64 of 167
TOWNSHIP OF SOUTH FRONTENAC CONSENT APPLICATION 4. Have you consulted with Township Planning Staff regarding this application?
limo
D Yes
Date Fee Paid:
Name of Planner:
Date of Meeting:
- The description of the subject land:
D Bedford
District: Civic Address: _Z3\
?ame
Lot Number:
Reference Plan Number: Roll Number: 10.80‘-{IX}|(‘DCl
5
Part Number(s):
IOZ
Numbe-r(P|N):
Propertyldenti?caljon
U Stornngton
.
44
Conoession Number:
E‘Loughborough
D Portland
,7 ?
‘
Q>Z‘lbO‘5éO
- Indicate the frontage(s). depth and area of the subject land. The subject land is the whole property prior to any changes. Please indicate the name of the road/lane and waterbody (if applicable).
Frontage on water (m):
Frontage on road/lane (m):
Name of Waterbody:
Name of Road/Lane:
§?yI}Q$‘5\
Area(acres/ha):_
_
Depth(m):
7-1’ -5
_‘____j
tn
l5i_cr§’§_____
- Select the type of consent being applied for:
mt?reation of a New Lot E Easement (right of way)
Elcorrection of Title D Lease
C|Lot Addition
UOthen
l:lChargeIDischarge of Mortgage 8. Please provide a brief description of your application. Indicate the reason why you are applying for a consent. |
Q
I
Page 65 of 167
TOWNSHIP OF SOUTH FRONTENAC CONSENT APPLICATION
- Create a NEW LOT
—
Complete
this section ONLY if you are applying to create a new lot
The foliowing information is regarding the land intended to be severed (created) and the land to be retained.
i Severed Lot (Proposed _
.,__,
-,
new lot):
Frontage on RoadILane (In):
Retained Lot:
_.;
….
f
lfn
,1CI7__[Y1
r
N
f R<a):|deILoane:
Vd,
W
I’jB1rn(bc)
Kd
'
I
V
I
Frontage on Water (m):
1 Name of Waterbody: i ‘
Depth(m): Acres (acres or ha):
kl
II
I16
\
BUR
1
\
lqbgg {5}
m
12: .
2 5 a crcs
.s_.(W_2
I1. 5
acn-,3
I
_
1
5
Please list the existing and proposed USES and STRUCTURES.
I Severed Lot (Proposed
new lot):_
Retained Lot:
i 1
Existing Use of Lot
I 1
Existing Buildings/Structures:
Proposed V
I Use of Lot:
Proposed Buildingslstructures:
TO builda,Pa,rvI-‘ls’
Irbusc
‘
Page 66 of 167
TOWNSHIP OF SOUTH FRONTENAC CONSENT APPLICATION
LOT ADDITION Complete this section ONLY if you are applying for a lot addition. —
The following information is regarding the land intended to be severed (created) and the land to be retained. 7 Proposed
‘l parcel):
Lot Addition (Severed
Retained Lot:
Frontage on Road/Lane (rn):
Frontage on Water
2(ml: 1
fName of Waterbody: Depth (m):
E
;Acres (acres or har l l
The following inforrnalion.is regarding the Bene?tting Lands alseknown as the land being enlarged which are receiving th e lot addition. Existing Bene?tting Lot (Before Lot Addition)
Enlarged Lot with addedLandzm (After Lot Addition)
Frontage on Road/Lane (m): Name of RoadlLane: Frontage on Water
Ina;-"*9 0” waterbody:
Page 67 of 167
TOWNSHIP OF SOUTH FRONTENAC CONSENT APPLICATION Please list the existing and proposed
USES and STRUCTURES.
I
Lot Addition:
Existin7gV"“’
Retained Lands:
Bene?tting Lands:
I
‘-
7
1 i
I
iiuse Existing
of Lot:
i‘Buildingslstructures: E I
‘
f?roposea of Lot: ‘LUse 1Proposed :Buildingslstructurest
_'
T
“MT
“(*7
'
J…
- EASEMENTS & RIGHT OF WAY easement
T”
—
Complete this section if you ONLY are applying for an
or a right-of-way
Length:
Depth:
Width:
Area:
Civic address of Bene?tting lands: Roll Number of Bene?tting Lands:
Describe the purpose and effect of the easement
12.Type of Servicing Proposed
—
WATER (indicate the method by which water will be provided >‘
(NEW LOT) Severed Parcel
j
E 3
and the property that will bene?t:
Retained Parcel
Municipal water system Privately owned and operated
well
3 3
Municipal water system Privately owned and operated
Lake water
E]
Lake water
Other:
D
Other:
wel
Page 68 of 167
TOWNSHIP OF SOUTH FRONTENAC CONSENT APPLICATION 13.Type of Sewage Disposal System Proposed (How will sewage disposal system be provided?): (NEW LOT) Severed Parcel
Retained Parcel
U Publicly owned and operated communal D Publicly owned and operated septic system
septic system
Privately owned and operated individual [I septic system:
Privately owned septic system:
K‘
Leaching Bed (Class 4)
—
Holding Tank (Class 5) _
Greywater Pit (Class 2)
:1
Privy/Outhouse
(Class 1)
D I: El E.
communal individual
and operated
Leaching bed (Class 4) Holding Tank (Class 5) Greywater Pit (Class 2)
Privy/Outhouse (Class 1)
- Please list the name of the person(s) to whom the land or an interest in the land is to be transferred, charged or leased (if known):
leann OldF<.. E,rnr‘?t‘,it 15.Are there any existing easements
m\;§Am§ or restrictive covenants?
If Yes. please provide a description of each easement
D Yes
No
Dunknown
or covenant and its effect:
16.Are you aware of any abandoned wells on the subject property’?
U Ves E No
- Name of road or lane which accesses:
Please indicate whether access to the land will be by:
D Provincial highway
M Municipal Road maintained year round
E] Municipal Road
~
seasonally maintained
D Lane U A right of way D Water (see next page!
Page 69 of 167
TOWNSHIP OF SOUTH FRONTENAC CONSENT APPLICATION If access is by water only, describe the parking and docking facilities to be used and the approximate distance of these facilities from the subject land and the nearest public road. Parking and Docking for water access only properties MUST be legally deeded access. Please provide
con?rmation.
The New Lot:
The Retained Lot: 1B.What is the zoning of the subject lands? (Check www_fronteriacmagsi:-g)
Rural . 19. What is the current Official ?an
Designation of the subject lands?
__Rul’El 20.Please describe how the application conforms with the T0_w_ri_s_t_ip OfficialPlan 8. County Official Plan by citing speci?c applicable sections and sub sections. Please make sure to look at Sections 5 and 7 in the Township Of?cial Plan and Section 3 in the County Of?cial Plan. if you are unsure.please indicate that you do not know.
21.ls the application consistent with the 2020 Provincial Policy Statement’?
DYes D No
D Unknown
Please explain:
Page 70 of 167
TOWNSHIP OF SOUTH FRONTENAC CONSENT APPLICATION
22.Has the subject land ever been. or is currently, the subject of an application for approval of a plan of subdivision under section 51 of the Planning Act, for a consent under section 53 of the Planning Act, for a minor variance, for approval of a site plan, or for an amendment to an o?icial plan, an amendment to the zoning by-law or a Ministers zoning ordef? Complete all applicable
l
El Yes
El No
D Unknown
i
l
l
.g
iApplication Type
Application Number
Date of Application
‘
Decision
1:: Plan of Subdivision
4
i El Consent l
t…
.i,,, …é._.__..
iCl Minor Variance
.
._
.,.
.#__.Ae._j__7?_7
§ 121Site Plan Approval
El Of?cial Plan Amendment
rt] Zoning By—lawAmendment
‘
Cl_Minister’s Zoning Order
23.Has land been previously severed from the subject property, since September provide date of transfer; name of transferee and uses of the land.
D Yes
5, 2000? If yes, please
D No
- Did the current owner acquire the subject land as a result of a consent?
D Yes
D No
- A SKETCH must be submitted. For more infonnation on what the sketch needs to show, please see “A guide to completing your consent application fonn”. If your application is approved and then the required survey shows different frontages, area and location than was submitted, a new consent may be required including submission of a new application and fees.” Please note that the sketch must include the same metric as on the application, switching between meters and feet will not be acceptable unless both are shown.
The sketch must include the following: 10
Page 71 of 167
TOWNSHIP OF SOUTH FRONTENAC CONSENT APPLICATION
U A directional arrow with North at the top of the page. D The boundaries and dimensions of the whole property. LABELthe part that is to be severed and the part that is to be retained, including the total area (acres or hectares), road frontages on all roads/lanes for each and waterbodies.
U lndite
ifthe owner of the subject property also owns other lands near the proposal.
D The distance between the subject land and the nearest road, bridge or railway crossing
D The location of all land previously severed from the parcel (if applicable) originally acquired by the current owner of the subject land.
D All natural and arti?cial features that are located on the subject property and on land beside the subject property.
Please label and show the approximate location of:
a.
Existing Buildings, wells and septic systems, bridges. railways, roads, hydro lines
in.
Waterbodies, watercourses, areas
c.
Land?lls, propane facility, quarry‘s and pits
d.
Barns
drainage ditches. river or stream banks, wetlands, wooded
Note: The existence of a nearby barn will require you to complete a Minimum Distance Separation Calculation in order to consider compatibility issues. Please check with the Planning Department regarding the implications of any farm structure, on your application.
D Please include any information on natural and arti?cial features (as listed above) that in the applicants opinion may affect the application
U Please indicate the current uses of land that is surrounding the property, such as residential, agricultural and commercial uses (if agricultural, please indicate the approximate distance of any barn structure from the proposed new lot).
D The location, width and name of any roads within or abutting the subject land.indicating whether it is an unopened
road allowance.a public travelled road, a private road or a right of way.
D if access to the subject land is by water only, please show the location of the parking and boat docking facilities to be used. and the title documents to demonstrate legal deeded use of these facilities
D The location and nature of any easement affecting the subject land. D The location of any abandoned wells on the property 11
Page 72 of 167
TOWNSHIP OF SOUTH FRONTENAC CONSENT APPIJCATION PERMISSION, ACKNOWLEDGEMENT, AGREEMENT AND DECLARATION OF APPLICATION II We, the undersigned. being the registered property owner(s) and/or agent acting on behalf of the owner agree that the information recorded in this Consent Application Form is accurate and agrees that representatives of the Township and relevant commenting agencies may enter onto the subject property for the purpose of determining the appropriateness of the site for the proposed development.
ACKNOWLEDGEMENT OF ADDITIONAL REQUIREMENTS
ll We, the undersigned. being the registered property owner(s) andlor agent acting on behalf of the owner, acknowledge that additional studies andlor peer review andlor legal review may be required by the Township as a part of the review of mylour application. Should the need arise, llwe are responsible for completing the studies as requested in order for the application to be deemed complete. Attached to this application is payment to the Township of South Frontenac in the correct amount representing payment of the applition fee, and additional payment (or proof of payment) for any required commenting agency review fees.
AGREEMENT TO INDEMNIFY The applicant hereby agrees to indemnify and save hannless The Corporation of the Township of South Frontenac (“the Municipality‘‘)from all costs and expenses that the Municipality may incur in connection with the processing of the app|icant’s application for approval under the Planning Act. Without limiting the foregoing, such costs will include all legal, engineering, planning. and consulting fees and charges incurred or payable by the Municipality to process the application together with all costs and expenses arising from or incurred in connection with the Municipality being required. or requested by the applicant, to appear at the hearing of any appeal to the Ontario Land Tribunal from any decision of the Council.Delegated Decision of Council, or Committee of Adjustments, of their designated approval authority, as the case may be, hearing the applicants application. The Owner/Applicant further agrees to provide the Municipality. upon request and in cases where an application has been appealed to the Ontario Land Tribunal, with a deposit (over and above the nomial application fee), from which the Municipality may, from time to time charge any fees and expenses incurred by the Municipality to prepare for and participate in the hearing. It such appeal expenses exceed the deposit, the OwnerlApp|icant shall pay the difference forthwith upon being billed by the municipality, with interest at the rate of 1.25% per month (15% per annum) on accounts overdue more than 30 days.
The applicant/owner acknowledges and agrees that if any amount owing to the Municipality in respect of the application is not paid when due, the Municipality will not appear before the Ontario Land Tribunal in in connection with the application until the invoice has been paid in full.
12
Page 73 of 167
Inset Inset Map Map
ROAD
TRY WOODS DRI UN CO
ELL PB M A C
STAGE COACH ROAD
CAMPBELL RD N/S
2900 CAMPBELL RD
¥
CAMPBELL RD N/S
PL-BDJ-2022-0073 (CLARK & WILLIAMS)
2910 CAMPBELL RD
2984 CAMPBELL RD
CAMPBELL ROAD
VE
2886 CAMPBELL RD
CAMPBELL RD N/S
CAMPBELL ROAD
Legend Subject Property Proposed Severance Assessment Parcel Provincially Significant Wetland
Proposed Severance
Wetland Wooded Area Lake Trout Lake - At Capacity Lake Trout Lake - Not at Capacity
2987 CAMPBELL RD
Non-Lake Trout Lake - At Capacity Waterbody
2937 CAMPBELL RD
Township Boundary
Retained Lands
Road 2901 CAMPBELL RD
33 COUNTRY WOODS DR
Railway
Produced by the Township of South Frontenac under license with the Ontario Ministry of Natural Resources © Queen’s Printer for Ontario, 2020.
Page 74 of 167
While the Township makes every effort to insure that the information presented is accurate for the intended uses of this map, there is an inherent error in all mapping products, and accuracy of the mapping cannot be guaranteed for all possible uses. This map displays basic topographic features only.
Scale: 1:2,000 0
10 20
40 m
UTM Zone 18 NAD 83 Date: 2022-05-19
Page 75 of 167
Report from Public Services PL-BDJ-2022-0073 Application Number: ___________________________________________________ Roland Clark Applicant’s Name: _____________________________________________________ 4 3 Loughborough Concession: _________________ Lot: _______________District:
Campbell Road Road: ________________________________________________________________
Road Maintenance:
✔ Year-round □
Seasonal □
Sight Lines: Are there adequate sight lines for the entrance?
✔ Yes □
No □
If no, what changes would be required to improve sight lines? The proposed severance has sufficient frontage to enable the development of a safe access onto the roadway.
Road Conditions:
Are there any special drainage/ditching concerns related to creation of new lot(s)? ✔ Yes □ No □ If yes, what action is the applicant required to take?
Is the overall road condition adequate to serve increased development/traffic? ✔ Yes □ No □ If no, please explain, and indicate if there are any measures that could be taken to correct the inadequacies.
Road Widening Required? ✔ Yes □ No □ To be determined by an Ontario Land Surveyor □ Any specific requirement?
Local road - rural classification. Ensure that there is a 20m (66ft road allowance) otherwise applicant to dedicate any shortfall of 10m from centerline.
Approved by the Public Services? ✔ Yes □ Yes, with conditions □ No □ If yes, with conditions, please describe conditions below.
- Field Entrance to be decommissioned and removed.
Signature on behalf of Public Services
2022-07-06
Date
Page 76 of 167
To: Committee of Adjustment Prepared by: Development Services Department Meeting Date: September 8, 2022 Consent Application PL-BDJ-2022-0073, Roland Clark (Leann Subject: Clark and Emmett Williams), 2937 Campbell Road, Loughborough District
Summary This application is for the creation of a residential lot. This report recommends denial of the application as it does not conform to the Township of South Frontenac Official Plan. Specifically, the property is not eligible for a consent since the property did not exist as a lot on the day the Official Plan was adopted in September 2000.
Background The Committee of Adjustment held a public hearing on this application on August 11, 2022. The Committee deferred making a decision on the application so that they could further review the reason why it does not conform to the Township of South Frontenac Official Plan. Designation and Zoning The subject property is designated Rural and is zoned Rural (RU). Application Table Severed Parcel
Retained Parcel
Area (ha)
1
5
Frontage on Campbell Road (m)
82
192
Related Applications The subject property is not subject to any other applications under the Planning Act.
www.southfrontenac.net Natural, Vibrant and Growing – a Progressive, Rural Leader.
Page 77 of 167
Township of South Frontenac Staff Report - Consent Application PL-BDJ-2022-0073, Roland Clark (Leann Clark and Emmett Williams), 2937 Campbell Road, Loughborough District
Review This application: Conform to section 51(24) of the Planning Act; Does not require a plan of subdivision for the proper and orderly development of the municipality (s. 53(1) Planning Act); Is consistent with the Provincial Policy Statement (s. 3(5) Planning Act); Conforms to the County of Frontenac Official Plan (s. 3.2 & 7.1); X Does not conform to the Township of South Frontenac Official Plan (s. 5.7.4 & 7.1); Complies with Zoning By-law No. 2003-75 (or will comply subject to a standard condition of rezoning or minor variance); and Has no unresolved objections/concerns raised from agencies or the public.
Discussion/Analysis Property Description The subject property is in located on Campbell Road south of Sydenham. The property consists of farmland. It is developed with a single detached dwelling. Summary of Proposal The purpose of this application is to create one new residential lot. The severed parcel would be approximately 1 hectare (2.5 acres) in area and have 82 metres of frontage on Campbell Road. The severed parcel is vacant. The retained parcel would be approximately 5 hectares (12.5 acres) in area and have 192 metres of frontage on Campbell Road. The single detached dwelling would be located on the retained parcel. Department Comments Public Services reported on July 7, 2022, that they have no objection to the approval of the consent application. They noted that the proposed lot would have sufficient frontage to enable the development of a safe access onto the roadway, and that an entrance permit will be required. The existing field entrance will need to be removed and decommissioned. A road widening may be required. If the application were to be approved, the surveyor who prepares a reference plan would need to determine by survey the width of Campbell Road to be 20 metres (100 feet).
www.southfrontenac.net Natural, Vibrant and Growing – a Progressive, Rural Leader.
Page 78 of 167
Township of South Frontenac Staff Report - Consent Application PL-BDJ-2022-0073, Roland Clark (Leann Clark and Emmett Williams), 2937 Campbell Road, Loughborough District
Building Services reported on August 8, 2022, that the severed parcel is capable of providing flexibility in siting a sewage disposal system dependent on any future proposal submitted through an Application to Construct a Sewage System. Building Services have no objection to the approval of the consent application. Public Comments No comments were received from the public. Planning Analysis The Provincial Policy Statement 2020 permits residential development on rural lands, including lot creation, that is locally appropriate. The County of Frontenac Official Plan (Section 3.3) also permit residential development in rural areas. The subject lands are designated Rural in the Township of South Frontenac Official Plan. Section 5.7.4(ii)(c) of the Township Official Plan states that new lots for rural residential purposes should be created by plan of subdivision. This policy also states that a maximum of three rural residential severances may be permitted from a lot existing on the day of adoption of the Plan by Council (i.e. in September 2000) in accordance with the lot creation policies of Section 7 when the consent approval authority is satisfied that a plan of subdivision is not warranted. Rural lots created after September 2000 are not eligible to sever new rural residential lots. The subject property was created in 2019 following the Committee of Adjustment approval of consent application S-79-18-L. Since the subject property did not exist as a lot in September 2000, when the Official Plan was adopted, the property is not eligible for the proposed rural residential severance. A severance cannot be taken from a lot that was itself created through a severance after September 2000. The potential for any further severances remains with the retained parcel from S-79-18-L (2901 Campbell Road). This severance application does not conform to Section 5.7.4(ii)(c) of the Township Official Plan. As such, staff cannot recommend approval of this application. This was discussed with the agent during the pre-consultation process prior to the application being submitted. Without a change to the policy included in Section 5.7.4 (ii)(c) by the applicant undertaking a property-specific Official Plan Amendment that would need to be adopted by South Frontenac Council and approved by the County of Frontenac, this application does not meet the requirement of conforming to the policies of the Township Official Plan. Staff recommend that the Committee of Adjustment deny this application, as it does not conform to the Official Plan as described above. www.southfrontenac.net Natural, Vibrant and Growing – a Progressive, Rural Leader.
Page 79 of 167
Township of South Frontenac Staff Report - Consent Application PL-BDJ-2022-0073, Roland Clark (Leann Clark and Emmett Williams), 2937 Campbell Road, Loughborough District
Notice/Consultation Notice of the Application was given pursuant to the requirements of the Planning Act, at least 14 days before the scheduled hearing on August 11, 2022. This included notice given:
by mail to every owner of land within 60 metres of the subject lands by posting notice signs on the subject lands by posting on the Township’s Current Planning Application webpage by e-mail to prescribed persons and public bodies
Recommendation It is recommended that application PL-BDJ-2022-0073 be denied. Submitted By: Christine Woods, MCIP RPP, Senior Planner Reviewed By: Claire Dodds, MCIP, RPP, Director of Development Services
www.southfrontenac.net Natural, Vibrant and Growing – a Progressive, Rural Leader.
Page 80 of 167
Page 81 of 167
B
number
Email Address of AuthorizedAgent:
‘..’—‘—‘——‘*——"’“—j— Phon_e of AuthorizedAgent:
“5
Full Mailing Address of AuthorizedAgent:
Name of AuthorizedAgent:
’
"
'
'
‘———‘
Ifthe applicant is NOT the owner of the subject land, the written authorization of the owner that the applicant is authorized to make the application, must accompany the application.
A
'
ConcessionNumber:
El/Bedford
Z
description of the subject land:
District:
The
Signature(s) of Owner(s)
,,7._,§ 4 .4
Loughborough
EfLot Number:
Portland
processing this application for MinorVariance.
1,’_-f gp
Storrington
Agent as named above is hereby authorized to act on behalf of the owners for purposes of
I
EmailAddress of Owner(s):
Phone number of Owner(s):
File No:
SAel{Q ‘gr/‘<0
I
FullMailing Address of Owner(s):_
Name’of Owner(s):
Date Received:
Planning Act, R.S.O. 1990, c. P.13 as amended
TOWNSHIPOF SOUTH FRONTENACAPPLICATIONFOR MINOR VARIANCE
Page 82 of 167
ln’nn+
V
/
33?
? 12
re
4
‘
«Zia
Area:
road? maintained
S(Yes
’
'
maintainedroad?
Yes
file,
g No
please indicatethe parking and dockin ance of these facilitiesfrom the subject land
No
1%( €§£m4,7[€//\
.
I/C’/V1.
a//
Whatare the existing uses of the subject land?
(‘LV7L
,________________
and the nearest public road.
Name of Road/Lane:
OR a privately
£45
/35 / ‘£9 (g'30] ‘09 5% )
Frontage (on road/lane):
land.
extent of the relief from the Zoning ByThenature and law:
'
zoning ofthe subject land: current The .
Depth:
Frontage (on water): I
The frontage(s),depth and area of the subject
Doesthe subject property front on a rnunicipally
Page 83 of 167
I
¢r
/
X
-35 .16
, I
’
e/vnau
V0
Gr
I
.
1-”
.
L
__
W3)
14.Are any building(s) or structure(s), or additions to existing building(s) or
“m
13.The proposeduses of the subject land:
g2
'
Stale.
reel r
I $45:
/3-
I0
—i—
Setback from High Water Mark (If applicable)
Dimensions of Floor Area
.
(Also indicate if.itis one story or two story)
Height of Building
.__
,
I7’ujggfgu?
Side .Lot’Line
'
Setbackfrom
»
;
J.
/ ”/H‘?-7'7!
.
‘
C‘ If} E
Suwm
(2)
Rear Lot Line
Setback from
M)
W MM ‘(+.:
Front
Setback from ot Line
~
(1)
_J
W4)
structure(s), PROPOSED
——n
answer to item11 is yes, for EACHbuilding or structure indicate:
. Type of Structure (E.g. residence)
- If the
Planning Act, R.S.O. 1990, c. P.13 as amended
TOWNSHIP OF SOUTH FRONTENAC APPLICATION FOR MINORVARIANCE
Page 84 of 167
T
T
'
Outside
Setback from
‘
(1)
(2) (3) (4)
_
NOTES: 1) if the subject property is on waterfront, and on a private lane, the setback fromthe front lot line andthe setback from the high water mark willbe the same. 2) The‘ dimensions re quired in this question relate to the NEW CONSTRUCTION ONLY, and NOT to the total size of the completed building.
High Water Mark (If applicable) _
x_
(Also indicate if it is one story or two story)
Height of Building
Setback from. Side Lot Line
Rear Lot Line
Setback from
Setback from Front- Lot Line
Dimensions of Buildinglstructure
j:
Planning Act, R.S.O. 1990, c. P.13 as-amended
TOWNSHIPOF SOUTHFRONTENACAPPLICATION FOR MINORVARIANCE
Type of Structure. (E.g. residence)
l___
l
'
Q
- Ifthe answer to item 14 is yes, for each proposed addition, building or structure indicate:
.
Page 85 of 167
Yes
Increase in plumbingfixtures
Increase in livingspace
Willthe addition or structure encroach on the existing septic system?
(b)
(c)
(d)
ég
.
7L0
continued:
5661-
R No
No
Fat‘
S(No
g(No
Yes
or
1'5
tun
at/G/V
mmex
sewage system, a privately owned and operated individual or communal septic system, a privy, or other means:
«/0.
whethersewage disposal is provided to the subject land by a publicly owned and Indicate
operated
0;
or%
SKNO
- Indicatewhether water is provided to the subject land by a publicly owned and operated piped water system, a privately owned and operated individual or communal well, a lake, or other water body, or other means:
21.The lengthof time that the existing usesof the subject land have
I
Yes
l3(Yes
Yes
(a) ‘. Increase in number of bedrooms
What are the uses of the proposed development?
Ifyes, please provide details:
Doyour plans include the RAISINGof an existing structure?
19.The date the subject land was acquired by the current owner:
TOWNSHIPOF SOUTHFRONTENAC APPLICATION FOR MINORVARIANCE Planning Act, R.S.O. 1990, c. P.13 as amended
Page 86 of 167
E No
No
v)
iv)
iii)
ii)
i)
'
TOP OF THE PAGE.
'
The location of all abutting (neighbours’)lands.
The locationof a reference point……i.e. distance between the subject land and the nearest township lot line or landmarksuch as a bridge or railway crossing.
The boundariesand dimensionsof the subject land including the location of any existing and proposed buildings.
‘THE S.KETCH MUST HAVE A NORTHARROW AT THE
The approximate location of all natural and artificial features on the subject land and on the land that is adjacent to the subject land. Examples include buildings, railways, roads, . watercourses, drainage ditches, river or stream banks, barns, wetlands, wooded areas, ‘wells and septic tanks. Show distance of these features from the applicant’s property lines.
.
'
'
S’KETCH must be submitted showing the following:
If th_eanswer to item 27 is yes, please give the file number of the application and the status of the application.
A
Yes
- If known, please indicatewhether the subject land has ever been the subject of an application under Section 43 of the PlanningAct (Minor Variance).
of the application.
D Yes
- Please indicate whether the subject land is subject of an application under the Planning Act for approval of a Plan of Subdivisionor Consent.
TOWNSHIPOF SOUTHFRONTENAC APPLICATION FOR MINORVARIANCE Planning Act, R.S.O. 1990, c. P.13 as amended
Page 87 of 167
sheila.
[I371. DAYOF
4%
True
.202!
I, I’ & éodgc ON OF solemnlydeclare that all the statements contained in this application are declaration conscientiously believing it to be true and knowing that it is of the and I make this solemn same force and effect as if made under oath and by virtue of the Canada Evidenm Ant
THIS
DATED ATTHETOWNSHIPOF SOUTHFRONTENAC
The Owner/Applicant/Agent further agrees that, until such requests have been complied with, the municipality will have no continuing obligation to process the application or attend or be represented at the Ontario MunicipalBoard or any court or other administrativeproceeding in connection with the application:
The Owner/Applicant/Agent further agrees to provide the municipality, upon request and in cases where an application has been appealed to the Ontario Municipal Board, with a deposit (over and above the normal application fee), from which the municipality may, from time to time charge any fees and expenses incurred by the municipality in order to process the application. If such appeal expenses exceed the deposit, the Owner/Applicantshall pay the difference forthwith upon being billed by the municipality, with interest at the rate of 1.25% _per month (15% per annum) on accounts overdue more than 30 days,
the application.
Without limitingthe foregoing, such fees and expenses shall include the fees and expenses of consultants, planners, engineers, lawyers and such other professional and technical advisors as the municipalitymay, in its absolute discretion acting reasonably, consider necessary or advisable to more properly process and support
The Owner/Applicant/Agent agrees to reimburse and indemnify the municipality for all fees and expenses incurred by the municipality to process the application, including any fees and expenses attributable to proceedings before the Ontario Municipal Board or any court or other administrativetribunal if necessary to defend Council’s decision to support the application.
The Owner/Applicant/Agent agrees that the information recorded in this Minor Variance Application Form is accurate. The Owner/Applicant/Agent agrees that representatives of the Township and, where applicable, the appropriate ConservationAuthority, may enter onto the subject property for the purpose of determiningthe appropriateness of the site for the proposed development.
Attached to this application is a cheque payable to the Township of South Frontenac representing payment of the application fee. ,
AGREEMENT TO INDEMNIFY
TOWNSHIPOF SOUTHFRONTENAC APPLICATIONFOR MINORVARIANCE Planning Act, R.S.O. 1990, c. P.13 as amended
Page 88 of 167
—
'
are not sure, the roll number (the long number beginning with 1029) on your tax bill. If the check numbers are 010, 020 or 030, your district is Bedford; if the numbers are 040-050, your district is Loughborough; if the numbers are 060 or 070, your district is Storrington; and if the numbers are 080, your district is Portland. b. Concession and Lot Numbers: if you are not sure, check your tax bill c. Street Number: Your civic address if a civic number has not been assigned, leave this space blank. d._ Name of Road/Street: This question applies whether or not you are on a private lane or a public road. e. Reference Plan No: If your property has been surveyed, it willhave a plan number, and one or more parts on that plan. If your property has not been surveyed, leave this space blank. f. Roll’No:This is the number beginning with ‘1029’ which appears on your tax bill.Please take time to look it up before submitting the application.
'
- Reasonwhy you can’t comply: In other words, why can you not meet the required setbacks. It be, for example, because you are seeking a variance to add on to an existing “could structure
’
Nature and Extent of Relief: This question is asking what you are asking to do that requires the variance —.for example, it could be that you are asking to be 25 m rather than 30 m from the high water mark, or that you are asking to increase the height of a structure within30 m of the high water mark, or that you are seeking a variance to constructan accessory buildingcloser to the front lot line than the principal building.
Current zoning; You may not be aware of the zoning on your property and this can be when you come in for pre-consultation with planning staff. determined
Frontage, depth, area, acres: All parts of this question must be completed.
.
"
- Descriptionof the Subject Land: a. District:The Districts are the same as the former Townships. If you
authorization.
You may wish to appoint someone to act on your behalf during the variance process. If so, that person’s name, address and phone number should appear here All owner’s must sign the
The names of all owners must appear in this section, even if they live in separate residences, and the address(es) should be the full mailing address, complete with postal code.
A Guide to Completing the Minor Variance Form
Planning Act, R.S.O. 1990, c. P.13 as amended
TOWNSHIPOF SOUTHFRONTENACAPPLICATIONFOR MINORVARIANCE
Page 89 of 167
AZE ?£‘eG.s’u,:r9me32.?s
5?]
Leremaueei
.’_1;n:}3?“cw13:-‘37,C»Ee 09253;
-.\
‘
3é’x€?’i
I___________
G,-re f Lc:,ycr7_:,r’.
25.0
MAINLEVEL
9QoPo6ED
Page 90 of 167
613-273-8829 (co?age)
Sheiléi and Graham Corke
Pzoeosev BAggm:N 1’
FLooe. PLAN
Page 91 of 167
Inset Map
ace Sp
Ln
Bur ridg e Lake
MV-38-21-B (CORKE)
ge
La
ke
113 SPACE LANE
µ
Rd
147 SPACE LANE
id
rr
u SPACE B LANE N/S
Legend
139 SPACE LANE
Subject Property Parcel Fabric Provincially Significant Wetlands
151 SPACE LANE
Wetland Waterbody Road
147 SPACE LANE
153 SPACE LANE
Page 92 of 167
184 BURRIDGE LAKE RD
195 SPACE LANE
Sp
181 SPACE LANE
173 SPACE LANE
169-171 SPACE LANE
k
While the Township makes every effort to insure that the information presented is accurate for the intended uses of this map, there is an inherent error in all mapping products, and accuracy of the mapping cannot be guaranteed for all possible uses. This map displays basic topographic features only.
e
163 SPACE LANE
n a ce L 179 SPACE LANE
Produced by the Township of South Frontenac under license with the Ontario Ministry of Natural Resources © Queen’s Printer for Ontario, 2020.
r i B u r
d g
e
L
a
Scale 1:1,000
03.256.5
13
19.5
26
Meters UTM Projection NAD 83
Date: 2021-08-31
Technical Review Memorandum July 25, 2022
To: Sarah MacLeod-Neilson From: Terry K. Davidson Subject:
Slope Stability Assessment 147 Space Lane Godfrey, Ontario
As requested, I have reviewed the report entitled “Slope Stability Assessment” (Report No. 220142) dated May 24, 2022 by Kollaard Associated. The report appears to have been completed primarily for the purpose of determining the stability of the slope for the proposed concrete foundation for the existing cottage. The analysis and supporting field work have been carried out an appropriate level of detail for that purpose. The report has documented the present geometry of the slope in sufficient detail, and suitable methods have been used to characterize the soil characteristics. The report from the consultant indicates that they analyzed the slope at one (1) Section which had a Factor of Safety greater than 1.5.
I trust this is satisfactory for your purposes.
Terry K. Davidson, P.Eng. Director of Engineering & Regulations
Page 93 of 167
July 28, 2022 21-SFR-MVA-0018 (BEDFORD)
Township of South Frontenac Committee of Adjustment P.O. Box 100 4432 George Street Sydenham, ON K0H 2T0 Attention:
Anna Geladi, Planner
Corke, Sheila; Minor Variance Application – File No. MV-38-21-B – 147 Space Lane., Lot 23, Concession ;7, Former Township of Bedford, Now the Township of South Frontenac; Roll Number: 01290100502910000000 ———————————————————————————————————–Subject:
Dear Ms. Geladi, The following is provided as an update to comments previously provided by our office, dated September 17, 2021. At that time a request was made to defer a decision pending a geotechnical opinion of the slope on-site. A Slope Stability Assessment (prepared by Kollaard Associates Engineers, File 220253, dated May 24, 2022) was received by our office. Technical staff at our office review this report and supported the analysis indicating a stable slope. Through the provision and review of this report, our office is satisfied that Section 3.1 of the PPS has now been addressed. The following mitigation measures are recommended to allow for the protection and improvement of water quality as required by the PPS. Should the committee approve the minor variance the following should be considered in any implementing agreement or notes on the decision. •
•
All materials from construction (such as demolished materials or excess soil) will be disposed of 30m or more from the normal highwater mark of Burridge Lake at a proper disposal site Surface and roof water runoff management shall be implemented by directing runoff from eaves through placement and outlets to natural of constructed French drains or
Page 94 of 167
•
•
areas to allow for maximum infiltration of roof runoff and as much as possible away from services and the lake Erosion and sediment control measures shall be implemented around the construction site upland of the lake. These controls should be either silt fencing or straw bales properly staked into the ground and should remain in place until the disturbed areas has revegetated. Removal of sediment and erosion control should be done carefully, and all trapped sediment should be disposed of at least 30 m or more from the normal highwater mark of Burridge Lake at a proper disposal site Should any work be undertaken along the shoreline of Burridge Lake permits would be required by the Rideau Valley Conservation Authority in accordance with Ontario Regulation 174/06 (“Development, Interference with Wetlands and Alteration to Shorelines and Watercourses”).
Conclusions In conclusion, our office has no objection to the requested application. Thank you for the opportunity to comment and please do not hesitate to contact the undersigned at (613) 6923571 x1109 should you have any questions. Please advise us on the Committee’s decision respecting this application or any changes in the status of the application. Yours Truly,
Sarah MacLeod-Neilson Planner, RVCA cc – Sheila Corke, owner
Page Page 2 of 3 95 of 167
Page Page 3 of 3 96 of 167
To: Committee of Adjustment Prepared by: Development Services Department Date of Meeting: September 8, 2022 Subject:
Permission Application MV-38-21-B, Corke, 147 Space Lane, District of Bedford
Summary This report recommends that the Committee of Adjustment grant approval of this application for permission to enlarge a legal non-conforming building, per section 45(2) of Planning Act, subject to conditions.
Background Relief Requested The application seeks permission under Section 45(2) of the Planning Act to enlarge a single detached dwelling, by adding living space below grade and increasing the gross floor area, within the required setback from the highwater mark.
Discussion/Analysis Property Description The subject property is 1.86 acres (0.75 hectares), and is located on the west side of Burridge Lake. Space Lane runs through the middle of the property. The dwelling is located between Space Lane and the water in an area where the lot slopes steeply towards Burridge Lake. The slope is greater than 30% and consists of trees with a stone walkway leading from the dwelling to the water. The area to the west of Space Lane is relatively flat. The sewage system is located in this area. The sewage system was upgraded in 2019. The dwelling with attached deck has a footprint of 110.6 square metres (1190 square feet). The dwelling is 60.4 square metres (650 square feet) and the deck has a footprint of 50.2 square metres (540 square feet). It is located 25 metres (82 feet) from the highwater mark of Burridge Lake. The dwelling is one storey and is approximately 4.6 metres (15 feet) high. The dwelling is constructed on cement blocks.
www.southfrontenac.net Natural, Vibrant and Growing – a Progressive, Rural Leader.
Page 97 of 167
Township of South Frontenac Staff Report - Permission Application MV-38-21-B, Corke, 147 Space Lane, District of Bedford
Summary of Proposal The proposal is to permit the construction of a basement under the existing dwelling. The basement will be fully located under the dwelling, not the deck. It would have a gross floor area of 60.1 square metres (650 square feet). The walkout basement would include living space and a utility room. It would also provide access to the outdoor walkway that leads to the water. This proposal is being applied for to allow the applicants more living space and easier access to their dwelling when storing items that are used in the water. Slope Stability Study The applicant submitted a Slope Stability Study in support of the application (Kollard Associates, dated May 24, 2022) which speaks to the stability of the lakeside slope on the subject property. The study concluded that the slope at the site is stable and the foundation is supported by bedrock. They noted that there are no conditions that would prevent the construction of the poured foundation for the existing dwelling to replace the existing block piers within the existing building footprint. This means that the construction of the foundation under the dwelling as proposed by this application will not negatively impact the stability of the slope. The consultant recommended that any soil overburden be removed, that the footings be poured directly onto sound bedrock and that frost protection be considered. Department and Agency Comments Public Services – This application did not meet the criteria for circulation as it is located on a private lane. Building Services (Sewage System Review) – This application did not meet the criteria for circulation as the living space is not increasing by more than 15%. Rideau Valley Conservation Authority – Comments were received from Rideau Valley Conservation Authority on September 17, 2021 and updated comments were received on July 28, 2022. A slope stability study was requested by Rideau Valley Conservation on September 17, 2021. Rideau Valley Conservation Authority peer reviewed the slope stability study submitted. The Director of Engineering and Regulations for RVCA provided comments in a letter dated July 25, 2022 indicating that the analysis and field work have been carried out an appropriate level of detail. Their revised comments also speak to the received slope stability study and indicate that Staff have no objection to the approval of the application. Furthermore, RVCA staff provide three recommendations listed below: • All materials from construction will be disposed of 30 metres or more from the highwater mark of Burridge Lake at a proper disposal site www.southfrontenac.net Natural, Vibrant and Growing – a Progressive, Rural Leader.
Page 98 of 167
Township of South Frontenac Staff Report - Permission Application MV-38-21-B, Corke, 147 Space Lane, District of Bedford
•
•
Surface and roof water runoff management shall be implemented by directing runoff from eaves through placement and outlets to natural constructed French drains or areas to allow for maximum infiltration from roof runoff and as much as possible away from services and the lake Erosion and sediment control measures shall be implemented around the construction site upland of the lake.
It was noted that a permit under O. Reg 174/06 may be required for the proposed development. The applicant must contact Rideau Valley Conservation Authority at the building permit stage. Public Comments No comments were received from the public at the time of the writing of this report. Planning Analysis Section 5.10.2 of Zoning By-law 2003-75 states that existing buildings with less than the minimum 30 metre setback from the highwater mark of a waterbody may be repaired, renovated or strengthened to a safe condition provided there is no enlargement of the gross floor area or increase in height, and no addition of living space below the building. The dwelling is a legal non-conforming building because it was constructed prior to the passing of Zoning By-law No. 2003-75, and it is setback less than 30 metres from the highwater mark of Burridge Lake. The proposed basement would result in an increase in gross floor area and the addition of living space below the building. The applicants indicated that there will not be an increase in height. The basement will provide a more secure foundation than the pillars that currently exist today. In this situation, the Committee of Adjustment should consider whether to grant permission to enlarge the legal non-conforming building, by increasing its gross floor area, under Section 45(2) of the Planning Act. The basement will contain living space and a storage and utility space. There will be no additional bathrooms. The proposed dwelling has the same footprint as the existing dwelling so no overall changes to lot coverage will result through this application. The applicants are going to lift the dwelling to construct the basement. The dwelling will not be demolished. The setback from the highwater mark is not changing.
www.southfrontenac.net Natural, Vibrant and Growing – a Progressive, Rural Leader.
Page 99 of 167
Township of South Frontenac Staff Report - Permission Application MV-38-21-B, Corke, 147 Space Lane, District of Bedford
There are no visual impacts anticipated. Adding a basement to the existing dwelling will not affect surrounding properties as the height of the dwelling is not changing. The proposed development is similar to what exists on the property today, therefore, the limited increase in living space and gross floor area is not anticipated have any impact to adjacent properties beyond what currently exists. There are trees along the shoreline that will continue to screen the dwelling from the waterfront. The cottage sits on concrete pillars above the slope. The basement will be constructed into the slope. This means that the building height will not change. The lattice under the deck would be replaced with an open space so provide access to the basement. There are no concerns from a natural hazards perspective. The applicant submitted a satisfactory slope stability report which indicated that the slope is stable. Requiring a development agreement on the property will ensure that the development is undertaken in accordance with the Township’s environmental standards, and will implement the recommendations for roof run-off outlined by the Conservation Authority. It is the opinion of staff that it is appropriate for the Committee of Adjustment to grant permission to enlarge the legal non-conforming building, as described in this report.
Notice/Consultation Notice of the Statutory Public Hearing was given pursuant to the requirements of the Planning Act, at least 10 days in advance of the Public Hearing. This included notice given: • • • •
by mail to every owner of land within 60 metres of the subject lands by posting notice signs on the subject lands by posting on the Township’s Current Planning Application webpage by e-mail to prescribed persons and public bodies
Recommendation That the Committee of Adjustment receive comments from the public and, pending comments received, approve for application MV-38-21-B, subject to the following conditions.
- Permission is granted to enlarge a legal non-conforming building on the subject property. The existing dwelling is permitted to have a basement as per the submitted drawings, floor plans and application, that will be attached to the Decision as Schedule “A”.
- The applicant is required to enter into a Development Agreement to be registered on the title of the property to the satisfaction of the Township to address Township www.southfrontenac.net Natural, Vibrant and Growing – a Progressive, Rural Leader.
Page 100 of 167
Township of South Frontenac Staff Report - Permission Application MV-38-21-B, Corke, 147 Space Lane, District of Bedford
environmental policies, recommendations from the Slope Stability Study (Kollard Associates, dated May 24, 2022) and Rideau Valley Conservation Authority recommendations outlined in their letter dated July 28, 2022, including: • •
•
All materials from construction will be disposed of 30 metres or more from the highwater mark of Burridge Lake at a proper disposal site Surface and roof water runoff management shall be implemented by directing runoff from eaves through placement and outlets to natural constructed French drains or areas to allow for maximum infiltration from roof runoff and as much as possible away from services and the lake Erosion and sediment control measures shall be implemented around the construction site upland of the lake.
- A building permit is required for ALL demolition and construction on the property. There shall be no additional development, or demolition of existing structures, on the property without the approval from the Township of South Frontenac. Report Prepared By: Anna Geladi, MCIP, RPP, Planner Reviewed By: Christine Woods, MCIP RPP, Senior Planner
www.southfrontenac.net Natural, Vibrant and Growing – a Progressive, Rural Leader.
Page 101 of 167
2.
_
Email Address of Owner(s):
-rrwf 6’, C CO
of Authorized Agent:
District:
D£Bedford
The description of the subject land:
Signature(s) of Owner(s)
LI Portland
Ll Loughborough
LIStorrington
Agent as named above is hereby authorized to act on behalf of the owners for purposes of processing this application for Minor Variance.
Email Address of Authorized Agent:
Phone number of Authorized Agent:
Full Mailing Address
Name. of Authorized Agent:
If the applicant is NOT the owner of the subject land, the written authorization of the owner that the applicant is authorized to make the application, must accompany the application.
_
Phone number of Owner(s):
\J
Full Mailing Address of Owner(s): _
Name of Owner(s):
File No:
TOWNSHIP OF SOUTH FRONTENAC APPLICATION FOR MINOR VARIANCE Planning Act, R.S.0. 1990, c. P.13 as amended
Date Received:
Page 102 of 167
Page 103 of 167
7‘7:2.¢{M
Z
I.’
03¢!‘ M‘
J!
Z AC,,f(,,
(ol.lM
I
U-’ <
Mcafre
Yes
l3€No
What are the existing uses of the subject land?
If access to the subject property is by water only, please indicate the parking and docking facilities used or to be used and the approximate distance of these facilities from the subject land and the nearest public road.
M ectjloot) LL./BN2
Name of Road/Lane:
Does the subject property front on a municipally maintained road? OR a privately maintained road? )5]Yes Ll No
‘I)L<l<‘_ g?elajg a/’)L4}lT(QAB E>6’l§‘l’—,(II’/:7
The reason why the proposed use cannot comply with the provisions of the Zoning By—|aw:
Z/’
0-O
The nature and extent of the relief from the Zoning By—|aw:
4 tMlTc(;l jgmgce,
Area:
Frontage (on road/lane):
Qes/pt?euflcsl lL»9rtE”;.2.ri??9rklir//
___IF/’<;§£/L;/xf
‘3;.QiL{!‘_’j
The current zoning of the subject land:
Depth:
Frontage (on water):
The frontage(s), depth and area of the subject land.
TOWNSHIP OF SOUTH FRONTENAC APPLICATHONFOR MINOR VARIANCE Planning Act, R.S.O. ‘i990, c. PII3 as amended
TOWNSHIP OF SOUTH FRONTENAC APPLICATION FOR MINORVARIANCE Planning Act, R.S.0. 1990, c. P.13 as amended
J
.
M
‘4
.5.‘op«L 3:33
iigxéssq
UHQ,
R
i STD/*7’ g; Cp2’ 3‘> ,45}{ _ HA6‘,
i
L3
_
£8 95Z M
1 OM.g«L9,
“
13.The proposed uses of the subject land:
7,65 IV? 14/ M (I¥‘;a;::i¢=naabT:a)
Setback from High
Dimensions of FloorArea
(Also indicéte if it is one story or «two story)
Heightof Building
Side
Setback from Lot Line
Setback from Rear Lot Line
Setback from Front Lot Line
Type of Structure (E.g. residence)
(1)
SQ/I
33 M
- If the answer to item 11 is yes, for EACH building or structure indicate:
{QLéL
Page 104 of 167
Page 105 of 167
'
I
7
‘
IV)
I/I
02Xg M
l A/\
)4
. ., ‘ 5’ M ‘Z 7
3
QDOM 5-MU
(1) (2) (3) (4)
lot line and the setback from the high water mark will be the same.a2) The dimensions required in this question relate to the NEW CONSTRUCTIONONLY, and NOT to the total size of the completed building.
NOTES: 1) If the subject property is on waterfront, and on a private lane, the setback fromthe front
Setback from High Water Mark (If applicable)
Outside Dimensions of Buildinglstructure
(Also indicate if it is one story or two story)
Height of Building
Setback from Side Lot Line
Setback from Rear Lot Line
Setback from Front Lot Line
Type of Structure (E.g. residence)
- If the answer to item 14 is yes, for each proposed addition, building or structure indicate:
TOWNSHIP OF SOUTH FRONTENAC APPLlCATlON FOR MINORVARIANCE Planning Act, R.S.O. 1990, c. P.‘l3 as amended
18.
Increase in number of bedrooms
Increase in plumbing fixtures
increase in living space
Will the addition or structure encroach on the existing septic system?
(a)
(b)
(c)
(d)
What are the uses of the proposed development?
if yes, please provide details:
Do your plans include the RAISING of an existing structure?
,
M
_l 5.
7
23 I ‘l
LzlJNo
J No
§ltNo
time
&:No
NW;
D0
Indicate whether sewage disposal is provided to the subject land by a publicly owned and operated sewage system, a privately owned and operated individual or communal septic system, a privy, or other means:
(Pr
Indicate whether water is provided to the subject land by a publicly owned and operated piped water system, a privately owned and operated individual or communal well, a lake, or other water body, or other means:
§AIUlC&.l0LJ/‘J
21 .The length of time that the existing uses of the subject land have continued:
btulcuou?/U
20.The date the existing buildings and structures were constructed on the subject lands:
2
CC! :9 PM
I_ Yes
jg Yes
Yes
Yes
Yes
TOWNSHIP OF SOUTH FRONTENAC APPLICATION FOR MINORVARHANCE Planning Act, R.S.0. 1990, c. P.’l3 as amended
19.The date the subject land was acquired by the current owner:
Page 106 of 167
Page 107 of 167
If the answer to question 25 is yes, please give the file number of the application and the status of the application.
i>l7NO
’
If the answer to item 27 is yes, please give the file number of the the application.
llNo
lines.
The approximate location of all natural and artificial features on the subject land and on the land that is adjacent to the subject land. Examples include buildings, railways, roads, watercourses, drainage ditches, river or stream banks, barns, wetlands, wooded areas, wells and septic tanks. Show distance of these features from the app|icant’s property
v)
The location of a reference point……i.e. distance between the subject land and the nearest township lot line or landmark such as a bridge or railway crossing.
iii)
The location of all abutting (neighbours’) lands.
The boundaries and dimensions of the subject land including the location of any existing and proposed buildings.
ii)
iv)
THE SKETCH MUST HAVE A NORTH ARROW AT THE TOP OF THE PAGE.
application and the status of
i)
A SKETCH must be submitted showing the following:
llYes
If known, please indicate whether the subject land has ever been the subject of an application under Section 43 of the Planning Act (Minor Variance).
Ll Yes
25.PIease indicate whether the subject land is subject of an application under the Planning Act for approval of a Plan of Subdivision or Consent.
TOWNSHIP OF SOUTH FRONTENAC APPLICATION FOR MINORVARIANCE Planning Act, R.S.O. 1990, c. P.13 as amended
Page 108 of 167
Page 109 of 167
%
é
I’ ;4…._..¢..u
I
Page 110 of 167
:
1,
_-
1
»..~—
3
.
.. -..1
4
L.
. "
:
,
.3 x
Page 111 of 167
Inset Inset Map Map
NE
E EEL ST
D ROA
MEADOW LANE
MA VE LA P L E GRO
ROB IN LANE 9B ROBIN LANE
¥
ROBIN LANE
9B ROBIN LANE
PL-ZNA-2022-0108 (DAGLEY / PIEKKOLA)
Bobs Lake 41 MEADOW LANE MEADOW LANE
51 MENDOW LANE Legend Subject Property Assessment Parcel Township Boundary Lake Trout Lake - At Capacity
LAN
E
Lake Trout Lake - Not at Capacity
MEA DOW
Non-Lake Trout Lake - At Capacity Wooded Area Waterbody Provincially Significant Wetland
51 MEADOW LANE
Wetland Road
Bobs Lake MEADOW LANE
Produced by the Township of South Frontenac under license with the Ontario Ministry of Natural Resources © Queen’s Printer for Ontario, 2020.
Page 112 of 167
While the Township makes every effort to insure that the information presented is accurate for the intended uses of this map, there is an inherent error in all mapping products, and accuracy of the mapping cannot be guaranteed for all possible uses. This map displays basic topographic features only.
61 MEADOW LANE
Scale: 1:700 0
5
10
20 m
UTM Zone 18 NAD 83 67 MEADOW LANE
Date: 2022-07-31
August 29, 2022 22-SFR-MVA-0055 (Bedford) Township of South Frontenac Committee of Adjustment PO Box 100 4432 George Street Sydenham, ON K0H 2T0
Attention: Anna Geladi RPP, MCIP
Subject:
Dagley, Darline & Piekkola, Grant; Application for Minor Variance, PL-ZNA2022-0108 – 51 Meadow Lane, Lot 24, Concession 3; Geographic Township of Bedford, Now the Township of South Frontenac; Roll Number: 1029 0200 2028 1000 0000 ———————————————————————————————————–Dear Ms. Geladi, The Rideau Valley Conservation Authority (RVCA) has reviewed the subject applications within the context of:
- Section 2.1 Natural Heritage, 2.2 Water and 3.1 Natural Hazards of the Provincial Policy Statement under Section 3 of the Planning Act;
- The Rideau Valley Conservation Authority (“Development, Interference with Wetlands and Alteration to Shorelines and Watercourses” regulation 174/06 under Section 28 of the Conservation Authorities Act);
- The Mississippi-Rideau Source Water Protection Plan;
- The Tay-River-Bobs Lake Catchment Report
The Proposal The RVCA understands this application is to construct a 15 m2 sunroom on an existing deck approximately 27m from Bobs Lake. The sunroom is to be constructed on the north side of the existing dwelling and will not encroach on the setback established by the dwelling.
Page 113 of 167
The Property The subject property is an irregularly shaped 0.32 ha (0.8 acres) lot with 36.4 m of frontage on Bobs Lake (West Basin). The property is developed with a dwelling and attached deck, garage and boat house. The lot slopes steeply to the waterfront and is accessed by a stairway. The lot has several mature trees and manicured lawn, with rock outcrops and natural vegetation along the lot edges. A review of the desktop mapping and a site visit to the subject property on April 1, 2022, indicated the following natural hazards or natural heritage features: -Our office has a regulated flood level of 163.07 metres above sea level associated with Bobs Lake -Bobs Lake is considered to be a watercourse for the purpose of our regulation -The property overlies a highly vulnerable aquifer -Steep slopes are present along portions of the shoreline A review of our records does not reveal the presence of marine clays, organic soils, or wetland areas. Review Comments Provincial Policy Statement Regarding Section 2.1 our office has no concerns. About Section 2.2 of the PPS, our office has no concerns as the sunroom will not encroach into the existing setback and will be built on the existing deck. Recommendations are provided related to the management of stormwater runoff. Concerning section 3.1 of the PPS our office has no concerns with respect to steep slopes as the sunroom is to be constructed on an existing structure. Ontario Regulation 174/06 Currently, our office regulates the shoreline of Bobs Lake. Should any development be proposed along the shoreline of Bobs Lake (including, but not limited to, grading, site alteration, dock installation, or erosion protection works) prior written permission is required from our office in accordance with our (Development, Interference with Wetlands and Alterations to Shorelines and Watercourses) made under Section 28 of the Conservation Authorities Act. The development proposed in the subject application does not include any shoreline alteration and will not require written permission from our office. Bobs Lake-Crow Lake Catchment Report This lot is located on West Basin in Bobs Lake, the 2017 report indicates that West Basin has a water quality rating that ranges from “Fair” to “Very Good”. Few nutrient exceedances, good fish habitat conditions in late summer, and generally clear water contributed to the rating. The catchment report notes that well-vegetated shorelines are critically important in protecting water quality, and habitat conditions and reducing the potential for erosion. It highlights the
Page 114 of 167
Page 2 of 4
importance of shoreline protection particularly where water setbacks cannot be met and the role in reducing the amount of stormwater runoff to the lake, this is particularly important on sensitive waterfront properties that have steep slopes or shallow soils. Mississippi Rideau Source Water Protection Plan This property has been identified as overlying a highly vulnerable aquifer as stated in the catchment report and indicated in the Mississippi-Rideau Source Water Protection Plan. These are aquifers that are vulnerable to surface contaminants due to thin or absent soils overlying bedrock that may be fractured. Where these conditions exist, it may be possible for contaminants to enter drinking groundwater supplies. For this reason, care should be taken to avoid land uses and practices that may inadvertently lead to undesirable effects on groundwater. For this reason, care should be taken to avoid land uses and practices that may inadvertently lead to undesirable effects on groundwater. Some best practices that could be considered include: • • • • •
increased well casing depths; increased distance of septic systems from drinking water wells; ensuring wells are located upgradient of septic sewage disposal systems ensuring that wells and septic systems are properly maintained, avoiding the use of pesticides, herbicides, and fertilizers.
Recommendations Should the Township allow the variance our office would have the following recommendation for conditions of any implementation agreement or notes to be included in any decision:
- A planting plan showing improved shoreline vegetation adjacent to Bobs Lake should be provided and implemented. The planting plan should take the form of a drawing showing where the vegetation would be improved along the shoreline to an area a minimum of 3 m from the high-water mark. It should be noted that this would not preclude the removal of dead or diseased trees. The applicant is encouraged to discuss this with our office if assistance is required. RVCA staff can assist in planning and planting shoreline vegetation, whether trees or shrubs and would be willing to discuss grant programs that the applicants may wish to consider. If the applicants are interested in this service, they should contact Meaghan MacDonald (Meaghan.mcdonald@rvca.ca or 613-692-3571 x 1192) at our Manotick office.
- Roof runoff should be directed to the rear or side yards and to an area of soil depth or containment adequate to allow for absorption, infiltration, and treatment. Collection and management of runoff in this manner helps to control untreated surface water from running overland to Bobs Lake. This assists in preventing nutrients and sediment from reaching these features. This shall be to the satisfaction of the Township. -Should any work be undertaken along the shoreline of Bobs Lake permits would be required by the Rideau Valley Conservation Authority in accordance with Ontario Regulation 174/06 (“Development, Interference with Wetlands and Alteration to Shorelines and Watercourses”).
Page 115 of 167
Page 3 of 4
Conclusions In conclusion, our office has no objection to the subject application. Please advise us on the Committee’s decision respecting this application or any changes in the status of the application. Thank you for the opportunity to comment and please do not hesitate to contact the undersigned at (613) 692-3571 x1109 should you have any questions. Yours truly,
Sarah MacLeod-Neilson Planner cc –Darline Dagley & Grant Piekkola, owners cc – Meaghan McDonald, RVCA
Page 116 of 167
Page 4 of 4
To: Committee of Adjustment Prepared by: Development Services Department Date of Meeting: September 8, 2022 Permission Application (S. 45(2) of the Planning Act) Subject: PL-ZNA-2022-0108 (Dagley)(Piekkola) – 51 Meadow Lane, District of Bedford
Summary This application is requesting permission to construct a 15 square metre enclosed sunroom on the existing deck within 30 metres of the highwater mark of Bobs Lake, therefore enlarging a legal non-conforming building. This report recommends that the Committee of Adjustment grant approval of this application for permission to enlarge a legal nonconforming building, per section 45(2) of the Planning Act, subject to conditions.
Background Official Plan Designation: Rural Zoning: Limited Service Residential Waterfront – RLSW
Relief Requested The application seeks permission under Section 45(2) of the Planning Act to increase living space and enlarge a dwelling within 30 metres of the highwater mark.
Discussion/Analysis Property Description The subject property is located at 51 Meadow Lane. Meadow Lane is accessed from Maple Grove Lane which is accessed from Steele Road. The property has an area of approximately 0.36 hectares (0.88 acres) and has waterfrontage on Bobs Lake. The property rises gradually from Bobs Lake to Meadow Lane. There is a flat area closer to the lane where parking is available for cars. The dwelling is built into the slope of the property. The vegetation on the property consists of manicured lawn and trees scattered around the property.
www.southfrontenac.net Natural, Vibrant and Growing – a Progressive, Rural Leader.
Page 117 of 167
Township of South Frontenac Staff Report - PL-ZNA-2022-0108 (Dagley)(Piekkola) – 51 Meadow Lane, District of Bedford
The property is developed with a dwelling, a garage, and a boat house. The seasonal dwelling has a wrap around deck on the north, east and south sides. The dwelling plus deck have a total footprint of 213.8 square metres (2301 square feet). The dwelling is setback 27 metres from the highwater mark, and the deck is setback 24 metres. The dwelling is single storey. The garage has a footprint of 37.5 square metres (404 square feet) and is located 33 metres from the highwater mark of Bobs Lake.
Summary of Proposal The applicants are proposing to build an enclosed sunroom on a portion of the existing deck. The enclosed sunroom will be located on the north side of the deck. It will have a ground floor area of 15 square metres (161.5 square feet) and will line up with the side of the dwelling facing the water, setback 27 metres from the highwater mark. The proposed roofline of the sunroom will be lower than the existing roof of the dwelling. The remainder of the deck (on the east and south sides of the dwelling) will remain as it is existing, uncovered. The proposal would not result in the footprint of the building getting any larger, and the sunroom would be no closer to the highwater mark of Bobs Lake than the deck that currently exists. Permission is required to allow an enlargement of the gross floor area of the dwelling within 30 metres of the lake. The applicants have indicated that they are proposing a sunroom to allow for more indoor useable space before entering the dwelling, similar to a mudroom.
Department and Agency Comments This application did not meet the criteria for circulation to Building Services for a sewage review because the proposed increase in living space is less than 15%. Rideau Valley Conservation Authority provided comments on August 29, 2022 which indicate that Staff have no objection to the approval of the application. RVCA Staff note that the sunroom is to be constructed on the north side of the existing dwelling and will not encroach on the setback that is established by the dwelling. RVCA provides two recommendations in their letter including that roof run off be directed to the rear or side yards and that the applicant undertake a planting plan to improve the shoreline vegetation www.southfrontenac.net Natural, Vibrant and Growing – a Progressive, Rural Leader.
Page 118 of 167
Township of South Frontenac Staff Report - PL-ZNA-2022-0108 (Dagley)(Piekkola) – 51 Meadow Lane, District of Bedford
adjacent to Bobs Lake. RVCA notes that they can help the applicant prepare the planning plan. RVCA notes that the development proposed in the subject application does not include any shoreline alteration and will not require written permission from their office under O. Reg. 174/06.
Public Comments No comments have been received from the public to date.
Planning Analysis The property is zoned RLSW, so the dwelling is a permitted use. The way that the property is being used will not change because of the proposed sunroom. Section 5.10.2 of Zoning By-law No. 2003-75 states that existing buildings with less than the minimum 30 metre setback from the highwater mark of a waterbody may be repaired, renovated or strengthened to a safe condition provided there is no enlargement of the gross floor area or increase in height. This provision does not allow the enlargement of these existing buildings within 30 metres. This makes them legal non-conforming structures. According to the Municipal Property Assessment Corporation (MPAC), the existing dwelling was constructed between 1975 and 1985. This means it existed when the Zoning By-law was passed, and is a legal non-conforming building because it is setback 27 metres from the highwater mark at its closest point. Permission is required to make changes to legal non-conforming buildings. This application is seeking permission to enlarge the gross floor area by 15 square metres (161.5 square feet). In this situation, the Committee of Adjustment should consider whether to grant permission to enlarge the legal non-conforming building under Section 45(2) of the Planning Act. The dwelling currently has a wrap around deck on the north, east and south sides, predominately facing the lake. The proposal is to build a sunroom on top of a portion on the existing deck. The footprint of the dwelling and deck will not increase nor will lot coverage. The height of the sunroom will not be higher than the height of the existing roof line of the main part of the dwelling. The sunroom would be no closer to the highwater mark of than the deck that currently exists. The existing deck extends further out, closer to the highwater mark than where the sunroom is being proposed. www.southfrontenac.net Natural, Vibrant and Growing – a Progressive, Rural Leader.
Page 119 of 167
Township of South Frontenac Staff Report - PL-ZNA-2022-0108 (Dagley)(Piekkola) – 51 Meadow Lane, District of Bedford
The proposal involves enclosing a portion of the deck to be added to the dwelling and is not anticipated to increase the nutrient loading associated with the septic system as no plumbing is being added as part of the proposal. The proposal is designed to preserve as much as possible a site’s physical attributes and cause minimal disturbance. At this time, no development agreement is being proposed however the Township also encourages the applicant to work with RVCA to improve planting along the shoreline. The existing dwelling is compatible with the established built form and character of the surrounding properties. It is the opinion of staff that it is appropriate for the Committee of Adjustment to grant permission to enlarge the legal non-conforming dwelling, as described in this report.
Notice/Consultation Notice of the Statutory Public Hearing was given pursuant to the requirements of the Planning Act, at least 10 days in advance of the Public Hearing. This included notice given: • • • •
by mail to every owner of land within 60 metres of the subject lands by posting notice signs on the subject lands by posting on the Township’s Current Planning Application webpage by e-mail to prescribed persons and public bodies
Recommendation That the Committee of Adjustment receive comments from the public and, pending comments received, approve application PL-ZNA-2022-0108, subject to the following conditions:
- Permission is granted to enlarge the legal non-conforming dwelling on the subject property as per the drawing submitted with PL-ZNA-2022-0108, received on July 21, 2022, that will be attached to the Decision as Schedule “A”.
- A building permit is required for ALL construction and demolition on the property. There shall be no additional development, or demolition of existing structures, on the property without the approval from the Township of South Frontenac.
Report Prepared By: Anna Geladi, MCIP, RPP, Planner
Reviewed By: Christine Woods, MCIP RPP, Senior Planner
www.southfrontenac.net Natural, Vibrant and Growing – a Progressive, Rural Leader.
Page 120 of 167
Page 121 of 167
38 File No:
LILLICEAP ’l7Nlom7/
of Authorized Agent:
MM. C:LEZ(Ai\l
V
District:
Bedford
The description of the subject land:
Signature(s) of Owner(s,
Portland
D Loughborough
E Storrington
Agent as named above is hereby authorized to act on behalf of the owners for purposes of processing this application for Minor Variance.
Email Address of Authorized Agent: _
Phone number of Authorized Agent: _
Full Mailing Address
Name of Authorized Agent:
if the applicant is NOT the owner of the subject land, the written authorization of the owner that the applicant is authorized to make the application, must accompany the application.
Email Address of Owner(s):
Phone number of Owner(s):
Full Mailing Address of Owner(s):
Name of Owner(s):
Date Received:
TOWNSHIP OF SOUTH FRONTENAC APPLICATION FOR MINOR VARIANCE Planning Act, R.S.O. 1990, c. P.13 as amended
Page 122 of 167
VS’:
‘Sci-7 7.
to
R L.
Area:
0.84;
\33
Er?o
What are the existing uses of the subject land?
A.
If access to the subject property is by water only, please indicate the parking and docking facilities used or to be used and the approximate distance of these facilities from the subject land and the nearest public road.
M‘/Moggwf Er9A7>
Name of Road/Lane:
_
Yes
The reason why the proposed use cannot comply with the provisions of the Zoning By—Iaw:
@ Al.Lou</ To Remand lrJSl|’-DE.30M5Er5Aca4FZMl-lléil Bl-DC-n umr?ii. Explsmié coidvadgp
@ Cl‘é‘-«$66. :9? use: Aglow E$l.9‘l‘IL\G To ACCEé§0l27’ name:Bl-D6. DNELLMGCKBM
HEc.TAEE.
Frontage (on road/lane):
(ma-r.¢£s>
The nature and extent of the relief from the Zoning By—Iaw:
§ECTior\l
The current zoning of the subject land:
Depth:
Frontage (on water):
The frontage(s), depth and area of the subject land.
Does the subject property front on a mu icipally maintained road? OR a privately maintained road? Yes No
TOWNSHIP OF SOUTH FRONTENAC APPLICATION FOR MINOR VARIANCE Planning Act, R.S.O. 1990, c. P.13 as amended
Page 123 of 167
.
.
f
3
4 _“
IL‘I51,”
32 37
4; Z ;< Z 7
3 I
I342
100*
3 2-87
(REM 0 Veg)
$459 MEML
<3)
indicate:
55/\€mAL Q?é?ik?ow <o\’\’A(=E_
WW7;
wot
II-39
2 ~‘
“L7 ("$9
2.7.4.7I ,.l
1- 5
I8.86 We
W
\77.é’I
5¢—2I’?0 5M0/6,0
Mgr“,
(4)) I
Qamguw
9? E‘¢4$Tu)Ca. €.=.ce~T Sum/E7!
7+6ac 4/2.
More:éae
13.The proposed uses of the subject land:
Setback from High Water Mark (If applicable)
‘|TI§2f’§feSa°
D
may
.5_4 3
22.4?
ggggagcgfggng \4. I8
HeIg_ht_of B_u_I|_dIng <’’:::’:;“;::::.;;:;:,;’“e I
I00 *’
(
WWEZCmsmlmw
§Z2?af§J[?n'2 74
Setback from Front Lot Line
Type of (E.g. residence)
C’AT5m.I
<2)
Structurenew Cof1’AC~E
<1)
- If the answer to item 11 is yes, for EACH building or structure
TOWNSHIP OF SOUTH FRONTENAC APPLICATION FOR MINOR VARIANCE Planning Act, R.S.O. 1990, c. P.13 as amended
Page 124 of 167
c},_{L.
Setback from Rear Lot Line
NOTES:
I
I
2
.; _w,
6-FORE‘!
54¢
I8
(2) (3)
(4)
- If the subject property is on waterfront, and on a private lane, the setback from the front lot line and the setback from the high water mark will be the same.
- The dimensions required in this question relate to the NEW CONSTRUCTION ONLY, and NOT to the total size of the completed building.
Setback from High Water Mark (If applicable)
Outside Dimensions of Building/Structure
(Also indicate if it is one story or two story)
Height of Building
Setback from Side Lot Line
%-I ‘
Setback from Front Lot Line
mm“ wk?radcfug
MaulCorr 5
Type of Structure (E.g. residence)
(1)
15.lf the answer to item 14 is yes, for each proposed addition, building or structure indicate:
TOWNSHIP OF SOUTH FRONTENAC APPLICATION FOR MINOR VARIANCE Planning Act, R.S.O. 1990, c. P.13 as amended
_
I] Yes
increase in living space
Will the addition or structure encroach on the existing septic system?
(c)
(cl) '
No
V4) J
{A0
%
%es JNO
RwAme. WELL
Indicate whether sewage disposal is provided to the subject land by a publicly owned and operated sewage system, a privately owned and operated individual or communal septic system, a privy, or other means:
A New
Indicate whether water is provided to the subject land by a publicly owned and operated piped water system, a privately owned and operated individual or communal well, a lake, or other water body, or other means:
21 .The length of time that the existing uses of the subject land have continued:
20.The date the existing buildings and structures were constructed on the subject lands:
Yes
Yes
Increase in plumbing fixtures
(b) "
Yes
Increase in number of bedrooms
(a)
What are the uses of the proposed development?
If yes, please provide details:
Do your plans include the RAISING of an existing structure?
TOWNSHIP OF SOUTH FRONTENAC APPLICATION FOR MINOR VARIANCE Planning Act, R.S.O. 1990, c. P.13 as amended
19.The date the subject land was acquired by the current owner:
Page 125 of 167
Page 126 of 167
No
/Theboundaries and dimensions of the subject land including the location of any existing
ii)
The approximate location of all natural and artificial features on the subject land and on the land that is adjacent to the subject land. Examples include buildings, railways, roads, watercourses, drainage ditches, river or stream banks, barns, wetlands, wooded areas, wells and septic tanks. Show distance of these features from the applicant’s property lines.
The location of all abutting (neighbours’) lands.
the subject land and the The location of a reference point……i.e. distance nearest township lot line or landmark such as a bridge or railway crossing.
between
SKETCH MUST HAVE A NORTH ARROW AT THE TOP OF THE PAGE.
and proposed buildings.
~/THE
i)
A SKETCH must be submitted showing the following:
If the answer to item 27 is yes, please give the file number of the application and the status of the application.
"
If known, please indicate whether the subject land has ever been the subject of an application under Section 43 of the Planning Act (Minor Variance).
Yes
If the answer to question 25 is yes, please give the file number of the application and the status of the application.
\7/NO
ll Yes
- Please indicate whether the subject land is subject of an application under the Planning Act for approval of a Plan of Subdivision or Consent.
TOWNSHIP OF SOUTH FRONTENAC APPLICATION FOR MINOR VARIANCE Planning Act, R.S.O. 1990, c. P.13 as amended
Page 127 of 167
The cabin was built by the present owners grandfather and great uncles over 60 years ago and there is much sentiment around the times that have been spent there over the years. At present there is an outhouse by the cabin(which we plan to remove) and another ugly metal storage building by the water, that we also plan to remove so there will be no facilities at lake level for toilet or water, except the lake of course…. The existing cabin has a small sink and counter space that we will remoVe…not sure where the waste water goes, but the water comes from the lake…we are drilling a new well near the new cottage this summer for the new build. There is a steep hill from the cabin to the new cottage location with a narrow path that leads alongside of the hill…great for mountain goats…see the photos enclosed…to carry a chair, let alone a canoe would be a real challenge…it is a narrow, winding, steep path the cottage was built by bringing all materials in by boat and to demolish it we would have to set up a barge operation to remove it….you would be hard pressed for two people to carry a canoe up the path to the top of the hill. We would like to convert this cabin into a storage building, for a place for lawn furniture, canoe, and in the winter or long terms of absence, small motor boat 0 as per the plans, we are proposing to add a double door at one end with a ramp to allow to get boats, canoes etc into this space 0 we are proposing to close up the door facing the water, which as per the photos has no stairs or accessibility to the ground 0 at some time in the future we will also re~side and clean up the appearance of the cabin At this point, although raised in Kingston, the owner lives mainly in England, so he needs a place to keep his lakeside chairs, canoe etc safe and accessible we have no plans to use this for a sleeping cabin. The new cottage will have the only plumbing and toilet facilities. We just need some sort of building at water level for storage of canoes, boats and furniture.
S€VEfEllFEEISOHSI
As per the drawings submitted there is an existing cabin 9 metres back from the water. This building is 24’ x 20’. At this point we have started to build a new cottage behind the 100’ mark from the water. We have submitted the documentation and the deposit of $10,000.00 that states that we are to remove the existing cabin before we will receive our occupancy permit for the new cottage. This application is to ask permission to leave the existing cabin and make it into a storage building, for
Attention: Planner Twsp of South Frontenac
July 24/22 RE: 2009 McAndrews Rd Committee of Adjustment Pre—consultation
L VI DE
AD RO KE LA
M ONARC H
¥
L ANE
AL E
&
E
D
AY T H IS W
HI L L
LA N
Christie Lake Inset Map Inset Map
E
LA KE
N
C AN
DREW
E AN S L
LOO
M
TD V IL LA WE S
LANE
LA
NE
PL-ZNA-2022-0112 (LILLICRAP) (GERVAN)
N
E
Devil Lake
2009 MCANDREWS ROAD Legend Subject Property
Devil Lake
Township Boundary Lake Trout Lake - At Capacity Lake Trout Lake - Not at Capacity Non-Lake Trout Lake - At Capacity Wooded Area 2009 MCANDREWS RD
Waterbody Provincially Significant Wetland Wetland
MC AN DR EW S
LA NE
Road
Page 128 of 167
1989 MCANDREWS RD
MCANDREWS RD
Produced by the Township of South Frontenac under license with the Ontario Ministry of Natural Resources © Queen’s Printer for Ontario, 2020. While the Township makes every effort to insure that the information presented is accurate for the intended uses of this map, there is an inherent error in all mapping products, and accuracy of the mapping cannot be guaranteed for all possible uses. This map displays basic topographic features only.
Scale: 1:1,500 0
12.5
25
50 m
UTM Zone 18 NAD 83
Date: 2022-08-09
Page 129 of 167 LAND SURVEYORS
ma-?ns I“ am
|SSU:I‘IEYTIIESUR’IInEVDI’I
1’I|SP|?,|gl§u|0|‘VllD omuuwow
nmsusussouurmu 2175103
A$O0IA110N OFONTARIO "
_ j;‘;‘J;’.‘
LOT 9 COM. 11
CALC
F1
I
1054 593
g_;0 o.;,
r
(pomr o
OHTL
HP
F2
M
O-_;.
s
wt
g 2
Q
Ia IF‘
I 5515 SIB
CI
:21 O Q
NOTE BEARING S NORTHER LY HAVING A
Page 130 of 167 (wane
6.2x 2.7
METAL CLADSHED
STAKES)
30 metre SETBACK
G
Sgep
<00’? I70/yéxh? 5
TO A BOATHOUSE
CONVERTEXISTINGCABIN
3A.‘Iim
so METRE EXCLUSION.
REMOVE METAL SHED2.7 x 3.7
HYDRO POLE
_
\
mil I
108.5
New HYDRO SERVICE. (UNDERGROUND PREFERRED.)
SITE PLAN
NEWWELLLOCATION
is
LAKE
NEW COTTAGE
%
DEVIL
1
PRIMARYCONTACT AREA (SEPTIC)
ELEVATIONS 1 m = 500 m
RADE’I NEWG
COTTAGE /—NEW
Ham
»
FUTURE 16’ X 20’ BUNKY
3
9:
APP ROX
1 00 3 01 2 1 0 00 0 0 0
CIVIC:20 ROLL#09 0 EXPANDED LOADING AREA546m’
COUNT Y
PARTof
CONC LOADING AREA31.sm= TOW ESSIO NS HIP (SOUTH N CONTACTAREA133m’
FILTER BED
+
LAKE(9 METRES)
Page 131 of 167
EXISTING PLAN VIEW 1/4in=1ft
(CROSSTIES)@ 100”
WALLS @ 86”
<—CEIL|NG
5’
4-1
<—
3:6u j>4:
LAKE(9 METRES)
‘-
3I_6lI T,‘
, 18..
.. 1‘ ‘.:i‘:.:f’:1‘~’
REMOVED
WALLS @ 86”
.« ’*’ .".
/
‘T6’-4" —j>I
(CROSSTIES)@ 100"
NEW PLAN VIEW 1/4in=1ft
<jDooR
<——
:~
rt
<—cEiLiNG
3] ‘»‘it’IjIL’-‘3":".’:;",’ ra‘.‘.:’i£
H REMOVE EXISTING DOORWAY
Page 132 of 167 -‘
I
I
‘
V"
V
Page 133 of 167 View from the West
View From the Water
steep inciine Down to Existing Cabin
-Sr
256 MowatAve. Kingston
<3‘
alongside of the hill … alone a canoe woul gre the cottage wasd buil tat set up a barge opera tion to canoe up the path We would like to co nv canoe, and in the wi ert 0 nt as per the plans, er get boats, canoe s we are proposin g or accessibility t 0 at some time in ot At this point, althou gh lak place to keep his we have no plansesi to de and toilet facilities. boats and furniture. Also, the building e made into a useful xi s p I hope you will find this apst s plia c cat e ion
As per the drawings submit This building is 24’ xted 20’. At this point we have starte d submitted the documentati before we w existing cabin on This application is to askill p er several reasons: m
- The cabin was built is there is much sentisi ment At present there isoa nn storage building by level for toilet or wa The existing cabinter , waste water goes, b u cottage this summer t There is a steep hill
Attention: Planner Twsp of South Frontenac
Page 134 of 167 50
100
200
300
0 Metres
400
500
600
700
800
900
1 Kilometre
—/’
SUBJECTCABIN
_
SUBJECTPROPERTY 2009 MCANDREWSRD. (LANE)—\\
’
August 31, 2022
File: MV/FRS/270/2022
Sent by E-mail Ms. Michelle Hannah, Planning Assistant Township of South Frontenac P.O. Box 100 Sydenham, Ontario K0H 2T0 Dear Ms. Hannah: Re:
Application for Minor Variance PL-ZNA-2022-0112 (Lillicrap) (Gervan) Pt Lot 10, Concession 11; 2009 McAndrews Road Bedford District, Township of South Frontenac Waterbody: Devil Lake
Cataraqui Conservation staff have reviewed the above-noted application for minor variance and provide the following comments for the Committee of Adjustment. Proposal The proposal involves the conversion of an existing cabin to an accessory storage building on a property which is currently undergoing the construction of a new principal dwelling. The change of use requires relief from section 5.24.2 of the South Frontenac Zoning By-law, which requires accessory buildings to erected to the rear of the projected front or exterior side wall of the main building. Relief is also requested to allow the proposed accessory building to remain within the 30 metre setback from the highwater mark, as required by section 5.8.2(a) of the South Frontenac Zoning By-law. Site Description The property is located on the north shore of Devil Lake. The topography of the property can be described as rising quickly from the shoreline, then continuing to rise steadily toward the east where the main dwelling is being constructed. There is an existing cabin approximately 9 metres from the shoreline located in the centre of the lot. The property is densely covered in mature tree and vegetation growth. The property is designated ‘Rural’ in the Official Plan and zoned ‘Limited Service Residential – Waterfront Zone’ (RLSW) in the implementing Zoning By-law. Devil Lake is designated as a moderately sensitive Lake Trout Lake in the Official Plan and is zoned Environmental Protection’ (EP) in the Zoning By-law.
Page 1 of 3
Page 135 of 167
Ms. Hannah (PL-ZNA-2022-0112) August 31, 2022 Discussion The main interests of the CRCA in this proposal are the protection of the water quality of Devil Lake and the avoidance of natural hazards (e.g. flooding and erosion) associated with the shoreline. Water Quality The Official Plan recognizes the need to minimize lake impacts by reducing phosphorous inputs, preventing erosion and maintaining natural appearances. Accordingly, policies have been included that can vary the setback from the highwater mark from 30 to 90 m depending on the site characteristics such as steepness of slope, vegetation cover, soil depth and soil phosphorus retention. Section 5.2.7 (b)(ii)(3) of the Official Plan indicates that a reduction from the setback may only be considered if it is not physically possible or environmentally desirable to meet the 30 metre water setback requirement, and that there will be no negative impacts to fish habitat or water quality. Staff recognize that the existing cabin (proposed accessory structure) is in non-compliance with the current zoning by-law and is entirely situated within the required 30 metre setback from the highwater mark of Devil Lake. Cataraqui Conservation’s Environmental Planning Policy (EPP) considers new development, including a change in land use, within the 30 metre water setback area only if there are no reasonable alternatives for locating the development outside of the water setback area, the development is no closer to the water than existing buildings or structures on the property, and is set back as far as possible from the water in all directions, complies with the maximum lot coverage provisions of the Zoning By-law, and suitable methods to minimize negative impacts on water quality are incorporated into the development. Given that the proposal involves some minor renovations to the existing cabin (i.e. addition of double doors and a ramp) and a change of use, staff recognize that the development is located in a reasonable location, is not encroaching closer to the water, and complies with the maximum lot coverage provisions of the zoning by-law. However, staff emphasize that any future rebuild of the existing cabin would need to be reviewed by the CRCA to determine if the construction complies with our policies and guidelines. In order to protect the shoreline and water quality in the long-term, staff recommend maintenance and enhancement of a healthy buffer of native vegetation between all buildings/structures and the water and use of runoff controls to direct stormwater from hardened surfaces away from the lake where natural infiltration can occur. Natural Hazards Flooding: The maximum recorded water level for Devil Lake is 131.96 metres geodetic. For Devil Lake, the maximum recorded water level is used in lieu of an engineered flood plain. Cataraqui Conservation’s Guidelines for Implementing Ontario Regulation 148/06 (see description below) requires that all development be set back a minimum of 6 metres from the regulatory floodplain of a waterbody. Based upon elevation mapping data, the existing cabin is located outside of any area that may be subject to potential flood risk.
Page 136 of 167
Ms. Hannah (PL-ZNA-2022-0112) August 31, 2022 Erosion: The CRCA, in accordance with provincial technical standards, defines the extent of potential erosion hazards to include an allowance for toe erosion (2 metres), a stable slope allowance for till shorelines of 3(h):1(v) (6 metres), plus an erosion access allowance of 6 metres. Therefore, the total erosion hazard allowance has been determined to be 14 metres (2 + 6 + 6). Staff note that the existing structure is located within the 6 metre access allowance but not within the stable slope hazard itself. Since the structure is already there, staff do not believe that the proposal will further restrict access to the slope, and thus does not further aggravate the hazard. Additionally, since the proposal involves a change of use from a dwelling to accessory structure, the proposal does not have an adverse effect on public safety, from an erosion hazard perspective. Staff have no concerns with the proposal from a natural hazard perspective. Recommendation In summary, staff have no objection to the approval of application PL-ZNA-2022-0112 based on our consideration for natural hazards, natural heritage, and water quality and quantity protection policies. We also recommend implementation of the above-noted environmental mitigation measures (in bold text). Ontario Regulation 148/06 Please note that portions of the subject lands are subject to Ontario Regulation 148/06: Development, Interference with Wetlands, and Alterations to Shorelines and Watercourses, which is administered by the CRCA. The purpose of the regulation is to ensure that proposed changes (e.g. development and site alteration) to a property are not affected by natural hazards, such as flooding and erosion, and that the changes do not put other properties at greater risk from these hazards. The proposed change of use associated with this application does not require a permit from our office, but any rebuild of the existing cabin, or any other development proposed within 15 metres of the floodplain of Devil Lake (131.96 metres geodetic) or 15 metres of the erosion hazard of Devil Lake (8 metres measured inland from the toe of slope) is subject to O. Reg. 148/06 and will require a permit from our office. Please inform this office of any decision made by the Committee with regard to this application. If you have any questions, please contact the undersigned at 613-546-4228 ext. 239, or by e-mail at jtreash@crca.ca. Yours truly, . Janelle Treash Resource Planner cc:
Christine Woods, Senior Planner, South Frontenac Township, via e-mail
Page 137 of 167
To: Committee of Adjustment Prepared by: Development Services Department Date of Meeting: September 8, 2022 Minor Variance Application (S. 45(1) of the Planning Act) Subject: PL-ZNA-2022-0112, Timothy Lillicrap, 2009 McAndrews Lane, Bedford District
Summary The subject application seeks zoning relief to permit an accessory building to be located within the projected front yard of an existing dwelling. This report recommends that the Committee of Adjustment grant approval of this application subject to conditions, as this application meets the four tests of a minor variance outlined in section 45(1) of Planning Act.
Background Official Plan Designation: Rural Zoning: Limited Service Residential – Waterfront (RLSW) Zoning Relief Requested Section 5.24.2 – to permit an accessory building to be located in front of the projected front wall of the dwelling whereas the Zoning By-law requires an accessory building to be erected to the rear of the projected front or exterior side wall of the main building. Related Applications The subject property is not subject to any other applications under the Planning Act.
Discussion/Analysis Property Description The 0.84 hectare (2 acre) property on Devil Lake is accessed from McAndrews Lane. The shoreline consists of a steep bank. The lands within 15 metres of the lake are generally www.southfrontenac.net Natural, Vibrant and Growing – a Progressive, Rural Leader.
Page 138 of 167
Township of South Frontenac Staff Report - PL-ZNA-2022-0112, Timothy Lillicrap, 2009 McAndrews Lane, Bedford District
level. The lands beyond 15 metres consist of a high, steep slope. There is a generally level area at the top of the slope. The lands are forested. A new 1819 square foot (169 square metre) seasonal dwelling is under construction on the property. The new dwelling is more than 30 metres from the highwater mark of Devil Lake. The property also contains the original cabin, and two sheds. Summary of Proposal The owners propose to convert the original cabin to an accessory storage building. The two sheds are proposed to be removed. The cabin has a 494 square foot (45.9 square metre) floor area. It is setback 8.6 metres from the highwater mark, and is in the front yard of the new dwelling. A minor variance is being requested to recognize the location of the accessory storage building in the front yard of the new dwelling. Department and Agency Comments Cataraqui Conservation indicated on August 31, 2022, that it has no objection to the application. They noted that the proposed change of use associated with this application does not require a permit from under O. Reg. 148/06, but any rebuild of the existing cabin, or any other development proposed within 15 metres of the floodplain of Devil Lake (131.96 metres geodetic) or 15 metres of the erosion hazard of Devil Lake (8 metres measured inland from the toe of slope) is subject to O. Reg. 148/06 and will require a permit from their office. Public Comments No comments were received from the public at the time of the writing of this report. Planning Analysis The proposal needs to be assessed against the four tests of a minor variance outlined in Section 45(1) of the Planning Act. It is the opinion of Planning staff that the proposal meets the four tests as explained below. Does the variance maintain the general intent and purpose of the Official Plan? The proposed variance maintains the general intent and purpose of the Official Plan. The subject lands are designated Rural in the Official Plan on Schedule A. The proposed accessory building is a use associated with the permitted residential use of the property. www.southfrontenac.net Natural, Vibrant and Growing – a Progressive, Rural Leader.
Page 139 of 167
Township of South Frontenac Staff Report - PL-ZNA-2022-0112, Timothy Lillicrap, 2009 McAndrews Lane, Bedford District
Vegetation and the soil mantle will not be altered since the building exists, thereby minimizing any potential environmental and visual lake impacts from the change of use. Does the variance maintain the general intent and purpose of the Zoning By-law? The proposed variance maintains the general intent and purpose of the Zoning By-law. The original cabin was constructed more than 60 years ago according to the application. Its location less than 30 metres from the highwater mark is legal non-conforming. There will be no enlargement of the gross floor area or increase in the height of the building as part of its conversion to an accessory storage building. The variance would allow the existing building to be used as a storage building that would be accessory to the new dwelling. Is the requested variance desirable for the appropriate development or use of the land, building or structure in question? The requested variance is desirable for the appropriate development of the land. The original cabin has existed in its current location for more than 60 years. Permitting its continued existence, but as an accessory storage building, is desirable as it allows the adaptive reuse of an existing building. Two existing sheds, also within 30 metres of the highwater mark, are proposed to be removed once the new dwelling and cabin conversion are complete. Vegetation and the soil mantle will not be altered since the building exists, thereby minimizing any potential environmental and visual lake impacts from the change of use. Is the variance minor? The requested variance is minor as it maintains the general intent and purpose of the Official Plan and Zoning By-law, and is desirable for the appropriate development of the land. There is no development on the neighbouring property immediately adjacent to this building and to this property to be impacted by the change of use.
Notice/Consultation Notice of the Statutory Public Hearing was given pursuant to the requirements of the Planning Act, at least 10 days in advance of the Public Hearing. This included notice given:
by mail to every owner of land within 60 metres of the subject lands by posting notice signs on the subject lands by posting on the Township’s Current Planning Application webpage by e-mail to prescribed persons and public bodies
www.southfrontenac.net Natural, Vibrant and Growing – a Progressive, Rural Leader.
Page 140 of 167
Township of South Frontenac Staff Report - PL-ZNA-2022-0112, Timothy Lillicrap, 2009 McAndrews Lane, Bedford District
Recommendation It is recommended that the Committee of Adjustment receive comments from the public and, pending comments received, approve minor variance application PL-ZNA-2022-0112 for the property at 2009 McAndrews Lane, subject to the following conditions.
- The minor variance is for an accessory building (storage building). The storage building is permitted to be located in the front yard of the dwelling, and setback a minimum of 8.6 metres from the highwater mark of Devil Lake, all as per the submitted sketches (Drawing S-1, Mac Gervan & Associates Ltd., July 11, 2022), which would be attached to the Decision as Schedule “A”.
- A building permit is required for ALL demolition and construction on the property. There shall be no additional development on the property without the approval from the Township of South Frontenac.
- Minor variance PL-ZNA-2022-0112 is applicable only to Zoning By-law No. 2003-75 and not to any subsequent zoning by-laws. Report Prepared By: Christine Woods, MCIP RPP, Senior Planner
www.southfrontenac.net Natural, Vibrant and Growing – a Progressive, Rural Leader.
Page 141 of 167
Page 142 of 167
’
my-10’
818-? [249.4 M]
(246.8 M]
I_usTN::rm5_o_
__’. X #4..
Page 143 of 167
’
lat:-.,.ai%i‘§£?.’?% ‘lame
31 HILLENDALE AVE. TEL 613 531-7873. KINGSTON, ONTARIO CEL 613 561-3428 FAX 613 531-0602 K7M 1S2
ASPHALT SHINGLES(TYP)
12 ALUMINUM FASCIA
6
TOP OF WALL 10’-8" VENTED ALUMINUM SOFFIT COMPLETE W/ EAVESTROUGHING
8X8 TIMBER POST(TYP)
4" STONE VENEER
10’
ENGINEERED VERTICAL SIDING(TYP)
FINISH GRADE TOP OF SLAB 0’-8"
1 A1
2 A1
FRONT ELEVATION 1/4" - 1’-0"
SIDE ELEVATION 1/4" - 1’-0"
GENERAL NOTES:
- BASEMENT SLAB AND ALL FOOTINGS TO BE CONSTRUCTED ON COMPACTED GRANULAR ‘A’. GRANULAR ‘A’ TO BE LAYED IN 6" LIFTS AND COMPACTED TO 98% STD. PROCTOR.
- USE 25 MPa CONCRETE WITH MAXIMUM SLUMP OF 4" AND ENTRAINED AIR OF 5-7% FOR CONCRETE FOOTINGS AND FOUNDATION WALLS. 3.ALL EXTERIOR CONCRETE WORK INCLUDING STEPS, PORCH SLABS, AND GARAGE SLABS TO BE 32 MPa WITH ENTRAINED AIR OF 5-8%.
- FOOTINGS MUST BE A MINIMUM OF 4’ BELOW GRADE OR DOWN TO BEDROCK. IF FOOTINGS DO NOT EXTEND 4’ BELOW GRADE, ENGINEERED DESIGN OF APPROPRIATE FROST PROTECTION IS REQUIRED.
- ALL FOOTINGS ARE 6" DEEP, UNLESS NOTED OTHERWISE
- EAVE PROTECTION TO CONFORM WITH SECTION 9.26.5.1 O.B.C.
- ALL LINTELS ARE (2)2X10, UNLESS NOTED OTHERWISE
- INSTALL ATTIC VENTILATION TO CONFORM WITH SECTION 9.19.1. O.B.C.
- ALL WOOD USED FOR DECKS, EXTERIOR STAIRS AND EXTERIOR RAILINGS TO BE PRESSURE TREATED.
- ANY STRUCTURAL CONCERNS THAT A BUILDING OFFICIAL MAY HAVE AND REQUIRE INSPECTION FROM A PROFESSIONAL ENGINEER, MUST REMAIN EXPOSED UNTIL THE PROFESSIONAL ENGINEER HAS MADE THE INSPECTION. THE CONTRACTOR CAN EXPECT TO DEMOLISH ANY MATERIAL THAT PREVENTS A ADEQUATE INSPECTION OF THE STRUCTURAL ELEMENTS.
- ALL GIRDER TRUSSES TO BE SUPPORTED BY A MINIMUM NUMBER OF STUDS FORMING A COLUMN INSIDE THE STUD WALL AS INDICATED ON TABLE A-35 O.B.C. P287. ALL GIRDER TRUSSES REQUIRE A MINIMUM BEARING LENGTH OF 140mm UNLESS SPECIFIED OTHERWISE BY THE TRUSS MANUFACTURER.
- IF ANY GIRDER TRUSSES BEAR ON A LINTEL OR TRANSFER THE APPLIED LOAD FROM THE GIRDER TRUSS DOWN TO A LINTEL, THE CONTRACTOR MUST CONTACT PROFESSIONAL ENGINEER TO VERIFY LINTEL SIZING.
- ALL DIMENSIONS TO BE CONFIRMED BY CONTRACTOR PRIOR TO ORDERING MATERIALS
- ALL ELECTRICAL TO BE CONFIRMED BY OWNER PRIOR TO ORDERING ELECTRICAL COMPONENTS
ELECTRICAL LEGEND SYMBOL
DESCRIPTION CEILING MOUNTED LIGHT FIXTURE: SURFACE/PENDANT WALL MOUNTED LIGHT FIXTURE: FLUSH MOUNTED
48’
110V RECEPTACLE: DUPLEX GFI
3
10’ 4’
48X36
DESCRIPTION
BY
REVISIONS
12 1/2"
D
SS OFE IONAL PR
E. R. TROUGHT 100121350
APR 7, 2022 VI NC E OF
ON
TA
DRAWINGS MUST NOT BE SCALED CONTRACTOR SHALL VERIFY AND BE RESPONSIBLE FOR ALL DIMENSIONS AND SHALL REPORT ANY DISCREPANCY TO THE ENGINEER BEFORE PROCEEDING
8 1/2"
THESE PLANS WERE DESIGNED IN ACCORDANCE WITH THE ONTARIO BUILDING CODE. THESE PLANS FORM THE BASIS FOR PERMIT ISSUANCE AND ANY DEVIATIONS FROM THESE PLANS AND DETAILS, INCLUDING THE VENTILATION SYSTEM, HEATING SYSTEM, WOODSTOVE, FIREPLACES, DECKS, BALCONIES AND FINISHED BASEMENTS, WILL REQUIRE A REVISED DRAWING AND CLEARANCE BY THE BUILDING DEPARTMENT.
3’
NEW EXTERIOR WALL CONSTRUCTION:
- VERTICAL ENGINEERED SIDING
- 1" R-10 CONTINUOUS RIGID INSULATION W/ ALL SEEMS TUCK TAPE
- 1/2" OSB
- 2X6 STUD WALL @ 16" O/C
- 5 1/2" R-24 BATT INSULATION
- 6 MIL POLY VAPOUR BARRIER
- 1/2" GYPSUM BOARD
DATE
SS
48X36
PRE-ENGINEERED TRUSSES @ 24" O/C
22’-6"
10’ 4’
RENOVATIONS TO RESIDENCE
3'
36
LOCATION:
(2)1 3/4" X 9 1/2" LVL 8’ X 8’ GARAGE DOOR
(2)1 3/4" X 9 1/2" LVL 8’ X 8’ GARAGE DOOR
(2)1 3/4" X 9 1/2" LVL 8’ X 8’ GARAGE DOOR
4'
10'
SIZE
EER GIN EN
24'
DESCRIPTION
O
EAVES 1’-6"
DASHED LINE REPRESENTS ROOF LINE 2-PLY 2X6 BUILT UP COLUMN INSIDE STUD WALL(TYP)
SYMBOL
PR
3
WALL LEGEND
NEW EXTERIOR WALL CONSTRUCTION:
- STONE VENEER
- 1" AIR SPACE
- 1" R-10 CONTINUOUS RIGID INSULATION W/ ALL SEEMS TUCK TAPE
- 1/2" OSB
- 2X6 STUD WALL @ 16" O/C
- 5 1/2" R-24 BATT INSULATION
- 6 MIL POLY VAPOUR BARRIER
- 1/2" GYPSUM BOARD
CARPORT
GFI
3-WAY SWITCH
No.
5-PLY 2X6 BUILT UP COLUMN INSIDE STUD WALL
3 CAR GARAGE
S
IO
10’-6"
SINGLE POLE SWITCH
LICEN CE
34’-11"
1’-6"(TYP)
S
R
TIMBER BEAM 8X10
GFI: GROUND FAULT RECEPTACLES
5-PLY 2X6 BUILT UP COLUMN INSIDE STUD WALL
TIMBER BEAM 8X10
2024 MEREDITH STREET VERONA FOR:
TIM LLOYD DRAWING:
ELEVATION & PLAN VIEWS 1 A3
3'
8'
3'
8'
3'
Page 144 of 167
3 A1
8'
3'
12'
SCALE
REVIEWED BY: DEPT.
NAME
ARCH.
JM
STR.
ET
PLAN VIEW
MEC.
NA
DATE
3/8" - 1’-0"
ELE.
NA
APR 7, 2022
JOB #:
21339B
DRAWING No.
AS SHOWN
SHEET:
1 OF 3
A1 21338B
31 HILLENDALE AVE. TEL 613 531-7873. KINGSTON, ONTARIO CEL 613 561-3428 FAX 613 531-0602 K7M 1S2
36'
10’-6"
1’-6"
10M STIRRUPS @ 12" O/C
1’-6"
3 A2
1’-6" (TYP)
12'
(4)15M CONTINUOUS DOWELS
SECTION A-A 3’(TYP)
4" STONE VENEER 8X8 TIMBER POST TO BE FASTENED TO KNIFE BASE PLATE W/ (2) 3/4"Ø BOLTS COMPLETE W/ NUTS & WASHERS 8"
FINISH GRADE
21'
24'
GRADE BEAM 1’(TYP)
A
A
1'
4'
CRACK CONTROL LINES
GENERAL NOTES:
- BASEMENT SLAB AND ALL FOOTINGS TO BE CONSTRUCTED ON COMPACTED GRANULAR ‘A’. GRANULAR ‘A’ TO BE LAYED IN 6" LIFTS AND COMPACTED TO 98% STD. PROCTOR.
- USE 25 MPa CONCRETE WITH MAXIMUM SLUMP OF 4" AND ENTRAINED AIR OF 5-7% FOR CONCRETE FOOTINGS AND FOUNDATION WALLS. 3.ALL EXTERIOR CONCRETE WORK INCLUDING STEPS, PORCH SLABS, AND GARAGE SLABS TO BE 32 MPa WITH ENTRAINED AIR OF 5-8%.
- FOOTINGS MUST BE A MINIMUM OF 4’ BELOW GRADE OR DOWN TO BEDROCK. IF FOOTINGS DO NOT EXTEND 4’ BELOW GRADE, ENGINEERED DESIGN OF APPROPRIATE FROST PROTECTION IS REQUIRED.
- ALL FOOTINGS ARE 6" DEEP, UNLESS NOTED OTHERWISE
- EAVE PROTECTION TO CONFORM WITH SECTION 9.26.5.1 O.B.C.
- ALL LINTELS ARE (2)2X10, UNLESS NOTED OTHERWISE
- INSTALL ATTIC VENTILATION TO CONFORM WITH SECTION 9.19.1. O.B.C.
- ALL WOOD USED FOR DECKS, EXTERIOR STAIRS AND EXTERIOR RAILINGS TO BE PRESSURE TREATED.
- ANY STRUCTURAL CONCERNS THAT A BUILDING OFFICIAL MAY HAVE AND REQUIRE INSPECTION FROM A PROFESSIONAL ENGINEER, MUST REMAIN EXPOSED UNTIL THE PROFESSIONAL ENGINEER HAS MADE THE INSPECTION. THE CONTRACTOR CAN EXPECT TO DEMOLISH ANY MATERIAL THAT PREVENTS A ADEQUATE INSPECTION OF THE STRUCTURAL ELEMENTS.
- ALL GIRDER TRUSSES TO BE SUPPORTED BY A MINIMUM NUMBER OF STUDS FORMING A COLUMN INSIDE THE STUD WALL AS INDICATED ON TABLE A-35 O.B.C. P287. ALL GIRDER TRUSSES REQUIRE A MINIMUM BEARING LENGTH OF 140mm UNLESS SPECIFIED OTHERWISE BY THE TRUSS MANUFACTURER.
- IF ANY GIRDER TRUSSES BEAR ON A LINTEL OR TRANSFER THE APPLIED LOAD FROM THE GIRDER TRUSS DOWN TO A LINTEL, THE CONTRACTOR MUST CONTACT PROFESSIONAL ENGINEER TO VERIFY LINTEL SIZING.
- ALL DIMENSIONS TO BE CONFIRMED BY CONTRACTOR PRIOR TO ORDERING MATERIALS
- ALL ELECTRICAL TO BE CONFIRMED BY OWNER PRIOR TO ORDERING ELECTRICAL COMPONENTS
25MPa CONCRETE
2 A2
3"
7 1/4"
1’-6"
4 1/4"
(5)15M BARS EVENLY SPACED IN BOTH DIRECTIONS
3" (TYP)
7 1/2" (TYP) 2’-6"
4 A2
3’
No.
DATE
DESCRIPTION
BY
REVISIONS
1" = 1’-0"
E. R. TROUGHT 100121350
1/2"Ø ANCHOR BOLTS @ 5’ O/C
1" R-5 SM RIGID INSULATION
APR 7, 2022 VI NC E OF
O
5" THICK 32MPa CONCRETE SLAB
5" THICK 32MPa CONCRETE SLAB
PR
1/2"Ø ANCHOR BOLTS @ 5’ O/C
1" R-5 SM RIGID INSULATION
EER GIN EN
D
SS OFE IONAL PR
IO
3/8" - 1’-0"
TYPICAL CONCRETE PIER DETAIL
R
4 A2
FOUNDATION PLAN
LICEN CE
1 A2
ON
TA
DRAWINGS MUST NOT BE SCALED CONTRACTOR SHALL VERIFY AND BE RESPONSIBLE FOR ALL DIMENSIONS AND SHALL REPORT ANY DISCREPANCY TO THE ENGINEER BEFORE PROCEEDING
FINISH GRADE
10"
6" COMPACTED GRANULAR ‘A’
8"
3" R-15 SM RIGID INSULATION
1’-6"
1’-6"
3" R-15 SM RIGID INSULATION
THESE PLANS WERE DESIGNED IN ACCORDANCE WITH THE ONTARIO BUILDING CODE. THESE PLANS FORM THE BASIS FOR PERMIT ISSUANCE AND ANY DEVIATIONS FROM THESE PLANS AND DETAILS, INCLUDING THE VENTILATION SYSTEM, HEATING SYSTEM, WOODSTOVE, FIREPLACES, DECKS, BALCONIES AND FINISHED BASEMENTS, WILL REQUIRE A REVISED DRAWING AND CLEARANCE BY THE BUILDING DEPARTMENT.
10"
8"
FINISH GRADE
6" COMPACTED GRANULAR ‘A’
RENOVATIONS TO RESIDENCE (2)15M CONTINUOUS BARS W/ 21" OVERLAPPING SPLICES
8" 12"
2"
2 A2
2" R-10 2" OWENS CORNING FOAMULAR 600 HIGH DENSITY EXTRUDED POLYSTYRENE RIGID INSULATION
GRADE BEAM DETAIL 1 1" = 1’-0"
2" R-10 2" OWENS CORNING FOAMULAR 600 HIGH DENSITY EXTRUDED POLYSTYRENE RIGID INSULATION 3 A2
8" 12"
2"
GRADE BEAM DETAIL 2 1" = 1’-0"
(2)15M CONTINUOUS BARS W/ 21" OVERLAPPING SPLICES
LOCATION:
2024 MEREDITH STREET VERONA FOR:
TIM LLOYD DRAWING:
FOUNDATION PLAN & DETAILS
SCALE
REVIEWED BY:
Page 145 of 167
DEPT.
NAME
ARCH.
JM
STR.
ET
MEC.
NA
DATE
ELE.
NA
APR 7, 2022
JOB #:
21339B
DRAWING No.
AS SHOWN
SHEET:
2 OF 3
A2 21338B
6
4"
NOTE:
- ALL SHARPE EDGES TO BE BROKEN AND ALL BURRS REMOVED
- BRACKET TO BE PRIMED AND PAINTED BEFORE BEING INSTALLED
4"
5 1/8"
8"
12
1 3/8" (TYP)
ROOF CONSTRUCTION (TYP): -AGWAY METALS STEEL ROOF SHEATHING -1/2" PLYWOOD W/ ‘H’ CLIPS @ 24" O/C -PRE ENGINEERED ROOF TRUSS @ 24" O/C -R-60 INSULATION -6 MIL POLY VAPOUR BARRIER -RESILIENT CHANNEL @ 16" O/C -1/2" GYPSUM BOARD
2 1/2"
1/2" THICK 50W PLATE (TYP)
8" 3/4" Ø HOLES
3"
8"
1/4"
2 1/2"
1/4"
1/2" ANCHOR BOLTS @ 5’ O/C
15M REBAR
SINGLE COURSE OF MASONRY BLOCK
VOID IN BLOCK TO BE FILLED W/ 25 MPa CONCRETE WERE ANCHOR BOLTS PASS
SLAB CONSTRUCTION (TYP): -5" 32 MPa CONCRETE -6X6X6GA. REINFORCING WIRE MESH -3" R15 SM RIGID INSULATION -6" COMPACTED GRANULAR ‘A’
1 A3
1’-6"
1/2"
EXTERIOR WALL CONSTRUCTION (TYP): -4" STONE VENEER -1" AIR SPACE -1" R-5 CONTINUOUS RIGID INSULATION TUCT TAPE ALL SEEMS -1/2" OSB -2X6 STUD WALL @ 16" O/C -R- 20 BATT INSULATION -6 MIL POLY VAPOR BARRIER -1/2" GYPSUM BOARD
EXTERIOR WALL CONSTRUCTION (TYP): -ENGINEERED VERTICAL SIDING -1" R-5 CONTINUOUS RIGID INSULATION TUCT TAPE ALL SEEMS -1/2" OSB -2X6 STUD WALL @ 16" O/C -R20 BATT INSULATION -6 MIL POLY VAPOR BARRIER -1/2" GYPSUM BOARD
5"
11’
GARAGE
31 HILLENDALE AVE. TEL 613 531-7873. KINGSTON, ONTARIO CEL 613 561-3428 FAX 613 531-0602 K7M 1S2
2 A3
GENERAL NOTES:
- BASEMENT SLAB AND ALL FOOTINGS TO BE CONSTRUCTED ON COMPACTED GRANULAR ‘A’. GRANULAR ‘A’ TO BE LAYED IN 6" LIFTS AND COMPACTED TO 98% STD. PROCTOR.
- USE 25 MPa CONCRETE WITH MAXIMUM SLUMP OF 4" AND ENTRAINED AIR OF 5-7% FOR CONCRETE FOOTINGS AND FOUNDATION WALLS. 3.ALL EXTERIOR CONCRETE WORK INCLUDING STEPS, PORCH SLABS, AND GARAGE SLABS TO BE 32 MPa WITH ENTRAINED AIR OF 5-8%.
- FOOTINGS MUST BE A MINIMUM OF 4’ BELOW GRADE OR DOWN TO BEDROCK. IF FOOTINGS DO NOT EXTEND 4’ BELOW GRADE, ENGINEERED DESIGN OF APPROPRIATE FROST PROTECTION IS REQUIRED.
- ALL FOOTINGS ARE 6" DEEP, UNLESS NOTED OTHERWISE
- EAVE PROTECTION TO CONFORM WITH SECTION 9.26.5.1 O.B.C.
- ALL LINTELS ARE (2)2X10, UNLESS NOTED OTHERWISE
- INSTALL ATTIC VENTILATION TO CONFORM WITH SECTION 9.19.1. O.B.C.
- ALL WOOD USED FOR DECKS, EXTERIOR STAIRS AND EXTERIOR RAILINGS TO BE PRESSURE TREATED.
- ANY STRUCTURAL CONCERNS THAT A BUILDING OFFICIAL MAY HAVE AND REQUIRE INSPECTION FROM A PROFESSIONAL ENGINEER, MUST REMAIN EXPOSED UNTIL THE PROFESSIONAL ENGINEER HAS MADE THE INSPECTION. THE CONTRACTOR CAN EXPECT TO DEMOLISH ANY MATERIAL THAT PREVENTS A ADEQUATE INSPECTION OF THE STRUCTURAL ELEMENTS.
- ALL GIRDER TRUSSES TO BE SUPPORTED BY A MINIMUM NUMBER OF STUDS FORMING A COLUMN INSIDE THE STUD WALL AS INDICATED ON TABLE A-35 O.B.C. P287. ALL GIRDER TRUSSES REQUIRE A MINIMUM BEARING LENGTH OF 140mm UNLESS SPECIFIED OTHERWISE BY THE TRUSS MANUFACTURER.
- IF ANY GIRDER TRUSSES BEAR ON A LINTEL OR TRANSFER THE APPLIED LOAD FROM THE GIRDER TRUSS DOWN TO A LINTEL, THE CONTRACTOR MUST CONTACT PROFESSIONAL ENGINEER TO VERIFY LINTEL SIZING.
- ALL DIMENSIONS TO BE CONFIRMED BY CONTRACTOR PRIOR TO ORDERING MATERIALS
- ALL ELECTRICAL TO BE CONFIRMED BY OWNER PRIOR TO ORDERING ELECTRICAL COMPONENTS
TIMBER CONNECTION DETAIL 3" = 1’-0"
CONSTRUCTION SECTION 3/8" = 1’-0"
No.
DATE
DESCRIPTION
BY
D
SS OFE IONAL PR
EER GIN EN
E. R. TROUGHT 100121350
O
VI NC E OF
IO
PR
APR 7, 2022 R
LICEN CE
REVISIONS
ON
TA
DRAWINGS MUST NOT BE SCALED CONTRACTOR SHALL VERIFY AND BE RESPONSIBLE FOR ALL DIMENSIONS AND SHALL REPORT ANY DISCREPANCY TO THE ENGINEER BEFORE PROCEEDING
THESE PLANS WERE DESIGNED IN ACCORDANCE WITH THE ONTARIO BUILDING CODE. THESE PLANS FORM THE BASIS FOR PERMIT ISSUANCE AND ANY DEVIATIONS FROM THESE PLANS AND DETAILS, INCLUDING THE VENTILATION SYSTEM, HEATING SYSTEM, WOODSTOVE, FIREPLACES, DECKS, BALCONIES AND FINISHED BASEMENTS, WILL REQUIRE A REVISED DRAWING AND CLEARANCE BY THE BUILDING DEPARTMENT.
RENOVATIONS TO RESIDENCE
LOCATION:
2024 MEREDITH STREET VERONA FOR:
TIM LLOYD DRAWING:
CONSTRUCTION SECTION & DETAIL
SCALE
REVIEWED BY:
Page 146 of 167
DEPT.
NAME
ARCH.
JM
STR.
ET
MEC.
NA
DATE
ELE.
NA
APR 7, 2022
JOB #:
21339B
DRAWING No.
AS SHOWN
SHEET:
3 OF 3
A3 21338B
Page 147 of 167
Page 148 of 167
r—
_
———
“W,
I
—
B18‘-2’[249.4 M]
—
V
—r
,
—
—
~——-
~~
‘
7
..—,—r—
—
~-
,
,,,,
———~
332-1’ [2535 M]
so9—n7[24e.aM1
2 . 7a9’-11J[§s1u§m] 5254;‘
M] 755’-11-12395
,,
BOB‘-6’[246.4M]
<….,.._
sea-5-[2511 M]
—
54421-[257.3M]
\‘\"~———-——_—— 325:1-[2515 M] ..
. ,,
., _
,,__,
,
..
_
__ _V
Map Title
Legend Road Highway Major Road Secondary Road Ferry Route
Assessment Parcels Citations
Page 149 of 167
0.2
1: 4,514 0
0.11
WGS_1984_Web_Mercator_Auxiliary_Sphere Includes Material © 2019 of the Queen’s Printer for Ontario. All Rights Reserved.
0.2 Kilometers
This map is a user generated static output from an Internet mapping site and is for reference only. Data layers that appear on this map may or may not be accurate, current, or otherwise reliable. THIS MAP IS NOT TO BE USED FOR NAVIGATION
Notes
Page 150 of 167
—
Catherine Sinclair CSinclair@quinteconservation.ca
A
territories of the Anishnabek, HuronWorking, living, and learning on the traditional Wendat, and Haudenosaunee (Iroquois) peoples.
Mark Boone, P.Geo Hydrogeologist/Regulations Officer Quinte Conservation mboone@quinteconservation.ca
Mark
Regards,
I trust that the above is satisfactory to your requirements and please let me know should you have any questions.
During the site visit we also discussed your future plans of replacing your deck and the possibility of adding a screened in shelter. As per this discussion it was indicated that the replacement deck would be on the same foot print and the screened in shelter would be within this limit. This potential work is also located outside of the regulated area and as such a permit from this office is NOT required.
During inspection of the site Catherine Sinclair and myself reviewed the location of the proposed garage and surrounding area. A wetland was identified to the southeast of your residence. Quinte Conservationregulates lands within 45 metres of this wetland feature by virtue of Ontario Regulation 319/09. The edge of this wetland feature was flagged and the distance to the proposed garage location is beyond the area regulated by this office and as such a permit from this office is NOT required.
- Dear Mr. Lloyd, It was a pleasure meeting you at your property on May 13, 2022. It is
- understood that you have applied for a permit to construct a new 3 car garage on your
- property at the location illustrated by the site plan prepared by E.R. Trout Design Inc,
- Dated May 5, 2022 Drawing Number SP1 with approximate location shown on the
- attached map.
Mark Boone MBoone@quinteconservation.ca
- Permit App. 164-2022, 2024 Meredith Lane, Lot 2, Concession 13, Portland
- May 17, 2022 at 10:19 AM
Page 151 of 167
fo.rone of Quinte Conservation’s e-newsletters!
Q
A
7
’
.
‘PORTLfiND
2324 r.-lerec:r-Lane
,
“A
‘
? v
Pvwh?ll
ltxsn:
=1: CJ'f£.S
Wtdmrtann
L.:M:1 In! Sbjn
?u
l‘Az1::u:tfp
<:«u’ma Cam”-axon Jmx$’>’.i3rI
L:-I Lino
Anxmxzaz
Wnrusrlr?Mal suiuwd
Ewfnritd |‘uV:¢.1!9~e3- om:
E\¢udtdl‘¢V)‘1:I’O
Disclaimer: This is intended for the addressee indicated above. it may contain information that is privileged, confidential, or otherwise protected from disclosure under the Municipal Freedom of Information and Privacy Protection Act. If you have received this in error, please notify us immediately.
RR#2, 2061 Old Hwy #2, Belleville, ON K8N 4Z2 Phone: (613) 968-3434 or (613) 354-3312 ext 120
www.QuinteConservation.ca www.QuinteSourceWater.ca
Click here to siggp
can reach the office by calling 613-938willbe postponed until further notice. Residents 3434 or by emailing info@quinteconservation.ca. Documents can be dropped off via the mail slot at the main office or by mail at 2061 Old Hwy 2. Belleville ON, K8N 4Z2.
To: Committee of Adjustment Prepared by: Development Services Department Date of Meeting: September 8, 2022 Minor Variance Application (S. 45(1) of the Planning Act) Subject: PL-ZNA-2022-0116 (Lloyd) – 2024 Meredith Lane, District of Portland
Summary This application is a request for zoning relief to permit three accessory structures to be located within the projected front yard of an existing dwelling. This report recommends that the Committee of Adjustment grant approval of this application, subject to conditions, as this application meets the four tests of a minor variance under section 45(1) of Planning Act.
Background Official Plan Designation: Rural (RU) Zoning: Residential (R) Zoning Relief Requested Section 5.24.2 – to permit three accessory structures (garage and two sheds) to be in front of the projected front wall of the dwelling whereas the Zoning By-law requires an accessory building to be erected to the rear of the projected front or exterior side wall of the main building. Related Applications This subject property is not subject to any other applications under the Planning Act.
Discussion/Analysis Property Description The subject property municipally known as 2024 Meredith Lane is to the south of Bauder Drive and on the west side of Meredith Lane. It has frontage on both Meredith Lane and Bauder Drive. It is a large residential property and has an area of approximately 4.6
www.southfrontenac.net Natural, Vibrant and Growing – a Progressive, Rural Leader.
Page 152 of 167
Township of South Frontenac Staff Report - PL-ZNA-2022-0116 (Lloyd) – 2024 Meredith Lane, District of Portland
hectares (11.39 acres). The property also has waterfrontage on Buffy Lake. The subject property contains a single detached dwelling. The property slopes gradually from Bauder Drive towards Buffy Lake. The subject property contains a wetland located on the north side along Bauder Drive, approximately 100 metres from the existing dwelling. The rest of the property is well treed and contains various rock outcrops scattered throughout. There is a steep elevation change both to the north and to the south around the location of the existing dwelling; there is a hill located to the north and a steep valley to the south. The existing dwelling has a footprint of 158 square metres (1700 square feet) and is located 128 metres from Buffy Lake, 253 metres from Bauder Drive and approximately 45 metres from Meredith Lane. It is located at the end of the driveway that is accessed from Meredith Lane. The sewage system is located to the west of the dwelling between the dwelling and west property line. The surrounding lots are developed with similar residential uses. Summary of Proposal The application is requesting permission to locate three accessory buildings (one detached garage and two sheds) in the front yard of the dwelling. The front yard on this property is the public road, Bauder Drive. The private lane (Meredith Road) is an interior side yard and the waterfront (Buffy Lake) is the rear yard. The proposed detached garage is 7.3 metres by 14.6 metres (24 feet by 48 feet). It will have a total footprint of 107 square metres (1152 square feet). It will be single storey with a height of 5.1 metres (17 feet). It will be located between the dwelling and Meredith Lane off the existing driveway and current area used for parking on the property. The garage will be located 246 metres from Bauder Drive and 95 metres from Buffy Lake. The garage is located in the front yard because it is located 246 metres from Bauder Drive and the dwelling is located 253 metres from Bauder Drive. Through the review of this application, it was discovered that there are two sheds on the property that are also located in the front yard as they are located between the dwelling and Bauder Drive. As part of this application, relief is also being requested to formally allow the existing sheds to be located in the front yard. Shed #1 is a small wooden shed that was built in 2017. Shed #2 was built in 2006. Both sheds are small enough that they do not require a building permit. Shed #1 is located 239 metres from Bauder Drive and Shed #2 is located 246 metres from Bauder Drive. Shed #1 is www.southfrontenac.net Natural, Vibrant and Growing – a Progressive, Rural Leader.
Page 153 of 167
Township of South Frontenac Staff Report - PL-ZNA-2022-0116 (Lloyd) – 2024 Meredith Lane, District of Portland
located to the north of where the proposed garage will go. Shed #2 is located to the north of the existing dwelling. Both sheds are well setback from Meredith Lane.
Department and Agency Comments Public Services has no objections to the application. They noted that the proposed garage will have no impacts on municipal road operations and will be accessed from a private lane. Quinte Conservation provided comments in an e-mail dated August 16, 2022 that the application is seeking relief for an area that is located outside of Quinte Conservation’s regulated area and therefore they did not require to be circulated. They have no concerns and no permit will be required for the garage. Public Comments No comments were received from the public at the time of the writing of this report. Planning Analysis The proposal needs to be assessed against the four tests of a minor variance outlined in Section 45(1) of the Planning Act. All four tests must be met for an application to be approved. It is the opinion of Planning staff that the proposal meets the four tests as explained below. Does the variance maintain the general intent and purpose of the Official Plan? The variance maintains the general intent and purpose of the Official Plan. The subject property is designated Rural in the Township Official Plan. The proposed accessory garage and existing accessory sheds are uses associated with the permitted residential use of a property in the Rural designation. All buildings will be setback more than 30 metres from Buffy Lake. Does the variance maintain the general intent and purpose of the Zoning By-law? The proposed variance maintains the general intent and purpose of the Zoning By-law. The proposed accessory garage and the existing accessory sheds are permitted uses on the subject property. Together, they do not exceed lot coverage for accessory buildings, and they are not larger than the principal building.
www.southfrontenac.net Natural, Vibrant and Growing – a Progressive, Rural Leader.
Page 154 of 167
Township of South Frontenac Staff Report - PL-ZNA-2022-0116 (Lloyd) – 2024 Meredith Lane, District of Portland
The location of the existing dwelling in the middle of the subject property, far from Bauder Drive, as well as the wetlands and steep hill located to the north and the steep valley and lake located to the south, results in any accessory building needing to be placed in the front yard of the dwelling (ie. between the dwelling and Bauder Drive). The proposed building and existing buildings are located a suitable distance from property lines, all are located more than 200 metres from Bauder Drive and approximately 40 metres from Meredith Lane. These locations are more than six times the distance than the minimum 20 metres required for the principal building from a public road and the minimum 5 metres required from a lane. The detached garage and the sheds also exceed the required minimum side yard for an accessory building in the Residential zone and the minimum setback from the highwater mark. Is the requested variance desirable for the appropriate development or use of the land, building or structure in question? The requested variance is desirable for the appropriate development of the land. As a waterfront property, it is preferable to have the accessory structures in the front yard, between the dwelling and the road, rather than between the dwelling and the lake to maintain protect the environmentally sensitive lands between the dwelling and Buffy Lake, and to avoid impacts to lake water quality. It is also practical to locate the proposed garage in the front yard off the existing driveway off Meredith Lane. The proposed garage will be located on an existing gravel pad in an area that has previously been cleared. Allowing the garage to be in the front yard on this property is convenient as it facilitates access to the garage and provides safe storage of materials near the garage and near the dwelling. All the accessory buildings on the property will be visually screened from both the lake and/or the road and the lane by both distance and existing tree cover. They are similarly screened from adjacent properties. Is the variance minor? The requested variance is minor as it maintains the general intent and purpose of the Official Plan and Zoning By-law, and is desirable for the appropriate development of the land. The way the subject property is currently being used will not change as a result of the requested variance. The proposed development is not anticipated to impact the existing use of the property nor adjacent uses.
Notice/Consultation Notice of the Statutory Public Hearing was given pursuant to the requirements of the Planning Act, at least 10 days in advance of the Public Hearing. This included notice given: www.southfrontenac.net Natural, Vibrant and Growing – a Progressive, Rural Leader.
Page 155 of 167
Township of South Frontenac Staff Report - PL-ZNA-2022-0116 (Lloyd) – 2024 Meredith Lane, District of Portland
• • • •
by mail to every owner of land within 60 metres of the subject lands by posting notice signs on the subject lands by posting on the Township’s Current Planning Application webpage by e-mail to prescribed persons and public bodies
Recommendation That the Committee of Adjustment receive comments from the public and, pending comments received, approve minor variance application PL-ZNA-2022-0116 for 2024 Meredith Lane, District of Portland, subject to the following conditions:
- The Minor Variance is for a new detached garage and to acknowledge the existing storage sheds to be in the front yard. The detached garage and the two storage sheds are permitted to be in the front yard of the dwelling, and to be setback a minimum of 200 metres from Bauder Drive, all as per the site plan drawing (dated August 2, 2022) which was submitted and received with PL-ZNA-2022-0116, attached to the Decision as Schedule “A”.
- A building permit is required for ALL construction and demolition on the property. There shall be no additional development, or demolition of existing structures, on the property without the approval from the Township of South Frontenac.
- Minor variance PLZNA-2022-0116 is applicable only to Zoning By-law No. 2003-75 and not to any subsequent zoning by-laws.
Report Prepared By: Anne Geladi, MCIP, RPP, Planner Reviewed By: Christine Woods, MCIP RPP, Senior Planner
www.southfrontenac.net Natural, Vibrant and Growing – a Progressive, Rural Leader.
Page 156 of 167
Page 157 of 167
Page 158 of 167
Page 159 of 167
Page 160 of 167
Page 161 of 167
Page 162 of 167
Page 163 of 167
Page 164 of 167
To: Committee of Adjustment Prepared by: Development Services Department Date of Meeting: September 8, 2022 Subject: Decisions on Delegated Consents
Summary This report is an information report to the Committee of Adjustment summarizing the Consents that have been approved by Delegated Authority since the last Committee of Adjustment Meeting.
Background The authority to grant undisputed consents is delegated to the Director of Development Services under By-law 2020-27. This report lists the applications which met the criteria for being considered as an undisputed consent and have received provisional consent approval. Committee of Adjustment is notified for information. Discussion/Analysis a) S-36-21-B (Pintea) This undisputed consent was granted provisional consent on August 19, 2022. The purpose of this consent application was to create one new residential lot. b) PL-BDJ-2022-0053 (2599432 Ontario Inc.) (Fotenn Planning + Design) This undisputed consent was granted provisional consent on September 2, 2022. The purpose of this consent application is to create one new residential lot. c) PL-BDJ-2022-0053 (2599432 Ontario Inc.) (Fotenn Planning + Design) This undisputed consent was granted provisional consent on September 7, 2022. The purpose of this consent application is to create one new residential lot.
www.southfrontenac.net Natural, Vibrant and Growing – a Progressive, Rural Leader.
Page 165 of 167
Township of South Frontenac Staff Report - Decisions on Delegated Consents
d) PL-BDJ-2022-0080 (Noordhof) This undisputed consent was granted provisional consent on August 19, 2022. The purpose of this consent application is to create one new lot addition. e) PL-BDJ-2022-0082 (Noordhof) This undisputed consent was granted provisional consent on August 19, 2022. The purpose of this consent application is to create one new residential lot. f) PL-BDJ-2022-0085 (Rodenburg) This undisputed consent was granted provisional consent on August 15, 2022. The purpose of this consent application is to create one new lot addition. g) PL-BDJ-2022-0091 (Ogilvie) This undisputed consent was granted provisional consent on September 7, 2022. The purpose of this consent application is to create one new residential lot. h) PL-BDJ-2022-0094 (Berry) (Fraser) This undisputed consent was granted provisional consent on August 15, 2022. The purpose of this consent application is to create one new residential lot. i) PL-BDJ-2022-0080 (Noordhof) This undisputed consent was granted provisional consent on August 19, 2022. The purpose of this consent application is to create one new residential lot. j) PL-BDJ-2022-0106 (RD Equipment & Rentals Inc.) (Greer Galloway) This undisputed consent was granted provisional consent on September 6, 2022. The purpose of this consent application is to create a drainage easement.
www.southfrontenac.net Natural, Vibrant and Growing – a Progressive, Rural Leader.
Page 166 of 167
Township of South Frontenac Staff Report - Decisions on Delegated Consents
k) PL-BDJ-2022-0110 (11188615 Canada Inc.) (Cooke) This undisputed consent was granted provisional consent on September 7, 2022. The purpose of this consent application is to create an easement. l) PL-BDJ-2022-0110 (11188615 Canada Inc.) (Cooke) This undisputed consent was granted provisional consent on September 7, 2022. The purpose of this consent application is to create a lot addition.
Attachments None. Approvals Report Prepared By: Michelle Hannah, Planning Assistant Approved by: Christine Woods, Senior Planner
www.southfrontenac.net Natural, Vibrant and Growing – a Progressive, Rural Leader.
Page 167 of 167
