Body: Council Type: Agenda Meeting: Regular Date: December 9, 2025 Collection: Council Agendas Municipality: South Frontenac
[View Document (PDF)](/docs/south-frontenac/Agendas/Council/2025/Council - 09 Dec 2025 - Agenda.pdf)
Document Text
Page 1 of 157
Township of South Frontenac Council Meeting Agenda
TIME: DATE: PLACE:
7:00 PM, Tuesday, December 9, 2025 Council Chambers/Virtual Via Zoom .
Meeting to Order
a)
Resolution
That the Council meeting of December 9, 2025 be called to order at ___ p.m. 2.
Roll Call
Approval of Agenda (and Addendum)
a)
Resolution
That the agenda be approved, as presented. 4.
Disclosure of Pecuniary Interest
Committee of the Whole “Closed Session”
Recess (If Required)
Ceremonial Presentations
Public Meeting
a)
Resolution
b)
Notice of Collection
c)
Zoning By-law Amendment Application PL-ZBA-2025-0101, Scott (The Boulevard Group), 4413 Road 38
d)
Resolution
Delegations
a)
Brenda Crawford will be present to speak to Council regarding a proposed Memory Wall for Veterans.
Briefings
Reports from Administration
a)
Willowbrook Subdivision Phase 1 - Deeming By-Law and Dedication of 0.3m Reserve
5 6 - 33
34 - 39
That By-law 2025-77, attached to Report Number 2025-77, as Exhibit A, to deem the property described as Block 8, Plan 13M105, District of Storrington, Township of South Frontenac as not being in a plan of subdivision, be given first and second reading; and That By-law 2025-78 attached to Report Number 2025-78, as Exhibit B, to dedicate the 0.3 metre reserve that is Block 12 on Plan 13M105, be given first and second reading; and
Page 2 of 157
That By-law 2025-77and By-law 2025-78 be presented to Council for third reading. b)
Build Canada Homes Application
40 - 41
That Council endorse the Build Canada Homes Application in the amount of $21 million, including a capital grant contribution of $6 million and a repayable loan of $15 million. That the CAO be authorized to revise the authorized application amount while discussing proposed terms within 5% of the approved amount. That the final terms of any Build Canada Homes successful conditional approvals be brought back for Council endorsement. 12.
Reports from Advisory Committees
a)
Motion Received from Recreation and Leisure Advisory Committee:
42 - 43
That the Recreation and Leisure Services Advisory Committee recommend that Council support the proposed changes to the summer program registration model, as outlined in Recreation and Leisure Services Advisory Committee Report Number 2025-014. 13.
Information Reports
a)
2026 Draft Capital Budget
44 112
b)
Verona Housing Update
113 121
c)
Bill 60 - Fighting Delays, Building Faster Act
122 137
d)
Bill 68 - Plan to Protect Ontario Act, 2025
138 142
e)
3rd Quarter 2025 – Building Services Report
143 146
f)
3rd Quarter Planning Services Report – 2025
147 152
Committee of the Whole
Communications
Tabling of Documents
New Business
Notice of Motion
a)
Notice of Motion One:
Moved by Councillor Turcotte Seconded by That Council direct staff to prepare and submit a formal letter of objection to the Premier of Ontario and the Minister of Municipal Affairs and Housing, expressing our profound concern that the “Strong Mayor” model, the proposed consolidation of Conservation Authorities, and the municipal planning implications of Bill 60, the Fighting Delays, Building Faster Act, represent a systematic erosion of municipal democratic agency and local environmental oversight, and further, that this letter be shared with the Association
Page 3 of 157
of Municipalities of Ontario (AMO), our local Conservation Authorities and all neighbouring municipalities. b)
Notice of Motion Two:
Moved by Councillor Ruttan Seconded by Whereas the Conservation Authorities Act (1946) established Conservation Authorities (CAs) as local, watershed-based bodies to manage natural resources in partnership with municipalities; Whereas Conservation Authorities are governed by Boards of Directors comprised of municipally elected officials or appointees, ensuring direct accountability to the local tax base; Whereas the current funding model relies heavily on municipal levies and selfgenerated revenue, with the Province of Ontario contributing approximately 5% or less to operating budgets (e.g., Cataraqui Conservation receives ~48% from municipalities and only ~5% from the Province); Whereas the Province of Ontario has introduced Schedule 3 of Bill 68 and Environmental Registry of Ontario (ERO) posting 025-1257, which proposes to amalgamate Ontario’s 36 Conservation Authorities into seven (7) centralized regional entities governed by a new “Ontario Provincial Conservation Agency”; Whereas this forced amalgamation threatens to dilute local decision-making, sever the critical link between local property taxes and local service delivery, and ignore the unique hydrological and environmental differences between our distinct watersheds; Therefore be it Resolved That the Council of South Frontenac Township formally opposes the proposed amalgamation of Conservation Authorities as outlined in ERO 025-1257; And Further That Council calls upon the Province of Ontario to:
- Pause the implementation of Bill 68, Schedule 3;
- Maintain the current watershed-based governance model that ensures local accountability; and
- Engage in meaningful consultation with municipalities to address specific concerns regarding efficiency without dismantling local governance; And Further That a copy of this resolution be forwarded to the Premier of Ontario, the Minister of the Environment, Conservation and Parks, the Minister of Municipal Affairs and Housing, our local MPP John Jordan, the Association of Municipalities of Ontario (AMO), and all Conservation Authorities within our region. c)
Notice of Motion Three:
Moved by Councillor Leonard Seconded by That Council request the Bank of Montreal to reconsider the proposed closure of the Verona BMO Branch due to the anticipated growth to occur in Verona in the near future (Verona Housing Project, McMullen Manor); and That a copy of the resolution be provided to MPP John Jordan and the Bank of Montreal. 19.
Approval of Minutes
Page 4 of 157
a)
Resolution
153 156
That the minutes of the December 2, 2025 Council meeting be approved. 20.
Approval of By-laws
a)
Resolution
That By-laws Numbers (1) and (2) be given third reading. b)
Summary of By-laws
Summary of By-laws:
- By-law 2025-77 - A By-Law to deem part of Plan of Subdivision No. 13M105 not to be a registered plan of subdivision: Block 8, Plan 13M105, District of Storrington.
- By-law 2025-78 - A By-Law to dedicate certain lands within the Township for Public Use; Plan 13M105
Committee of the Whole “Closed Session”
Confirmation By-law
a)
Resolution
157
That By-law 2025-79, being a by-law to confirm generally all actions and proceedings of the Council of the Township of South Frontenac, be given first and second reading; and That By-law 2025-79, being the confirmatory by-law, be given third reading, signed and sealed. 23.
Date of Next Meeting
a)
The next Council meeting is scheduled for January 13, 2026 at 7:00 p.m.
Adjournment
a)
Resolution South Frontenac is a welcoming and thriving rural community
Notice of Collection • Personal information, as defined by the Municipal Freedom of Information and protection of Privacy Act (MFIPPA), including (but not limited to names, addresses, opinions and comments, is collected under the authority of the Municipal Act, 2001, Planning Act and in accordance with MFIPPA. • All personal information may form part of the meeting agendas and minutes, and therefore will be made available to members of the public at the meetings, through requests, and through the website of the Corporation of the Township of South Frontenac. • Questions regarding the collection, use and disclosure of this personal information may be directed to the Township Clerk. Page 5 of 157
Public Meeting under the Planning Act
Zoning By-law Amendment Application PL-ZBA-2025-0101 7:00 p.m. Council Meeting
Page 6 of 157
Tuesday, December 9, 2025
Public Meeting Statement
Page 7 of 157
• The purpose of this public meeting is to hear comments on Zoning By-Law Amendment Application PL-ZBA-2025-0101. • If you wish to be notified of the decision of Council in respect to the applications, you must submit a written request to the Township Clerk by email care of planning@southfrontenac.net. This will also entitle you to be advised of an Ontario Land Tribunal appeal. • Subsection 34(19) of the Planning Act defines the people and public bodies that may appeal the decision to the Ontario Land Tribunal. • Appeals must be filed within 20 days of the notice of decision. They must be filed with the Clerk via the Ontario Land Tribunal’s e-file service at https://olt.gov.on.ca/e-file-service/.
Meeting Format
- Mayor introduces application
- Planner or Agent presents application/reviews proposal
- Applicant/agent permitted to address Council
- Questions from Council
- Members of the public permitted to address Council
- Council discussion
- Close meeting Page 8 of 157
How to Speak to an Application • The Mayor will open the floor to public comments • You will have five minutes to address Council • In person
• Raise your hand and wait for the Mayor to acknowledge you • Move to the table, turn on microphone, and clearly state your name for the record
• On Zoom
• Click “Raise Hand” button to request to speak or dial *9 (star nine) when participating by telephone • The Mayor will acknowledge you, and the Meeting Host will unmute you • Once you are done speaking or Council has no further questions, the Meeting Host will mute your microphone Page 9 of 157
PL-ZBA-2025-0101 Applicant(s): Lori Scott & Gregory Gray Agent: The Boulevard Group Property: 4413 Road 38
Page 10 of 157
Overview PROPOSAL: Sever one (1) parcel and rezone the proposed severed parcel from Rural ‘RU’ to Special Rural ‘RU-XX’ SUBJECT PROPERTY: 4413 Highway 38 APPLICATIONS: Consent (CoA), Zoning By-law Amendment (Council)
6
Page 11 of 157
Application for Zoning By-law Amendment – 4413 Highway 38
Subject Lands & Immediate Context Area: +/- 109.62 hectares Uses:
- Single detached dwelling
- Unoccupied livestock facility
- Accessory buildings (sheds)
Application for Zoning By-law Amendment – 4413 Highway 38
7
Page 12 of 157
Surrounding Uses:
- NORTH: agricultural
- EAST: residential, agricultural
- SOUTH: residential, agricultural
- WEST: quarry, agricultural
Consent Proposed Severed Parcel:
- FRONTAGE: +/- 175.1 m (Quinn Rd W)
- AREA: +/- 3.94 ac Proposed Retained Parcel:
- FRONTAGE: +/- 158.6 m (Quinn Rd W), +/600.0 m (Hwy 38)
- AREA: +/- 269.68 ac
8
Page 13 of 157
Application for Zoning By-law Amendment – 4413 Highway 38
9
Page 14 of 157
Application for Zoning By-law Amendment – 4413 Highway 38
Policy Analysis
Planning Act
- Section 2 – Provincial Interest: ¬ protection of ecological systems, including natural areas, features and functions ¬ the protection of the agricultural resources of the Province ¬ the conservation and management of natural resources and the mineral resource base ¬ the adequate provision and efficient use of communication, transportation, sewage and water services and waste management systems ¬ the adequate provision of a full range of housing, including affordable housing ¬ the protection of public health and safety ¬ the appropriate location of growth and development
1 0
Page 15 of 157
Application for Zoning By-law Amendment – 4413 Highway 38
Policy Analysis
Provincial Planning Statement
- 2.2. Housing
- 2.5. and 2.6. Rural Areas/Lands
- 3.5. Land Use Compatibility
- 3.6. Sewage, Water and Stormwater
- 4.1. Natural Heritage ¬ The future residential development is anticipated to blend in with the rural landscape and will be serviced with individual on-site sewage and water services ¬ The proposal is compatible with the adjacent land uses ¬ A viable building envelope exists outside of the required setback from the watercourse
1 1
Page 16 of 157
Application for Zoning By-law Amendment – 4413 Highway 38
Policy Analysis
County of Frontenac OP
- 2.1.2. Mining and Mineral Aggregate Resources
- 3.3. Rural Lands
- 4.2. Servicing
- 7.1. Natural Environment
¬ The future residential development is anticipated to blend in with the rural landscape and will be serviced with individual on-site sewage and water services ¬ The proposal is compatible with the adjacent land uses ¬ A viable building envelope exists outside of the required setback from the watercourse
1 2
Page 17 of 157
Application for Zoning By-law Amendment – 4413 Highway 38
Policy Analysis
Township of South Frontenac OP
- 4.1. (current) / 5.1. (new) Natural Heritage
- 5.5. (current) / 4.6 (new) Mineral Aggregate
- 5.7. (current) / 4.2. (new) Rural Lands
- 6.10. (current) / 7.4. (new) Servicing
- 7.1. (current) / 9.3. (new) Consent Policies ¬ The future residential development is anticipated to blend in with the rural landscape and will be serviced with individual on-site sewage and water services ¬ The proposal is compatible with the adjacent land uses
Application for Zoning By-law Amendment – 4413 Highway 38
1 3
Page 18 of 157
¬ A viable building envelope exists outside of the required setback from the watercourse
Zoning 5.34.2.: Residential land uses may be permitted on lands between 300 metres (984.3 ft.) and 500 metres (1,640 ft.) of an existing or proposed quarry provided a minor variance or rezoning application is approved by the Township. Existing Zoning:
Rural ‘RU’
Proposed Zoning:
Special Rural ‘RU-XX’
- Rezone the proposed severed parcel to permit a single detached dwelling and accessory uses 230 metres from an existing quarry Page 19 of 157
Application for Zoning By-law Amendment – 4413 Highway 38
MDS Assessment
15
Page 20 of 157
Application for Zoning By-law Amendment – 4413 Highway 38
Land Use Compatibility Assessment ARA Site ID 2409 (Groenewegn Pit - O. Bettschen Quarry)
- LICENSE: Class ‘A’ (annual extraction up to 250,000 tonnes)
- AREA UNDER LICENSE: 16.5 ha
Application for Zoning By-law Amendment – 4413 Highway 38
16
Page 21 of 157
- The nearest point of extraction is over 300 metres away from the identified buildable area
- Traffic noise from Quinn Road West (60 km/h speed limit) acts as a “buffering effect”
- The quarry’s extraction operations occur during normal hours (Monday-Friday 6AM-5PM)
- Four (4) existing dwellings are located in closer proximity to the licensed area than the identified buildable area and have co-existed with the quarry with no known adverse effects
- The quarry’s berm and intervening vegetation provide buffering
Conclusion
- The proposal is appropriate notwithstanding the neighbouring quarry in accordance with existing intervening land uses and location of extraction area on-site
- The proposal is compatible with surrounding livestock facilities in accordance with OMAFRA Publication 853
- The proposal has regard for matters of provincial interest identified in the Planning Act and is consistent with the Provincial Planning Statement
- The proposal maintains the general intent and purpose of both the current and new Township of South Frontenac Official Plan and Township of South Frontenac Comprehensive Zoning By-law No. 2003-75, as amended
Application for Zoning By-law Amendment – 4413 Highway 38
17
Page 22 of 157
The proposed Zoning By-law Amendment constitutes good land use planning.
Department and Public Comments • Public Services confirmed the proposed lot would have a safe entrance location • Building Services expressed no immediate concerns regarding the installation of a sewage system on the proposed lot (to be determined through building permit process) • Cataraqui Conservation had no objection to the proposal • No public comments were received before this presentation was finalized Page 23 of 157
Next Steps • South Frontenac Council should receive comments from the public • A report with a recommendation will be brought to a future Council meeting
Page 24 of 157
Open Discussion 1. 2. 3. 4.
Applicant/agent permitted to address Council Questions from Council Members of the public permitted to address Council Council discussion
Page 25 of 157
Adjourn Public Meeting
Page 26 of 157
Page 27 of 157
To:
Council
From:
Director, Development Services
Date of Meeting:
Tuesday, December 9, 2025
Subject:
Public Meeting for Zoning By-law Amendment Application PL-ZBA-20250101, Scott (The Boulevard Group), 4413 Road 38
Report Number:
2025-163
Summary This report provides Council with information about Zoning By-law Amendment Application PL-ZBA-2025-0101 for the property municipally known as 4413 Road 38. If approved, the zoning on a portion of the subject property would be changed from Rural (RU) to a Rural special exception zone (RU-XX) that would allow a residential land use less than 300 metres from a licensed quarry. Consistent with Council’s Procedural By-law, Council will receive comments from the public on the application through the public meeting. Staff will bring a more detailed report considering applicable policy and public comments, as well as providing a recommendation to Council on this application at a future meeting. Recommendation This report is for information only. Background The subject property is situated beside a licensed quarry. The Zoning By-law does not allow new residential uses (e.g. new lot and/or new house) within 300 metres of a quarry, but they may be allowed on land between 300 metres and 500 metres. The purpose of the proposed by-law is to permit the creation of a new rural residential building lot which is partly within 300 metres of the neighbouring quarry. A future dwelling on the proposed severed lot would be more than 300 metres from the licensed extraction area of the quarry. The Township is in receipt of a consent application for a rural residential building lot. The proposed severed lot would be approximately 3.94 acres in area with 175 metres of frontage on Quinn Road West. The zoning by-law amendment must be considered first because the consent application currently does not comply with the zoning by-law. The draft by-law that was submitted with the application would change the zone in the area of the proposed lot from RU to RU-XX. www.southfrontenac.net South Frontenac is a welcoming and thriving rural community.
Township of South Frontenac Staff Report Number: 2025-163
Page 28 of 157
Under the Planning Act, a public meeting is required to be held to receive comments from the public on the proposed rezoning. The subject property is located on the west side of Road 38 and on the north side of Quinn Road West, approximately 750 metres from the Settlement Area of Harrowsmith. It is approximately 109.62 hectares in size. The property consists of parts of Lot 7 and 8 of Concession 3 in the former Township of Portland. The lands located within Lot 7 and 8 maintain separate assessment roll numbers but are merged under a single property identifier number (PIN). Existing development is concentrated to the east side of the subject property and consists of a single dwelling, unoccupied barn and two accessory buildings. The northern third of the subject property is densely vegetated, while the southern portion has multiple cleared areas used for agriculture. A seasonal watercourse enters through the southwestern corner and extends on a diagonal approximately 225m into the interior of the property. The abutting property to the west (3728 Wilton Road) contains an existing quarry, which operates under Aggregate Resources Act License ID 2409. The surrounding area consists of smaller rural residential lots and large rural landholdings. Application and Supporting Documents The application and supporting documents can be accessed through the Township’s CivicWeb Document Centre, https://southfrontenac.civicweb.net/filepro/documents/114028/
Planning Justification and Land Use Compatibility Report A Planning Justification and Land Use Compatibility Report (The Boulevard Group, October 2025) was submitted in support of the application. The report assessed the appropriateness of the proposed zoning by-law amendment in the context of the surrounding area as well as its conformity with the applicable policy and regulatory framework. The report reviewed the compatibility of the proposed lot in relation to the existing quarry in the area. The report concluded that the proposed lot would not result in any compatibility issues with the existing quarry that is not already addressed through operational practices and the regulatory framework governing the quarry. Department and Agency Comments Public Services confirmed that the proposed lot would have a safe entrance location. Building Services expressed no immediate concerns regarding the installation of a sewage system on the proposed severed lot. The details and location of a sewage system are typically determined through the building permit process. Cataraqui Conservation had no objection to the proposal. Public Comments No public comments were received before this report was finalized.
www.southfrontenac.net South Frontenac is a welcoming and thriving rural community.
Township of South Frontenac Staff Report Number: 2025-163
Page 29 of 157
Preliminary Planning Analysis The proposed zoning by-law amendment will need to be assessed against the applicable policies of the Provincial Planning Statement 2024, County of Frontenac Official Plan, and Township of South Frontenac Official Plan, as well as the provisions of Zoning By-law No. 2003-75, as amended. The Provincial Planning Statement (PPS) 2024 indicates that mineral aggregate resources shall be protected for long-term use (section 4.5). It also states that mineral aggregate operations shall be protected from development and activities that would preclude or hinder their expansion or continued use or which would be incompatible for reasons of public health, public safety or environmental impacts. The County of Frontenac Official Plan contains policies that are consistent with the PPS. It requires the Township to identify and protect all existing mineral aggregate operations from incompatible uses (section 2.1.2.2.4) The Township of South Frontenac Official Plan intends to protect, wherever possible and practical, sand and gravel resources and a reasonable amount of bedrock resources for aggregate extraction and ensure that the resources are utilized in accordance with property controls. The existing licensed quarry is designated “Mineral Extraction” and is zoned “Quarry B-2”. The Official Plan prohibits residential land uses within 300 metres of an existing quarry as a means of protecting mineral aggregates and existing quarries from incompatible land uses. The Official Plan also intends to prevent incompatible land uses less than 500 metres but more than 300 metres from an existing quarry. The 500 metres is an influence area, which is not meant to be a strict buffer or setback area in which development is prohibited, but rather, it is an area where impacts may occur or may be experienced, and development may occur subject to a form of technical assessment. These policies are implemented through the Zoning By-law. Section 5.34.1 prohibits residential land uses within 300 metres of an existing quarry. Section 5.34.2 of the Zoning By-law specifies that residential land uses may be permitted on lands between 300 metres and 500 metres of an existing quarry provided a minor variance or rezoning application is approved by the Township. The subject property abuts a licensed quarry. The owners proposed to sever a new lot in the southwest corner of the property. A portion of the proposed lot would be within 300 metres of the licensed quarry site to the west. The location of proposed residential development (e.g. dwelling) on the proposed lot would be more than 300 metres from the licensed area of the quarry. The Planning Justification and Land Use Compatibility Report (The Boulevard Group, October 2025) concluded that approval of the new lot will not result in any incompatibility that is not able to be addressed by the operational practices and the regulatory framework governing the quarry. It was noted that as the extractive operations of the quarry continue at a greater depth over time, nuisance-related impacts from noise, dust and vibration will gradually reduce at off-site sensitive receptors. Additionally, the report suggests that the www.southfrontenac.net South Frontenac is a welcoming and thriving rural community.
Township of South Frontenac Staff Report Number: 2025-163
Page 30 of 157
quarry license would recognize the existence of four dwellings located in closer proximity to the quarry, and place limitations on blasting and extraction activities from these existing residential lands, such that any future residential development on the proposed severed lot is correspondingly protected. It was determined that an Official Plan Amendment was not required as numbers in the Official Plan are not fixed or rigid, particularly related to mineral aggregate resource influence areas. However, a zoning by-law amendment is required because residential land uses are specifically prohibited within 300 metres of an existing quarry. The draft by-law submitted with the application proposes to permit residential land uses within 215 metres of the neighbouring quarry. It appears that this was determined by measuring the distance between the QB-2 Zone of the quarry and the “buildable area” on the proposed severed lot. Staff note that this distance should be measured from closest proposed property line to the quarry’s licensed area. Staff measurements using Frontenac Maps indicate that the proposed lot would be approximately 248 metres from the licensed area. Staff note that the proposed lot would meet other applicable policies including those related to minimum distance separation from livestock facilities. A detailed policy analysis will be provided in a subsequent report to Council following the public meeting. The report may include a by-law for consideration by Council. The content of a proposed by-law may be refined based on the detailed policy analysis and consideration of comments received at the public meeting. Financial Implications Not applicable Relationship to Strategic Plan ☒ Not applicable to this report. ☐ This initiative adheres to the following strategic pillars and directions of the 2023-2026 Strategic Plan. • •
Pillars: Choose an item. Action Item (If Applicable): Insert Text
Climate Considerations ☒ Not applicable to this report. ☐ This initiative supports climate change mitigation/adaption efforts in South Frontenac; and/or impacts the Township’s resilience to climate change. Notice/Consultation Notice of the Statutory Public Meeting was given pursuant to the requirements of the Planning Act, 20 days in advance of the Public Meeting. This included notice given: www.southfrontenac.net South Frontenac is a welcoming and thriving rural community.
Township of South Frontenac Staff Report Number: 2025-163
• • • •
by mail to every owner of land within 120 metres of the subject lands by posting notice signs on the subject lands by posting on the Township’s Public Notice webpage by email to prescribed persons and public bodies
Attachments Exhibit A – Proposed Site-Specific RU-XX Zone Approvals Prepared By: Noah Perron, Planner Submitted By:
Brad Wright, RPP, MCIP, AICP, PLE Director of Development Services Approved By:
Louise Fragnito, CGA, CPA Chief Administrative Officer
www.southfrontenac.net South Frontenac is a welcoming and thriving rural community.
Page 31 of 157
Page 32 of 157
BY-LAW NUMBER 2025-XX BEING A BY-LAW TO AMEND BY-LAW 2003-75, AS AMENDED, TO REZONE LANDS FROM RURAL (RU) TO RURAL SPECIAL EXCEPTION (RU-XX) ON LANDS DESCRIBED AS QUINN ROAD WEST, ASSESSMENT ROLL NUMBER 1029-080-010-15300, CON 3 PT LOT 8, DISTRICT OF PORTLAND: GREOGRY GRAY & LORI SCOTT Whereas pursuant to the provisions of Section 34 of the Planning Act, RSO 1990 as amended, the Council of a Municipality may enact by-laws regulating the use of land and the erection, location and use of buildings and structures thereon; Whereas By-law 2003-75 being the Zoning By-law regulates the use of land and the erection, location and use of buildings and structures within the Township of South Frontenac; Whereas the Council of the Corporation of the Township of South Frontenac considered all written and oral submissions received on this application, the effect of which helped Council make an informed decision; And that there be no further notice pursuant to Section 34 (17) of the Planning Act; Therefore be it resolved that the Council of the Corporation of the Township of South Frontenac hereby enacts as follows: 1.
THAT Schedule “A” to Zoning By-law Number 2003-75 as amended, is hereby further amended by changing the zoning from Rural (RU) to Rural Special Exception (RU-XX) for the lands shown on Schedule “1”.
FURTHER THAT Zoning By-law Number 2003-75 as amended is hereby further amended by adding a new section ‘RU-XX’ (QUINN ROAD WEST, ASSESSMENT ROLL NUMBER 1029-080-010-15300, CON 3 PT LOT 8, DISTRICT OF PORTLAND: GREOGRY GRAY & LORI SCOTT) immediately after the last Rural Special Exception section to read as follows: ‘RU-XX’ - (QUINN ROAD WEST, ASSESSMENT ROLL NUMBER 1029-080010-15300, CON 3 PT LOT 8, DISTRICT OF PORTLAND: GREOGRY GRAY & LORI SCOTT) Notwithstanding the provisions of Section 5.34 regarding the proximity of residential uses to pits and quarries, on lands zoned ‘RU-XX’ a single detached dwelling and accessory uses shall be permitted 215 metres from an existing quarry. All other provisions of this By-law shall apply.
THIS BY-LAW shall come into force in accordance with Section 34 of the Planning Act, 1990, as amended, either upon the date of passage or as otherwise provided by said Section 34. Given First and Second Readings: _________, _________, 2025. Given Third Readings and Passed: _________, _________, 2025.
Ron Vandewal, Mayor
James Thompson, Clerk
Page 33 of 157
Page 34 of 157
To:
Council
From:
Development Services Department
Date of Meeting:
December 9, 2025
Subject:
Willowbrook Subdivision Phase 1 - Deeming By-Law and Dedication of 0.3m Reserve
Report Number:
2025-164
Summary This report recommends that Council pass a by-law to deem Block 8 on Plan 13M105 (Willowbrook Subdivision Phase 1) not to be a lot in a plan of subdivision for the purpose of applying 50(3) of the Planning Act. The report also recommends that Council pass a by-law dedicating the 0.3 metre reserve that is Block 12 on Plan 13M105 as a public road. Recommendation That By-law 2025-77, attached to Report Number 2025-77, as Exhibit A, to deem the property described as Block 8, Plan 13M105, District of Storrington, Township of South Frontenac as not being in a plan of subdivision, be given first and second reading; and That By-law 2025-78 attached to Report Number 2025-78, as Exhibit B, to dedicate the 0.3 metre reserve that is Block 12 on Plan 13M105, be given first and second reading; and That By-law 2025-77and By-law 2025-78 be presented to Council for third reading. Background Willowbrook Subdivision is a residential subdivision in Inverary. The subdivision is being developed in two phases. The developer has requested the Township issue preliminary and final acceptance of the Phase 1 works. There are only a few outstanding items remaining before the Township can accept the works. One of those items requires Council to pass a deeming by-law. There is a large wetland on the west side of the subdivision. The wetland spans four properties. The wetland is known as Block 8 on Plan 13M105 within Phase 1. It was a condition of the draft plan of subdivision approval to have the wetland conveyed to an adjacent property owner. The intent was to keep the wetland intact and to minimize the number of owners. The subdivision agreement (Schedule J, clause 27) required the developer to convey Block 8 to the owner of the adjacent property (PIN: 362920158). The agreement also required a www.southfrontenac.net South Frontenac is a welcoming and thriving rural community.
Township of South Frontenac Staff Report Number: 2025-164
Page 35 of 157
deeming by-law be passed so that the two parcels would merge on title and not be separately conveyable. There is a 0.3 metre reserve on Summerside Drive between Phase 1 and Phase 2. The purpose of the reserve was to prevent direct access to the Phase 2 lands until certain conditions are met. The effect is to prohibit development. The developer has requested the Township to lift the 0.3 metre reserve on Summerside Drive between Phase 1 and Phase 2. They currently have a licence agreement to legally cross the reserve to prepare the land for development. Discussion Under the Planning Act, whole lots and blocks in a plan of subdivision are always legally able to be sold separately. A deeming by-law must be passed by Council deeming Block 8 on Plan 13M105 not to be in the subdivision so that the parcel can merge with the adjacent property (i.e., so they stick together) and the Parcel Identification Numbers (PINs) can be consolidated through the Land Registry Office. The effect is that the two parcels will become one parcel. Regarding the 0.3 metre reserve, staff have determined that it is now appropriate to dedicate the 0.3 metre reserve as a public highway. The Phase 2 subdivision was registered and the developer and Township entered into a subdivision agreement. The 0.3 metre reserve on Summerside Drive must be lifted to provide legal access to the subdivision lots so that building permits can be issued. The by-law calls for the dedication but not assumption of the reserve. Council will be asked to pass a separate by-law to assume the subdivision roads and the reserve block when the Township is ready to issue final acceptance of all the works in the subdivision. This usually happens after a majority of the lots are developed and road construction is completed. Financial Implications The cost of registration of the required documentation will be paid by the developer. Relationship to Strategic Plan ☒ Not applicable to this report. ☐ This initiative adheres to the following strategic pillars and directions of the 2023-2026 Strategic Plan. • •
Pillars: Choose an item. Action Item (If Applicable): Insert Text
Climate Considerations ☒ Not applicable to this report. ☐ This initiative supports climate change mitigation/adaption efforts in South Frontenac; and/or impacts the Township’s resilience to climate change. www.southfrontenac.net South Frontenac is a welcoming and thriving rural community.
Township of South Frontenac Staff Report Number: 2025-164
Page 36 of 157
Notice/Consultation These requests did not require statutory notice and/or circulation. Public Services is coordinating the required review for preliminary and final acceptance of the works associated with Phase 1. They have no concerns with dedicating the 0.3 metre reserve. The Clerk’s Office was consulted on dedicating the 0.3 metre reserve and the licence agreement. The developer and the adjacent landowner were notified that a deeming by-law would be considered by Council, in accordance with the terms of the subdivision agreement. Attachments Exhibit A – Deeming By-law 2025-77 Exhibit B – 0.3m Reserve Dedication By-law 2025-78 Exhibit C – Plan 13M105 Approvals Prepared By: Christine Woods RPP, MCIP, Manager of Planning Submitted By:
Brad Wright, RPP, MCIP, AICP, PLE Director of Development Services Approved By:
Louise Fragnito, CPA, CGA Chief Administrative Officer
www.southfrontenac.net South Frontenac is a welcoming and thriving rural community.
Page 37 of 157 Township of South Frontenac By-Law Number 2025-77 Page 1 of 1 By-Law Number 2025-77 Being a By-Law to deem part of Plan of Subdivision No. 13M105 not to be a registered plan of subdivision: Block 8, Plan 13M105, District of Storrington Whereas section 50(4) of the Planning Act R.S.O. 1990, c. P.13, authorizes Council to pass a by-law to designate any plan of subdivision, or part thereof that has been registered for eight years or more, to be deemed not to be a registered plan of subdivision for purposes of the part lot control provisions of section 50(3) of the Planning Act. Whereas Plan of Subdivision 13M105 has been registered for more than eight (8) years; and Whereas Council considers it appropriate and necessary that those parts of Plan 13M105 described in this by-law be deemed not to be a registered plan of subdivision to facilitate the merging of lands that will be utilized as one property and is developed as a single property for a period greater than eight years. Therefore be it resolved that the Council of the Corporation of the Township of South Frontenac hereby enacts as follows:
- THAT Block 8, Plan of Subdivision 13M105, District of Storrington is hereby deemed not to be a registered plan of subdivision for purposes of the part lot control provisions of subsection 50(3) of the Planning Act.
- That the developer of the subdivision shall pay all costs associated with the development, passage and registration of this By-law.
- That this By-law shall be registered in the proper Land Registry Office and the Municipality shall be provided with appropriate documentation that the registration has been completed within ten (10) business days of the date of registration;
- That passage of this By-law shall be deemed to include authorization to legal counsel to register same in the appropriate Land Registry Office without further written authorization;
- That this By-law shall come into effect when registered in the proper Land Registry Office. Given First and Second Readings: Tuesday, December 9, 2025 Given Third Reading and Passed: Tuesday, December 9, 2025
James Thompson, Clerk
Ron Vandewal, Mayor
Page 38 of 157 Township of South Frontenac By-Law Number 2025-78 Page 1 of 1 By-Law Number 2025-78 Being a By-Law to dedicate certain lands within the Township for Public Use; Plan 13M105 Whereas certain lands were convened to the Corporation of the Township of South Frontenac for the purpose of a 0.3 metre reserve; and Whereas pursuant to Section 27(1) of the Municipal Act, 2001, as amended, a municipality may pass by-laws in respect of a highway only if it has jurisdiction over the highway; and Whereas pursuant to Section 28(2) of the Municipal Act, 2001, as amended, a local municipality has jurisdiction over all road allowances, highways, streets and lanes shown on a registered plan of subdivision; and Whereas the dedication of the 0.3 metre reserve is required to allow access to a property; Therefore be it resolved that the Council of the Corporation of the Township of South Frontenac hereby enacts as follows:
- That the lands situated in the Township of South Frontenac, being Block 12 on Plan 13M105, being a 0.3 metre reserve, are hereby dedicated, but not assumed, as part of the road known as Summerside Drive.
- That the developer of the subdivision shall pay all costs associated with the development, passage, and registration of this By-law.
- That this By-law shall be registered in the proper Land Registry Office and the Municipality shall be provided with appropriate documentation that the registration has been completed within ten (10) business days of the date of registration;
- That passage of this By-law shall be deemed to include authorization to legal counsel to register same in the appropriate Land Registry Office without further written authorization;
- That passage of this By-law shall also be deemed to include authorization to legal counsel to delete the licence agreement regarding the 0.3 metre reserve from the title of PIN 36292-0319 without further written authorization; and
- That this By-law shall come into effect when registered in the Ontario Land Registry Office. Given First and Second Readings: Tuesday, December 9, 2025 Given Third Reading and Passed: Tuesday, December 9, 2025
James Thompson, Clerk
Ron Vandewal, Mayor
PLAN OF SUBDJVSJON
3 T1013) :MLLo?NggNg’?SSMN 5,3 4““ 5% ‘3: e e ween
as
0
LOTS 18 and 19, CONCESSION 2 Ge og’rap h’LC Township of Loughb 07'0th (Former
'
U'
j
E
l
REPRESENTATIVE FOR THE LAND REDISTRAR FOR THE LAND TITLES DIVISION 0F WNW“ (”a”)
of Stonington) To WNSHIP of SOUTH FRONTENAC Municipal
.
Page 39 of 157
PLAN 13111—105 ?i?np?‘éa‘éWigs]??? ri?a?‘fs?gw? ‘33)” 2%???’5‘.” Y1 9- 070’ max
OF
Township
THIS PLAN COMFRDIJISES
0)“
PART
PIN 36292—0304
COUNTY of FRONTE’NAC SCALE =
1:1500
SBA-nave:
50
HE HOPIaNS
100
ISOrnelreS
:9:
CHITTY LANDSURVEYDRSINC. -2016—
2 2 9 3 5
P I N SB
,
I
a"
.1“ s:
/ (we!)
0’“ 1n
I
“7 (1.301“
5
5 0 1 "
wail», a
5‘ 09
,‘u)
J “1.20”
.\
I
ssu
E.
.
\I.
S
p
i“-
“151165“\
4%44/ 41?}
3‘ S
/
V \4
ssn (I566)
7k? 1?\
"
.o I
‘
:“
‘\
‘5‘
E 3
“’- E
:1 0 E p
i
2
..
:U
C0
I
‘
.
L O 2
' 2
*5
I
J
‘\
7:77 8149\909 \
4
s?
2
\
\
“x‘
\
‘
7L?
‘
0.; a a
‘9 ’42., ’9
a
\sa
nose)
0.5;
?
“
/
\
.3.
=
In
a
2
n
:0
e
E E m
m (mu)
[4,
NO.
'
‘\ ‘Q8914 ‘\
31.9mm? a, ”lay,
ulo
0
\
4 44/11
m55
m‘.
l
5;
P (1m)
gé
m
E (a
10
p
re
5
5“
BLOCK 3
‘o‘
a_
\k
2
. ‘1
P‘ q
5
’
7~\ “4%.”, ‘45 ’t’rgz”
2r:
|
:5
z
79‘ \Jl‘i’?ttto Far 4S
°.§
1
.3:
“’
‘7 a
\ ‘
.
a
b
2
.-
u«.2
_\
2
0
.’-. \
Ea
§
’U
~
7
909?k?
\
“
‘
2
(rec)
,
D.
‘°
a ‘9
w
3._
b
a 5‘
E
2
NU
A,
S
I
- s
(Incl)
“’
(“a“)
.E
‘
.
“(Mm . N15.55201 \‘Z’L
.5.
W,
6-0630”?
N7
”5.509
)
l
’
(1m)
”
”.5193 /
H)
I
7 9
h
2.1
a
a;
”I
h:-
|
g
Q)
~.
a:
‘
Q
3
(\3
Co
3
3
g E ,_.
O]
I
‘5-p
:x p“ l
..
535
En‘ m
‘0
l S!
(IMO)
s
5522 33.3 :3." 5s 59
. .Nas'15’l5’E 83.590
um)
-r
an (ud1)
I
.
'
10.!
t u) (gm—mm
[I o.
.3
N a: Q n
5’
I?
5P
\‘0
i’ y?
P
I
N
z
mm
9:
BLOCK 8
1
| |
'
L O 2
'
7 8 '
I
5.i E:9.5s a
3’
E
a
u
2‘
E 3
u a a o. m l [E
I…
u:-
as :9 3.
‘U
L;
1
(“20)
(m)
55.;
0!
Nortnwux Dov-Mr Magnum-8625
in
($7
PART aszsz-mm
to
;
5
PART 3
w“ .
m
(5’: ,,
é 35192—0065 t?
le
pm 58292—0066
HIV
{lwgggglo’w k MI
|
PART 2
1
H
75.72:
-*-’
‘ H
1312—862
PLAN
1“
I
D
0’” _ 1””
'
Z ‘1: “
. ' NBZPJ?éao?)
_..
“are? (?z??S-U
I
(x;
D
co 01
PIN sang—um
ALWGM‘?
Road
..
.r Concesswns “5?“?
Between
'
*1-
S I O N C 0 N C E S ”‘5
or COUNTY ROAD No,
SIB
ssm
RB RP
5"” u)
(1556) (14:27) (1120)
To
‘“surrmmr
'
”VENUE”
mi 3:?“an,
'
Rack Rock
'
NULTIPLnNc
[ran
DISTANCES
piiiim?‘i’gc ”33;“;
Past
“M“
'
Ileana-2d
.
0
M 5m. mpg,“ 0mm].
1,
Jams
'
gm.“
A. Him-s
APPRoVED
__ (ILLS.
mmpb.”
Chan]
Land
Sway”, _
L1,; —
my
0L3.
yr
“‘Y
”’5
\
$11 my
PLAN ARE IN METRES
~
1.7 m
'
.
a a] t.
“ms
PRESIDENT. 1059823 aNTARIa LTD. (I HAVE Tm: Amok!” To Emu THE caRPORAmN)
. 2,
AIIINI
TM SURVEY um
Nwembv‘.
may ran—2119.7 5ERIVL‘D . “WM” U”! ZONE II, F"
OBSERVED REFERENCE POINTS (DRPS) BY caNVENrIaNAL TOTAL STATION oDSEn ATIaNS 7" Mm"
1:12;” :fgff’gmus 2121553110232;
I
'
h
m. .A. URP
_
B
_
Nanmmc
EAerNc
“mama
”2257.54
497552159
352I49.25
cooRDINATES CANNOT. IN THEMSELVES BE USED To RE-E’SI‘ABLISIICORNERS 0R BOUNDARIESSHO’N ON THIS PLAN.
an
M. 8rd
day
of
f?/ INC. LAND SURVtYDRSr ./ I ./ //"
CHITT)’
'
. FEBRUARY
M
PDINT ID
campL-kd
2015
HOPKINS
”“5
cammflo”
”‘5’
“MT.
_
1, TM: Sunny and Plan a.” Eon-IE! and (n act-Dram! mm. In. SURVEYS ACT. Nu SURVtYORS ACT and MM LAND TITLES ACT and HI! REGULATIONS mad. undar Hum.
DRIVE
TRDNTENACAS PUBLIC mummy. ‘7’
DN THIS
,
CERT,"
, CLERK
050mm;
SNDNN
,SURVEYOR 5’ CERTIFICATE:
THE
I2
:1
JAN Em:
INSTRUCTIONS.
“T”
3
8
5 2 r: :1
or
'
,
(55)
51
THAT:
- THE srnzgrs m ”away or THE TDNNSNIP or SHUT}! ””5“
5:.
W,
INCLUSIVE, ELocRS D AND 11. RESERVES
- L073 1 To 7, Earn NANELY ELDL’KS 9, 10 AND 12 AND STREETS Bum: NlLLonIRaoIr AND SUNNERSIDE DRIVE HAVE DSEN LAID 007 IN AccaRDANcE
va
UNDER
PLANNIND ACT ON THIS
[m
01.5;
O’NER’S CERTIFICATE THIS IS TO CERT!"
NAS
or 0.9997519
BY THE EDUEINED SCALE FACTOR AND caaRDINATES
—
THIS TINAI. PLAN or SUEDIVISIDN Is
Pia-n ?lfhgf c 1/ rd
cLocImSE
AND CAN BE CONVERTED To PEET E)’ DMDING BY 0.3045
Enr
'
or 1-25'00’
DISTANCES ARE DRDUNDAND cAN DE CONVERTED Ta GRID BY
?g 5::(mum)
THE NORTHWESTERLY LIMIT
HAVINI: A DEARIND or (CSRs) (199M) DESIDNATED
FOR HEARING DDUPARISDNS.A RaTAI’IaN APPLIED Ta BEARINGS aN IaR—ISDDD
Surv-v MDnum-nl u ml
Sunvl
Standard Sher; Standard
'
$3) :. (“’22)
”I": Planted Found
'
- mass
UTII zaNE
AS ‘REEERENEE BEARINS’.
HEREoN
S Fun“
ARE UTII GRID. DERIVED may to PER Ian—21193
DEARINcS
Nat’ns’sa’E
LEGEND’-D— dmotas -l-
. (Not In Scale)
Detml
31.56:” N86'47’l 1 (IAN—21:91:14)
'
”’5
“’
Hm
I
0 L5
c”,
‘
/ an.»
W
E:
Dr
metal
Dy-
PI-n
Dy: Pm:
LAND SURVEYORS INC. CHM-TY Ontano Land Surveyors
HOPIHNS
HCLS
www. hup k.msc h.lny.cum
534—535 NORRIS comer KINGSTON.ONTARIO INF-239
$23,255, f: (1533)
PROJECT Na . 2012—266-2 LOT 15 I: :9. CONCESSION 2 TaNNSHIP or LDUDNDoRoUcII
Page 40 of 157
To:
Council
From:
Office of the Chief Administrative Officer
Date of Meeting:
December 9, 2025
Subject:
Build Canada Homes Application
Report Number:
2025-171
Summary The purpose of this report is to seek Council’s endorsement of an application for funding and financing under the new Build Canada Homes program for the Verona Housing project. Recommendation That Council endorse the Build Canada Homes Application in the amount of $21 million, including a capital grant contribution of $6 million and a repayable loan of $15 million. That the CAO be authorized to revise the authorized application amount while discussing proposed terms within 5% of the approved amount. That the final terms of any Build Canada Homes successful conditional approvals be brought back for Council endorsement. Background On November 26, 2025, the Build Canada Homes (BCH) investment policy framework was released. The program is funded by the Government of Canada and replaces programs that were previously available through CMHC. As reference in their announcement from November 2025: “The framework outlines the agency’s priorities, investment principles, and eligibility criteria—setting the foundation for a new, flexible, and outcome-driven approach to housing delivery—that will deliver on affordable housing in communities across the country”. The focus of the program is to prioritize projects that are: -Ready to build: Construction to begin within 12 months -Affordability: affordability that meets local needs and creates capacity for non-profit housing. Build Canada Homes defines affordability as:
- Housing is affordable when it costs no more than 30% of a household’s before-tax income, based on the median income in the local area. This approach reflects the realities of different communities and household types across Canada. -Innovation & Speed: Leverage modern construction methods -Strong Partnerships: Collaborative projects www.southfrontenac.net South Frontenac is a welcoming and thriving rural community.
Township of South Frontenac Staff Report Number: 2025-171
Page 41 of 157
- Made in Canada: Canadian materials to strengthen public supply chains and support local labour. Discussion/Analysis One of the next steps in the Verona Housing project is to apply for apply for capital funding including financing. Lindsay Blair, Executive Director of 2B Development who is our consultant on the project has fully reviewed the investment policy framework and application requirements. The Build Canada homes portal recently opened for application submissions. Since the change in government, access to project funding has been limited, and as a result, there will be a surge in applications to BCH. We are seeking approval to apply to the BCH portal in December 2025 so that the project can be submitted and remain in line for funding. 2B Developments will prepare the application on behalf of the Township with final review by the CAO prior to submission. The requested capital funding is for $21 million with a capital contribution of $6 million (grant) and a repayable loan of $15 million. This information is based on our current proforma with a total project cost of $29.5 million for the construction based on 90 units to be constructed on Verona Street with two apartment buildings and 4 blocks of townhomes. Financial Implications The Build Canada Homes program is the preferred choice for the financing and funding of 21 million out of the 29.5 million project. The remainder of the funding is coming partially from Township funds $467,800 (prior land acquisition and committed budget to 2025) as well as confirmed and pending conditional grants. Should the Township be unsuccessful in this application, other options remain available such as multiple programs (in order of preference) under CMHC, Infrastructure Ontario funding as well as a mortgage through a financial institution. Relationship to Strategic Plans ☐ Not applicable to this report. ☒ This initiative adheres to the following guiding principle of the 2023-2026 Strategic Plan. •
Priority: Community
Notice/Consultation Lindsay Blair, Executive Director 2B Developments Approvals Approved By:
Louise Fragnito, CPA CGA, Chief Administrative Officer www.southfrontenac.net South Frontenac is a welcoming and thriving rural community.
Page 42 of 157
To:
Recreation & Leisure Services Advisory Committee
From:
Director, Public Services
Date of Meeting:
November 27, 2025
Subject:
Summer Program Registration Model Updates
Report Number:
2025-014
Summary This report seeks approval from the Recreation and Leisure Services Advisory Committee for proposed changes to the summer program registration model. Recommendation That the Recreation and Leisure Services Advisory Committee recommend that Council support the proposed changes to the summer program registration model, as outlined in Recreation and Leisure Services Advisory Committee Report Number 2025-014. Background At the November 2024 Recreation and Leisure Services Advisory Committee meeting, the Committee approved a revised registration format as per 2024-013. Despite these changes, demand for summer programs continues to exceed available capacity. Staff received feedback from parents and guardians expressing frustration that some children were able to attend camp for most of the summer, while others were unable to secure any weeks at all. In response to this feedback, and following a review of practices in comparable municipalities, staff are recommending the implementation of a four-week participation cap per child for the summer program season. Discussion/Analysis As in previous years, summer programs for the 2025 season reached capacity within minutes of registration opening. While parents and community members acknowledged and appreciated efforts to ensure fair access for residents, concerns remained that many children were still missing out on camp opportunities. To address this, staff recommend instituting a four-week cap limit on the number of weeks each camper is eligible to attend. This approach allows participants to enjoy up to half of the summer at camp while more equitably distributed program spaces among children. Staff also note that the Xplore Recreation registration software uses GIS integration for address verification. However, users must enter “South Frontenac” as the municipality in www.southfrontenac.net South Frontenac is a welcoming and thriving rural community.
Township of South Frontenac Staff Report – 2025-014
Page 43 of 157
the address field rather than their specific village or hamlet. This requirement contributed to confusion during the 2025 registration period, as most residents naturally identify their community by its local name. This limitation will continue to affect the registration process, and staff will develop and implement a strategic public communication plan to reduce confusion and prevent inadvertent misclassification of residency status. All other changes to the registration model that was approved in November 2024 will remain in place. Financial Implications None. Relationship to Strategic Plans ☐ Not applicable to this report. ☒ This initiative adheres to the following guiding principle of the 2023-2026 Strategic Plan. •
Priority: Community
Climate Considerations ☒ Not applicable to this report. ☐ This initiative supports climate change mitigation/adaption efforts in South Frontenac; and/or impacts the Township’s resilience to climate change. Notice/Consultation None. Approvals Prepared By: Amanda Pantrey, Recreation and Events Coordinator Submitted By:
Tim Laprade, Manager of Recreation and Facilities Approved By:
Kyle Bolton, Director of Public Services
www.southfrontenac.net South Frontenac is a welcoming and thriving rural community.
Page 44 of 157
To:
Council
From:
Director of Finance & Treasurer
Date of Meeting:
December 9, 2025
Subject:
2026 Draft Capital Budget
Report Number:
2025-0169
Summary The annual budget process tables the draft budget in two sections, capital and operating. This report provides Council the preliminary draft capital budget for the 2026 fiscal year. Recommendation This report is for information purposes only. Discussion/Analysis The capital budget is concentrated on long-term investments and improvements within the Township. Exhibit B summarizes the complete draft 2026 capital budget and includes detailed sheets for each capital project proposal. Capital budget submissions are prepared and reviewed based on Council’s established strategic priorities, community engagement and targets established within the Long-Range Financial Plan. The capital budget is brought forward to Council in December to provide time for a comprehensive review and discussion on the proposed capital projects. The proposed combined operating and capital budget is scheduled to be received by Council and tabled publicly on January 13, 2026. A full day budget deliberation is scheduled for January 22, 2026. Financial Implications Not applicable to this report. Relationship to Strategic Plan ☐ Not applicable to this report. ☒ This initiative adheres to the following strategic pillars and directions of the 2023-2026 Strategic Plan. www.southfrontenac.net South Frontenac is a welcoming and thriving rural community.
Township of South Frontenac Staff Report Number - 2025-0169
• •
Page 45 of 157
Pillar: Sustainable Long-Term Prosperity Action Item (If Applicable): Insert Text
Climate Considerations ☒ Not applicable to this report. ☐ This initiative supports climate change mitigation/adaption efforts in South Frontenac; and/or impacts the Township’s resilience to climate change. Attachments Exhibit A – 2026 Draft Capital Budget Presentation Exhibit B – 2026 Draft Capital Budget and detailed sheets Approvals Submitted By:
Stephanie Kuca, Director of Finance & Treasurer Approved By:
Louise Fragnito, Chief Administrative Officer
www.southfrontenac.net South Frontenac is a welcoming and thriving rural community.
2026 Capital Budget Overview Council December 9, 2025 Page 46 of 157
Introduction
The Capital Budget is one component of the overall budget process which focuses on major cost items for each area of the Township’s infrastructure, assets or studies which support the delivery of services to the community or helps support future capital investment decisions.
The Capital Budget is a key tool in the investment required to achieve our strategic priorities
Page 47 of 157
2026 Capital Budget • The draft capital budget represents proposed capital budget items received from department heads, vetted by the Treasurer and CAO. • It incorporates input from the Township’s strategic plan, committees and Council. Many proposed items are driven by established replacement schedules which are funded by defined reserves (e.g. Equipment Reserve). • Staff review the proposed items taking consideration for the impact to the tax levy and available reserve funds. • Funding sources will be shown when the full budget is reviewed. Sources of revenue to pay for the Capital budget include: • Taxation • Reserves • Grants including
• Ontario Community Investment Funding (OCIF) • CCBF from the Province and the County(Formerly Gas Tax)
Page 48 of 157
• Development Charges • Parkland Reserves • Confirmed one-time grants such as HEWSF, CMHC & FCM (Verona Housing) and CSRIF (Centennial Park)
2026 Capital Budget • The capital budget sheets provide details on the description of a project, its rationale, full forecasted project costs, any actuals to date along with its funding breakdown. • Carry forward capital projects that were approved in prior years, but are not yet completed are not listed in the 2026 budget, except for multiyear projects requiring funding in 2026. These projects are identified as pre-approved in the summary project list. • The items presented in the 2026 Capital Budget are in line with the targeted annual capital budget as set out in the Township’s 10 year long range financial plan (LRFP) previously reviewed with Council. Page 49 of 157
Corporate Services Financial Software Replacement
$250,000
Cemetery Site Plans
$10,000
Asset Management Plan (Levels of Service)
$50,000
Emergency Management Digital Road Signs
$100,000
Verona Housing Project
$15,576,162
Page 50 of 157
Fire Department Fleet and Equipment Hose and Appliances
$25,000
Trailer replacement
$15,000
Radio Tower Equipment Upgrade
$75,000
Wildland Equipment for Wildland Units
$36,000
Mobile Gear Racks
$21,000
Wildland Unit ATV side by side with tracks
$61,500
Page 51 of 157
Public Services Fleet Boat Replacement
$15,000
Water Tank Replacement
$50,000
Tandem Plow Truck Replacement
$435,000
Page 52 of 157
Public Services Linear Infrastructure Road 38 Design and Construction (Kingston Rd to Murton Road)
$1,485,000
Murvale Creek Culvert (B12) Reconstruction Westport Road
$625,000 $139,500
Buck Lake Culvert (OSIM) Design
$17,000
Rutledge Road Reconstruction Desert Lake Road Reconstruction
$4,550,000 $1,180,000
Round Lake Road Reconstruction Keeley Road Reconstruction
$362,000 $328,000
Surface Treatment (LCB) Preservation (listing on next slide)
$1,000,000 $85,000
Gravel Road Reconstruction Program 2026
$340,000
Arterial Road Culvert Replacement Program 2026
$50,000
Page 53 of 157
Pre-Engineering Roads 2027
Page 54 of 157
Public Services Water System Water Tower Rehabilitation - Design and Tender
$64,500
Sydenham Water Treatment Plant - GAC Renewal
$12,000
Sydenham Water System – Enterprise Asset Management System
$9,500
Solid Waste Green Bay WDS - Slope Stability Review
$10,000
Page 55 of 157
Public Services Facilities $95,000
Portland Garage Water Well
$25,000
Bedford Garage Heating System Replacement
$55,000
Portland Garage Overhead Hoist
$6,000
Facility & Parks Flagpoles
$20,000
Station 1 – Siteworks
$48,000
Station 2 – Backup Generator
$25,000
Station 3 – HVAC and Interior Repairs Station 4 – Exterior lighting
$25,000 $6,000
Station 7 – HVAC and Siteworks
$30,200
Page 56 of 157
Bedford Garage Site Works
Public Services Recreation Centennial Park Accessible/Inclusive Play Structures
$100,000
Centennial Park - New Accessible Washrooms Design and Build
$550,000
Sydenham Point Canteen Renovation
$40,000
Playground Rehabilitation
$5,500
Bellrock Mill Fencing and Site Work
$55,000
Sydenham Point Beach Rehabilitation
$25,000
Page 57 of 157
Development Services SUV replacement
$51,000
CityView Portal update
$50,000
Digitization of building permit records
$55,000
Page 58 of 157
List of deferred items Public Services
Fleet
Zero Turn Mower Replacement
$30,000
Public Services
Fleet
Two (2) 1-Ton Truck Replacements
$230,000
Public Services
Fleet
Rubber Tire Excavator Replacement
$550,000
Public Services
Facilities
Liquid Storage Tanks
$75,000
Public Services
Facilities
Storrington Centre Emergency Backup Generator
$100,000
Public Services
Facilities
Princess Anne Gravel Parking Lot and Walkway
$70,000
Fire Department Equipment
Wildland Unit ATV side by side
$55,000
Public Services
Recreation
Bleacher Replacements
$58,000
Public Services
Roads & Bridges
Bedford Mills Bridge Rehabilitation
$870,300
Public Services
Roads & Bridges
Pre-Engineering Bridge 2027
$85,000 Page 59 of 157
Questions?
Page 60 of 157
Township of South Frontenac 2026 Draft Capital Budget
Detailed Sheet Project # Project page #
1 2 3 4 5
6 7 8 9 10 11
22-06 26-01 26-02 26-03 26-87
25-12 26-11 26-12 26-14 26-16 26-18
2026 PreApproved
CORPORATE SERVICES Verona Housing Project Emergency Management Digital Road Signs Financial Software Replacement Asset management Plan - Levels of Service Cemetery Site Plans TOTAL CORPORATE SERVICES
YES YES
23-56 25-34 24-41B 25-36 26-31 26-32 26-33 26-34 26-35 26-36 26-37 26-40
Exhibit B - 2025-0169
YES YES YES YES
2027 Budget
Notes
12,635,402
50,000
15,000 21,000 61,500 36,000 75,000 25,000 233,500
0
0
15,000 50,000 435,000 500,000
0
1,485,000 625,000 139,500 17,000 4,550,000 1,180,000 362,000 328,000 1,000,000 85,000 340,000 50,000 10,161,500
0
3,766,650 831,000 1,362,500 35,000
5,995,150
12,635,402 Grant and Financing Applied for grant - 50% Community Emergency Preparedness Grant
Page 61 of 157
15 16 17 18 19 20 21 22 23 25 26 27
26-21 26-22 26-25
2026 Budget
15,576,162 100,000 250,000 50,000 10,000 15,986,162
50,000
TOTAL FIRE
12 13 14
859,587
859,587
FIRE ATV with Trailer Replacement x2 Mobile Gear Racks Wildland Unit ATV side by side with tracks Wildland Equipment for Wildland Units Radio Tower Equipment Upgrade Hoses and Appliances PUBLIC SERVICES FLEET Boat Replacement Water Tank Replacement Tandem Plow Truck Replacement subtotal - Fleet ROADS INFRASTRUCTURE Road 38 Design and Construction (Kingston Rd to Murton Road) Murvale Creek Culvert (B12) Reconstruction Westport Road Buck Lake Culvert (OSIM) Design Rutledge Road Reconstruction Desert Lake Road Reconstruction Round Lake Road Reconstruction Keeley Road Reconstruction Surface Treatment (LCB) Preservation Pre-Engineering Roads 2027 Gravel Road Reconstruction Program 2026 Arterial Road Culvert Replacement Program 2026 subtotal - Roads Infrastructure
Previous Year Budget Approved towards Project
Township of South Frontenac 2026 Draft Capital Budget
Detailed Sheet Project # Project page #
28 29 30
31
32 33 34 35 36 37 38 39 40 41
42 43 44 45 46 47
48 49 50
26-66 26-67 26-68
26-71
25-52 26-51 26-52 26-53 26-55 26-62 26-63 26-64 26-65 26-86
24-56 26-79 26-54 26-59 26-76 26-77
26-27 26-81 26-82
SYDENHAM WATER Water Tower Rehabilitation - Design and Tender Sydenham Water Treatment Plant - GAC Renewal Sydenham Water - Enterprise Asset Management System subtotal - Sydenham Water SOLID WASTE Green Bay WDS - Slope Stability Review subtotal - Solid Waste FACILITIES Bedford Garage Site Works Portland Garage Water Well Bedford Garage Heating System Replacement Portland Garage Overhead Hoist Facility & Parks Flagpoles Station 1 – Siteworks Station 2 – Backup Generator Station 3 -HVAC and Interior Repairs Station 4 – Exterior lighting Station 7 – HVAC and Siteworks subtotal - Facilities RECREATION Centennial Park - New Accessible Washrooms Design and Build Centennial Park Accessible/Inclusive Play Structures Sydenham Point Canteen Renovation Playground Rehabilitation - Inverary Playground Bellrock Mill Fencing and Site Work Sydenham Point Beach Rehabilitation subtotal - Recreation TOTAL PUBLIC SERVICES DEVELOPMENT SERVICES SUV replacement CityView Portal update Digitization of building permit records TOTAL DEVELOPMENT SERVICES Total
YES
Previous Year Budget Approved towards Project
2027 Budget
Notes
0
64,500 12,000 9,500 86,000
241,000
0
10,000 10,000
0
95,000 25,000 55,000 6,000 20,000 48,000 25,000 25,000 6,000 30,200 335,200
0
64,100
64,100 YES YES
2026 Budget
180,000
241,000
180,000 6,239,250
550,000 100,000 40,000 5,500 55,000 25,000 775,500 11,868,200
Community Sport and Recreation Infrastructure Fund Grant Community Sport and Recreation Infrastructure Fund Grant
0 241,000
0 7,148,837
51,000 50,000 55,000 156,000 28,243,862
0 12,876,402
Page 62 of 157
Exhibit B - 2025-0169
2026 PreApproved
Capital Project Detail Sheet Project Information Project Name: Verona Housing Project
Type of Project: Other
Project Number: 22-06
Basis for Activity: Service Level Change
Department: 1210 - CAO
Relationship to Strategic Plan: Priority #3 - People and Partnerships
Description: The Verona Housing project consists of the development of two parcels of land on Verona Street that the Township purchased in 2020. The project is geared towards providing affordable and seniors housing with an estimate of 90 units with a mix of seniors, affordable and market rents. The construction would see the use of communal services to providing the servicing for both parcels with 2 apartment building on the west side of Verona street and row housing on the east parcel. Construction is anticipated to take place in 2026 and 2027. Project Management for the project was awarded in 2024 to 2B Developments under report 2024-057, architectural services to RAW Design under report 2024-204 and continued EA work in relation to the servicing to JL Richards under report 2024-209
Rationale: Through the Verona Master Plan developed in 2022, a need was identified for housing as well as defining the size and scale of developments with consideration for new housing to incorporate compatible heights, massing, aesthetics, and proper separations from existing properties. Confirmed grants to date: County $339,180 FCM $280,000 CMHC Seed $20,900 OPHI/COCHI (City of Kingston) $1,400,000 HEWSF $3,212,137 Pending grant/financing decisions: CHIF $2,226,495 CMHC Innovation Fund Build $3,150,000 Build Canada Homes $21 million (financing and non-repayable loan)
Staff Contact: Louise Fragnito (lfragnito)
Project Finances
Actuals Description 55330 - Consultant Total
Expensed to Current Year Expenses / Expenditure
Budget Total Project
Prior Approved
2026
2027
2028
2029
2030
426,830
29,073,151
859,587
15,576,162
12,637,402
0
0
0
426,830
29,073,151
859,587
15,576,162
12,637,402
0
0
0
Total Project Costs Breakdown
Page 63 of 157
1
Land Costs 262,500 Soft Costs 3,537,804 Hard Costs 22,550,000 Contingencies and taxes 3,149,696 Total 29,500,000 *Variance in this table and Budget above is due to land purchase and separate project for initial phase 1/2 of EA study
Capital Project Detail Sheet Project Information Project Name: Portable Digital Mobile Road Signs - Five (5)
Type of Project: Other
Project Number: 26-01
Basis for Activity: Other
Department: 2300 - Emergency Management
Relationship to Strategic Plan: Priority #3 - People and Partnerships
Description: Purchase of five (5) Potable Digital Roads Signs - $20,000 per sign
Rationale: The purchase of five (5) portable digital mobile road signs will enable staff to provide residents with important / critical up to date information regarding the status of fire bans or other emergency situations. These mobile road signs will provide communication flexibility as they can be positioned throughout numerous locations, including main traffic corridors. Current mobile road signs are already heavily used for community events and roads updates such as construction. Staff have applied to the community emergency preparedness grant seeking $50,000 towards the cost of these mobile road signs.
Staff Contact: James Thompson (jthompson)
Project Finances
Actuals Description 53310 - Materials
Expensed to Current Year Expenses / Expenditure
Total 41500 - Grnts-Prov Total
Budget
Revenues / Funding Source
Total Project
Prior Approved
2026
2027
2028
2029
2030
0
100,000
0
100,000
0
0
0
0
0
100,000
0
100,000
0
0
0
0
0
50,000
0
50,000
0
0
0
0
0
50,000
0
50,000
0
0
0
0
Page 64 of 157
2
Capital Project Detail Sheet Project Information Project Name: Financial Software Replacement
Type of Project: Software & Support
Project Number: 26-02
Basis for Activity: Other
Department: 1275 - Corporate Services
Relationship to Strategic Plan: Priority #1 - Sustainable Long-Term Prosperity
Description: Purchase of financial system software and resources to implement full system migration.
Rationale: Microsoft Dynamics Great Plains announced its end of life during 2025. This software is currently used for all accounting services including property taxation, payroll, accounts payable, receivables. Microsoft will stop supporting this software by the end of 2028. A new system must be acquired and a full system data migration needed to continue financial operations.
Staff Contact: Stephanie Kuca (skuca)
Project Finances
Actuals Description 80100 - Equipment Total
Budget
Expensed to Current Year Expenses / Expenditure
Total Project
Prior Approved
2026
2027
2028
2029
2030
0
250,000
0
250,000
0
0
0
0
0
250,000
0
250,000
0
0
0
0
Page 65 of 157
3
Capital Project Detail Sheet Project Information Project Name: Asset Management Plan – Levels of Service
Type of Project: Other
Project Number: 26-03
Basis for Activity: Other
Department: 1275 - Corporate Services
Relationship to Strategic Plan: Priority #1 - Sustainable Long-Term Prosperity
Description: Asset Management Plan – Levels of Service as required under Ontario Regulation 588/17.
Rationale: Prepare Asset Management Plan - Levels of Service to achieve compliance with Ontario Regulation 588/17 which was due July 1, 2025.
Staff Contact: Stephanie Kuca (skuca)
Project Finances
Actuals Description 55290 - Contracted Services Expenses / Expenditure Total
Budget
Expensed to Current Year
Total Project
Prior Approved
2026
2027
2028
2029
2030
0
50,000
0
50,000
0
0
0
0
0
50,000
0
50,000
0
0
0
0
Page 66 of 157
4
Capital Project Detail Sheet Project Information Project Name: Cemetery Site Plans
Type of Project: Plans/Studies
Project Number: 26-87
Basis for Activity: Service Level Change
Department: 7000 - Cemeteries
Relationship to Strategic Plan: Priority #1 - Sustainable Long-Term Prosperity
Description: Cemetery site plan designs for future columbarium walls.
Rationale: Design plans are required to determine feasibility and opportunity for future columbarium walls.
Staff Contact: James Thompson (jthompson)
Project Finances
Actuals Description 55330 - Consultant Total
Budget
Expensed to Current Year Expenses / Expenditure
Total Project
Prior Approved
2026
2027
2028
2029
2030
0
10,000
0
10,000
0
0
0
0
0
10,000
0
10,000
0
0
0
0
Page 67 of 157
5
Capital Project Detail Sheet Project Information Project Name: Replacement of Two (2) ATV’s and Trailers
Type of Project: Light Weight
Project Number: 25-12
Basis for Activity: Asset Renewal
Department: 2100 - Fire
Relationship to Strategic Plan: Priority #2 - Municipal Service Excellence
Description: 2026 budget is for additional funds to finalize project for purchase of 1 enclosed trailer.
Rationale: Scope of project amended to enclosed trailers in order to have wildland equipment on trailer.
Original 2025 scope was 2 ATVs and trailers (open).
Staff Contact: Del Blakney (dblakney)
Project Finances
Actuals Description 80105 - Fleet Total
Expensed to Current Year Expenses / Expenditure
Budget Total Project
Prior Approved
2026
2027
2028
2029
2030
46,655
65,000
50,000
15,000
0
0
0
0
46,655
65,000
50,000
15,000
0
0
0
0
Page 68 of 157
6
Capital Project Detail Sheet Project Information Project Name: Mobile Gear Racks
Type of Project: Equipment
Project Number: 26-11
Basis for Activity: Other
Department: 2100 - Fire
Relationship to Strategic Plan: Priority #2 - Municipal Service Excellence
Description: Mobile Gear Racks for station 2
Rationale: Station 2 and 4 are the last two stations. Stations 1,3,5,6,7,8 have been completed.
Staff Contact: Del Blakney (dblakney)
Project Finances
Actuals Description 80100 - Equipment Total
Budget
Expensed to Current Year Expenses / Expenditure
Total Project
Prior Approved
2026
2027
2028
2029
2030
0
21,000
0
21,000
0
0
0
0
0
21,000
0
21,000
0
0
0
0
Page 69 of 157
7
Capital Project Detail Sheet Project Information Project Name: Wildland Unit ATV side by side with tracks
Type of Project: Light Weight
Project Number: 26-12
Basis for Activity: Service Level Change
Department: 2100 - Fire
Relationship to Strategic Plan: Priority #2 - Municipal Service Excellence
Description: Side by side vehicle with tracks to be used for wildland firefighting and remote medical/rescue calls.
Rationale: Climate action change and MNR predict a 40% increase in wildfires over the next 14 years. 44% of the township is in a MNR high risk wildfire zone. Preparations for significant wildfires are required. We continually call mutual aid for this resource as we do not own one.
Staff Contact: Del Blakney (dblakney)
Project Finances Expense Type 80100 - Equipment
Operating Impact Description
FTE
Maintenance
0.00
2026 1,000
Actuals Description 80105 - Fleet Total
2028
1,000
2029
1,000
2030
1,000
0
Budget
Expensed to Current Year Expenses / Expenditure
2027
Total Project
Prior Approved
2026
2027
2028
2029
2030
0
61,500
0
61,500
0
0
0
0
0
61,500
0
61,500
0
0
0
0
Page 70 of 157
8
Capital Project Detail Sheet Project Information Project Name: Wildland Equipment for Wildland Units
Type of Project: Equipment
Project Number: 26-14
Basis for Activity: Service Level Change
Department: 2100 - Fire
Relationship to Strategic Plan: Priority #2 - Municipal Service Excellence
Description: Wildland equipment for wildland units.
Rationale: Climate action change and MNR predict a 40% increase in wildfires over the next 14 years. 44% of the township is in a MNR high risk wildfire zone. Preparations for significant wildfires are required.
Staff Contact: Del Blakney (dblakney)
Project Finances
Actuals Description 80100 - Equipment Total
Budget
Expensed to Current Year Expenses / Expenditure
Total Project
Prior Approved
2026
2027
2028
2029
2030
0
36,000
0
36,000
0
0
0
0
0
36,000
0
36,000
0
0
0
0
Page 71 of 157
9
Capital Project Detail Sheet Project Information Project Name: Radio Tower Equipment Upgrade
Type of Project: Equipment
Project Number: 26-16
Basis for Activity: Asset Renewal
Department: 2100 - Fire
Relationship to Strategic Plan: Priority #2 - Municipal Service Excellence
Description: Upgrade radio transmission equipment on the Jamieson Tower
Rationale: Communications are a concern across the Township with a lack of coverage and broken messages. Existing equipment is old and creates gaps in tower overlap.
Staff Contact: Del Blakney (dblakney)
Project Finances
Actuals Description 80100 - Equipment Total
Budget
Expensed to Current Year Expenses / Expenditure
Total Project
Prior Approved
2026
2027
2028
2029
2030
0
75,000
0
75,000
0
0
0
0
0
75,000
0
75,000
0
0
0
0
Page 72 of 157
10
Capital Project Detail Sheet Project Information Project Name: Hoses and Appliances
Type of Project: Equipment
Project Number: 26-18
Basis for Activity: Other
Department: 2100 - Fire
Relationship to Strategic Plan: Priority #2 - Municipal Service Excellence
Description: Replacement Hoses and Appliances
Rationale: Part of the SFFR Fleet and Equipment Asset Management Plan includes the annual replacement hoses and appliances for structural firefighting operations. Annual costs and investments are spread out to reduce significant one time costs.
Staff Contact: Del Blakney (dblakney)
Project Finances
Actuals Description 80100 - Equipment Total
Budget
Expensed to Current Year Expenses / Expenditure
Total Project
Prior Approved
2026
2027
2028
2029
2030
0
25,000
0
25,000
0
0
0
0
0
25,000
0
25,000
0
0
0
0
Page 73 of 157
11
Capital Project Detail Sheet Project Information Project Name: Boat Replacement
Type of Project: Equipment
Project Number: 26-21
Basis for Activity: Asset Renewal
Department: 3000 - Overhead
Relationship to Strategic Plan: Priority #1 - Sustainable Long-Term Prosperity
Description: Replacement of boat and motor that is inadequately sized for Public Services operations.
Rationale: The current small Jon Boat that is used for the placement of swim rafts/lines/etc. does not provide enough room and float for two Staff transporting heaving anchors/buoys, etc.
Staff Contact: Brian Kirk (bkirk)
Project Finances
Actuals Description 80105 - Fleet Total
Budget
Expensed to Current Year Expenses / Expenditure
Total Project
Prior Approved
2026
2027
2028
2029
2030
0
15,000
0
15,000
0
0
0
0
0
15,000
0
15,000
0
0
0
0
Page 74 of 157
12
Capital Project Detail Sheet Project Information Project Name: Water Tank Replacement
Type of Project: Auxiliary Attachment
Project Number: 26-22
Basis for Activity: Asset Renewal
Department: 3000 - Overhead
Relationship to Strategic Plan: Priority #2 - Municipal Service Excellence
Description: Water tank replacement for unit #62 (Asset ID 23805), year 2015.
Rationale: Asset replacement required due to holes, corrosion, and frequent repair costs. Breakdowns on this unit have been causing lengthy downtime.
Staff Contact: Brian Kirk (bkirk)
Project Finances
Actuals Description 80105 - Fleet Total
Budget
Expensed to Current Year Expenses / Expenditure
Total Project
Prior Approved
2026
2027
2028
2029
2030
0
50,000
0
50,000
0
0
0
0
0
50,000
0
50,000
0
0
0
0
Page 75 of 157
13
Capital Project Detail Sheet Project Information Project Name: Tandem Plow Truck Replacement
Type of Project: Equipment
Project Number: 26-25
Basis for Activity: Asset Renewal
Department: 3000 - Overhead
Relationship to Strategic Plan: Priority #1 - Sustainable Long-Term Prosperity
Description: Tandem plow truck replacement for unit FT36 (asset 33509), year 2006.
Rationale: Asset renewal in accordance with the 15 year life cycle replacement schedule in the LRFP.
Staff Contact: Brian Kirk (bkirk)
Project Finances
Actuals Description 80105 - Fleet Total
Budget
Expensed to Current Year Expenses / Expenditure
Total Project
Prior Approved
2026
2027
2028
2029
2030
0
435,000
0
435,000
0
0
0
0
0
435,000
0
435,000
0
0
0
0
Page 76 of 157
14
Capital Project Detail Sheet Project Information Project Name: Road 38 Design and Construction (Kingston Rd to Murton Road)
Type of Project: Arterial Roadway
Project Number: 23-56
Basis for Activity: Asset Renewal
Department: 3300 - Hardtop
Relationship to Strategic Plan: N/A
Description: Asset # 54910
Rationale: The reconstruction of Road 38 has been identified as a priority road project for 2025 within the 5 year plan received by Council on May 2, 2023.
Project will include the detailed design and reconstruction of approximately 5.8km of Road 38 from Kingston Road to Murton Road.
Council accepted the recommendations of the Preliminary Design and provided staff direction to advance the Detailed Design Phase on August 13th, 2024.
Recommended design will include full depth reconstruction of the roadway complete with two lanes and two paved shoulders (11.0m width) and shoulder roundings.
This section of Road 38 was last constructed in 1993. Surface conditions are poor and unplanned maintenance demands continue to be a concern for meeting service levels.
Work on the corridor will be phased over 2025 and 2026. Additional related works at Murvale Creek can be found under project # 25-34.
Current AADT is 9,205 vehicles per year. PCI rating of 60 (Fair) in 2022.
Staff Contact: Troy Dunlop (tdunlop)
Project Finances
Actuals Description 53310 - Materials
Expensed to Current Year
Budget Total Project
Prior Approved
2026
2027
2028
2029
2030
Expenses / Expenditure
12,051
0
0
0
0
0
0
0
55290 - Contracted Services Expenses / Expenditure
2,948,424
250,000
175,000
75,000
0
0
0
0
235,645
5,001,650
3,591,650
1,410,000
0
0
0
0
3,196,120
5,251,650
3,766,650
1,485,000
0
0
0
0
55330 - Consultant Total
Expenses / Expenditure
Page 77 of 157
15
Capital Project Detail Sheet Project Information Project Name: Murvale Creek Culvert (B12) Reconstruction
Type of Project: Bridge
Project Number: 25-34
Basis for Activity: Asset Renewal
Department: 3100 - Structures
Relationship to Strategic Plan: N/A
Description: ASSET # 63110 (OSIM Structure)
Rationale: The reconstruction of the Murvale Creek Culvert has been identified as a priority project for 2025 within the 5 year plan received by Council on May 2, 2023.
The Murvale Creek Culvert is an OSIM structure located on Road 38 just 0.7km north of Murton Road.
The OSIM Structure is believed to have been constructed in the 1980’s and last rehabilitated in the 1990’s.
The structure is a 3.66m diameter Structural Plate Corrugated Steel Pipe (SPCSP) that is approximately 30m long .
The structure was last inspected in 2023 and has a Bridge Condition Index rating of 60.2 (Fair).
The navigable structure is located within a Provincially Significant Westland and will be removed and replaced with a new structure with updated roadside barrier systems.
It is currently recommended that the structure be completed with the Road 38 reconstruction from Kingston Road to Murton Road.
The configuration of the new structure will be confirmed through Detailed Design in consultation with Quinte Conservation and Transport Canada. Staff Contact: Troy Dunlop (tdunlop)
Project Finances
Actuals Description
Expensed to Current Year
55290 - Contracted Services Expenses / Expenditure 55330 - Consultant Total
Budget
Expenses / Expenditure
Total Project
Prior Approved
2026
2027
2028
2029
2030
501,850
1,400,000
800,000
600,000
0
0
0
0
0
56,000
31,000
25,000
0
0
0
0
501,850
1,456,000
831,000
625,000
0
0
0
0
Page 78 of 157
16
Capital Project Detail Sheet Project Information Project Name: Westport Road
Type of Project: Arterial Roadway
Project Number: 24-41B
Basis for Activity: Asset Renewal
Department: 3300 - Hardtop
Relationship to Strategic Plan: N/A
Description: ASSET # 57900 and 58015
Rationale: The reconstruction of Westport Road has been identified as a priority road project for 2025 within the 5 year plan received by Council on May 2, 2023.
Road Reconstruction - Double Surface Treatment Reconstruction of 4.0km section of Westport Road from Garret Road to Devil Lake.
Sections of road were last constructed in 2000 and 2008. Surface conditions are poor and unplanned maintenance demands continue to be a concern for meeting service levels.
Construction to include full depth reclamation, placement of granular A materials, 2 major culvert crossings, culvert renewals, guide rail replacements and double surface treatment (chip seal).
Current AADT is 371 & 750 vehicles per year. PCI rating of 54 and 53 (Poor) in 2022.
Project will also include roadside drainage improvements. Staff Contact: Troy Dunlop (tdunlop)
Project Finances
Actuals Description
Expensed to Current Year
Budget Total Project
Prior Approved
2026
2027
2028
2029
2030
50100 - Wages
Expenses / Expenditure
82,057
50,200
50,200
0
0
0
0
0
53310 - Materials
Expenses / Expenditure
328,349
419,000
419,000
0
0
0
0
0
55290 - Contracted Services Expenses / Expenditure
428,436
943,300
803,800
139,500
0
0
0
0
55330 - Consultant
Expenses / Expenditure
23,853
0
0
0
0
0
0
0
58001 - Internal Equipment
Expenses / Expenditure
67,946
89,500
89,500
0
0
0
0
0
930,640
1,502,000
1,362,500
139,500
0
0
0
0
Total
Page 79 of 157
17
Capital Project Detail Sheet Project Information Project Name: Buck Lake Culvert (OSIM) Design
Type of Project: Bridge
Project Number: 25-36
Basis for Activity: Asset Renewal
Department: 3100 - Structures
Relationship to Strategic Plan: N/A
Description: ASSET # 63040 (OSIM Structure)
Rationale: The reconstruction of the Buck Lake Culvert has been identified as a priority project for replacement in 2027 within the 5 year plan received by Council on May 2, 2023.
The Buck Lake Culvert is an OSIM structure located on Perth Road approximately 7.8km north of Opinicon Road at Buck Lake.
The OSIM Structure is believed to have been constructed in 1970.
The structure is a 3.2m diameter Structural Plate Corrugated Steel Pipe (SPCSP) that is approximately 17.2m long.
The structure was last inspected in 2023 and has a Bridge Condition Index rating of 49.35 (Poor).
The navigable structure is located within the Buck Lake Causeway and will be rehabilitated or replaced with a new structure with updated roadside barrier systems.
It is recommended that designs and consultations for this crossing move forward 2 years in advance of project delivery due to the social impacts (lake access), Federal approvals (Fisheries/Transport Canada) and possible detour considerations.
Staff Contact: Troy Dunlop (tdunlop)
Project Finances
Actuals Description 55330 - Consultant Total
Budget
Expensed to Current Year Expenses / Expenditure
Total Project
Prior Approved
2026
2027
2028
2029
2030
0
52,000
35,000
17,000
0
0
0
0
0
52,000
35,000
17,000
0
0
0
0
Page 80 of 157
18
Capital Project Detail Sheet Project Information Project Name: Rutledge Road Reconstruction
Type of Project: Arterial Roadway
Project Number: 26-31
Basis for Activity: Asset Renewal
Department: 3300 - Hardtop
Relationship to Strategic Plan: N/A
Description: Asset # 56520 Project will include the detailed design, permits and reconstruction of approximately 5.8km of Rutledge Road from 2.2km East of Sydenham Road to Perth Road. Construction to include full depth reclamation, placement of granular A, asphalt surface (HCB) replacement, paved shoulders, culvert replacements and guide rail replacements.
Rationale: The reconstruction of Rutledge Road has been identified as a priority road project for 2026 within the 5 year plan endorsed by Council on May 2, 2023. Current AADT is 2140 vehicles per day. PCI rating for road surface is 60 (Fair) in 2025.
Staff Contact: Troy Dunlop (tdunlop)
Project Finances
Actuals Description
Budget
Expensed to Current Year
Total Project
Prior Approved
2026
2027
2028
2029
2030
55290 - Contracted Services Expenses / Expenditure
0
4,410,000
0
4,410,000
0
0
0
0
55330 - Consultant
0
140,000
0
140,000
0
0
0
0
0
4,550,000
0
4,550,000
0
0
0
0
Total
Expenses / Expenditure
Page 81 of 157
19
Capital Project Detail Sheet Project Information Project Name: Desert Lake Road Reconstruction
Type of Project: Arterial Roadway
Project Number: 26-32
Basis for Activity: Asset Renewal
Department: 3300 - Hardtop
Relationship to Strategic Plan: N/A
Description: Asset # 52495 Project will include the detailed design, permits and reconstruction of approximately 2.95km of Desert Lake Road from Road 38 to 0.15km West of High Falls Road. Construction to include full depth reclamation, placement of Granular A, double surface treatment renewal, fog seal, culvert replacements and guide rail replacements.
Rationale: The reconstruction of Desert Lake Road has been identified as a priority road project for 2026 within the 5 year plan endorsed by Council on May 2, 2023. Current AADT is 953 vehicles per day. PCI rating for road surface is 46 (Poor) in 2025.
Staff Contact: Troy Dunlop (tdunlop)
Project Finances
Actuals Description
Budget
Expensed to Current Year
Total Project
Prior Approved
2026
2027
2028
2029
2030
55290 - Contracted Services Expenses / Expenditure
0
1,121,000
0
1,121,000
0
0
0
0
55330 - Consultant
0
59,000
0
59,000
0
0
0
0
0
1,180,000
0
1,180,000
0
0
0
0
Total
Expenses / Expenditure
Page 82 of 157
20
Capital Project Detail Sheet Project Information Project Name: Round Lake Road Reconstruction
Type of Project: Local Roadway
Project Number: 26-33
Basis for Activity: Asset Renewal
Department: 3300 - Hardtop
Relationship to Strategic Plan: N/A
Description: Asset # 45520 Project will include detailed design, permits, and reconstruction of approximately 2.0km of Round Lake Road from Latimer Road to Duff Road. Construction to include full depth reclamation, placement of granular A, double surface treatment renewal, fog seal and culvert replacements.
Rationale: The reconstruction of Round Lake Road was not originally forecasted as a 2026 renewal project, however the surface conditions have deteriorate substantially since 2022 and unplanned maintenance demands are very high (hot/cold patching). Current AADT is 395 vehicles per day. PCI rating for road surface is 40 (Poor) in 2025.
Staff Contact: Troy Dunlop (tdunlop)
Project Finances
Actuals Description
Budget
Expensed to Current Year
Total Project
Prior Approved
2026
2027
2028
2029
2030
50100 - Wages
Expenses / Expenditure
0
60,000
0
60,000
0
0
0
0
53310 - Materials
Expenses / Expenditure
0
50,000
0
50,000
0
0
0
0
55290 - Contracted Services Expenses / Expenditure
0
191,000
0
191,000
0
0
0
0
58001 - Internal Equipment
0
61,000
0
61,000
0
0
0
0
0
362,000
0
362,000
0
0
0
0
Total
Expenses / Expenditure
Page 83 of 157
21
Capital Project Detail Sheet Project Information Project Name: Keeley Road Reconstruction
Type of Project: Local Roadway
Project Number: 26-34
Basis for Activity: Asset Renewal
Department: 3300 - Hardtop
Relationship to Strategic Plan: N/A
Description: Asset # 43375 Project will include detailed design, permits, and reconstruction of approximately 2.2km of Keeley Road from 0.3km east of Sydenham Road to Park Valley Road. Construction to include full depth reclamation, placement of granular A, double surface treatment renewal, fog seal and culvert replacements.
Rationale: The reconstruction of Keeley Road was not originally forecasted as a 2026 renewal project, however the surface conditions have deteriorated substantially since 2022 and unplanned maintenance demands are very high (hot/cold patching). Current AADT is 725 vehicles per day. PCI rating for road surface is 44 (Poor) in 2025.
Staff Contact: Troy Dunlop (tdunlop)
Project Finances
Actuals Description
Budget
Expensed to Current Year
Total Project
Prior Approved
2026
2027
2028
2029
2030
50100 - Wages
Expenses / Expenditure
0
57,000
0
57,000
0
0
0
0
53310 - Materials
Expenses / Expenditure
0
56,000
0
56,000
0
0
0
0
55290 - Contracted Services Expenses / Expenditure
0
158,000
0
158,000
0
0
0
0
58001 - Internal Equipment
0
57,000
0
57,000
0
0
0
0
0
328,000
0
328,000
0
0
0
0
Total
Expenses / Expenditure
Page 84 of 157
22
Capital Project Detail Sheet Project Information Project Name: Surface Treatment (LCB) Preservation
Type of Project: Local Roadway
Project Number: 26-35
Basis for Activity: Asset Renewal
Department: 3300 - Hardtop
Relationship to Strategic Plan: N/A
Description: Rehabilitation of over 20 km of surface treated roadways with localized repairs and application of a low class bituminous Single Surface Treatment (chip seal). A priority list has been attached as a project document with additional details on forecasted roadways.
Rationale: The application of a single surface treatment (chip seal) is a key asset management strategy for long term performance of the Township’s road network of low class bituminous (LCB) roadways. Single surface treatments can add 5 to 7 years of added service life at a low cost and help manage unplanned maintenance expenses (potholes, cracking, and edge break-up). The commitment to an annual LCB preservation plan is reflected as a 2026 project in the 5 year plan endorsed by Council on May 2, 2023.
Staff Contact: Troy Dunlop (tdunlop)
Project Finances
Actuals Description
Budget
Expensed to Current Year
Total Project
Prior Approved
2026
2027
2028
2029
2030
50100 - Wages
Expenses / Expenditure
0
35,000
0
35,000
0
0
0
0
53310 - Materials
Expenses / Expenditure
0
80,000
0
80,000
0
0
0
0
55290 - Contracted Services Expenses / Expenditure
0
850,000
0
850,000
0
0
0
0
58001 - Internal Equipment
0
35,000
0
35,000
0
0
0
0
0
1,000,000
0
1,000,000
0
0
0
0
Total
Expenses / Expenditure
Page 85 of 157
23
SURFACE TREATMENT (LCB) Preservation - 2026 Projects Public Services Department Section ID 45880 46780 41550 43735 43120 43150 43345 42790 42940 44110 46060 46570 45970 42355 45820 40495 45025 42415 45520
Street Snider Road York Road Country Woods Drive Latimer Road Holmes Road Holmes Road Johns Way Road Heska Crescent Hitchcock Drive Maple Hill Way Stone Point Drive White Lake Road Stagecoach Road Freeman Road Sills Bay Road Botting Road Petworth Road Garrison Court Round Lake Road
From Street
To Street
2km South of Arena Boundary Rd South end South end Davidson Road Davidson Road Old Boy Road Heska Crescent Holmes Road West end South end North end Buck Bay Road Orser Road Bedford Road Botting Road Bedford Road German Road South end Moreland Dixon Road
Road 38 Bellrock Road Campbell Road 1.7km West of Perth Road Latimer Road Perth Road 10 Heska Crescent Holmes Road Sunbury Road Hitchcock Drive Hitchcock Drive 1.7km East of Buck Bay Road Railton Road Sills Bay Road North End Sills Bay Road Bridge Petworth Road Latimer Road
Width (m) 6.5 6.2 6.0 6.4 6.6 6.4 6.5 6.8 6.3 6.5 6.7 6.1 6.0 6.3 6.5 6.2 6.2 5.8 6.2 TOTAL
Length (Km)
AADT
PCI
3.0 1.3 0.7 4.0 1.4 1.2 0.3 1.3 0.9 0.3 1.2 1.7 2.9 0.8 1.7 0.8 0.2 0.5 0.8 24.8
436 72 75 455 670 327 49 225 307 49 49 100 773 100 75 254 538 78 299
72 38 62 60 59 66 68 59 71 62 81 68 65 79 72 79 82 59 66
*The above road list is subject to change. Each road section will undergo a final condition review in the spring of 2026.
Page 86 of 157
24
Capital Project Detail Sheet Project Information Project Name: Pre-Engineering Roads 2027
Type of Project: Local Roadway
Project Number: 26-36
Basis for Activity: Asset Renewal
Department: 3300 - Hardtop
Relationship to Strategic Plan: N/A
Description: Pre-engineering work in support of future road reconstruction that includes: topographic surveys, geotechnical investigations, culvert permits and other associated works. Candidate road projects for 2027 to be determined by Township Council as part of the review of updates to the 5 year capital forecast for roadways.
Rationale: The design process for road reconstruction projects requires a 1 to 2 year timeframe to address pre-engineering activities, topographic surveys, stakeholder engagement, drainage permits, utility relocation and property acquisition (where necessary). The pre-engineering for 2027 roadwork has been identified as a defined 2026 project within the 5 year plan endorsed by Council on May 2, 2023.
Staff Contact: Troy Dunlop (tdunlop)
Project Finances
Actuals Description 55330 - Consultant Total
Budget
Expensed to Current Year Expenses / Expenditure
Total Project
Prior Approved
2026
2027
2028
2029
2030
0
85,000
0
85,000
0
0
0
0
0
85,000
0
85,000
0
0
0
0
Page 87 of 157
25
Capital Project Detail Sheet Project Information Project Name: Gravel Road Reconstruction Program 2026
Type of Project: Local Roadway
Project Number: 26-37
Basis for Activity: Asset Renewal
Department: 3000 - Overhead
Relationship to Strategic Plan: N/A
Description: Asset # 41080 and 41095 Canoe Lake Road (James Wilson Road to 3km South of Westport Road) Reconstruction to include extensive rock ditching, rock cut removals (roadside hazards) localized widenings (hills/corners) and placement of new gravel wear surface (100mm) granular M. These two sections of Canoe Lake Road comprise a total length of 5.5km and represent the only gravel sections remaining between Desert Lake Road and Westport Road. AADT 137 vehicles per day.
Rationale: The development of dedicated capital towards gravel road improvements is one of the key findings of the 2022 Road Needs Study. Investments in drainage improvements will improve road performance, customer service levels and reduce unplanned maintenance costs over time.
Staff Contact: Troy Dunlop (tdunlop)
Project Finances
Actuals Description
Budget
Expensed to Current Year
Total Project
Prior Approved
2026
2027
2028
2029
2030
50100 - Wages
Expenses / Expenditure
0
29,000
0
29,000
0
0
0
0
53310 - Materials
Expenses / Expenditure
0
134,000
0
134,000
0
0
0
0
55290 - Contracted Services Expenses / Expenditure
0
112,000
0
112,000
0
0
0
0
58001 - Internal Equipment
0
65,000
0
65,000
0
0
0
0
0
340,000
0
340,000
0
0
0
0
Total
Expenses / Expenditure
Page 88 of 157
26
Capital Project Detail Sheet Project Information Project Name: Arterial Road Culvert Replacement Program 2026
Type of Project: Arterial Roadway
Project Number: 26-40
Basis for Activity: Asset Renewal
Department: 3300 - Hardtop
Relationship to Strategic Plan: N/A
Description: The arterial road culvert replacement program targets the renewal of cross culvert assets on the Township’s major roadways that bear a poor or very poor condition rating. The program was initially created in 2025 and has been developed as part of the continued investments supporting the recommendations and findings from investments in Asset Management Planning.
Rationale: Public Services launched a cross culvert assessment program using internal technical staff in the spring of 2024. Records indicate that there had not been a similar inspection program since 2018. Data collected on arterial culverts in 2024 indicated that 1 in 3 culverts inventoried was poor or very poor condition. The program targets the replacement of approximately 10 crossings per year. This years focus will include continued work on Perth Road (Buck Lake heading South).
Staff Contact: Troy Dunlop (tdunlop)
Project Finances
Actuals Description
Budget
Expensed to Current Year
Total Project
Prior Approved
2026
2027
2028
2029
2030
50100 - Wages
Expenses / Expenditure
0
0
0
0
0
0
0
0
53310 - Materials
Expenses / Expenditure
0
0
0
0
0
0
0
0
55290 - Contracted Services Expenses / Expenditure
0
50,000
0
50,000
0
0
0
0
58001 - Internal Equipment
0
0
0
0
0
0
0
0
0
50,000
0
50,000
0
0
0
0
Total
Expenses / Expenditure
Page 89 of 157
27
Capital Project Detail Sheet Project Information Project Name: Water Tower Rehabilitation - Design and Tender
Type of Project: Water Main
Project Number: 26-66
Basis for Activity: Asset Renewal
Department: 4000 - Water Treatment
Relationship to Strategic Plan: N/A
Description: Initial phase of project will include the advancement of site investigations, condition reports and preparation of tender specifications for rehabilitation work. The planned rehabilitation work on tower accessories would advance in the winter of 2026/2027 and the interior surface/exterior surface coating repairs would follow in 2027.
Rationale: On July 15th, 2025, Township Council endorsed an application for infrastructure funding under the Municipal Housing Infrastructure Program - Health and Safety Water Stream (HSWS). An application for a multi year project was endorsed which is consistent with the priorities identified in the Asset Management Plan and Long Term Forecast by Utilities Kingston for the water tower. We have recently been advised that we were unsuccessful with the grant.
Staff Contact: Troy Dunlop (tdunlop)
Project Finances
Actuals Description
Budget
Expensed to Current Year
Total Project
Prior Approved
2026
2027
2028
2029
2030
55290 - Contracted Services Expenses / Expenditure
0
43,250
0
43,250
0
0
0
0
55330 - Consultant
0
262,250
0
21,250
241,000
0
0
0
0
305,500
0
64,500
241,000
0
0
0
Total
Expenses / Expenditure
Page 90 of 157
28
Capital Project Detail Sheet Project Information Project Name: Sydenham Water Treatment Plant - GAC Renewal
Type of Project: Water Main
Project Number: 26-67
Basis for Activity: Asset Renewal
Department: 4000 - Water Treatment
Relationship to Strategic Plan: N/A
Description: The Sydenham drinking water treatment process utilizes two granular activated carbon (GAC) contactors to treat water for taste and odour control. The GAC contactors more specifically aid in the removal of dissolved organics which which react with chlorine to produce chlorination byproducts. The GAC media at the water treatment plant currently requires replacement.
Rationale: The granular activated carbon materials at the water plant was last sampled and tested in the fall of October 2024. Lab sample results on the testing of the media indicated the materials would be due for replacement in 2026.
Staff Contact: Troy Dunlop (tdunlop)
Project Finances
Actuals Description 55290 - Contracted Services Expenses / Expenditure Total
Budget
Expensed to Current Year
Total Project
Prior Approved
2026
2027
2028
2029
2030
0
12,000
0
12,000
0
0
0
0
0
12,000
0
12,000
0
0
0
0
Page 91 of 157
29
Capital Project Detail Sheet Project Information Project Name: Sydenham Water - Enterprise Asset Management System
Type of Project: Water Main
Project Number: 26-68
Basis for Activity: Service Level Change
Department: 4000 - Water Treatment
Relationship to Strategic Plan: N/A
Description: New Enterprise Asset Management System - Drinking Water Assets - Utilities Kingston. New system will support all aspects of management, operations, preventative maintenance, work orders systems, and water asset records in both Kingston and South Frontenac.
Rationale: Utilities Kingston is advancing with the roll-out of an Enterprise Asset Management System that will manage all records relating to the operation, preventative maintenance and replacement of drinking water assets in the City of Kingston. This EAM model and associated software support will ultimately drive the day to day operations and records management for all UK field personnel and UK plans to integrate Sydenham Water operations in order to harmonize records management. The initial set up for the Sydenham System will be high in the initial year. Operating costs for operating costs will be approximately $1,400 per year going forward adjusted for inflation.
Staff Contact: Troy Dunlop (tdunlop)
Project Finances
Actuals Description 55290 - Contracted Services Expenses / Expenditure Total
Budget
Expensed to Current Year
Total Project
Prior Approved
2026
2027
2028
2029
2030
0
9,500
0
9,500
0
0
0
0
0
9,500
0
9,500
0
0
0
0
Page 92 of 157
30
Capital Project Detail Sheet Project Information Project Name: Green Bay WDS - Slope Stability Review
Type of Project: Facilities
Project Number: 26-71
Basis for Activity: Other
Department: 3000 - Overhead
Relationship to Strategic Plan: N/A
Description: The Closure Plan development for the Green Bay landfill (Burns Road) has identified that the south slope of the landfill may require a Slope Stability Review pending further discussions with the Ministry of Environment, Conservation and Parks.
Rationale: On August 13th, 2024, Township Council directed staff to advance a closure plan for the Green Bay Waste Disposal Site. Cambium and the Township have been working on the closure plan details throughout 2025. The south slope of the waste mound at the Green Bay WDS currently has a steep embankment that extends to an existing watercourse. This side slope at the landfill is unlikely to meet the required 4H:1V slope typically required as part of the end state for closure. Cambium has flagged that a slope stability study may be requested by the MECP and has advised that it should be included in the budget for 2026 as a contingency item.
Staff Contact: Troy Dunlop (tdunlop)
Project Finances
Actuals Description 55330 - Consultant Total
Budget
Expensed to Current Year Expenses / Expenditure
Total Project
Prior Approved
2026
2027
2028
2029
2030
0
10,000
0
10,000
0
0
0
0
0
10,000
0
10,000
0
0
0
0
Page 93 of 157
31
Capital Project Detail Sheet Project Information Project Name: Bedford Garage Site Works
Type of Project: Facilities
Project Number: 25-52
Basis for Activity: Asset Renewal
Department: 1200 - Administrative Facilities
Relationship to Strategic Plan: Priority #1 - Sustainable Long-Term Prosperity
Description: Multi-year site works project for the Bedford Garage.
Rationale: The site is currently supplied water from the Glendower Hall and required a dedicated water source for that property.
Scope includes the installation of a water service and parking lot drainage work in 2025 and planning for asphalt paving in 2026.
The site is low and requires drainage improvements in advance of a new paved parking lot proposed for 2026. The storm water drainage work will be done in conjunction with the installation of a new oil & grit separator (previously approved project 24-52).
Staff Contact: Tim Laprade (tlaprade)
Project Finances
Actuals Description
Budget
Expensed to Current Year
Total Project
Prior Approved
2026
2027
2028
2029
2030
50100 - Wages
Expenses / Expenditure
0
6,800
6,800
0
0
0
0
0
53310 - Materials
Expenses / Expenditure
0
10,000
10,000
0
0
0
0
0
55290 - Contracted Services Expenses / Expenditure
0
128,000
33,000
95,000
0
0
0
0
55330 - Consultant
Expenses / Expenditure
0
5,000
5,000
0
0
0
0
0
58001 - Internal Equipment
Expenses / Expenditure
0
9,300
9,300
0
0
0
0
0
0
159,100
64,100
95,000
0
0
0
0
Total
Page 94 of 157
32
Capital Project Detail Sheet Project Information Project Name: Portland Garage Water Well
Type of Project: Facilities
Project Number: 26-51
Basis for Activity: Asset Renewal
Department: 3000 - Overhead
Relationship to Strategic Plan: Priority #1 - Sustainable Long-Term Prosperity
Description: The old well was decommissioned, thus water to the Portland Garage is supplied by the well at the OPP station.
Rationale: There are numerous occasions when water is limited or not available.
Staff Contact: Tim Laprade (tlaprade)
Project Finances
Actuals Description 55290 - Contracted Services Expenses / Expenditure Total
Budget
Expensed to Current Year
Total Project
Prior Approved
2026
2027
2028
2029
2030
0
25,000
0
25,000
0
0
0
0
0
25,000
0
25,000
0
0
0
0
Page 95 of 157
33
Capital Project Detail Sheet Project Information Project Name: Bedford Garage Heating System Replacement
Type of Project: Facilities
Project Number: 26-52
Basis for Activity: Asset Renewal
Department: 3000 - Overhead
Relationship to Strategic Plan: Priority #1 - Sustainable Long-Term Prosperity
Description: Replacement of 6 of the heating units with tube style radiant heaters.
Rationale: Three “red-tagged” units pose immediate safety risks, making the continued use of old, failing units an unacceptable option. Replacing the entire system will be more cost-effective in the long run than ongoing repairs, especially since the failing units are causing high operating costs.
Staff Contact: Tim Laprade (tlaprade)
Project Finances
Actuals Description 55290 - Contracted Services Expenses / Expenditure Total
Budget
Expensed to Current Year
Total Project
Prior Approved
2026
2027
2028
2029
2030
0
55,000
0
55,000
0
0
0
0
0
55,000
0
55,000
0
0
0
0
Page 96 of 157
34
Capital Project Detail Sheet Project Information Project Name: Portland Garage Overhead Hoist
Type of Project: Equipment
Project Number: 26-53
Basis for Activity: Asset Renewal
Department: 3000 - Overhead
Relationship to Strategic Plan: Priority #1 - Sustainable Long-Term Prosperity
Description: Replacement of Garage Overhead Hoist
Rationale: The current overhead hoist is no longer suitable for use and is rated as ‘Very Poor’ in the FCA
Staff Contact: Tim Laprade (tlaprade)
Project Finances
Actuals Description
Budget
Expensed to Current Year
Total Project
Prior Approved
2026
2027
2028
2029
2030
55290 - Contracted Services Expenses / Expenditure
0
0
0
0
0
0
0
0
80105 - Fleet
0
6,000
0
6,000
0
0
0
0
0
6,000
0
6,000
0
0
0
0
Total
Expenses / Expenditure
Page 97 of 157
35
Capital Project Detail Sheet Project Information Project Name: Facility & Parks Flagpoles
Type of Project: Equipment
Project Number: 26-55
Basis for Activity: Other
Department: 3000 - Overhead
Relationship to Strategic Plan: Priority #2 - Municipal Service Excellence
Description: Installation of new flag poles at facilities & parks.
Rationale: The ones at Gerald Ball park present a risk to Staff when changing flags. The following stations do not currently have flag poles: Station #1, #2, #5.
Staff Contact: Tim Laprade (tlaprade)
Project Finances
Actuals Description 53310 - Materials
Budget
Expensed to Current Year
Total Project
Prior Approved
2026
2027
2028
2029
2030
Expenses / Expenditure
0
14,000
0
14,000
0
0
0
0
55290 - Contracted Services Expenses / Expenditure
0
6,000
0
6,000
0
0
0
0
0
20,000
0
20,000
0
0
0
0
Total
Page 98 of 157
36
Capital Project Detail Sheet Project Information Project Name: Station 1 – Siteworks
Type of Project: Facilities
Project Number: 26-62
Basis for Activity: Asset Renewal
Department: 2100 - Fire
Relationship to Strategic Plan: Priority #2 - Municipal Service Excellence
Description: Add additional exterior lighting off building to illuminate parking area.
Rationale: Addressing items identified in the Joint Health and Safety Committee inspections and improving the exterior of the site.
Tree removal Parking lot prep & asphalt paving Staff Contact: Tim Laprade (tlaprade)
Project Finances
Actuals Description 55290 - Contracted Services Expenses / Expenditure Total
Budget
Expensed to Current Year
Total Project
Prior Approved
2026
2027
2028
2029
2030
0
48,000
0
48,000
0
0
0
0
0
48,000
0
48,000
0
0
0
0
Page 99 of 157
37
Capital Project Detail Sheet Project Information Project Name: Station 2 – Backup Generator
Type of Project: Facilities
Project Number: 26-63
Basis for Activity: Service Level Change
Department: 2100 - Fire
Relationship to Strategic Plan: Priority #2 - Municipal Service Excellence
Description: Installation of a 200amp backup Generac
Rationale: Emergency power back-up as this location has a communication tower that provides 50% of communication coverage for Township.
Staff Contact: Tim Laprade (tlaprade)
Project Finances
Actuals Description 55290 - Contracted Services Expenses / Expenditure Total
Budget
Expensed to Current Year
Total Project
Prior Approved
2026
2027
2028
2029
2030
0
25,000
0
25,000
0
0
0
0
0
25,000
0
25,000
0
0
0
0
Page 100 of 157
38
Capital Project Detail Sheet Project Information Project Name: Station 3 - HVAC and Interior Repairs
Type of Project: Facilities
Project Number: 26-64
Basis for Activity: Asset Renewal
Department: 2100 - Fire
Relationship to Strategic Plan: Priority #1 - Sustainable Long-Term Prosperity
Description: Repair floor drain grates Repair women’s washroom ceiling Replace Furnace and convert from Oil to Propane (rated very poor in FCA).
Rationale: Facility and HVAC system rated very poor in FCA. Addressing items identified in JHSC inspections.
Staff Contact: Tim Laprade (tlaprade)
Project Finances
Actuals Description 55290 - Contracted Services Expenses / Expenditure Total
Budget
Expensed to Current Year
Total Project
Prior Approved
2026
2027
2028
2029
2030
0
25,000
0
25,000
0
0
0
0
0
25,000
0
25,000
0
0
0
0
Page 101 of 157
39
Capital Project Detail Sheet Project Information Project Name: Station 4 – Exterior lighting
Type of Project: Facilities
Project Number: 26-65
Basis for Activity: Asset Renewal
Department: 2100 - Fire
Relationship to Strategic Plan: Priority #1 - Sustainable Long-Term Prosperity
Description: Add additional exterior lighting off building to illuminate parking area.
Rationale: Addressing a H&S item identified in Joint Health and Safety Committee inspection.
Staff Contact: Tim Laprade (tlaprade)
Project Finances
Actuals Description 55290 - Contracted Services Expenses / Expenditure Total
Budget
Expensed to Current Year
Total Project
Prior Approved
2026
2027
2028
2029
2030
0
6,000
0
6,000
0
0
0
0
0
6,000
0
6,000
0
0
0
0
Page 102 of 157
40
Capital Project Detail Sheet Project Information Project Name: Station 7 – HVAC and Siteworks
Type of Project: Facilities
Project Number: 26-86
Basis for Activity: Asset Renewal
Department: 2100 - Fire
Relationship to Strategic Plan: Priority #1 - Sustainable Long-Term Prosperity
Description: Replace Furnace and convert from Oil to Propane (rated very poor in FCA). Replace Air Conditioning unit (rated very poor in FCA) Interior renovations (Install a door between training area and bay floor) Upgrading interior lighting to LED (rated very poor in FCA)
Rationale: Facility rated very poor in FCA.
Staff Contact: Tim Laprade (tlaprade)
Project Finances
Actuals Description 55290 - Contracted Services Expenses / Expenditure Total
Budget
Expensed to Current Year
Total Project
Prior Approved
2026
2027
2028
2029
2030
0
30,200
0
30,200
0
0
0
0
0
30,200
0
30,200
0
0
0
0
Page 103 of 157
41
Capital Project Detail Sheet Project Information Project Name: Centennial Park New Accessible Washrooms Design and Build
Type of Project: Facilities
Project Number: 24-56
Basis for Activity: Growth Related
Department: 8000 - Parks & Recreation
Relationship to Strategic Plan: Priority #1 - Sustainable Long-Term Prosperity
Description: New Centennial Park Accessible Washroom and Park Building.
Rationale: Additional washrooms are required at Centennial Park as it is becoming the most frequented park in SFT and a destination location for many events.
AODA compliant Washroom closer to Grand Pavilion. The use of the washrooms would be from attendees at the Pavilion and Soccer Fields where we are currently renting portable toilets. 50% funded through CSRIF grant. New washroom building would be separate from the existing building to increase the amount of washrooms and provide another location in the park. Staff Contact: Tim Laprade (tlaprade)
Project Finances
Actuals Description 80110 - Building-New Total
Budget
Expensed to Current Year Expenses / Expenditure
Total Project
Prior Approved
2026
2027
2028
2029
2030
5,088
730,000
180,000
550,000
0
0
0
0
5,088
730,000
180,000
550,000
0
0
0
0
Page 104 of 157
42
Capital Project Detail Sheet Project Information Project Name: Centennial Park Accesible/Inclusive Playstructures
Type of Project: Equipment
Project Number: 26-79
Basis for Activity: Service Level Change
Department: 8000 - Parks & Recreation
Relationship to Strategic Plan: Priority #3 - People and Partnerships
Description: Addition of Accessible & Inclusive Play structures.
Rationale: To meet the needs of our Community and have a destination Accessible/Inclusive Playground.
50% funded through CSRIF grant.
Staff Contact: Tim Laprade (tlaprade)
Project Finances
Actuals Description
Budget
Expensed to Current Year
Total Project
Prior Approved
2026
2027
2028
2029
2030
55290 - Contracted Services Expenses / Expenditure
0
0
0
0
0
0
0
0
80300 - Land Improvements
0
100,000
0
100,000
0
0
0
0
0
100,000
0
100,000
0
0
0
0
Total
Expenses / Expenditure
Page 105 of 157
43
Capital Project Detail Sheet Project Information Project Name: Sydenham Point Canteen Renovation
Type of Project: Facilities
Project Number: 26-54
Basis for Activity: Asset Renewal
Department: 8000 - Parks & Recreation
Relationship to Strategic Plan: Priority #1 - Sustainable Long-Term Prosperity Rationale: Current canteen is rated as ‘Very Poor’ in the FCA. We are seeing and increase in demand for use of the canteen. It requires replacement of fixtures and overall refresh.
Description: Sydenham Point Canteen Renovation.
Staff Contact: Tim Laprade (tlaprade)
Project Finances
Actuals Description
Budget
Expensed to Current Year
Total Project
Prior Approved
2026
2027
2028
2029
2030
55290 - Contracted Services Expenses / Expenditure
0
0
0
0
0
0
0
0
80115 - Building-Renovations Expenses / Expenditure
0
40,000
0
40,000
0
0
0
0
0
40,000
0
40,000
0
0
0
0
Total
Page 106 of 157
44
Capital Project Detail Sheet Project Information Project Name: Playground Rehabilitation
Type of Project: Park
Project Number: 26-59
Basis for Activity: Asset Renewal
Department: 8000 - Parks & Recreation
Relationship to Strategic Plan: Priority #2 - Municipal Service Excellence
Description: Replace playground boarders and wood chips at Inverary playground.
Rationale: Inverary Boarder needs to be replaced as it is a hazard with rotting wood and exposed nails.
Staff Contact: Tim Laprade (tlaprade)
Project Finances
Actuals Description 53310 - Materials Total
Budget
Expensed to Current Year Expenses / Expenditure
Total Project
Prior Approved
2026
2027
2028
2029
2030
0
5,500
0
5,500
0
0
0
0
0
5,500
0
5,500
0
0
0
0
Page 107 of 157
45
Capital Project Detail Sheet Project Information Project Name: Bellrock Mill Fencing & Site Work
Type of Project: Park
Project Number: 26-76
Basis for Activity: Other
Department: 8000 - Parks & Recreation
Relationship to Strategic Plan: Priority #3 - People and Partnerships
Description: Siteworks to clean up site to leave it in a safe and maintainable condition. Project to include perimeter fencing to secure the site.
Rationale: Looking to bring the site to a state where the construction fencing can be removed and the site maintained with minimal effort.
Staff Contact: Tim Laprade (tlaprade)
Project Finances
Actuals Description
Budget
Expensed to Current Year
Total Project
Prior Approved
2026
2027
2028
2029
2030
55290 - Contracted Services Expenses / Expenditure
0
45,000
0
45,000
0
0
0
0
80300 - Land Improvements
0
10,000
0
10,000
0
0
0
0
0
55,000
0
55,000
0
0
0
0
Total
Expenses / Expenditure
Page 108 of 157
46
Capital Project Detail Sheet Project Information Project Name: Sydenham Point Beach Rehabilitation
Type of Project: Park
Project Number: 26-77
Basis for Activity: Asset Renewal
Department: 8000 - Parks & Recreation
Relationship to Strategic Plan: Priority #2 - Municipal Service Excellence
Description: Adding a tiered level at the Sydenham Point Beach beach deep side and borders around sand cells
Rationale: With the current slope all the peastone migrates down to the water exposing the ground cloth. It requires constant maintenance. It also creates an unusable area by visitors. By creating a tiered area it would reduce the loss of peastone, create a useable seating area while reducing risk. Sand cells need borders to reduce sand migration,
Staff Contact: Tim Laprade (tlaprade)
Project Finances
Actuals Description 55290 - Contracted Services Expenses / Expenditure Total
Budget
Expensed to Current Year
Total Project
Prior Approved
2026
2027
2028
2029
2030
0
25,000
0
25,000
0
0
0
0
0
25,000
0
25,000
0
0
0
0
Page 109 of 157
47
Capital Project Detail Sheet Project Information Project Name: SUV replacement
Type of Project: Equipment
Project Number: 26-27
Basis for Activity: Asset Renewal
Department: 3000 - Overhead
Relationship to Strategic Plan: Priority #1 - Sustainable Long-Term Prosperity
Description: Development Services SUV replacement for unit 17-39 (asset 32606), year 2017.
Rationale: Asset renewal in accordance with 9 year life cycle replacement schedule in LRFP.
Staff Contact: Brian Kirk (bkirk)
Project Finances
Actuals Description 80105 - Fleet Total
Budget
Expensed to Current Year Expenses / Expenditure
Total Project
Prior Approved
2026
2027
2028
2029
2030
0
51,000
0
51,000
0
0
0
0
0
51,000
0
51,000
0
0
0
0
Page 110 of 157
48
Capital Project Detail Sheet Project Information Project Name: CityView Portal
Type of Project: Software & Support
Project Number: 26-81
Basis for Activity: Service Level Change
Department: 9000 - Planning
Relationship to Strategic Plan: Priority #2 - Municipal Service Excellence
Description: A capital project to implement digital submissions of building permits through the CityView portal online system. This allows for online submission and payment of building permit applications.
Rationale: Implementing this tool would eliminate email submissions of building permits and provide a streamlined approval process for submissions and payments. It would reduce staff time following up with applicants on incomplete building permit applications. Applicants would still be able to submit building permit applications in person.
Staff Contact: Brad Wright (bwright)
Project Finances
Actuals Description 55290 - Contracted Services Expenses / Expenditure Total
Budget
Expensed to Current Year
Total Project
Prior Approved
2026
2027
2028
2029
2030
0
50,000
0
50,000
0
0
0
0
0
50,000
0
50,000
0
0
0
0
Page 111 of 157
49
Capital Project Detail Sheet Project Information Project Name: Digitization of Building Permit Records
Type of Project: Other
Project Number: 26-82
Basis for Activity: Other
Department: 2605 - Building
Relationship to Strategic Plan: Priority #2 - Municipal Service Excellence
Description: This project proposes the digitization of all historic building permit files (files older than five years) to improve operational efficiency, reduce the need for physical storage space, and provide easy, digital access for staff to all historic building files complete with all contents. Permit Building files 2022-2026 will be kept in office. This will be funded through the Building Reserve Fund as it directly deals with Building Services Operations.
Rationale: Substantial efficiencies and cost savings will be created through the digitization of records. Digitize all building permit files, excluding the most recent five years, provide easy access to documentation in a consistent format and will provide efficiency in staff time to have access to files through digitization
Staff Contact: Rebecca Roy (rroy)
Project Finances
Actuals Description 55290 - Contracted Services Expenses / Expenditure Total
Budget
Expensed to Current Year
Total Project
Prior Approved
2026
2027
2028
2029
2030
0
55,000
0
55,000
0
0
0
0
0
55,000
0
55,000
0
0
0
0
Page 112 of 157
50
Page 113 of 157
To:
Council
From:
Office of the Chief Administrative Officer
Date of Meeting:
December 9, 2025
Subject:
Verona Housing Update
Report Number:
2025-170
Summary The purpose of this report is to provide an update on the Verona Housing project. Recommendation This Report is for information purposes. Background This report provides a further update from report 2025-128 on the September 2nd, 2025 agenda under item 13b. Discussion/Analysis Since the September report, the following items are provided as updates:
- 2B Developments remains the Project manager overseeing all aspects (grants, studies, and all other aspects of residential construction) of the project except for the MCEA where they are working alongside Township staff. They also continue to monitor the housing market and have updated our financial modelling based on various factors including the creation of a new federal agency, Build Canada Homes. Despite the various changes, the financial modelling remains in a very good position.
- JL Richards is continuing their work the phase 3 component of the MCEA.
- Cambium has finalized their Environmental Impact Study.
- Completion of Environmental Site Study (ESA).
- RAW architects have provided updated renderings on both the apartments blocks and townhomes, provided as attachment A, a draft landscape plan as provided under attachment B and are working towards completion of 33% drawings and more detailed site plans.
- Finalizing the zoning bylaw amendment application to be submitted by end of year.
- Finalization of OPHI/COCHI grants through the City of Kingston by end of the year.
- updated project proforma + 2026/2027 budget forecast. Looking ahead to 2026, next steps include:
- Finalization of HEWSF funding agreement www.southfrontenac.net South Frontenac is a welcoming and thriving rural community.
Township of South Frontenac Staff Report Number: 2025-170
Page 114 of 157
- Confirmation of CMHC innovation and CHIF grants status
- Public meeting on zoning bylaw amendment
- Finalization of phase 3 of MCEA for the servicing of water/wastewater and next steps to begin Source Water requirements on the project.
- Progression of drawings to tender documents
- Discussion ownership options for the project including a Municipal Service Corporation.
- Develop an approval process for tenants interested in applying and becoming renters.
- Applying for financing through the new Build Canada Homes program (separate report attached 2025-171).
- Application for building permit and beginning of construction. In January 2026, staff will be creating a dedicated page for the Verona Housing component with a continued dedicated page for the servicing of the project. Both pages will be under Engage Frontenac. Once the additional page is create, we will advise the public through our social media channels, website and banner ad. These pages will be updated regularly as new information becomes available. Further significant updates will also be provided through our social media channels. Financial Implications Not applicable Relationship to Strategic Plans ☐ Not applicable to this report. ☒ This initiative adheres to the following guiding principle of the 2023-2026 Strategic Plan. •
Priority: Community
Climate Considerations ☒ Not applicable to this report. Notice/Consultation Lindsay Blair, Executive Director 2B Developments Attachments Attachment A – Renderings November 2025 Approvals Approved By:
Louise Fragnito, CPA CGA, Chief Administrative Officer www.southfrontenac.net South Frontenac is a welcoming and thriving rural community.
“z: _,q ulII ILHm-u
«a -: _ All] IIIJ’
31
\IW “HI”?! “£117
.a?lllld
‘
Page 115 of 157
Page 116 of 157
u“
Page 117 of 157
Page 118 of 157
SYMBOLS LEGEND: PROPOSED DECIDUOUS TREES
PRECAST CONCRETE PAVERS
CAST IN PLACE CONCRETE PROPOSED CONIFEROUS TREES
RIVER STONE MAINTENANCE STRIP VINYL COATED CHAIN LINK FENCE (4FT.)
WOOD FIBRE MULCH WOODEN PRIVACY FENCE (6FT.)
PERENNIAL PLANTING WOODEN PRIVACY FENCE (4FT.)
SHRUB PLANTING ACCESSIBLE BENCH THIS DRAWING IS THE PROPERTY OF THE ARCHITECT AND MAY NOT BE REPRODUCED OR USED WITHOUT THE EXPRESS CONSENT OF THE ARCHITECT. THE CONTRACTOR IS RESPONSIBLE FOR CHECKING AND VERIFYING ALL LEVELS AND DIMENSIONS AND SHALL REPORT ALL DISCREPANCIES TO THE ARCHITECT AND OBTAIN CLARIFICATION PRIOR TO COMMENCING WORK. DRAWING IS IN METRIC UNITS U.N.O. IF IMPERIAL DIMENSIONS ARE INDICATED, IT IS FOR CONVENIENCE ONLY. IF A ROUNDING DISCREPANCY EXISTS, THE METRIC MEASUREMENT SHALL GOVERN
TURFGRASS ACCESSIBLE SITE FURNISHINGS
BIKE RACK
ISSUE RECORD
WASTE RECEPTACLE (CAN INCLUDE ASH RECEPTACLE)
APPROX LINE OF EXISTING TREES TO BE RETAINED
STONE RETAINING WALL
SMALL BREED DOG AREA
1 BED (BF)
1 BED (BF)
1 BED (BF)
1 BED (BF)
1 BED (BF)
INDOOR AMENITY
107
108
109
110
111
54 m² [578 ft²]
53 m² [575 ft²]
53 m² [575 ft²]
53 m² [575 ft²]
108 m² [1158 ft²]
1 BED (BF)
1 BED (BF)
1 BED (BF)
INDOOR AMENITY
103
104
105
106
114
53 m² [575 ft²]
53 m² [575 ft²]
53 m² [575 ft²]
54 m² [578 ft²]
107 m² [1154 ft²]
STAIR B
STAIR B
ST-B
ST-B
ELEV
STAIR A
100
ST-A
INTERCOM
APARTMENT BLOCK E (2 STOREYS) CORR
VEST.
APARTMENT BLOCK F (2 STOREYS)
CORR
VEST.
100
100A
100B
92 m² [992 ft²]
STAIR A
100
REVISION RECORD
ST-A
ELEV 100 1 BED (BF) 1 BED (BF)
1 BED (BF)
1 BED (BF)
1 BED (BF)
1 BED (BF)
1 BED (BF)
1 BED (BF)
106
105
104
103
102
54 m² [585 ft²]
53 m² [575 ft²]
53 m² [575 ft²]
53 m² [575 ft²]
53 m² [575 ft²]
101 Redundant [Redundant Area Area]
1 BED (BF)
1 BED (BF)
1 BED (BF)
1 BED (BF)
110
109
108
107
112
113
55 m² [588 ft²]
53 m² [575 ft²]
53 m² [575 ft²]
53 m² [575 ft²]
53 m² [575 ft²]
54 m² [585 ft²]
COMMUNITY GARDEN AREA
ATV TRAIL
VERONA STREET
SIDEWALK
2 BED
2 BED
C2
2 BED
C4
8 m² [81 ft²]
8 m² [81 ft²]
1 BED
1 BED
C1
C3
57 m² [618 ft²]
54 m² [578 ft²]
1 BED C5
2 BED
2 BED
C6
C7
8 m² [81 ft²]
8 m² [81 ft²]
TOWNHOUSE BLOCK A (2 STOREYS) 58 m² [624 ft²]
2 BED
C9
2 BED
C11
8 m² [81 ft²]
2 BED
C2
8 m² [81 ft²]
2 BED
C4
8 m² [81 ft²]
8 m² [81 ft²]
1 BED
1 BED
1 BED
1 BED
1 BED
C8
C10
C12
C1
C3
56 m² [600 ft²]
56 m² [602 ft²]
58 m² [619 ft²]
57 m² [618 ft²]
54 m² [578 ft²]
1 BED C5
2 BED
2 BED
C6
C7
8 m² [81 ft²]
8 m² [81 ft²]
2 BED
C9
TOWNHOUSE BLOCK B (2 STOREYS) 58 m² [624 ft²]
2 BED
C11
8 m² [81 ft²]
2 BED
C2
8 m² [81 ft²]
2 BED
C4
8 m² [81 ft²]
8 m² [81 ft²]
1 BED
1 BED
1 BED
1 BED
1 BED
C8
C10
C12
C1
C3
56 m² [600 ft²]
56 m² [602 ft²]
58 m² [619 ft²]
57 m² [618 ft²]
54 m² [578 ft²]
1 BED
2 BED
2 BED
C6
C7
8 m² [81 ft²]
8 m² [81 ft²]
C5
58 m² [624 ft²]
2 BED
C9
TOWNHOUSE BLOCK C (2 STOREYS)
2 BED
C11
8 m² [81 ft²]
2 BED
C2
8 m² [81 ft²]
2 BED
C4
8 m² [81 ft²]
8 m² [81 ft²]
1 BED
1 BED
1 BED
1 BED
1 BED
C8
C10
C12
C1
C3
56 m² [600 ft²]
56 m² [602 ft²]
58 m² [619 ft²]
57 m² [618 ft²]
54 m² [578 ft²]
C6
2 BED
2 BED C7
1 BED C5
58 m² [624 ft²]
8 m² [81 ft²]
2 BED
C9
TOWNHOUSE BLOCK D (2 STOREYS) 8 m² [81 ft²]
C11
8 m² [81 ft²]
8 m² [81 ft²]
1 BED
1 BED
C8
C10
C12
56 m² [600 ft²]
56 m² [602 ft²]
58 m² [619 ft²]
1 BED
NORTH
405-317 ADELAIDE STREET WEST TORONTO CANADA M5V 1P9 +1 416 599 9729 WWW.RAWDESIGN.CA
24070 VERONA ST, SOUTH FRONTENAC, ON
1 L1
VERONA HOUSING
PARCELS A & B LANDSCAPE CONCEPT 1:400
2B DEVELOPMENTS 1:400 0
LANDSCAPE CONCEPT 5
10
20
SITE PLAN
50 metres
C
SCALE: As indicated
L1
Page 119 of 157
DO NOT SCALE DRAWING
R N FO TIO T C O N TRU S N O
SYMBOLS LEGEND:
VERONA STREET
PROPOSED DECIDUOUS TREES
VERONA STREET PROPOSED CONIFEROUS TREES
WOODEN PRIVACY FENCE (6FT.) WOODEN PRIVACY FENCE (4FT.)
THIS DRAWING IS THE PROPERTY OF THE ARCHITECT AND MAY NOT BE REPRODUCED OR USED WITHOUT THE EXPRESS CONSENT OF THE ARCHITECT. THE CONTRACTOR IS RESPONSIBLE FOR CHECKING AND VERIFYING ALL LEVELS AND DIMENSIONS AND SHALL REPORT ALL DISCREPANCIES TO THE ARCHITECT AND OBTAIN CLARIFICATION PRIOR TO COMMENCING WORK. DRAWING IS IN METRIC UNITS U.N.O. IF IMPERIAL DIMENSIONS ARE INDICATED, IT IS FOR CONVENIENCE ONLY. IF A ROUNDING DISCREPANCY EXISTS, THE METRIC MEASUREMENT SHALL GOVERN
ISSUE RECORD
ACCESSIBLE BENCH BIKE RACK PRECAST CONCRETE PAVERS RIVER STONE MAINTENANCE STRIP MULCH GARDEN BENDS PERENNIAL PLANTING SHRUB PLANTING TURFGRASS
REVISION RECORD
2 BED
2 BED
2 BED
C11
C2
C4
8 m² [81 ft²]
8 m² [81 ft²]
8 m² [81 ft²]
1 BED
1 BED
1 BED
C12
C1
C3
58 m² [619 ft²]
57 m² [618 ft²]
54 m² [578 ft²]
1 BED C5 58 m² [624 ft²]
2 BED
2 BED
2 BED
2 BED
C6
C7
C9
C11
C2
8 m² [81 ft²]
8 m² [81 ft²]
8 m² [81 ft²]
8 m² [81 ft²]
8 m² [81 ft²]
2 BED
1 BED
1 BED
1 BED
C8
C10
C12
1 BED C1
56 m² [600 ft²]
56 m² [602 ft²]
58 m² [619 ft²]
57 m² [618 ft²]
NORTH
405-317 ADELAIDE STREET WEST TORONTO CANADA M5V 1P9 +1 416 599 9729 WWW.RAWDESIGN.CA
24070 APPROX. LINE OF EXISTING TREES TO BE RETAINED
1 L2
VERONA ST, SOUTH FRONTENAC, ON
VERONA HOUSING
TYPICAL LANDSCAPE CONCEPT FOR TOWNHOUSE BLOCKS 1:150
2B DEVELOPMENTS 1:150 0
2.5
5
10
LANDSCAPE PLAN
25 metres
TYP. TOWNHOUSE BLOCK
C
SCALE: As indicated
L2
Page 120 of 157
DO NOT SCALE DRAWING
R N FO TIO T C O N TRU S N O
SYMBOLS LEGEND: PROPOSED DECIDUOUS TREES
PRECAST CONCRETE PAVERS
PROPOSED CONIFEROUS TREES
CAST IN PLACE CONCRETE
RIVER STONE MAINTENANCE STRIP VINYL COATED CHAIN LINK FENCE (4FT.)
WOOD FIBRE MULCH ACCESSIBLE BENCH
PERENNIAL PLANTING ACCESSIBLE SITE FURNISHINGS
SHRUB PLANTING BIKE RACK
THIS DRAWING IS THE PROPERTY OF THE ARCHITECT AND MAY NOT BE REPRODUCED OR USED WITHOUT THE EXPRESS CONSENT OF THE ARCHITECT. THE CONTRACTOR IS RESPONSIBLE FOR CHECKING AND VERIFYING ALL LEVELS AND DIMENSIONS AND SHALL REPORT ALL DISCREPANCIES TO THE ARCHITECT AND OBTAIN CLARIFICATION PRIOR TO COMMENCING WORK. DRAWING IS IN METRIC UNITS U.N.O. IF IMPERIAL DIMENSIONS ARE INDICATED, IT IS FOR CONVENIENCE ONLY. IF A ROUNDING DISCREPANCY EXISTS, THE METRIC MEASUREMENT SHALL GOVERN
TURFGRASS
WASTE RECEPTACLE (CAN INCLUDE ASH RECEPTACLE) APPROX LINE OF EXISTING TREES TO BE RETAINED
STONE RETAINING WALL
ISSUE RECORD
SMALL BREED DOG AREA
REVISION RECORD
1 BED (BF)
1 BED (BF)
1 BED (BF)
1 BED (BF)
1 BED (BF)
INDOOR AMENITY
107
108
109
110
111
54 m² [578 ft²]
53 m² [575 ft²]
53 m² [575 ft²]
53 m² [575 ft²]
108 m² [1158 ft²]
ST-B
1 BED (BF)
1 BED (BF)
103
104
105
106
114
53 m² [575 ft²]
53 m² [575 ft²]
53 m² [575 ft²]
54 m² [578 ft²]
107 m² [1154 ft²]
STAIR B
1 BED (BF)
INDOOR AMENITY
STAIR B ST-B
SHADE STRUCTURE COMMUNITY MAILBOX
ELEV
STAIR A
100
ST-A
INTERCOM
APARTMENT BLOCK E (2 STOREYS)
CORR
VEST.
APARTMENT BLOCK F (2 STOREYS)
VEST.
100
100A
100B
92 m² [992 ft²]
CORR 100
STAIR A ST-A
ELEV 100
1 BED (BF) 112 1 BED (BF)
1 BED (BF)
1 BED (BF)
1 BED (BF)
1 BED (BF)
1 BED (BF) 101 Redundant Area [Redundant Area]
106
105
104
103
102
54 m² [585 ft²]
53 m² [575 ft²]
53 m² [575 ft²]
53 m² [575 ft²]
53 m² [575 ft²]
55 m² [588 ft²]
OVERHEAD STRUCTURE REFER TO ARCHITECTURE
1 BED (BF)
1 BED (BF)
1 BED (BF)
1 BED (BF)
1 BED (BF)
110
109
108
107
113
53 m² [575 ft²]
53 m² [575 ft²]
53 m² [575 ft²]
54 m² [585 ft²]
53 m² [575 ft²]
COMMUNITY GARDEN AREA
ATV TRAIL
NORTH
VERONA STREET 405-317 ADELAIDE STREET WEST TORONTO CANADA M5V 1P9 +1 416 599 9729 WWW.RAWDESIGN.CA
24070 VERONA ST, SOUTH FRONTENAC, ON
1 L3
VERONA HOUSING
PARCEL B (APARTMENT BLOCK) LANDSCAPE CONCEPT 1:250
2B DEVELOPMENTS LANDSCAPE PLAN
1:250 0
2.5
5
10
PARCEL B
25 metres
C
SCALE: As indicated
L3
Page 121 of 157
DO NOT SCALE DRAWING
R N FO TIO T C O N TRU S N O
Page 122 of 157
To:
Council
From:
Director, Development Services
Date of Meeting:
December 9, 2025
Subject:
Bill 60 - Fighting Delays, Building Faster Act
Report Number:
2025-167
Summary This report provides a summary of Bill 60, Fighting Delays, Building Faster Act, 2025. Bill 60 amends 18 different Acts. This summary will focus on proposed changes to the Planning Act and Development Charges Act and the enactment of the Water and Wastewater Public Corporations Act. Recommendation For information only. Background Bill 60, also known as the Fighting Delays, Building Faster Act, 2025 received royal assent on November 27, 2025, and results in changes to the Planning Act and Development Charges Act, and enactment of the Water and Wastewater Public Corporations Act. Discussion/Analysis The policy changes to the Planning Act and Development Charges Act build on the changes approved under Bill 17, the Protect Ontario by Building Faster and Smarter Act, 2025.
Planning Act Changes: As-of-Right Variations to Zoning By-law Performance Standards
The changes allow the Minister of Municipal Affairs and Housing to establish a regulation that would permit minor variances to a Zoning By-law “as of right” without the need for a Council decision. The exemptions to performance standards such as building height, lot coverage or setbacks would apply to specified lands identified in the regulation. The draft regulation is not yet available for review. Under the proposal the Minister would be able to permit a variation to a Zoning By-law to be “as of right” if a proposal was within a prescribed percentage (e.g. 10%) of the requirement. The reason for the proposal is to avoid lengthy approval processes, fast-track priority housing projects, and lower costs passed on from developers to home purchasers and reduce expenses for homeowners making essential modifications.
www.southfrontenac.net South Frontenac is a welcoming and thriving rural community.
Township of South Frontenac Staff Report Number: 2025-167
Page 123 of 157
Staff Comment: The regulation stipulates that the ‘as of right’ variations would only apply to urban residential lands, therefore not applicable to the Township. Furthermore, most minor variance applications request variances that are greater than 10%.
Exempting Ministerial Decisions from the Requirements of Provincial Policy Statement
Changes in Bill 60 allow the Minister to make decisions on land use outside the Greenbelt Area that do not adhere to the Provincial Planning Statement, 2024 (PPS). The PPS is issued under section 3 of the Planning Act and sets out provincial land use policy direction related to growth and development that all municipalities must adhere to. From it flows Official Plan policies and implementation tools such as Zoning By-laws. Subsection 3(5) of the Act requires that decisions affecting a planning matter “shall be consistent with” PPS policies. Bill 60 allows Ministerial decisions to be exempt from PPS policies. Staff Comment: This change is in direct opposition of land use planning policies across the province and appears illogical and counterintuitive to the direction of the Planning Act.
Amendments to the Implementation of Community Improvement Plans (CIPs) Changes are proposed to the Planning Act to support flexible implementation of Community Improvement Plans (CIPs), including enabling all upper-tier municipalities to establish regional Community Improvement Plans and allow funding to lower-tier municipalities for their CIPs. A CIP is a tool under section 28 of the Planning Act that permits municipalities to make grants or loans within the community improvement plan project areas to help pay for certain costs despite the general municipal prohibition on bonusing. Currently, only prescribed uppertier municipalities who have official plan policies in place can adopt regional CIPs. Municipalities can only provide funding for the CIP of its respective upper or lower-tier municipality if the municipality has official plan policies in place to do so. The proposed changes would remove barriers to enable the flexible use of CIPs, including allowing all upper-tier municipalities to establish regional CIPs and financially support lower-tiers. South Frontenac’s Official Plan contains policies pertaining to CIPs in the Township. Council can designate certain areas as a Community Improvement Project Area under the policy including the authority to offer incentives to stimulate or leverage private and/or public sector investment. The policies in the Official Plan contain criteria for the designation of a Community Improvement Area and guidance on the preparation of Community Improvement Plans. Frontenac County is not currently a designated as an upper tier municipality, so it does not have the ability to establish regional CIPs. The County now has the authority to introduce CIP policies in its Official Plans. Staff Comment: Staff support the proposed changes to the Planning Act to allow Frontenac County to introduce CIP policies in its Official Plan.
Changes to the Reporting of Minister’s Zoning Orders (MZOs)
Changes to the Planning Act and, as necessary, related legislation, to enable Minister’s zoning orders (MZOs) to be made by non-regulatory orders and published on a Government of Ontario website. MZOs are currently approved by the Minister and filed with the Registrar of Regulations as regulations under the Planning Act. The proposed change would remove the opportunity for public comment and expedite the process, thereby enabling the Minister www.southfrontenac.net South Frontenac is a welcoming and thriving rural community.
Township of South Frontenac Staff Report Number: 2025-167
Page 124 of 157
to make faster decisions aimed at supporting provincial priorities such as supporting longterm care, transit-oriented communities and housing. Staff Comment: MZOs are generally GTA focused, however, removing the opportunity for public comments reduces accountability and transparency of development projects and does not uphold the public interest.
Changes to the Development Charges Act
Bill 60 has introduced further amendments to the Development Charges Act. Watson and Associates, the Township’s development charge consultants have prepared a commentary on the changes and it is included with this report as Attachment A. The changes include introducing a new class of development, “land acquisition class”, enabling municipalities to collect development charges for the acquisition of property. The land costs for various capital projects would be grouped together for the purpose of the calculation. Currently land costs are included in the required level of service calculations for various services being provided. The proposed amendment restricts the anticipated capital costs for land to 10 years with the exception of hard services, including water, wastewater, highways, police and fire. A separate reserve fund is to be created to fund land costs. Municipalities will be required to provide a copy of the Development Charge Background Study and the Development Charge By-law to the Minister of Municipal Affairs and Housing on request by the specified deadline. The current Act requires the Treasurer to provide Council with a financial statement on development changes collected and expended each year on date specified by Council. It is proposed that the Treasurer be required to bring forward their report on or before June 30th of the year. The final proposed amendment to the Act will require municipalities to establish local services policies for each service referred to in the Act and for which the By-law imposes a development charge. Staff Comment: The ability for municipalities to collect development charges for the acquisition of property is a positive change. This allows for improved implementation of municipal long range strategic planning initiatives.
Proposed New Water and Wastewater Public Corporations Act
Bill 60 introduces a new Water and Wastewater Public Corporations Act to permit the Minister to designate a corporation as a water and wastewater public corporation under the Business Corporations Act to provide water and sewage services on behalf of lower-tier municipalities that are prescribed by the regulations. The Act goes on to describe the purpose of the corporation, how water and wastewater services are to be delivered through the corporation, powers and duties of the corporation, board of direction responsibilities, submission of rate plans to the Minister, authority provided to the Minister to approve rate plans, request corporations to amend their rate plans, or refuse to approve the plan, provision of annual reports, etc. If the rate plan is not approved, provision is provided that the rates will be established in accordance with a provincial regulation pertaining to fees and charges. www.southfrontenac.net South Frontenac is a welcoming and thriving rural community.
Township of South Frontenac Staff Report Number: 2025-167
Page 125 of 157
The rationale used by the Minister in introducing this Act is a view that municipal service corporations are more flexible than a municipality in how it uses debt to finance municipal infrastructure. The Minister stated, “Using a municipal service corporation can amortize those costs (water and sewer infrastructure) out over decades—rather than the first-time homebuyer (paying the cost through development charges) …. and it reduces the price of a home. It will reduce reliance on municipal development charges, allowing further reductions in the cost of new homes. It’s a smarter and faster way to fund infrastructure, saving homebuyers money and accelerating the construction of new housing.” It is not clear how the capital planning undertaken by these corporations for water and wastewater works will relate to the background work that municipalities do in establishing development charges. Staff Comment: Staff are concerned that the rationale of introducing a provincially controlled public corporation for water and wastewater differs from the concept of a Municipal Services Corporation (MSC), which is already in place in South Frontenac. MSCs are municipally owned and governed and enable municipal autonomy over water and wastewater services with the advantages of increased debt financing capability for the Township. Staff will continue to monitor this initiative as further information becomes available. Environmental Registry of Ontario Consultations In addition to the above-noted changes to the Planning Act and Development Charges Act, the Province has posted three consultations on the ERO seeking feedback on proposed changes. ERO 025-1101: Consultation on Enhanced Development Standards – Lot Level (outside of buildings) This consultation requests input on the future use of Enhanced Development Standards (“EDS”) at the lot level outside of a building envelope. Sometimes referred to as “green development standards,” EDS are not limited to environmental features and can encompass a broader range of municipal requirements imposed through zoning by-laws, site plan control and development agreements. EDS may include requirements for features such as bioswales, permeable pavement, vegetative elements, native tree planting, soil volume requirements and bicycle parking, among other matters. The specific consultation on the municipal use of EDS requirements follows the Province’s prior confirmation that municipal authorities are not empowered to impose environmental or “green” building standards that exceed the Ontario Building Code. The Province is now consulting on whether to extend this prohibition to lot-level requirements imposed through the Planning Act approval process, citing concerns that EDS vary widely across jurisdictions. ERO 025-1100: Consultation on Minimum Lot Sizes This consultation focuses on minimum lot size requirements imposed upon urban residential lands and their effects on housing options, affordability and homeownership access. The consultation is specific to minimum lot size requirements imposed on lands that have access to municipal water and wastewater services. www.southfrontenac.net South Frontenac is a welcoming and thriving rural community.
Township of South Frontenac Staff Report Number: 2025-167
Page 126 of 157
ERO 025-1099: Consultation on Simplifying and Standardizing Official Plans Based on concerns that official plans have become lengthy, complicated and highly restrictive planning documents that take multiple years to prepare and update, are difficult to understand and comply with and vary widely between municipalities, this consultation requests feedback on how official plans could be simplified and standardized. Financial Implications Proposed changes to the Development Charges Act pertaining to the merging of services for the purpose of applying for DC credits may have financial impact to the municipality depending how many applications the Township receives and what services are included. Relationship to Strategic Plan ☒ Not applicable to this report. ☐ This initiative adheres to the following strategic pillars and directions of the 2023-2026 Strategic Plan. •
Pillars: Choose an item.
Climate Considerations ☒ Not applicable to this report. Notice/Consultation Watson & Associates Economists Ltd. Chief Administrative Officer Attachments Attachment A: A letter from Watson & Associates Economists Ltd. to municipal clients Approvals Submitted By:
Brad Wright, RPP, MCIP, AICP, PLE Director of Development Services Approved By:
Louise Fragnito, CPA, CGA Chief Administrative Officer
www.southfrontenac.net South Frontenac is a welcoming and thriving rural community.
Page 127 of 157
November 4, 2025
To our Municipal Clients: Re: Bill 60, Fighting Delays, Building Faster Act, 2025 and Regulatory Proposals 25-MMAH018 and 25-MMAH030 In our continued efforts to keep our clients up to date on legislative changes that may impact them, we are writing to inform you of proposed legislative changes to the Development Charges Act, 1997 (D.C.A.) and associated regulation (Ontario Regulation 82/98). The provincial government has introduced Bill 60, an Act to amend various Acts and to enact the Water and Wastewater Public Corporations Act, 2025 (referred to as the Fighting Delays, Building Faster Act, 2025). This Bill proposes amendments to the following legislation: • • • • • • • • • • • • • • •
Building Transit Faster Act, 2020; Construction Act; Development Charges Act, 1997; GO Transit Station Funding Act, 2023; Highway Traffic Act; Local Roads Boards Act; Municipal Act, 2021; Ontario Water Resources Act; Photo Card Act, 2008; Planning Act; Public Transportation and Highway Improvement Act; Residential Tenancies Act, 2006; Toronto Waterfront Revitalization Corporation Act; Towing and Storage Safety and Enforcement Act; Transit-Oriented Communities Act, 2020;
The Bill also introduces new legislation: the Water and Wastewater Public Corporations Act, 2025. In addition to the legislative amendments, the Province is also proposing changes to the development charge (D.C.) regulation (Ontario Regulation 82/98). The proposed changes, which are intended to standardize and streamline the D.C. framework, are available for comments via the Regulatory Registry at the following links: • •
25-MMAH018: https://www.regulatoryregistry.gov.on.ca/proposal/52054; and 25-MMAH030: https://www.regulatoryregistry.gov.on.ca/proposal/52308.
2233 Argentia Rd. Suite 301 Mississauga, Ontario L5N 2X7
Office: 905-272-3600 Fax: 905-272-3602 www.watsonecon.ca
Page 128 of 157
The deadline to submit comments on the above-referenced proposals is November 22, 2025, and November 23, 2025, respectively. This letter provides a summary and preliminary analysis of the proposed changes to the D.C.A. and Ontario Regulation 82/98.
Proposed Changes to the Development Charge Framework
1.1
Proposed Changes to the Development Charges Act, 1997
The proposed changes to the D.C.A. are presented in Schedule 3 of Bill 60, Fighting Delays, Building Faster Act, 2025. The following is a list of the proposed changes, which are discussed in further detail below:
- Addition of Class of Service for land acquisition;
- Required timelines for the Annual Treasurer’s Statement;
- Addition of requirements for Local Service Policies; and
- Requirement to provide documents to the Minister. 1.1.1
Addition of Class of Service for Land Acquisition
Background Context In preparing the D.C. calculations as part of a D.C. background study, most services[1] require a Level of Service calculation to be undertaken, as the D.C.A. requires that the increase in need for service must not exceed the historical Level of Service when determining the charge. This requirement is set out in subsection 5 (1) 4 of the D.C.A. and section 4 of Ontario Regulation 82/98. The regulation requires that the Level of Service be calculated by identifying quantity and quality measures of service. These measures have generally been interpreted to reflect the quantity of capital assets used to provide the service and the current replacement value (i.e., quality) of the capital assets. The combination of the measures results in the per capita historical replacement value, which, when applied to the forecast population, provides the total D.C.-eligible amount that can be included in the D.C. calculations for recovery. In determining the replacement value (i.e., quality) of the assets, the scope of capital costs is consistent with the definition in subsection 5 (3) of the D.C.A. The Act defines capital costs to include “costs to acquire land or an interest in land, including a leasehold interest.” Compliance with the D.C.A. requires that the scope of capital costs included in the increase, the need for service, and the historical Level of Service be the same. As such, the historical Level of Service calculations commonly include the value of land. Over the past few years, the development community has raised concerns [1]
All D.C.-eligible services, except water, wastewater, stormwater, and transit services.
Watson & Associates Economists Ltd.
PAGE 2
Page 129 of 157
regarding the inclusion of land in the required Level of Service calculations when no future land costs are identified. The increase in the value of land and all other infrastructure has led to an increase in the D.C.-eligible amount that can be included in D.C. calculations. Proposed Changes The legislative proposal is to include land acquisition as a separate class of service.[1] Under this proposal, anticipated land acquisition capital needs would be grouped together for the purposes of the D.C. calculations. Land acquisition capital needs would also be excluded from the historical Level of Service restrictions. In identifying the land acquisition needs by service, the proposal restricts the anticipated capital costs for land to 10 years for all services except for the following: • • • • • • • •
Water; Wastewater; Stormwater; Services related to a highway; Electrical; Transit; Police; and Fire.
As land acquisition will be established as a class of service, municipalities will be required to establish a separate reserve fund for these capital costs. As such, funds would be segregated for this purpose, only to be used for land costs. Similar to other reserve funds, monies in this reserve fund can be borrowed and repaid, with interest. With respect to credits, municipalities will need to ensure that credits for land are accounted for separately from credits for other applicable services. Section 35 of the D.C.A. is amended to add an exception to the use of monies in established reserve funds. This section states that monies in a reserve fund can be used for land acquisition; however, they cannot be used for land acquisition if those costs are to be paid for with the reserve fund established for land acquisition.
[1]
Section 7 of the D.C.A. states that a class of service may be established for the purposes of a D.C. by-law that is a combination of D.C.-eligible services or a subset of a D.C.-eligible service. Note, land acquisition related to the Toronto-York and Yonge North Subway Extensions is not required to be a class of service.
Watson & Associates Economists Ltd.
PAGE 3
Page 130 of 157
Potential Impacts The removal of land from the Level of Service calculations would have varying impacts across municipalities. Where land values are significant, the removal of these amounts from the Level of Service calculations will result in a decrease in the D.C.-eligible amount that may restrict D.C. funding for future capital projects. For example, the removal of land values from the replacement costs of recreation facilities would have the effect of reducing the Level of Service cap on D.C. funding for recreation services. While this may be impactful, this change enables the Level of Service calculations to be more accurately compared to the anticipated increase in need for service and allows land needs to be included without the Level of Service restriction. The restriction on the forecast period for certain services appears to be inconsistent with previous changes to the D.C.A., which removed the 10-year forecast period restriction for all services except Transit.[1] As land purchases are commonly undertaken years before the construction of a facility, there may be some requirements to include a postperiod benefit deduction if the land is required for a facility that will benefit growth outside the 10-year forecast period. Municipalities may consider having different land acquisition calculations for the various forecast periods. For example, one calculation may be undertaken for the 10-year restricted services, whereas one or more calculations may be undertaken for those services with unrestricted forecast periods. With respect to establishing a reserve fund for the land acquisition class of service, there may be some transitional matters to consider when preparing the D.C. background study calculations. For example, where land acquisition has been included in previous D.C. background studies, and reserve fund monies have been allocated and/or committed to land acquisition projects, reserve fund adjustments may be required. As the changes to the D.C.A. state that a class of service for land shall be established (i.e., required to recover land as a separate service), a separate reserve fund is required. Once a municipality undertakes a new D.C. by-law, the capital costs included in the class of service for land acquisition must be funded from the land acquisition reserve fund.
[1]
In 2019, the Province passed Bill 108, which removed the requirement to forecast capital needs over a 10-year period for all services other than water, wastewater, stormwater, services related to a highway, electrical power services, police, fire, and the Toronto-York subway extension, as these services were previously not restricted to a 10-year forecast.
Watson & Associates Economists Ltd.
PAGE 4
Page 131 of 157
1.1.2
Required timelines for the Annual Treasurer’s Statement
Proposed Changes Currently, the Annual Treasurer’s Statement must be prepared each year by a date determined by Council. Subsection 43 (1) of the Act is amended to require the Treasurer’s Statements to be completed by June 30 of each year. Currently, the Annual Treasurer’s Statement is required to be provided to the Minister of Municipal Affairs and Housing upon request. Subsection 43 (3) of the Act is amended to require a copy of the Treasurer’s Statement to be submitted to the Minister by July 15 of each year. Potential Impacts Municipalities will need to ensure the Annual Treasurer’s Statements are completed by June 30 and submitted to the Minister by July 15. 1.1.3
Addition of Requirements for Local Service Policies
Proposed Changes Currently, subsection 2 (5) of the D.C.A. precludes a D.C. by-law from imposing charges with respect to local services described in section 59 of the D.C.A. Section 59 of the D.C.A. provides a link to the Planning Act, such that, as a condition of subdivision or consent agreement, a municipality may require local services to be installed or paid for by the owner. Local services are considered when preparing a D.C. background study to ensure compliance with the legislative requirements. As such, a Local Service Policy is generally included in our D.C. background studies for transparency to stakeholders and for municipal staff administration. New subsections 59 (2.2) through 59 (2.11) are proposed, which generally set out the following: • •
A Local Service Policy is required for all D.C.-eligible services to which a D.C. bylaw imposes a charge and where some part of the service will be provided as a local service. A Local Service Policy is required to impose a condition of local services on development, and only to the extent it has been identified in the Local Service Policy. That is, a municipality could not require a work or classes of work to be provided as a local service if it is not identified as such in the Local Service Policy. o This does not apply where a municipality does not impose a D.C. for that service.
Watson & Associates Economists Ltd.
PAGE 5
Page 132 of 157
• •
• •
o This applies the day a municipality establishes the Local Service Policy or 18 months after Bill 60 receives Royal Assent. Required content for a Local Service Policy includes: o Works or classes of works related to development that are intended to be required as a Local Service. Optional content for a Local Service Policy includes: o Works or classes of works that are not intended to be required as a Local Service. o Works or classes of works that are partially required as a Local Service. The municipality shall give a copy of the Local Service Policy to the Minister of Municipal Affairs and Housing upon request, by the date requested. The Local Service Policy must be reviewed, requiring a resolution of Council declaring if a revision is needed. The resolution shall be passed at the time of passing any D.C. by-law or when a revision to the policy is required.
Note, there appears to be an error in the newly proposed subsection 59 (2.5). This subsection refers to subsection 2.8; however, that subsection refers to sending a copy of the Local Service Policy to the Minister of Municipal Affairs and Housing. It appears the appropriate reference should be subsection 2.7. Potential Impacts At Watson & Associates Economists Ltd. (Watson), it is our current practice to include Local Service Policies as part of D.C. background studies. This provides transparency to stakeholders and the municipality by delineating between local service capital costs and D.C.-eligible capital costs. The proposed changes regarding the required and optional content appear to be generally in line with Watson’s current practice. Some municipalities, however, currently include wording in their Local Service Policies that provides flexibility for the municipality’s interpretation of what costs can be deemed local service. The proposed changes aim to provide clarity on which costs would be deemed local service; therefore, municipalities may consider updating their current Local Service Policies to ensure removal of the “flexible” language. Furthermore, municipalities may require more frequent updates to their Local Service Policies as items are raised through the development approvals process that may not be appropriately captured in the Local Service Policy. The proposed subsection 59 (2.2) requires that a Local Service Policy cover the services set out in subsection 2 (4) of the D.C.A. that are included in a D.C. by-law. Land acquisition is a service as defined in this section, as it is proposed to be a subservice of capital costs for eligible services. As such, it would appear that land is required to be addressed in the Local Service Policy. Proposed subsection 59 (2.6) appears to clarify that if a municipality does not impose a D.C. for a particular service, there is no requirement to have that service set out in the
Watson & Associates Economists Ltd.
PAGE 6
Page 133 of 157
Local Service Policy. This would also appear to apply to municipalities without D.C. bylaws. Municipalities will need to ensure that all D.C. background study processes include a Local Service Policy and that the policy be expressly approved in the resolution of Council when the D.C. background study and by-law are adopted. This would appear to apply to all D.C. background study processes, including those prepared for by-law amendments and streamlined amendments to by-laws that do not require a background study under subsection 19 (1.1). Given there is a transitional deadline of 18 months after this legislation takes effect, municipalities with existing D.C. by-laws that do not have Local Service Policies should consider reviewing and approving a Local Service Policy. Note, if a municipality determines that there is no service in their D.C. by-law for which they will impose local service requirements, it does not appear that the municipality would be required to prepare a Local Service Policy. 1.1.4
Requirement to Provide Documents to the Minister
Proposed Changes Currently, there is no requirement to provide the D.C. background study or by-law to the Minister of Municipal Affairs and Housing. The proposed changes to section 10 and section 13 of the D.C.A. would require municipalities to provide copies of the documents to the Minister upon request, by the date requested. In addition, there is currently no requirement to provide the Local Service Policy to the Minister of Municipal Affairs and Housing. A proposed new subsection 59 (2.8) will require a copy of the Local Service Policy to be provided to the Minister upon request, by the date requested. Potential Impacts There does not appear to be any impact to municipalities, as the D.C. background study is already required to be posted on the municipality’s website, and copies of the by-law and Local Service Policy are typically included within the D.C. background studies. 1.2
Proposed Changes to Ontario Regulation 82/98
In addition to the proposed changes to the D.C.A., the Province has proposed regulatory changes to Ontario Regulation 82/98. These changes are with respect to the following matters:
- Merging of credits for water supply services and wastewater services;
Watson & Associates Economists Ltd.
PAGE 7
Page 134 of 157
- Making Benefit to Existing allocations more transparent in D.C. background studies;
- Detailing land acquisition costs in D.C. background studies; and
- Making information in financial statements relating to D.C.s more transparent and easily accessible. These changes are discussed in more detail below. Note that the draft regulation has not yet been released. Our preliminary comments are based on the summary of the proposed changes provided on the Provincial Regulatory Registry website. 1.2.1
Merging of Credits
Watson has previously provided commentary on the merging of credits.[1] Our commentary included the following potential impacts: Removal of municipal discretion Currently, municipalities have the ability to agree to apply credits to other services within a D.C. by-law. In many cases, the municipality will undertake a cashflow analysis of their D.C. reserve funds to determine if this is feasible. This proposed change appears to remove a municipality’s discretion to combine services by agreement in certain instances. Cashflow implications for municipalities Combining services for the purposes of credits would have cashflow implications for municipalities, where funds held in a D.C. reserve fund for a service not included under the section 38 agreement would be reduced. This could delay the timing of capital projects for these impacted services and/or increase financing costs, as municipalities tend to confine funding for projects to the reserve funds available for that service and not borrow between reserve funds/services. Proposed Changes This proposed change aims to merge water supply services and wastewater services for the purposes of credits. As provided in subsection 2 (4) of the D.C.A., the D.C.-eligible services of water supply and wastewater include distribution and treatment, and sewers and treatment, respectively.
[1]
Watson & Associates Economists Ltd. June 4, 2025 letter to the Ministry of Municipal Affairs and Housing: https://www.watsonecon.ca/insights/opinions/bill-17-comments-forregulatory-registry.pdf
Watson & Associates Economists Ltd.
PAGE 8
Page 135 of 157
Potential Impacts The proposal is of concern as some municipalities have invested significant amounts into their water and wastewater systems. To elaborate on why this is a concern, in certain circumstances, municipalities have separated their water and wastewater D.C.s into the following categories: • • • •
Water supply and storage; Water distribution; Wastewater treatment; and Wastewater collection.
Where significant investments in water supply and storage or wastewater treatment have been made, separating the D.C.s into the categories above may assist in ensuring D.C. cashflows are available to pay existing debt payments. The proposal to combine water supply and wastewater services would entitle a developer to receive D.C. credits against both services if D.C.-eligible capital costs/works have been provided directly for either service. This would negatively impact cashflows for the service not directly provided by the developer. 1.2.2
Transparency of Benefit to Existing Calculations
Proposed Changes The proposed regulatory changes would require municipalities to provide greater details with respect to how capital costs are determined and how the growth-related and nongrowth-related shares of the costs are determined. The proposed wording appears to require this for each service, rather than on a project-by-project basis. Potential Impacts It is positive that the Province has not established a required methodology, as there is no standardized approach across all municipalities (although there are best practices that are generally followed). Providing further details in the background study will enhance transparency for stakeholders. While this will require additional effort in the preparation of the D.C background study, it should reduce the effort required by municipal staff to address stakeholder questions related to the determination of capital and benefit to existing deductions once the background study is released. Although the proposal suggests that the D.C. background study will require the methodology to be provided by service, there may be situations where a project-by-project determination is required.
Watson & Associates Economists Ltd.
PAGE 9
Page 136 of 157
1.2.3
Details of Land Acquisition
Proposed Changes It is proposed that land acquisition capital needs shall be treated as a class of service. As such, section 8 of Ontario Regulation 82/98 will be amended to require land acquisition costs to be included in the D.C. background presentation of: • • • • •
The total of the estimated capital costs relating to the service; The allocation of the total of the estimated costs between costs that would benefit new development and costs that would benefit existing development; The total of the estimated capital costs relating to the service that will be incurred during the term of the proposed D.C. by-law; The allocation of the costs incurred during the term of the proposed by-law between costs that would benefit new development and costs that would benefit existing development; and The estimated and actual value of credits that are being carried forward relating to the service.
Potential Impacts See the comments above with respect to the inclusion of land acquisition as a class of service. 1.2.4
Information Accessibility
Proposed Changes The proposed changes increase reporting requirements for the Annual Treasurer’s Statements to include: • • •
The amount from each reserve fund that was committed to a project, but had not been spent, as of the end of the year; The amount of debt that had been issued for a project as of the end of the year; and The location in the D.C. background study where the project’s capital costs were estimated.
This would not apply in circumstances where a municipality uses a unique identifier in both background studies and Treasurer’s Statements to identify each project. Potential Impacts The proposed changes increase transparency for the public and can help demonstrate that D.C. funds are being used as required and to the extent allowable under the D.C.A.
Watson & Associates Economists Ltd.
PAGE 10
Page 137 of 157
These additional requirements will increase administrative effort by municipal staff. Municipalities may wish to provide unique project identifiers as part of the preparation of their next D.C. background study for ease of aligning projects in the D.C. background study with the projects identified in the Annual Treasurer’s Statement.
Concluding Remarks
The proposed changes to the D.C.A. and Ontario Regulation 82/98 are generally positive as they provide additional transparency of the D.C. calculations and how D.C.s are used by municipalities. The changes with respect to including land acquisition as a class of service appear to have a minor impact on municipalities where land values are minimal, with a greater impact on the Level of Service calculations for larger urban municipalities. The requirement for a Local Service Policy and its contents are generally in line with Watson’s current approach; however, updates may be required to existing Local Service Policies to provide more detail on which costs would be local service and which costs would be recovered through D.C.s. Watson continues to have concerns regarding the merging of services for the purposes of credits, as this may impact municipalities that have invested in water supply and/or wastewater treatment costs. We will continue to monitor any changes and inform you of the potential impacts on municipalities. Should you have any questions, please contact any of the undersigned or send an email to info@watsonecon.ca. Yours very truly, WATSON & ASSOCIATES ECONOMISTS LTD. Andrew Grunda, MBA, CPA, CMA, CEO Peter Simcisko, BA (Hons), MBE, Managing Partner Sean-Michael Stephen, MBA, Managing Partner Daryl Abbs, BA (Hons), MBE, PLE, Managing Partner Jamie Cook, MCIP, RPP, PLE, Managing Partner Jack Ammendolia, BES, PLE, Managing Partner
Watson & Associates Economists Ltd.
PAGE 11
Page 138 of 157
To:
Council
From:
Director, Development Services
Date of Meeting:
December 9, 2025
Subject:
Bill 68 - Plan to Protect Ontario Act, 2025
Report Number:
2025-168
Summary This report provides a summary of Bill 68, the Plan to Protect Ontario Act, 2025, and its implications to Conservation Authorities with jurisdiction within the Township. Recommendation For information only. Background Bill 68, also know as the Plan to Protect Ontario Act, 2025 received royal assent on November 27, 2025. Part of the bill includes changes to the Conservation Authorities Act, which would merge 36 conservation authorities to 7 regional conservation authorities, and would create a new Ontario Provincial Conservation Agency. Discussion/Analysis On October 31, 2025, the Minister of the Environment, Conservation and Parks (MECP) announced the Province’s intention to create the Ontario Provincial Conservation Agency through forthcoming legislation. The Ontario Provincial Conservation Agency is proposed to be a provincial board-governed agency with the stated purpose of providing centralized leadership, efficient governance, and strategic direction. As part of this announcement, the MECP also indicated that the Province plans to consolidate the existing 36 conservation authorities into 7 regional conservation authorities, which would receive oversight and governance from the single Ontario Provincial Conservation Agency. Ontario Provincial Conservation Agency The objectives of the agency include: • • •
Oversee the governance of authorities and other aspects of authorities such as their operations, including the programs and services they provide. Oversee the transition to a regional watershed-based framework for authorities in Ontario. Promote consistent policies, standards, and fees for programs and services provided by authorities. www.southfrontenac.net South Frontenac is a welcoming and thriving rural community.
Township of South Frontenac Staff Report Number: 2025-168
• • • • • • •
Page 139 of 157
Assess and report on the effectiveness of authorities. Oversee and evaluate the financial performance of authorities. Guide and evaluate the strategic planning by authorities to ensure it aligns with provincial objectives. Support the development and implementation of a standardized and centralized system for processing applications for permits issued by authorities. Lead the development and implementation of digital strategies and shared services. Support strategic investment in programs and services provided by authorities. Advise the Government of Ontario in respect of the programs and services authorities provide.
The Minister can issue directions to the Agency. The Agency can issue directions to one or more regional conservation authorities, which authorities must comply with, including but not limited to: • • • • • • • •
Key performance indicators (KPIs), key results and service delivery targets. Service standards. Information Technology. Procurement. Training of members and employees. Budgeting. Asset Management Planning. Strategic Planning (to align with Provincial Interests not local).
Environmental Registry of Ontario On November 7, 2025, Proposal 025-1257 was posted to the Environmental Registry of Ontario and provides further details on the proposed Ontario Provincial Conservation Agency and regional authorities consolidation. The Proposal seeks feedback on the boundaries and criteria for the proposed regional consolidation and is open for public comment until December 22, 2025. The Province published its current draft boundaries and explains in the post that it seeks to maintain and align natural hydrological boundaries; maintain existing relationships between conservation authorities and municipalities; balance expertise and capacity of conservation authorities; and provide service continuity. Conservation Authority Consolidation The province has provided the following reasons why they are proposing to consolidate Conservation Authorities and create a new provincial oversight agency: Patchwork of standards, service delivery: Each Conservation Authority has different policies, customer service standards, fees, processes and staffing and technical capacity leading to unpredictable and inconsistent turnaround times for approvals across all Conservation Authorities. This can result in uncertainty and delays for builders, landowners, and farmers seeking permits. Outdated and fragmented systems: Discrepancies in the tools and technology that Conservation Authorities use have led to varying types and quality of technology and data www.southfrontenac.net South Frontenac is a welcoming and thriving rural community.
Township of South Frontenac Staff Report Number: 2025-168
Page 140 of 157
management. This can compromise effective province-wide flood risk management and evidence-based decision making. Administrative duplication: Under the current framework, municipalities are forced to fund duplicate corporate functions, diverting costs away from frontline conservation and service delivery. Need for more accountability and transparency: Lack of transparent performance monitoring and reporting, and inconsistent customer service standards. Continue to focus on managing natural hazards and watershed health: Proposed changes are intended to strengthen the capacity, influence and impact of Conservation Authorities in providing vital watershed management, in safeguarding people and property from flooding, and in being transparent and accountable in the delivery of permitting, programs, and services to Ontario’s communities. Deliver faster services to municipalities: With better tools and resources, and central enablement and support, CAs can operate with greater consistency and transparency, and deliver improved services to municipalities and permit applicants aligned with provincial priorities on housing, the economy, and resilient infrastructure. St. Lawrence & Eastern Lake Ontario Regional Conservation Authorities The Township of South Frontenac is situated within the headwaters of the jurisdictions of three Conservation Authorities – Cataraqui, Quinte, and Rideau Valley. Cataraqui and Rideau Valley are to be consolidated with 3 other Conservation Authorities to form the St. Lawrence Regional Conservation Authority. The current Conservation Authorities that would make up the proposed St. Lawrence Regional Conservation Authority include: • Cataraqui • Mississippi • South Nation • Raisin • Rideau Valley Quinte Conservation is to be consolidated with 6 other Conservation Authorities to become the Eastern Lake Ontario Regional Conservation Authority. The current Conservation Authorities that would make up the proposed Eastern Lake Ontario Regional Conservation Authority include: • Central Lake Ontario • Kawartha Region • Otonobee Region • Ganaraska Region • Lower Trent Region • Crowe Valley • Quinte Region
www.southfrontenac.net South Frontenac is a welcoming and thriving rural community.
Township of South Frontenac Staff Report Number: 2025-168
Page 141 of 157
Figure 1 below illustrates the 7 consolidated regional Conservation Authorities.
Conservation Authority Boards & Local Governance Currently, the Rideau Valley Conservation Authority has 18 member municipalities, all of whom have at least one seat on its Board of Directors. The proposed St. Lawrence Regional Conservation Authority would have 46 municipalities. It is anticipated that not all municipalities could have a seat on the new Board. Under the current model, seats are allocated based on population which would favour larger urban centres like Ottawa and Kingston while marginalizing the large number of small rural municipalities in Eastern Ontario. Despite their size or how seats are allocated on the new Board, each municipality’s influence would be diluted within a regional Conservation Authority. Regional Boards would also not be responsive to local watershed issues and community concerns. Conservation Authorities provide services on behalf of municipalities and deliver programs to address local watershed needs. These programs and services are at the discretion of the Board Municipalities. The appointed members of the Board of Directors govern Conservation Authorities including budgeting, programs, staffing, policies and strategic planning.
www.southfrontenac.net South Frontenac is a welcoming and thriving rural community.
Township of South Frontenac Staff Report Number: 2025-168
Page 142 of 157
Financials It is unclear at this time how budgets would be developed within regional Conservation Authorities as the levy capacity of municipalities varies from watershed to watershed. Programs vary between Conservation Authorities based on the needs and tax base of each local watershed. Larger municipalities would likely not support levy dollars being spent on programs or capital projects outside the watershed they benefit from or are impacted by. It is the opinion of Conservation Authority staff that it is important that the new regional Conservation Authorities remain independent corporations to ensure that all assets remain under Conservation Authority control and ownership including land holdings, buildings and financial reserves. The province has stipulated that Conservation Authority ownership of land would not change and that no assets would be transferred to the Agency or province as part of the proposed changes. Financial Implications None. Relationship to Strategic Plan ☒ Not applicable to this report. ☐ This initiative adheres to the following strategic pillars and directions of the 2023-2026 Strategic Plan. • •
Pillars: Choose an item. Action Item (If Applicable): Insert Text
Climate Considerations ☒ Not applicable to this report. Approvals Submitted By:
Brad Wright, RPP, MCIP, AICP, PLE Director of Development Services Approved By:
Louise Fragnito, CPA, CGA Chief Administrative Officer www.southfrontenac.net South Frontenac is a welcoming and thriving rural community.
Page 143 of 157
To:
Council
From:
Director, Development Services
Date of Meeting:
Tuesday, December 9, 2025
Subject:
3rd Quarter 2025 – Building Services Report
Report Number:
2025-165
Summary This report documents the delivery of Building Services within the Development Services Department between July 1st, 2025, to September 30th, 2025. Recommendation This report is for information purposes only. Background Building Services provides the following as an update report to Council on performance indicators, updated processes, and the quantity of building applications received and processed by the Township. Quarterly construction values from 2022 to 2025 are provided, as well as the amount of building permits issued and files closed. Discussion/Analysis Building Services Q3 was quite busy for Building Services, with July and September standing out as two of the busier months for the department in 2025. Staff have continued to promote pre-consultation meetings for building applications, and these sessions are becoming increasingly popular among applicants. By having our Permit Intake Coordinator and a Building Inspector participate in these meetings, we work to answer questions and to ensure applicants are fully informed about next steps. When necessary, we also include Planning staff to provide all the pertinent information to the applicant for their project. This collaborative approach often leads to a more streamlined process, ultimately saving time for both the applicant and Development Services staff. Given that Q3 is a busier time for staff, the team focused on in-house training with quick check-ins and consistent regular meetings to maintain open dialogue and discussion regarding current projects, ensuring consistency and support for staff. Looking ahead, staff will continue to engage in courses and workshops focused on Ministry qualifications and technical training starting again in Q4. At the end of Q3, staff prepared for the move back to the George Street Office, and they did a great job packing up our temporary office while continuing to assist the public with their applications and permits. South Frontenac Building Permits Issued & Other Approved Files The following two tables show the breakdown of permits issued by permit type for the 3rd quarter of 2025. They also provide comparisons with the same quarters from previous years. Additionally, the tables include a breakdown of other Part 8 Services and other files approved by Building Services. It’s important to note that the review process of Part 8(sewage systems) for planning applications have been redefined to focus more on complexed applications. This includes planning applications such as very small lots, congested lots with multiple structures, multi-residential/commercial/industrial sites under 10,000 L/day, plans of condo/subdivision. These changes allow our Inspectors to focus on essential applications and streamline reviews, enabling staff to prioritize other tasks. The changes are seen in the table below.
www.southfrontenac.net South Frontenac is a welcoming and thriving rural community.
Township of South Frontenac Staff Report Number: 2024-165
Page 144 of 157
Permits Issued Q3-2022 Accessory Building 33 Deck/Covered Porch 11 Demolition 10 Industrial/Commercial/Institutional 7 Multi-Residential Pool Enclosure 10 Renovation/Repair/Addition 12 Seasonal Dwelling 5 Secondary Dwelling Unit 1 Sewage System 92 Single Dwelling 22 Solar, Sign, Tent etc. 2 Woodstove/Fireplace 10 Totals 215 Part 8 Services Consent Review 23 Minor Variance Review 3 Performance Review 5 Record Search Site Plan Control Totals 31 Other Approved Files Food Trucks Civic Address Assignments 9
Q3-2023 18 12 9 1 1 4 24 5 1 82 22 6 8 192
Q3-2024 Q3-2025 10 11 21 31 13 13 6 4 4 8 13 17 3 2 3 3 48 45 13 12 5 4 12 9 151 159
9 5 13
9 3 4 8 1 25
2 3 5
12
13
13
Quarterly Construction Values for all issued permits (includes Part 8) The total construction value for Q3 building and sewage permits combined was $11,928,094 million dollars. Quarterly Construction Values 2022 2023 2024 2025
Q1
Q2
Q3
$16,150,397 $ 7,116,555 $18,581,640 $9,099,810
$25,241,485 $20,911,418 $12,000,318 $16,412,901
$21,974,324 $18,350,670 $14,472,054 $11,928,094
Q4
Totals
$17,801,458 $81,167,664 $11,411,605 $57,790,248 $15,880,281 $60,934,293 $37,442,830
Performance Indicators The following information provides an overview of the types, quantity and work cycle of files and the overall workload that Building Services completes throughout each quarter. www.southfrontenac.net South Frontenac is a welcoming and thriving rural community.
Township of South Frontenac Staff Report Number: 2024-165
Performance Indicators Intake of Files Incomplete Files Building Without Permit (BWP) OBC File Review OBC Re-Review Permits Issued Total Inspections Total Failed/Not Ready Inspections Site Visits Closed Files
Page 145 of 157 2024 Total 681 455 50 635 314 508 2727 375 124 549
Q1 92 66 5 72 37 76 343 68 27 111
Q2 168 113 9 101 69 131 554 83 40 128
2025 Q3 198 108 15 228 63 159 725 122 69 130
Q4
Total 458 287 29 401 169 366 1622 273 136 369
Building Application Intake In Q3, Building Services received a total of 198 files, both in person and via email. Initially, 108 of these files were deemed incomplete because the required documentation was either missing or insufficient at the time of submission. Of those 108 incomplete files, 75% progressed to the next step of the process within Q3 after the Permit Intake Coordinator received the necessary documentation, allowing the files to be considered adequate for zoning and building review. To note, all building application packages include a checklist to assist the applicant with the required documentation that is to be submitted. Building Code Review Once permit applications have all the required documentation, the file is moved to Planning Services for review and approval for zoning compliance. When approved, the Planning Coordinator gives the application to the assigned Inspector to start their Building Code review. In Q3, 228 building and sewage applications were reviewed and commented on, and 27% were re-reviewed. Often when staff are reviewing building applications, the required documentation provided lacks the necessary information to complete a full Building Code review. This triggers the request for additional information or clarification for our Building Inspectors to be able to complete their review. Once the building code review is complete, the permit is ready for issuance. After the associated fees are paid, the permit is then issued. Due to the number of re-reviews that are required for the building and sewage applications, difficult applications may be pending until all necessary documentation is received. It is important to note that when examining the numbers in the table above, the number of files received may not correspond directly to the files issued within each quarter. Issued permits can include applications from previous periods, often due to delays in receiving the necessary documentation for approval, which determines when a file is deemed ready for issuance. Inspections & Site Visits Our inspectors have been quite active with inspections and site visits during the 3rd quarter. These tasks constitute a significant part of their daily schedule. In Q3, 17% of inspections were not compliant and required re-inspection. In the 3rd quarter, we completed 35 inspections on permits issued before 2022 and 114 inspections on permits issued in 2022 and 2023. These inspections make up about 20% of all inspections completed during this time. Closed Building Files Closing both recent building permit files and historical files remains a priority within our department. We receive numerous requests from homeowners who are in the process of selling properties with open historical permits. Inspections on these older files have continued throughout the third quarter. These inspections significantly increase the workload for inspectors, as they often have to review files that may lack essential documentation, navigate older regulations, and inspect items that have been in use for several years.
www.southfrontenac.net South Frontenac is a welcoming and thriving rural community.
Township of South Frontenac Staff Report Number: 2024-165
Page 146 of 157
In Q3, our team successfully closed 130 permits, with 30% of those being permits that were issued prior to 2024. Building Without Permits & Complaints Staff have adopted a more hands-on approach to managing and following up on building without permit (BWP) files. In Q3, staff opened 15 BWP files, with 11 of them resolved by permits being issued. The team works with applicants to ensure that building applications are received with the relevant information to review under the Ontario Building Code and the Zoning By-law. We provide options for the applicants to have a pre-consultation meeting with both Building and Planning to achieve compliance in a quick and efficient manner. BWP Investigation files and complaints come from various sources, including mail, email, or illegal constructions identified by inspectors or planners during site visits and inspections. The public can submit complaints through an online form on our website, and written complaints are also accepted; however, complainants must provide their name and contact information for legitimacy. That said, all complainants remain anonymous. Financial Implications Building Fees and Part 8 Fees In Q3, the total revenue collected from all issued building permits in South Frontenac was $247,240 of which $40,098 was attributed to Part 8 services revenue. Relationship to Strategic Plan ☐ Not applicable to this report. ☒ This initiative adheres to the following strategic pillars and directions of the 2023-2026 Strategic Plan. •
Pillars: Municipal Service Excellence
Approvals Prepared By: Rebecca Roy, Chief Building Official, Manager of Building Services Submitted By:
Brad Wright, RPP, MCIP, AICP, PLE Director of Development Services Approved By:
Louise Fragnito, CGA, CPA Chief Administrative Officer
www.southfrontenac.net South Frontenac is a welcoming and thriving rural community.
Page 147 of 157
To:
Council
From:
Director, Development Services
Date of Meeting:
Tuesday, December 9, 2025
Subject:
3rd Quarter Planning Services Report – 2025
Report Number:
2023-166
Summary This report documents the delivery of Planning Services within the Development Services Department between July 1, 2025, and September 30, 2025 (3rd quarter, 2025). Recommendation This report is for information purposes only. Background The charts below break out planning activities by application type for Q3 2025 and compares the number to previous 3rd quarters over the past four years. The activities outlined below were completed by the Manager of Planning, Planner(s), Planning Coordinator, and Planning Clerk (Christine, Colin, Noah, Kamila, and Kate). Pre-consultation Meetings (3rd Quarter, 2025) Number of Meetings 2020 – 3rd Quarter Total
65
2021 – 3rd Quarter Total
75
2022 – 3rd Quarter Total
55
2023 – 3rd Quarter Total
60
2024 – 3rd Quarter Total
45
2025 – 3rd Quarter Total
40
www.southfrontenac.net South Frontenac is a welcoming and thriving rural community.
Township of South Frontenac Staff Report Number: 2025-166
Page 148 of 157
Consent Applications (3rd Quarter, 2025) Complete Applications Submitted 2020 – 3rd Quarter Total
9
2021 – 3rd Quarter Total
17
2022 – 3rd Quarter Total
17
2023 – 3rd Quarter Total
7
2024 – 3rd Quarter Total
22
2025 – 3rd Quarter Total
14
Consent Applications – Approvals by Delegated Approval versus Applications Heard by Committee of Adjustment (3rd Quarter, 2025) Undisputed Consents Approved by Director of Development Services
Disputed Consents Heard by Committee of Adjustment
2020 – 3rd Quarter Total
6
0
2021 – 3rd Quarter Total
17
0
2022 – 3rd Quarter Total
17
6
2023 – 3rd Quarter Total
11
3
2024 – 3rd Quarter Total
19
2
2025 – 3rd Quarter Total
18
5
Minor Variance Applications (3rd Quarter, 2025) Complete Applications Submitted 2020 – 3rd Quarter Total
18
2021 – 3rd Quarter Total
14
2022 – 3rd Quarter Total
9
2023 – 3rd Quarter Total
13
2024 – 3rd Quarter Total
8
2025 – 3rd Quarter Total
6
www.southfrontenac.net South Frontenac is a welcoming and thriving rural community.
Township of South Frontenac Staff Report Number: 2025-166
Page 149 of 157
Zoning By-law Amendment Applications (3rd Quarter, 2025) Complete Applications Submitted 2020 – 3rd Quarter Total
5
2021 – 3rd Quarter Total
4
2022 – 3rd Quarter Total
5
2023 – 3rd Quarter Total
6
2024 – 3rd Quarter Total
5
2025 – 3rd Quarter Total
6
Site Plan Control Applications (3rd Quarter, 2025) Applications Submitted 2020 – 3rd Quarter Total
6
2021 – 3rd Quarter Total
3
2022 – 3rd Quarter Total
3
2023 – 3rd Quarter Total
1
2024 – 3rd Quarter Total
1
2025 – 3rd Quarter Total
0
Development Agreements (3rd Quarter, 2025) Agreements Prepared 2020 – 3rd Quarter Total
17
2021 – 3rd Quarter Total
16
2022 – 3rd Quarter Total
8
2023 – 3rd Quarter Total
16
2024 – 3rd Quarter Total
15
2025 – 3rd Quarter Total
8
www.southfrontenac.net South Frontenac is a welcoming and thriving rural community.
Township of South Frontenac Staff Report Number: 2025-166
Page 150 of 157
Certificates of Official Issued (Finalizing Consent Applications) (3rd Quarter, 2025) Certificates Issued 2020 – 3rd Quarter Total
10
2021 – 3rd Quarter Total
15
2022 – 3rd Quarter Total
16
2023 – 3rd Quarter Total
14
2024 – 3rd Quarter Total
9
2025 – 3rd Quarter Total
12
Discussion/Analysis The application numbers and demand for planning services in Q3 2025 are comparable to previous years. Pre-consultation meetings: Planning Services staff regularly schedule pre-consultation meetings with applicants. Staff review and consider land development proposals and provide constructive feedback. This may include severance potential, lot addition scenarios, and various types of building projects, expansions, and renovations. Other items or projects that staff are working on not related to planning applications includes the following items: •
Issuance of Planning Compliance Certificates (62 in Q3, 2025): As part of the department’s goal of streamlining the development approval process, the Planning Coordinator reviews all planning and building permit applications for conformity with the Zoning By-law as well as any other pertinent requirements (e.g. Development Agreements, Committee of Adjustment decisions, License, Site Plan Control, and Plan of Subdivision/Condominium Agreements)
•
Building without Permit planning reviews: Planning staff work with Building Inspectors on Building Without Permits, and complete site visits. In general, files are move into compliance with planning and building approvals. This could include removal of a structure, moving of a structure to adhere to zoning by-law setbacks, planning approvals obtained, and/or building permit and associated inspections completed.
•
Zoning By-law complaints: Planning staff work with the Clerks department reviewing complaints on zoning compliance. This may include a desktop review of the existing structures on site, site visits, correspondence with the landowner, Clerk’s department and or By-law enforcement to identity and confirm issues and rectify to ensure compliance with the Zoning By-law. www.southfrontenac.net South Frontenac is a welcoming and thriving rural community.
Township of South Frontenac Staff Report Number: 2025-166
Page 151 of 157
•
OPPI Conference, July 2025: Planning staff attending the Ontario Professional Planning Institute Conference in July 2025 which contributes to their Continuous Professional Learning requirements as part of their registered professional planner requirements.
• •
Community Planning Permit System for waterfront property (County led initiative); Final approval stages for Applewood, Johnston Point, Cranberry Cove, Shield Shores condominium; Updating planning application guidance material; Updating site plan control guidelines. Ontario Land Tribunal hearings (2); Committee of Adjustment meetings and administration; Pre-consultation meetings for Additional Dwelling Units; Zoning Letters; Real estate inquiries from residents and real estate agents;
• • • • • • •
Other updates: •
•
The County approved the Township’s new Official Plan on November 19, 2025. Township staff are awaiting the 20-day appeal period, which ends on December 10, 2025 at which point the new Official Plan will be in full force. There have been a few inquiries regarding the Township’s new Official Plan and potential for land developments utilizing communal servicing.
Financial Implications None. Relationship to Strategic Plan ☒ Not applicable to this report. ☐ This initiative adheres to the following strategic pillars and directions of the 2023-2026 Strategic Plan. • •
Pillars: Choose an item. Action Item (If Applicable): Insert Text
Climate Considerations ☒ Not applicable to this report. ☐ This initiative supports climate change mitigation/adaption efforts in South Frontenac; and/or impacts the Township’s resilience to climate change. Notice/Consultation Planning Services staff www.southfrontenac.net South Frontenac is a welcoming and thriving rural community.
Township of South Frontenac Staff Report Number: 2025-166
Approvals Submitted By:
Brad Wright, RPP, MCIP, AICP, PLE Director of Development Services Approved By:
Louise Fragnito, CGA, CPA Chief Administrative Officer
www.southfrontenac.net South Frontenac is a welcoming and thriving rural community.
Page 152 of 157
Page 153 of 157 Minutes of Council December, 2, 2025
Township of South Frontenac Council Meeting Minutes
Meeting #2025-22 Time: 7:00 PM Location: Council Chambers/Virtual Via Zoom Present: Ray Leonard, Doug Morey, Steve Pegrum, Norm Roberts, Randy Ruttan, Ron Sleeth, Scott Trueman, Adam Turcotte, Mayor Ron Vandewal Staff: Louise Fragnito - Chief Administrative Officer, James Thompson - Clerk, Heather Woodland - Deputy Clerk, Kyle Bolton - Director of Public Services, Stephanie Kuca Director of Finance and Treasurer, Troy Dunlop - Manager of Engineer and Capital Projects, Melia Edgar - Deputy Treasurer
1
Meeting to Order
a)
Resolution Resolution No. [2025-22]-01 Moved by Councillor Pegrum Seconded by Councillor Turcotte That the Council meeting of December 2, 2025 be called to order at 7:00 p.m. Carried
2
Roll Call
3
Approval of Agenda (and Addendum)
a)
Resolution Resolution No. [2025-22]-02 Moved by Councillor Roberts Seconded by Councillor Leonard That the agenda be approved, as presented. Carried
4
Deputy Mayor - Oath of Office
a)
Resolution Councillor Pegrum undertook the Declaration of Office regarding the position of Deputy Mayor as outlined in Section 232 of the Municipal Act, 2001. Resolution No. [2025-22]-03 Moved by Councillor Morey Seconded by Councillor Sleeth That Councillor Pegrum be appointed as Deputy Mayor for the remainder of the current term of Council. Carried
5 a)
Disclosure of Pecuniary Interest There were none.
Page 154 of 157 Minutes of Council December, 2, 2025 6
Committee of the Whole “Closed Session”
7
Recess (If Required)
8
Ceremonial Presentations
9
Public Meeting
10
Delegations
a)
Representatives from Ontario for Alto’s Hight Speed Rail were present to speak to Council regarding a project overview for a proposed electrified passenger rail services proposed between Toronto and Quebec City.
11
Briefings
12
Reports from Administration
a)
Close Out Report – 2025 Private Lane Upgrade Assistance Program Resolution No. [2025-22]-04 Moved by Councillor Trueman Seconded by Councillor Turcotte That Council receive the close out summary report for the 2025 Private Lane Upgrade Assistance Program for information. Carried
b)
Pavement Condition Rating Updates 2025 Resolution No. [2025-22]-05 Moved by Councillor Roberts Seconded by Councillor Leonard That Council receive staff report 2025-161 Pavement Condition Rating Updates 2025 for information; and That Council direct staff to prepare an update to the 5-year plan for hard surfaced roads covering the period of 2026 to 2030 for review and consideration. Carried
13
Reports from Advisory Committees
14
Information Reports
a)
2026 Budget Direction
b)
2026 Budget Survey Results
15
Committee of the Whole
16
Communications
17
Tabling of Documents
18
New Business
19
Notice of Motion
a)
Moved by Councillor Turcotte Seconded by That Council direct staff to prepare and submit a formal letter of objection to the Premier of Ontario and the Minister of Municipal Affairs and Housing, expressing our profound concern that the “Strong Mayor” model, the proposed
Page 2 of 4
Page 155 of 157 Minutes of Council December, 2, 2025 consolidation of Conservation Authorities, and the municipal planning implications of Bill 60, the Fighting Delays, Building Faster Act, represent a systematic erosion of municipal democratic agency and local environmental oversight, and further, that this letter be shared with the Association of Municipalities of Ontario (AMO), our local Conservation Authorities and all neighbouring municipalities. b)
Moved by Councillor Ruttan Seconded by Whereas the Conservation Authorities Act (1946) established Conservation Authorities (CAs) as local, watershed-based bodies to manage natural resources in partnership with municipalities; Whereas Conservation Authorities are governed by Boards of Directors comprised of municipally elected officials or appointees, ensuring direct accountability to the local tax base; Whereas the current funding model relies heavily on municipal levies and selfgenerated revenue, with the Province of Ontario contributing approximately 5% or less to operating budgets (e.g., Cataraqui Conservation receives ~48% from municipalities and only ~5% from the Province); Whereas the Province of Ontario has introduced Schedule 3 of Bill 68 and Environmental Registry of Ontario (ERO) posting 025-1257, which proposes to amalgamate Ontario’s 36 Conservation Authorities into seven (7) centralized regional entities governed by a new “Ontario Provincial Conservation Agency”; Whereas this forced amalgamation threatens to dilute local decision-making, sever the critical link between local property taxes and local service delivery, and ignore the unique hydrological and environmental differences between our distinct watersheds; Therefore be it resolved that the Council of South Frontenac Township formally opposes the proposed amalgamation of Conservation Authorities as outlined in ERO 025-1257; And further that Council calls upon the Province of Ontario to:
- Pause the implementation of Bill 68, Schedule 3;
- Maintain the current watershed-based governance model that ensures local accountability; and
- Engage in meaningful consultation with municipalities to address specific concerns regarding efficiency without dismantling local governance; And further that a copy of this resolution be forwarded to the Premier of Ontario, the Minister of the Environment, Conservation and Parks, the Minister of Municipal Affairs and Housing, our local MPP John Jordan, the Association of Municipalities of Ontario (AMO), and all Conservation Authorities within our region.
c)
Moved by Councillor Leonard Seconded by That Council request the Bank of Montreal to reconsider the proposed closure of the Verona BMO Branch due to the anticipated growth to occur in Verona in the near future (Verona Housing Project, McMullen Manor); and
Page 3 of 4
Page 156 of 157 Minutes of Council December, 2, 2025 That a copy of the resolution be provided to MPP John Jordan and the Bank of Montreal. 20
Approval of Minutes
a)
Resolution Resolution No. [2025-22]-06 Moved by Councillor Sleeth Seconded by Deputy Mayor Pegrum That the minutes of the November 18, 2025 Council meeting be approved. Carried
21
Approval of By-laws
22
Committee of the Whole “Closed Session”
23
Confirmation By-law
a)
Resolution Resolution No. [2025-22]-07 Moved by Councillor Leonard Seconded by Councillor Morey That By-law 2025-76, being a by-law to confirm generally all actions and proceedings of the Council of the Township of South Frontenac, be given first and second reading. Carried Resolution No. [2025-22]-08 Moved by Councillor Ruttan Seconded by Councillor Roberts That By-law 2025-76, being the confirmatory by-law, be given third reading, signed and sealed. Carried
24
Date of Next Meeting
a)
The next Council meeting is scheduled for December 9, 2025 at 7:00 p.m.
25
Adjournment
a)
Resolution Resolution No. [2025-22]-09 Moved by Councillor Trueman Seconded by Councillor Ruttan That the Council meeting of December 2, 2025 be adjourned at 8:04 p.m. Carried
Ron Vandewal, Mayor James Thompson, Clerk South Frontenac is a welcoming and thriving rural community
Page 4 of 4
Page 157 of 157 Township of South Frontenac By-Law Number 2025-79 Page 1 of 1 By-Law Number 2025-79 A By-Law to Confirm generally all actions and proceedings of the Council meeting of the corporation of the Township of South Frontenac on December 9, 2025 Whereas Section 8 of the Municipal Act, S.O. 2001 c. 25 and amendments thereto provides that a municipality has the capacity, rights powers and privileges of a natural person for the purpose of exercising its authority under the Municipal Act of any other Act and; Whereas Subsection 2 of Section 11 of the Municipal Act S.O. 2001, c. 25 and amendments thereto provides that a lower-tier municipality and an upper-tier municipality may pass by-laws respecting matters within the spheres of the jurisdiction described in the Table to Subsection 2, subject to certain provisions, and; Whereas Section 5 of the Municipal Act, S.O 2001 c. 25 and amendments thereto provides that a municipal power, including a municipality’s capacity, rights, powers and privileges under Section 8 shall be exercised by its council and by by-law unless the municipality is specifically authorized to do otherwise, and; Whereas the Council of the Township of South Frontenac deems it expedient to confirm its actions and proceedings; Therefore, be it resolved that the Council of the Corporation of the Township of South Frontenac hereby enacts as follows:
- The all actions and proceedings of the Council of the Corporation of the Township of South Frontenac taken at its regular meeting held on December 9, 2025, be confirmed as actions for which the municipality has the capacity, rights, powers and privileges of a natural person.
- That all actions and proceedings of the Council of the Corporation of the Township of South Frontenac held December 9, 2025, be confirmed as being matters within the spheres of jurisdiction described in Subsection 2 of Section 11 of the Municipal Act, S.O. 2001, c.25 and amendments thereto.
- That all actions and proceedings of the Council of the Corporation of the Township of South Frontenac taken at its regular meeting held on December 9, 2025, except those taken by by-law and those required by bylaw to be done by resolution are hereby sanctioned, ratified and confirmed as though set out within and forming part of this bylaw.
- Execution by the Mayor and the Clerk of all Deeds, Instruments and other Documents necessary to give effect to any such Resolution, Motion or other action and the affixing of the Corporate Seal to any such Deed, Instruments or other Documents is hereby authorized and confirmed.
- This By-law shall come into force and take effect on the date of its passage. Given First and Second Readings: Tuesday, December 9, 2025 Given Third Reading and Passed: Tuesday, December 9, 2025
James Thompson, Clerk
Ron Vandewal, Mayor
