Township of South Frontenac Council Meeting Agenda
TIME: DATE: PLACE:
9:00 AM, Tuesday, December 12, 2023 Council Chambers/Virtual Via Zoom .
Call to Order
a)
Resolution
Declaration of pecuniary interest and the general nature thereof
Approval of Agenda
a)
Resolution
Scheduled Closed Session
Recess
Public Meeting
Delegations
Briefings
Approval of Minutes
a)
Resolution
Reports Requiring Action
a)
Township of South Frontenac - 2024 Draft Budget Deliberation
Advisory Committee Reports or Minutes
Reports Requiring Approval of By-laws
a)
Appointment of Treasurer
3-8
9 - 132
133 136
That By-law 2023-98 being a By-law to appoint Louise Fragnito as Treasurer be given first and second reading; and That By-law 2023-98 be given third reading, signed and sealed. 13.
Reports for Information
Committee of the Whole
Information Items
Notice of Motions
Rise and Report regarding County Council and External Boards
Announcements/Statements by Councillors
Closed Session (if requested)
Confirmatory By-law
Page 2 of 137
a)
Resolution
Adjournment
a)
Resolution Natural, Vibrant and Growing - A Progressive Rural Leader
137
Page 3 of 137 Minutes of Council December, 5, 2023
Township of South Frontenac Council Meeting Minutes
Meeting #34 Time: 7:00 p.m. Location: Council Chambers / virtual via Zoom Present: Charlene Godfrey, Ray Leonard, Doug Morey, Steve Pegrum, Norm Roberts, Randy Ruttan, Ron Sleeth, Scott Trueman, Mayor Ron Vandewal Staff: Louise Fragnito - Chief Administrative Officer, James Thompson - Clerk, Michelle Hannah - Deputy Clerk, Brad Wright - Director of Development Services, Kyle Bolton Director of Public Services, Troy Dunlop, Manager of Engineering & Capital Projects, Christine Woods - Senior Planner (virtual), Jan Minaker - Manager of Human Resources
1
Call to Order
a)
Resolution Resolution No. 2023:34:01 Moved by Councillor Pegrum Seconded by Councillor Ruttan That the Council meeting of December 5, 2023 be called to order at 7:00 p.m. Carried
2
Declaration of pecuniary interest and the general nature thereof
a)
There were none.
3
Approval of Agenda
a)
Resolution Resolution No. 2023:34:02 Moved by Councillor Leonard Seconded by Councillor Trueman That the agenda be approved, as presented. Carried
4 a)
5 a)
6 a)
7
Scheduled Closed Session There was none. Recess There was none. Public Meeting There was none. Delegations
Page 4 of 137 Minutes of Council December, 5, 2023 a)
Patricia Dawson and Hellen Hill were present to speak to Council regarding the proposed Alectra Energy Solutions, South Frontenac and Harrowsmith Energy Storage Projects.
8
Briefings
a)
Julie Gonyou and Chris Loreto from Strategic Corp spoke to Council regarding the proposed 2023-2026 Corporate Strategic Plan.
9
Approval of Minutes
a)
Resolution Resolution No. 2023:34:03 Moved by Councillor Trueman Seconded by Councillor Leonard That the minutes of the November 21, 2023 Council meeting be approved. Carried
10
Reports Requiring Action
a)
Strategic Plan Resolution No. 2023:34:04 Moved by Councillor Godfrey Seconded by Councillor Roberts That Council approve the 2023-2026 Corporate Strategic Plan document, attached as Schedule A to this report; and That Council direct staff to bring forward an implementation plan for the Strategic Plan in the first quarter of 2024. Carried
b)
Request for Lane Name Change – Neill Lane to James Thomas Lane Resolution No. 2023:34:05 Moved by Deputy Mayor Sleeth Seconded by Councillor Ruttan That Council direct staff to proceed with the advertising and notice requirements to rename Neill Lane. Carried
c)
2024 Meeting Schedule Resolution No. 2023:34:06 Moved by Councillor Pegrum Seconded by Councillor Trueman That notwithstanding By-law 2017-76, As Amended and By-law 2023-04, the following Council, Lake Ecosystem Advisory Committee and Recreation & Leisure Services Advisory Committee meeting dates be rescheduled as follows: • February 22, Recreation & Leisure Services Advisory Committee meeting rescheduled to February 29; • March 28, Lake Ecosystem Advisory Committee meeting rescheduled to March 21; and • July 9, Council meeting rescheduled to July 16; • December 26, Lake Ecosystem Advisory Committee meeting rescheduled to December 5; and That the 2024 Council, advisory committees and legislated committees meeting schedule, attached as Exhibit A to the Report, be approved. Carried
Page 2 of 6
Page 5 of 137 Minutes of Council December, 5, 2023 d)
Support for Enabling Accessibility Fund – Mid Sized Projects Application for the Centennial Park Accessibility Upgrades Project Resolution No. 2023:34:07 Moved by Councillor Godfrey Seconded by Councillor Leonard That Council support a grant application to the Employment and Social Development Canada Enabling Accessibility Fund – Mid Sized Projects for the Centennial Park Accessibility Upgrades Project; and That authorization be given to the Mayor and the Clerk to sign a transfer payment agreement with Employment and Social Development Canada for the funding if the grant application is successful. Carried
e)
IESO Municipal Support Resolution for Battery Energy Storage Systems Resolution No. 2023:34:08 Moved by Councillor Pegrum Seconded by Councillor Trueman That Council receive for information the Harrowsmith and South Frontenac Battery Energy Storage Phase II Project Request for Municipal Support Resolution report; And further that, in principle, the Council of the Township of South Frontenac grant a Municipal Council Support Resolution for the proposed battery energy storage system bids located at 3891 Alton Road West, Harrowsmith and 3562 Trousdale Road, Hartington. And further, that Council support for the proposals be contingent on further negotiations taking place between the Township and Alectra Convergent JV to provide final approval should their bid to the IESO be successful. These negotiations would include, but not limited to: A review of all applicable Municipal and Provincial by-laws and Standards as determined by the Municipality including site plan control by-law. Further public consultation to review community concerns. Impact of all stages of the project on Township infrastructure and resources. Defeated - See Recorded Vote
f)
(Recorded Vote - 2023:34:08) Yeas: Councillor Godfrey, Councillor Pegrum, Councillor Sleeth, Councillor Trueman (4) Nays: Councillor Leonard, Councillor Morey, Councillor Roberts, Councillor Ruttan, Mayor Vandewal (5) Absent: (0) Resolution No. 2023:34:09 Moved by Councillor Ruttan Seconded by Deputy Mayor Sleeth That the Council of the Township of South Frontenac does not grant a Municipal Council Support Resolution for the battery energy storage system bids proposed at 3891 Alton Road West, Harrowsmith and 3562 Trousdale Road, Hartington. Carried - See Recorded Vote
Page 3 of 6
Page 6 of 137 Minutes of Council December, 5, 2023 g)
(Recorded Vote - 2023:34:09) Yays: Councillor Godfrey, Councillor Leonard, Councillor Morey, Councillor Roberts, Councillor Ruttan, Councillor Sleeth, Mayor Vandewal (7) Nays: Councillor Pegrum, Councillor Trueman (2) Absent: (0)
11 a)
Advisory Committee Reports or Minutes There were none.
12
Reports Requiring Approval of By-laws
a)
Zoning By-law Amendment Application - PL-ZBA-2023-0048, Bob’s Lake CoOperative (ZanderPlan), Bedford District Resolution No. 2023:34:10 Moved by Councillor Morey Seconded by Councillor Pegrum That By-law 2023-96 being a By-law to amend Zoning By-law 2003-75, as amended, to amend the Limited Service Residential – Waterfront – Special Provision (RLSW-3) zone on lands described as Part of Lot 32, Concession 6 and Part of Lots 33 and 34, Concession 7, District of Bedford, be given first and second reading. Carried Resolution No. 2023:34:11 Moved by Councillor Godfrey Seconded by Councillor Trueman That By-law 2023-96 be given third reading, signed and sealed. Carried
13
Reports for Information
a)
Joint Rural Transportation Study
b)
Fuel Management System
c)
Bellrock and Petworth Mill Projects
d)
Rural Economic Development Support
e)
Close Out Report – 2023 Private Lane Upgrade Assistance Program
14
Committee of the Whole
a)
There was none.
15
Information Items
a)
Correspondence received from Sydenham High School regarding the 150th reunion.
b)
Correspondence received from Boulton Septic regarding Utilities Kingston
Page 4 of 6
Page 7 of 137 Minutes of Council December, 5, 2023 septage disposal rate increase. c)
Additional Correspondence received regarding BESS Proposal (Distributed, December 5, 2023)
d)
Correspondence received from Alectra Inc. regarding South Frontenac and Harrowsmith Energy Storage Projects. (Distributed December 5, 2023)
16
Notice of Motions
a)
There were none.
17
Rise and Report regarding County Council and External Boards
a)
County Council Councillor Leonard did not provide an update.
b)
Police Services Board Councillor Leonard did not provide an update.
c)
Cataraqui Conservation Deputy Mayor Sleeth advised that the Cataraqui Conservation Board continued the Strategic Plan discussions. He also noted that the General Manager, Katrina Furlanetto is leaving the organization. Mayor Vandewal inquired about the status of permits and noted that he has received phone calls from residents regarding the speed in which permits are processed.
d)
Frontenac Community Arena Board Councillor Roberts advised that the arena is running smoothly.
e)
Quinte Conservation Councillor Roberts advised that the next meeting is December 21st where the budget approval will be on the table.
f)
Rideau Valley Conservation Authority Councillor Godfrey advised that at their last meeting there were budget and BESS discussions. She noted that there will not be a meeting in December.
18 a)
Announcements/Statements by Councillors There were none.
19
Closed Session (if requested)
a)
Resolution Resolution No. 2023:34:12 Moved by Councillor Ruttan Seconded by Councillor Morey
Page 5 of 6
Page 8 of 137 Minutes of Council December, 5, 2023 That Council resolve itself into the Committee of the Whole “Closed Meeting” to consider the following items: a) Approval of the November 7, 2023 Committee of the Whole “Closed Meeting” minutes. b) A position, plan, procedure, criteria or instruction to be applied to any negotiations carried on or to be carried on by or on behalf of the municipality or local board. c)A proposed or pending acquisition or disposition of land by the municipality or local board - Sydenham Area. d) Personal matters about an identifiable individual, including municipal or local board employees. Carried b)
Resolution - That Council rise from the Committee of the Whole “Closed Meeting” without reporting. Resolution No. 2023:34:13 Moved by Deputy Mayor Sleeth Seconded by Councillor Pegrum That Council rise from the Committee of the Whole “Closed Meeting” without reporting. Carried
20
Confirmatory By-law
a)
Resolution Resolution No. 2023:34:14 Moved by Councillor Roberts Seconded by Councillor Leonard That By-law 2023-97, being a by-law to confirm generally all actions and proceedings of the Council of the Township of South Frontenac, be given first and second reading. Carried Resolution No. 2023:34:15 Moved by Councillor Godfrey Seconded by Councillor Leonard That By-law 2023-97, be given third reading, signed and sealed. Carried
21
Adjournment
a)
Resolution Resolution No. 2023:34:16 Moved by Councillor Morey Seconded by Councillor Ruttan That the Council meeting of December 5, 2023 be adjourned at 9:06 p.m. Carried
Ron Vandewal, Mayor
James Thompson, Clerk
Page 6 of 6
2024 Budget Day Presentation Special Council Meeting December 12, 2024 Page 9 of 137
Agenda
- Property Tax Primer
- 2024 Budget Background
- Overall Financial Impact
- Project and Program Highlights
- Reserves and Obligatory Reserve Funds
- Next Steps
- Questions? Page 10 of 137
Property Tax Primer Tax Bill is made up of 3 components:
• Township share set by Council • County Share set by County Council • Education Share set by the Province • We only have control over the Township share Page 11 of 137
Property Tax Primer Tax Bill = Township + County + Education Rates X Property Assessment + Local Improvement Charge (including Trailer Licence, Water Debenture) Page 12 of 137
Assessment values are set by MPAC
Property Tax Primer SF to be raised by taxes = $ Expenses - $ Revenues Township Rate =
SF to be raised by taxes Total Weighted Assessment
SF Share of Taxes = Township Rate X Property Assessment Page 13 of 137
Property Tax Primer The Target increase has historically been a 2.0% increase on the Township share of the Tax bill % Target = 2024 SF Taxes – 2023 SF Taxes 2023 SF Taxes
Page 14 of 137
Property Tax Primer • Due to the COVID-19 pandemic, the Ontario government postponed the 2020 Assessment Update. They have indicated that property assessments for the 2024 property tax years will continue to be based on the fully phased-in January 1, 2016 current values. • There has been no announcement at this time by the province as to when reassessments will be completed. It is unknown if this base valuation date will be updated for 2025. • MPAC continues to review properties during non-Assessment Update years as new homes are built, owners renovate, structures are demolished, and properties change use. Page 15 of 137
Property Taxes - Additional Resources • How Your Municipal Budget Works Video • How will my property assessment impact my property taxes?
Page 16 of 137
Budget Background • The 2024 Budget Schedule was originally approved by Council on September 5, 2023. • Budget Delegations were heard on November 7, 2023. One presentation was made by the Frontenac Arch Biosphere Network. • Also on November 7th, 2023 the 2024 Budget Direction and the 2024 – 2033 Long Range Financial Plan were presented. • On November 21st, 2023, the 2024 proposed Capital Budget was presented. Included with the presentation was a Project Summary and the Detailed Descriptions of the proposed 2024 projects. • November 21, 2023 the Budget Survey Results based on a public survey were released. Page 17 of 137
Budget Background
• This is the second budget for this term of Council. • The annual budget operationalizes the Strategic Plan • The budget should clearly show: • What the community values • What priorities are to be accomplished with an alignment to the strategic plan • Where the Township wants to be in the future Page 18 of 137
Budget Background • The 2024 Budget, and carry over projects, address important ongoing priorities including: Road Surface Treatment Program
Administration Office Construction
Facilities Upgrades and Repairs
Fleet Renewal
Recreation and Parks Improvements
Economic Development Strategy
Development Charge & Population Study
Changes in technology
Increased interest rates and increased cost of living
Continued increased demands for recreation programming and events
Labour supply and wage pressures
Page 19 of 137
Road and Bridge Infrastructure upgrades
Budget Background • The Budget Survey results indicated: • 70% of 564 responses preferred a reasonable increase to property taxes to maintain or enhance services. • Approximately 90% of responses indicated Roads and Fire Services were cited as most important day-to day operations. • 71% responded Roads capital projects as most important.
• The 2024 Budget Direction: • The 2024 Operational and Capital budgets being presented have been prepared focussing on priorities rather than tax rate. Consideration has been given to current market inflationary changes. • The 2024 budget aimed towards previous year’s tax rates as a target, which has historically primarily has been 2%, with 2023 at 2.62%. • The budget also was prepared to improve cost recovery in planning and recreation programs.
• And as always, it maintains a strong financial position for the Township
Page 20 of 137
• This budget conforms to Council’s long range financial plan which considers the Township’s ability to fund capital and operations over a 10-year period while observing strategic priorities and maintaining tax rate targets and reserve balances.
Budget Background Items of Note:
• The Capital budget does NOT include carry-over projects (projects approved and funded in prior year budgets); however, work may continue those projects in 2024. A separate summary of carryovers will be provided to Council in March. • Throughout the operating budget, you will see references to Transfer from Reserves and Transfer to Capital. • Transfer from Reserves fund expenditures and are primarily driven from the Capital budget as identified. These can vary significantly year over year. These amounts are largely driven by annual capital requirements. • Transfer to Capital is the way we move capital expenditures identified in the Capital Budget into the Operating Budget. Page 21 of 137
Overall Financial Impact • Total proposed Budget Expenditures: $44,559,632 • Operating budget of $26,792,892 • Capital budget of $17,766,740
• Represents 2.77% impact on average assessed property • Taxes (Township share) of $1,764.91 on average assessment of $278,126 Page 22 of 137
• Represents an annual increase of $47.53/year over 2023
Overall Financial Impact continued • Assessment growth of .99% which is lower than the growth from 2023 of 1.45% and the long-range financial plan forecast of 1.67% . • The Consumer Price Index (CPI) leveled down to 3.1 in October 2023 compared to 6.8% in 2022, 3.4% in 2021 and of 0.7% in 2020. The increase in 2023 was a 40-year high.
Page 23 of 137
• The continued impact of the cost of living increases experienced are seen throughout the 2024 Budget. Other expenses, where possible, have been flatlined from 2023 in order to achieve the 2.77% taxpayer impact.
Inflationary Impacts Specific items that are affected by inflation in the proposed budget are:
• Corporate Insurance (Property and General Liability) – 4% • Utilities (Heat, Hydro, Telephone) – 4% • Fuel – 3% • Wage and Benefits – 2%
Page 24 of 137
Overall Financial Impact continued
Changes from 2023 Cost Savings
Service Area
Amount
Hartington Parking Lot
-$8,000
One Time Software Costs
-$11,500
Hardware Replacements
-$22,050
Reduced Revenues Service Area
$159,062
Negative (-) amounts indicate a reduction of cost from the bottom line
Page 25 of 137
Ontario Community Infrastructure Fund (OCIF)
Amount
Overall Financial Impact continued
Changes from 2023 – Increased Revenues Service Area
Amount
OMPF Funding
-$7,500
AMP Revenues
-$15,500
Bank Interest and Investment Interest
-$290,000
Planning Fees
-$153,000
Page 26 of 137
Negative (-) amounts indicate a reduction of cost from the bottom line
Overall Financial Impact continued
Changes from 2023 – Increased Costs Service Area
$222,579 $96,750 $13,598 $56,778 $110,000 $30,000 $28,552 $22,353 $364,099
Page 27 of 137
Current Year Asset Investment Reserve (AIR) impact (1% of levy) Capital Taxation Requisition Insurance +4% Conservation Authorities Pavement Markings Mowing Local Roads Recycling Collection Computer Maintenance Contracts Staff Complement Annual Adjustments
Amount
Overall Financial Impact continued
Changes from 2023 – Enhanced Services Service Area
Amount
Swim / Daycamps – Net Fees including adding McMullen Beach (-$94,000) and Student Costs ($94,000) By-law Enforcement Contract
$7,100
Parks – Tree Planting to replace dead Ash trees
$20,000
Page 28 of 137
Negative (-) amounts indicate a reduction of cost from the bottom line
$0
Overall Financial Impact continued
Exclusions from 2024 Budget Service Area
Amount
LEO – Public Services (May – Dec.)
$51,111
Fire Prevention Officer – Contract Extension July – December
$51,020
Arborist for Tree Removal
$40,000
Tub Grinder Contract
$34,000
Frontenac Arch Biosphere Request
$17,000 Page 29 of 137
Negative (-) amounts indicate a reduction of cost from the bottom line
Overall Financial Impact continued
Previously Capital Allocations – will now be provided under identified projects Service Area
Amount
Sidewalks
$50,000
Guiderails
$50,000
Streetlights
$30,000
Page 30 of 137
Negative (-) amounts indicate a reduction of cost from the bottom line
Overall Financial Impact continued
Changes from 2023
Organizational Development Plan Service Area
Amount
Public Services Reorganization Annualization
$35,404
Development Services Reorganization Annualization Human Resources Advisor (May-Dec) Remove P/T HR Assistant Public Services PT LEO (Full Year - .75 FTE)
$96,077
Public Services FT LEO Facilities (May – Dec)
$51,111
$57,599 $52,032 Page 31 of 137
Project and Program Highlights • Continue Climate Change allocation of $100,000 • Townhall Expansion Construction • Continued Digital Modernization Project (Corporate Services and Development Services) • Development Charges and Population Studies • Transportation Master Plan • Economic Development Strategy Page 32 of 137
Project and Program Highlights
(Continued)
Page 33 of 137
• Bridge & Culverts Repairs • Road 38 Detailed Design • Storrington Roof and Parking Lot Upgrades • Enhanced Swim and Day camp Program with new site at McMullen Park • Centennial Park Facility upgrades • Petworth Mill wall cap and repairs • Parkette design at Petworth and Bellrock Mill
Reserves and Obligatory Reserve Funds • Overall the Township will be drawing down on reserves and reserve funds in 2024, however this is for specific projects, not to reduce the tax rate. • 2023 Estimated year end balances are $22.3 million • Contributions to Reserves from Taxation, Federal funding (CCBF), Building fees, Development Charges and Parkland will be $10.5 million • Projects to be funded from Reserves and reserve funds total $16 million
• The projected balance at the end of 2024 will be $16.8 million Page 34 of 137
Next Steps • Go over Budget Package pages for feedback or comments • December 19th Council – Report to Amend/Adopt 2024 Budget
Page 35 of 137
Questions?
Page 36 of 137
Page 1 of 2 2023-12-05
Township of South Frontenac 2024 Capital Budget with Financing
Detailed Project # Project * Sheet page # 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 38 39 40 41 42 43 44 45 46 47 48
22-02 23-12 24-01 24-03 24-04 24-05
24-11 24-12 24-13 24-14 24-15 24-16 24-17 24-18
24-21 24-22 24-23 24-24 24-25 24-26
21-R09 24-31 24-32 24-33 24-34 24-35 24-36 24-37 24-38 24-39 24-43 24-40 22-17 24-44 24-45 24-46 23-49 24-41 24-47 23-51
22-53 24-61
49
CORPORATE SERVICES Gateway Signage (2022-2025 Project) Wayfinding Sign Fabrication and Installation (2022-2025 Project) Website Redesign Cloud Server Records Management 14 Island Lake Dam Refurbishment subtotal FIRE Hoses and Appliances Electric Portable Fans Vehicle Replacement - Deputy Fire Chief Pumper Replacement Gas Detectors & Docking Stations Mobile Gear Racks - Station 5 & 7 Specialized Equipment for Squads Radio Communications Study subtotal PUBLIC SERVICES FLEET Tandem Plow Truck Tandem Roller-Pro Truck Two (2) 1-Ton Trucks with plow and sander attachments 1-Ton Truck with Dump Box and power lift Front Broom Attachment AVL - Light Duty Installs subtotal ROADS INFRASTRUCTURE Arterial Reserve (Road 38 - Reserve Transfer) Perth Road Reconstruction (at Loughborough Lake) Microsurfacing - Bellrock Road Orser Road Spooner Road Bedford Road Ormsbee Road Greenfield Road Kerr Road Tom Watson Road Devil Lake Road Surface Treatment (LCB) Preservation 12th Con Bridge (B32) Repair Sydenham Lake Bridge and Dam Bracken Culvert (Yarker Road) Long Swamp Bridge Study Transportation Master Plan Pre-Engineering Roads 2025 Road 38 Detailed Design Pleasant Valley Municipal Drain subtotal SYDENHAM WATER SCADA Software Upgrade Sydenham Drinking Water System Upgrades subtotal FACILITIES
2024 Budget
Tax)
53,333 266,667 33,190 85,000 100,000 200,000 738,190 18,000 30,000 75,000 550,000 40,000 18,000 20,000 10,000 761,000
430,000 625,000 230,000 120,000 40,000 20,000 1,465,000 2,450,000 520,000 495,000 157,500 64,100 1,432,000 819,100 215,900 161,500 124,400 346,600 900,000 38,500 534,000 527,200 35,000 75,000 75,000 100,000 18,750 9,089,550 275,000 37,500 312,500
24-02
Town Hall Expansion
3,500,000
24-51 24-52 24-54 24-55 24-56 24-57 24-58 24-59 24-82 24-83
Storrington Centre Roof and Parking Lot Upgrades Bedford Garage Equipment Upgrades Keeley Patrol Yard Waste Oil Disposal Sydenham Point Accessible Washroom Upgrades Centennial Park New Accessible Washrooms Design and Build Centennial Park Renovations to existing Canteen/Washrooms Harris Park Hall Flooring Replacement Glendower Hall Interior Design Plans Station 5 Exterior Upgrades Station 4 Flooring subtotal RECREATION Sydenham Point Field Score clock Power Centennial Park Walkway Connections Centennial Park Courts and Electrical Improvements McMullen Park - Parking Lot paving & storage bunker McMullen Park Beach and Washroom Building Upgrades Keeley/Bowes Diamond Upgrades Glendower Court Basketball nets Bellrock & Petworth Parkette Conceptual Design
435,000 48,500 25,000 30,000 30,000 150,000 29,000 20,000 15,000 8,000 4,290,500
24-60 24-66 24-80 24-67 24-75 24-68 24-69 24-70
10,000 240,000 49,000 46,000 16,000 208,000 11,000 15,000
0
0
0
Working Funds
Asset Invesment Reserve
53,333 186,667 33,190 85,000 100,000 200,000 658,190
Infrastructure
Landfill Climate Change Public Services Building Building Equipment Equipment Closure Reserve
Fire Equipment
Facilities
Sydenham Water Reserve
OPP Reserve
Wages-Fire Department (Stabilization)
Taxation
Other
Notes
Red Grant Program - 186k *3 + 80k * 3 grant =
80,000
0
0
0
0
0
0
0
0
0
0
0
0
0
80,000
0
0
0
0
0
0
0
0
0
10,000 10,000
0
761,000
0
40,000 20,000 60,000
0
1,465,000
18,000 30,000 75,000 550,000 40,000 18,000 20,000 0
0
0
0
0
0
0
751,000
430,000 625,000 230,000 120,000
0
0
0
0
0
0
0
0
1,405,000
0
0
0
0
0
0
2,450,000 495,000
25,000 495,000
157,500 64,100 500,000
County FGT
530,648
401,352 OCIF
819,100 215,900 161,500 124,400 346,600 400,000 38,500 179,500
500,000 OCIF 354,500
527,200 35,000 75,000 75,000 100,000 2,056,300
0
1,530,000
0
0
0
0
1,248,000
0
0
485,000
2,765,000
885,148
0
0
0
0
0
0
0
0
0
0
0
0
201,658
312,500
0
0
0
0
4,290,500
0
0
0
0
0
0
73,343 37,500 110,843
0
0
0
0
0
0
0
0
0
18,750 2,468,750
0
901,352
9,089,550
201,658 ICIP Grant Funding
250,000 435,000 48,500 25,000 30,000
30,000 150,000 29,000 20,000
50,000
0
0
485,000
2,765,000
0
15,000 8,000 990,500
10000 240,000 49,000 46000 16,000 208,000 11000 15,000
Page 37 of 137
50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69
Community Building Development Fund (formerly Federal Gas Parkland Charges
Page 2 of 2 2023-12-05
Township of South Frontenac 2024 Capital Budget with Financing
Detailed Project # Project * Sheet page # 70 71 72 73 74 75 76
24-71 24-72 24-74
24-76 24-77 24-78
Petworth Mill wall cap and repairs Shipyards Boat Ramp Rehabilitation New Picnic Tables subtotal DEVELOPMENT SERVICES Economic Development Strategy Replacement Building Vehicle Development Charge Study and Population Study subtotal Total
2024 Budget
Community Building Development Fund (formerly Federal Gas Parkland Charges Tax)
200,000 110,000 10,000 915,000 50,000 50,000 95,000 195,000 17,766,740
448,000
0
200,000 110,000 10,000 467,000
Working Funds
0
Asset Invesment Reserve
Infrastructure
0
0
Landfill Climate Change Public Services Building Building Equipment Equipment Closure Reserve
Fire Equipment
Facilities
0
0
0
0
0
0
Sydenham Water Reserve
OPP Reserve
0
0
0
0
0 110,843
Wages-Fire Department (Stabilization)
Taxation
Other
Notes
0
0
0
915,000
0
0 2,538,750
0 1,183,010
195,000 17,766,740
50,000 50,000 95,000 95,000 2,649,300
0 1,530,000
0 467,000
50,000 1,193,190
0 4,013,000
0 885,148
0 990,500
0 751,000
0 1,405,000
50,000 50,000
0
0
0
Page 38 of 137
Page 1
Capital Project Detail Sheets Corporate Services Projects
Page 39 of 137
Page 2
Capital Project Detail Sheet Project Information Project Name: Gateway Signage
Type of Project: Other
Project Number: 22-02
Basis for Activity: Growth Related
Department: 1210 - CAO
Relationship to Strategic Plan: Priority #4 - Be a catalyst for the creation of vibrant, complete communities
Description: Installation of gateway signage at Township border entry points.
Rationale: Gateway signs are important beacons where visitors and residents will easily recognize they are entering South Frontenac and what it represents. The use of updated gateway signage with South Frontenac’s new brand will promote attention to the natural assets and opportunities the Township provides.
(Pre-approved in 2022)
Staff Contact: Louise Fragnito (lfragnito)
Project Finances
Actuals Description 80100 - Equipment
Expensed to Current Year Expenses / Expenditure
Total 49650 - Reserve Total
Budget
Revenues / Funding Source
Total Project
Prior Approved
2024
2025
2026
2027
2028
0
220,000
113,333
53,333
53,334
0
0
0
0
220,000
113,333
53,333
53,334
0
0
0
0
113,333
113,333
0
0
0
0
0
0
113,333
113,333
0
0
0
0
0
Page 40 of 137
Page 3
Capital Project Detail Sheet Project Information Project Name: Wayfinding Sign Fabrication & Installation
Type of Project: Other
Project Number: 23-12
Basis for Activity: Other
Department: 1220 - Communications
Relationship to Strategic Plan: Priority #4 - Be a catalyst for the creation of vibrant, complete communities
Description: Wayfinding Signage Fabrication and Installation.
Rationale: Wayfinding signage will be prepared and installed in critical locations that will provide a clear, consistent and highly navigable system that will inform and direct visitors and residents to local businesses, services, attractions and recreational amenities and assets. The signage will use the new branding that will provide continuity in linking tourism and economic development in the Township.
(Pre-approved in 2022)
Staff Contact: Louise Fragnito (lfragnito)
Project Finances
Actuals Description
Budget
Expensed to Current Year
55290 - Contracted Services Expenses / Expenditure Total
Total Project
Prior Approved
2024
2025
2026
2027
2028
0
800,000
266,666
266,667
266,667
0
0
0
0
800,000
266,666
266,667
266,667
0
0
0
41500 - Grnts-Prov
Revenues / Funding Source
0
240,000
80,000
80,000
80,000
0
0
0
49650 - Reserve
Revenues / Funding Source
0
560,000
186,666
186,667
186,667
0
0
0
0
800,000
266,666
266,667
266,667
0
0
0
Total
Page 41 of 137
Page 4
Capital Project Detail Sheet Project Information Project Name: Website Redesign
Type of Project: Software & Support
Project Number: 24-01
Basis for Activity: Service Level Change
Department: 1220 - Communications
Relationship to Strategic Plan: Priority #4 - Be a catalyst for the creation of vibrant, complete communities
Description: Website Redesign
Rationale: Website requires updating due to new configurations in the software. The upgrade will improve search functions and accessibility as well as give a new look to the Township website.
Staff Contact: Louise Fragnito (lfragnito)
Project Finances
Actuals Description 55330 - Consultant Total
Budget
Expensed to Current Year Expenses / Expenditure
Total Project
Prior Approved
2024
2025
2026
2027
2028
0
33,190
0
33,190
0
0
0
0
0
33,190
0
33,190
0
0
0
0
Page 42 of 137
Page 5
Capital Project Detail Sheet Project Information Project Name: Cloud Server
Type of Project: Software & Support
Project Number: 24-03
Basis for Activity: Other
Department: 1275 - Corporate Services
Relationship to Strategic Plan: Priority #3 - Ensure the organizational capacity to deliver costeffective services
Description: Move all Township Data to Cloud Server from current equipment housed on-site.
Rationale: Improved Security of Data. Improved capacity for staff to access from any location which is especially important for upcoming administration building renovations.
Staff Contact: Shelley Stedall (sstedall)
Project Finances
Actuals Description 55290 - Contracted Services Expenses / Expenditure Total
Budget
Expensed to Current Year
Total Project
Prior Approved
2024
2025
2026
2027
2028
0
85,000
0
85,000
0
0
0
0
0
85,000
0
85,000
0
0
0
0
Page 43 of 137
Page 6
Capital Project Detail Sheet Project Information Project Name: Records Management
Type of Project: Other
Project Number: 24-04
Basis for Activity: Service Level Change
Department: 1275 - Corporate Services
Relationship to Strategic Plan: Priority #3 - Ensure the organizational capacity to deliver costeffective services
Description: Digitization and consistent organization of Township records. The project, which was started in 2022 will continue to complete digitization and organization with the use of one contract staff to the the end of 2024 who will be dedicated to the conversion of the records.
Rationale: Substantial efficiencies and cost savings are created through the digitization of records along with workflow improvements to our current finance and planning processes. Digital records provide easy access to information in a structured consistent format and will provide room for additional offices. Savings from staff time and storage space are estimated at $82,401 yearly based on the 2020 service delivery review report.
Staff Contact: Shelley Stedall (sstedall)
Project Finances
Actuals Description 50100 - Wages Total
Budget
Expensed to Current Year Expenses / Expenditure
Total Project
Prior Approved
2024
2025
2026
2027
2028
0
100,000
0
100,000
0
0
0
0
0
100,000
0
100,000
0
0
0
0
Page 44 of 137
Page 7
Capital Project Detail Sheet Project Information Project Name: 14 Island Lake Dam Refurbishment
Type of Project: Other
Project Number: 24-05
Basis for Activity: Other
Department: 3000 - Overhead
Relationship to Strategic Plan: N/A
Description: 14 Island Lake Dam is located on the south side of 14 Island Lake and flows into Spring and Verona Lakes and crosses Hinchinbrooke Road. The last major rehabilitation took place in the 1950’s. MNRF has been contact to cost share in project and advised that they were the regulator of the dam and not a funder as they do not own it.
Rationale: Funding of the 14 Island Dam refurbishment will safeguard it from further failure and risk of impact to surrounding lakes and Township assets.
Staff Contact: Louise Fragnito (lfragnito)
Project Finances
Actuals Description 55290 - Contracted Services Expenses / Expenditure Total
Budget
Expensed to Current Year
Total Project
Prior Approved
2024
2025
2026
2027
2028
0
200,000
0
200,000
0
0
0
0
0
200,000
0
200,000
0
0
0
0
Page 45 of 137
Page 8
Capital Project Detail Sheets Fire and Rescue Projects
Page 46 of 137
Page 9
Capital Project Detail Sheet Project Information Project Name: Hoses and Appliances
Type of Project: Equipment
Project Number: 24-11
Basis for Activity: Asset Renewal
Department: 2100 - Fire
Relationship to Strategic Plan: Priority #3 - Ensure the organizational capacity to deliver costeffective services
Description: Replacement Hoses and Appliances
Rationale: Part of the SFFR Fleet and Equipment Asset Management Plan includes the annual replacement hoses and appliances for structural firefighting operations. Annual costs and investments are spread out to reduce significant one time costs.
Staff Contact: Alex Bennett (abennett)
Project Finances
Actuals Description 80100 - Equipment Total
Budget
Expensed to Current Year Expenses / Expenditure
Total Project
Prior Approved
2024
2025
2026
2027
2028
0
18,000
0
18,000
0
0
0
0
0
18,000
0
18,000
0
0
0
0
Page 47 of 137
Page 10
Capital Project Detail Sheet Project Information Project Name: Electric Portable Fans
Type of Project: Equipment
Project Number: 24-12
Basis for Activity: Asset Renewal
Department: 2100 - Fire
Relationship to Strategic Plan: N/A
Description: Electric Portable Fans x 6
Rationale: To ensure electric portable fans are available in all pumpers.
Staff Contact: Alex Bennett (abennett)
Project Finances
Actuals Description 80100 - Equipment Total
Budget
Expensed to Current Year Expenses / Expenditure
Total Project
Prior Approved
2024
2025
2026
2027
2028
0
30,000
0
30,000
0
0
0
0
0
30,000
0
30,000
0
0
0
0
Page 48 of 137
Page 11
Capital Project Detail Sheet Project Information Project Name: Vehicle Replacement - Deputy Fire Chief
Type of Project: Light Weight
Project Number: 24-13
Basis for Activity: Asset Renewal
Department: 2100 - Fire
Relationship to Strategic Plan: Priority #3 - Ensure the organizational capacity to deliver costeffective services
Description: Replacement of Deputy Fire Chief vehicle.
Rationale: As part of the SFFR Fleet and Equipment Asset Management Plan, this is replacing the existing Deputy Chief vehicle and converting it back to a pick up truck for better flexibility for day to day operational-support, logistics and incident response.
Staff Contact: Alex Bennett (abennett)
Project Finances
Actuals Description 80105 - Fleet Total
Budget
Expensed to Current Year Expenses / Expenditure
Total Project
Prior Approved
2024
2025
2026
2027
2028
0
75,000
0
75,000
0
0
0
0
0
75,000
0
75,000
0
0
0
0
Page 49 of 137
Page 12
Capital Project Detail Sheet Project Information Project Name: Pumper Replacement
Type of Project: Heavy Weight
Project Number: 24-14
Basis for Activity: Asset Renewal
Department: 2100 - Fire
Relationship to Strategic Plan: Priority #3 - Ensure the organizational capacity to deliver costeffective services
Description: Pumper Replacement P371 - 2007 Pierce Pumper
Rationale: Existing pumper has identified deterioration of vehicle’s frame that will not successfully pass scheduled 2024 safety inspection. Given the current build-time for new apparatus of approximately 600-700 days, staff request Council pre-approval for the immediate availability of stock pumper meeting requirements consistent with existing SFFR front-run pumping apparatus (P341, P351, P371, P381) as per NFPA 1901, Standard for Automotive Fire Apparatus.
Staff Contact: Alex Bennett (abennett)
Project Finances
Actuals Description 80105 - Fleet Total
Budget
Expensed to Current Year Expenses / Expenditure
Total Project
Prior Approved
2024
2025
2026
2027
2028
0
550,000
0
550,000
0
0
0
0
0
550,000
0
550,000
0
0
0
0
Page 50 of 137
Page 13
Capital Project Detail Sheet Project Information Project Name: Gas Detectors & Docking Stations
Type of Project: Equipment
Project Number: 24-15
Basis for Activity: Other
Department: 2100 - Fire
Relationship to Strategic Plan: Priority #3 - Ensure the organizational capacity to deliver costeffective services
Description: A multi-gas detector is currently assigned to all front-run pumper vehicles as the primary response to residential fire and carbon monoxide (CO) alarms.
Rationale: The existing units require replacement due to age. The additional cost would be for (4) automates testing / docking station systems to be assigned to each Platoon Chief to coordinate regular service, bump testing, and recording.
Staff Contact: Alex Bennett (abennett)
Project Finances
Actuals Description 80100 - Equipment Total
Budget
Expensed to Current Year Expenses / Expenditure
Total Project
Prior Approved
2024
2025
2026
2027
2028
0
40,000
0
40,000
0
0
0
0
0
40,000
0
40,000
0
0
0
0
Page 51 of 137
Page 14
Capital Project Detail Sheet Project Information Project Name: Mobile Gear Racks - Station 5 & 7
Type of Project: Equipment
Project Number: 24-16
Basis for Activity: Other
Department: 2100 - Fire
Relationship to Strategic Plan: Priority #3 - Ensure the organizational capacity to deliver costeffective services
Description: Mobile Gear Racks - Station 5 & 7
Rationale: Station 5 and 7 do not currently have mobile gear racks and are using hooks off the wall. This provides updated racks similar to Station 6 and 8 for firefighter use.
Staff Contact: Alex Bennett (abennett)
Project Finances
Actuals Description 80100 - Equipment Total
Budget
Expensed to Current Year Expenses / Expenditure
Total Project
Prior Approved
2024
2025
2026
2027
2028
0
18,000
0
18,000
0
0
0
0
0
18,000
0
18,000
0
0
0
0
Page 52 of 137
Page 15
Capital Project Detail Sheet Project Information Project Name: Specialized Equipment for Squads
Type of Project: Equipment
Project Number: 24-17
Basis for Activity: Other
Department: 2100 - Fire
Relationship to Strategic Plan: Priority #3 - Ensure the organizational capacity to deliver costeffective services
Description: Defib & Oxygen bags and Rapid Intervention Team rehabilitation materials
Rationale: Equipment is currently only in Platoon Chief vehicle. This will ensure availability of resources evenly throughout Township by having a set on each of Squad, 341 and 381
Staff Contact: Alex Bennett (abennett)
Project Finances
Actuals Description 80100 - Equipment Total
Budget
Expensed to Current Year Expenses / Expenditure
Total Project
Prior Approved
2024
2025
2026
2027
2028
0
20,000
0
20,000
0
0
0
0
0
20,000
0
20,000
0
0
0
0
Page 53 of 137
Page 16
Capital Project Detail Sheet Project Information Project Name: Radio Communications Study
Type of Project: Equipment
Project Number: 24-18
Basis for Activity: Other
Department: 2100 - Fire
Relationship to Strategic Plan: Priority #3 - Ensure the organizational capacity to deliver costeffective services
Description: Joint Radio Communications Study for Fire and Public Services
Rationale: An operational deficiency has been identified in the ability to transmit radio communications in various geographical locations across the municipality creating additional risk to staff. A study to accurately identify these geographical locations via thermal mapping will help to gauge and correct deficiencies and provide clear and cost-effective means to increase effective operational communications.
Staff Contact: Alex Bennett (abennett)
Project Finances
Actuals Description 80100 - Equipment Total
Budget
Expensed to Current Year Expenses / Expenditure
Total Project
Prior Approved
2024
2025
2026
2027
2028
0
10,000
0
10,000
0
0
0
0
0
10,000
0
10,000
0
0
0
0
Page 54 of 137
Page 17
Capital Project Detail Sheets Fleet Projects
Page 55 of 137
Page 18
Capital Project Detail Sheet Project Information Project Name: Tandem Plow Truck
Type of Project: Equipment
Project Number: 24-21
Basis for Activity: Asset Renewal
Department: 3000 - Overhead
Relationship to Strategic Plan: Priority #3 - Ensure the organizational capacity to deliver costeffective services
Description: Tandem plow truck replacement for unit 43 (Asset ID 33511).
Rationale: Asset renewal in accordance with 15 year life cycle replacement schedule in the long range financial plan.
(Pre-approved in 2022)
Staff Contact: Brian Kirk (bkirk)
Project Finances
Actuals Description 80105 - Fleet Total
Budget
Expensed to Current Year Expenses / Expenditure
Total Project
Prior Approved
2024
2025
2026
2027
2028
0
430,000
0
430,000
0
0
0
0
0
430,000
0
430,000
0
0
0
0
Page 56 of 137
Page 19
Capital Project Detail Sheet Project Information Project Name: Tandem Roller-Pro Truck
Type of Project: Equipment
Project Number: 24-22
Basis for Activity: Asset Renewal
Department: 3000 - Overhead
Relationship to Strategic Plan: Priority #3 - Ensure the organizational capacity to deliver costeffective services
Description: Tandem plow truck replacement with unit being converted to a Roller-Pro roll off truck for multi-use and will be equipped with a snow plow & sander, water/DLA tank, and float deck.
Rationale: Asset renewal in accordance with 15 year life cycle replacement schedule in the long range financial plan. Tilt n load trailer (Asset ID 23605) and 2600gal water tank (Asset ID 23805) are also being replaced as part of this project.
(Pre-approved November 7, 2023) Staff Contact: Brian Kirk (bkirk)
Project Finances
Actuals Description 80105 - Fleet Total
Budget
Expensed to Current Year Expenses / Expenditure
Total Project
Prior Approved
2024
2025
2026
2027
2028
0
625,000
0
625,000
0
0
0
0
0
625,000
0
625,000
0
0
0
0
Page 57 of 137
Page 20
Capital Project Detail Sheet Project Information Project Name: Two (2) 1-Ton Trucks with plow and sander attachments
Type of Project: Equipment
Project Number: 24-23
Basis for Activity: Asset Renewal
Department: 3000 - Overhead
Relationship to Strategic Plan: Priority #3 - Ensure the organizational capacity to deliver costeffective services
Description: 3/4 Ton truck replacements for unit 16-03 (Asset ID 33208) and unit 16-41 (Asset ID 33207).
Rationale: Asset renewal in accordance with 7 year life cycle replacement schedule in the long range financial plan.
Staff Contact: Brian Kirk (bkirk)
Project Finances
Actuals Description 80105 - Fleet Total
Budget
Expensed to Current Year Expenses / Expenditure
Total Project
Prior Approved
2024
2025
2026
2027
2028
0
230,000
0
230,000
0
0
0
0
0
230,000
0
230,000
0
0
0
0
Page 58 of 137
Page 21
Capital Project Detail Sheet Project Information Project Name: 1-Ton Truck with dump box and power lift
Type of Project: Equipment
Project Number: 24-24
Basis for Activity: Growth Related
Department: 3000 - Overhead
Relationship to Strategic Plan: Priority #2 - Promote and support growth that meets the community’s needs
Description: Additional 1-Ton truck with dump box and power lift gate.
Rationale: Additional vehicle to the fleet to support growth in staff and operational requirements. Existing Perkins garbage body attachment will be replaced with a power lift gate as a more efficient and safe way to empty garbage cans.
Staff Contact: Brian Kirk (bkirk)
Project Finances
Actuals Description 80105 - Fleet Total
Budget
Expensed to Current Year Expenses / Expenditure
Total Project
Prior Approved
2024
2025
2026
2027
2028
0
120,000
0
120,000
0
0
0
0
0
120,000
0
120,000
0
0
0
0
Page 59 of 137
Page 22
Capital Project Detail Sheet Project Information Project Name: Front Broom Attachment
Type of Project: Equipment
Project Number: 24-25
Basis for Activity: Service Level Change
Department: 3000 - Overhead
Relationship to Strategic Plan: Priority #3 - Ensure the organizational capacity to deliver costeffective services
Description: Power broom attachment for the roadside tractor. Replacing existing loader mounted Sweepster power broom.
Rationale: Broom attachment to be used for spring sweeping and fall shouldering when the tractor is not mowing. Unit will increase utilization on the tractor and improve sweeping level of service in the rural areas.
Staff Contact: Brian Kirk (bkirk)
Project Finances
Actuals Description 80105 - Fleet Total
Budget
Expensed to Current Year Expenses / Expenditure
Total Project
Prior Approved
2024
2025
2026
2027
2028
0
40,000
0
40,000
0
0
0
0
0
40,000
0
40,000
0
0
0
0
Page 60 of 137
Page 23
Capital Project Detail Sheet Project Information Project Name: AVL - Light Duty Installs
Type of Project: Equipment
Project Number: 24-26
Basis for Activity: Service Level Change
Department: 3000 - Overhead
Relationship to Strategic Plan: Priority #3 - Ensure the organizational capacity to deliver costeffective services
Description: Automatic vehicle location system (AVL) installation in light duty vehicle fleet.
Rationale: Township switched AVL provider to Trackmatics in 2023 starting with the snow plows. This project will convert the light duty fleet to the new system.
Staff Contact: Kyle Bolton (kbolton)
Project Finances
Actuals Description 80105 - Fleet Total
Budget
Expensed to Current Year Expenses / Expenditure
Total Project
Prior Approved
2024
2025
2026
2027
2028
0
20,000
0
20,000
0
0
0
0
0
20,000
0
20,000
0
0
0
0
Page 61 of 137
Page 24
Capital Project Detail Sheets Roads Infrastructure Projects
Page 62 of 137
Page 25
Capital Project Detail Sheet Project Information Project Name: Arterial Reserve (Road 38)
Type of Project: Arterial Roadway
Project Number: 21-R09
Basis for Activity: Growth Related
Department: 3300 - Hardtop
Relationship to Strategic Plan: N/A
Description: Arterial reserve allocation for future funding of Road 38. Funds from 2024 budget will be transferred to the reserve for this project.
Rationale: Road 38 from the City boundary to Harrowsmith is currently in the long range financial plan under 2024 and 2025 with a cost estimate of 7.1 million.
Staff Contact: Troy Dunlop (tdunlop)
Project Finances
Actuals Description 58030 - Reserves
Expensed to Current Year Expenses / Expenditure
Total 40000 - Taxation Total
Revenues / Funding Source
Budget Total Project
Prior Approved
2024
2025
2026
2027
2028
1,920,000
4,370,000
1,920,000
2,450,000
0
0
0
0
1,920,000
4,370,000
1,920,000
2,450,000
0
0
0
0
1,920,000
1,920,000
1,920,000
0
0
0
0
0
1,920,000
1,920,000
1,920,000
0
0
0
0
0
Page 63 of 137
Page 26
Capital Project Detail Sheet Project Information Project Name: Perth Road Reconstruction (at Loughborough Lake)
Type of Project: Arterial Roadway
Project Number: 24-31
Basis for Activity: Asset Renewal
Department: 3100 - Structures
Relationship to Strategic Plan: N/A
Description: ASSET # 53875 Reconstruction of a 440m long section of Perth Road # 10 located immediately south of the Loughborough bridge and boat launch. Construction to include full depth reclamation, placement of new granulars, guide rails and new asphalt. Project will also incorporate geotechnical recommendations as appropriate to address ongoing settlement occurring on this section of highway.
Rationale: The reconstruction of this localized section of Perth Road has been identified as a priority road project for 2024 within the 5 year plan received by Council on May 2, 2023. Road conditions are poor and unplanned maintenance demands will continue to be a concern for meeting service level requirements.
Staff Contact: Troy Dunlop (tdunlop)
Project Finances
Actuals Description 55290 - Contracted Services Expenses / Expenditure Total
Budget
Expensed to Current Year
Total Project
Prior Approved
2024
2025
2026
2027
2028
0
520,000
0
520,000
0
0
0
0
0
520,000
0
520,000
0
0
0
0
Page 64 of 137
Page 27
Capital Project Detail Sheet Project Information Project Name: Microsurfacing - Bellrock Road
Type of Project: Arterial Roadway
Project Number: 24-32
Basis for Activity: Asset Renewal
Department: 3100 - Structures
Relationship to Strategic Plan: N/A
Description: ASSET # 51920 & 52035 Pavement Preservation - Double application of Microsurfacing Treatment Bellrock Road (#51920) - Bellrock Mill Street to Long Swamp Road - Existing paved shoulders. Total length of 2.1km Bellrock Road (#52035) - Long Swamp Road to Cross Road Existing paved shoulders. Total length of 3.2km
Rationale: The rehabilitation of these road assets has been identified as a priority road project for 2024 within the 5 year plan received by Council on May 2, 2023. Pavement preservation with micro surfacing treatments will extend service life of pavements by 6 to 8 years. Roadways were built in 2011 and 2012 and based on age factors and PCI ratings these roadways are ready for rehabilitation by micro surfacing.
Staff Contact: Troy Dunlop (tdunlop)
Project Finances
Actuals Description 55290 - Contracted Services Expenses / Expenditure Total
Budget
Expensed to Current Year
Total Project
Prior Approved
2024
2025
2026
2027
2028
0
495,000
0
495,000
0
0
0
0
0
495,000
0
495,000
0
0
0
0
Page 65 of 137
Page 28
Capital Project Detail Sheet Project Information Project Name: Orser Road
Type of Project: Local Roadway
Project Number: 24-33
Basis for Activity: Asset Renewal
Department: 3100 - Structures
Relationship to Strategic Plan: N/A
Description: ASSET # 44905 Road Reconstruction - Double Surface Treatment (boundary road with City of Kingston) Reconstruction of 2.4km of Orser Road from Stage Coach Road to west boundary limit. Construction to include full depth reclamation, placement of granular A materials and a double surface treatment (chip seal). Project will also include minor drainage improvements.
Rationale: The reconstruction of Orser Road has been identified as a priority road project for 2024 within the 5 year plan received by Council on May 2, 2023. This boundary road has also been identified as a priority of the City of Kingston within their capital plans. Road was last constructed in 2009. surface conditions are poor and unplanned maintenance demands continue to be a concern for meeting service level requirements.
Staff Contact: Troy Dunlop (tdunlop)
Project Finances
Actuals Description 55290 - Contracted Services Expenses / Expenditure Total
Budget
Expensed to Current Year
Total Project
Prior Approved
2024
2025
2026
2027
2028
0
157,500
0
157,500
0
0
0
0
0
157,500
0
157,500
0
0
0
0
Page 66 of 137
Page 29
Capital Project Detail Sheet Project Information Project Name: Spooner Road
Type of Project: Local Roadway
Project Number: 24-34
Basis for Activity: Asset Renewal
Department: 3100 - Structures
Relationship to Strategic Plan: N/A
Description: ASSET # 45945 Road Reconstruction - Double Surface Treatment (boundary road with City of Kingston) Reconstruction of 450m of Spooner Road from Leeman Road to Perth Road. Construction to include full depth reclamation, placement of granular A materials and a double surface treatment (chip seal). Project will also include minor drainage improvements.
Rationale: The reconstruction of this section of Spooner Road has been identified as a priority road project for 2024 within the 5 year plan received by Council on May 2, 2023. This boundary road has also been identified as a priority of the City of Kingston within their capital plans. Road was last constructed in 1995. Surface conditions are poor and unplanned maintenance demands continue to be a concern for meeting service level requirements.
Staff Contact: Troy Dunlop (tdunlop)
Project Finances
Actuals Description 55290 - Contracted Services Expenses / Expenditure Total
Budget
Expensed to Current Year
Total Project
Prior Approved
2024
2025
2026
2027
2028
0
64,100
0
64,100
0
0
0
0
0
64,100
0
64,100
0
0
0
0
Page 67 of 137
Page 30
Capital Project Detail Sheet Project Information Project Name: Bedford Road
Type of Project: Arterial Roadway
Project Number: 24-35
Basis for Activity: Asset Renewal
Department: 3100 - Structures
Relationship to Strategic Plan: N/A
Description: ASSET # 51690 Road Construction - Double Surface Treatment Reconstruction of 3.6km section of Bedford Road from Desert Lake Road to 1.0km North of Salmon Lake Road. Construction to include full depth reclamation, placement of granular A materials, culverts, guiderail renewals and double surface treatment (chip seal). Project will also include roadside drainage improvements.
Rationale: The reconstruction of Bedford Road has been identified as a priority road project for 2024 within the 5 year plan received by Council on May 2, 2023. Road was last constructed in 2007. Surface conditions are poor and unplanned maintenance demands continue to be a concern for meeting service level requirements.
Staff Contact: Troy Dunlop (tdunlop)
Project Finances
Actuals Description 55290 - Contracted Services Expenses / Expenditure Total
Budget
Expensed to Current Year
Total Project
Prior Approved
2024
2025
2026
2027
2028
0
1,432,000
0
1,432,000
0
0
0
0
0
1,432,000
0
1,432,000
0
0
0
0
Page 68 of 137
Page 31
Capital Project Detail Sheet Project Information Project Name: Ormsbee Road
Type of Project: Local Roadway
Project Number: 24-36
Basis for Activity: Asset Renewal
Department: 3100 - Structures
Relationship to Strategic Plan: N/A
Description: ASSET # 44890 Road Reconstruction - Double Surface Treatment Reconstruction of 2.65km section of Ormsbee Road from Millburn Road to east end. Construction to include full depth reclamation, placement of granular A materials, culvert renewals and double surface treatment (chip seal). Project will also include roadside drainage improvements.
Rationale: The reconstruction of Ormsbee Road has been identified as a priority road project for 2024 within the 5 year plan received by Council on May 2, 2023. Road was last constructed in 1994 with a single surface treatment in 2014. Surface conditions are poor and unplanned maintenance demands continue to be a concern for meeting service level requirements.
Staff Contact: Troy Dunlop (tdunlop)
Project Finances
Actuals Description
Budget
Expensed to Current Year
Total Project
Prior Approved
2024
2025
2026
2027
2028
50100 - Wages
Expenses / Expenditure
0
99,400
0
99,400
0
0
0
0
53310 - Materials
Expenses / Expenditure
0
198,000
0
198,000
0
0
0
0
55290 - Contracted Services Expenses / Expenditure
0
396,000
0
396,000
0
0
0
0
58001 - Internal Equipment
0
125,700
0
125,700
0
0
0
0
0
819,100
0
819,100
0
0
0
0
Total
Expenses / Expenditure
Page 69 of 137
Page 32
Capital Project Detail Sheet Project Information Project Name: Greenfield Road
Type of Project: Local Roadway
Project Number: 24-37
Basis for Activity: Asset Renewal
Department: 3100 - Structures
Relationship to Strategic Plan: N/A
Description: ASSET # 42665 Road Reconstruction - Double Surface Treatment Reconstruction of 0.8km section of Greenfield Road from 0.7km west of Perth Road to west end. Construction to include full depth reclamation, placement of granular A materials, culvert renewals, and double surface treatment (chip seal). Project to also include roadside drainage improvements.
Rationale: The reconstruction of a section of Greenfield Road has been identified as a priority road project for 2024 within the 5 year plan received by Council on May 2, 2023. Road was last constructed in 2000. Surface conditions are poor and unplanned maintenance demands continue to be a concern for meeting service level requirements.
Staff Contact: Troy Dunlop (tdunlop)
Project Finances
Actuals Description
Budget
Expensed to Current Year
Total Project
Prior Approved
2024
2025
2026
2027
2028
50100 - Wages
Expenses / Expenditure
0
21,700
0
21,700
0
0
0
0
53310 - Materials
Expenses / Expenditure
0
47,700
0
47,700
0
0
0
0
55290 - Contracted Services Expenses / Expenditure
0
107,200
0
107,200
0
0
0
0
58001 - Internal Equipment
0
39,300
0
39,300
0
0
0
0
0
215,900
0
215,900
0
0
0
0
Total
Expenses / Expenditure
Page 70 of 137
Page 33
Capital Project Detail Sheet Project Information Project Name: Kerr Road
Type of Project: Local Roadway
Project Number: 24-38
Basis for Activity: Asset Renewal
Department: 3100 - Structures
Relationship to Strategic Plan: N/A
Description: ASSET # 43435 Road Reconstruction - Double Surface Treatment Reconstruction of 0.6km section of Kerr Road from Petworth Road to north end of road. Construction to include full depth reclamation, placement of granular A materials, culvert renewals and double surface treatment (chip seal). Project will also include roadside drainage improvements.
Rationale: The reconstruction of Kerr Road has been identified as a priority road project for 2024 within the 5 year plan received by Council on May 2, 2023. Road was last constructed in 2003. Surface conditions are poor and unplanned maintenance demands continue to be a concern for meeting service level requirements.
Staff Contact: Troy Dunlop (tdunlop)
Project Finances
Actuals Description
Budget
Expensed to Current Year
Total Project
Prior Approved
2024
2025
2026
2027
2028
50100 - Wages
Expenses / Expenditure
0
18,100
0
18,100
0
0
0
0
53310 - Materials
Expenses / Expenditure
0
29,000
0
29,000
0
0
0
0
55290 - Contracted Services Expenses / Expenditure
0
79,200
0
79,200
0
0
0
0
58001 - Internal Equipment
0
35,200
0
35,200
0
0
0
0
0
161,500
0
161,500
0
0
0
0
Total
Expenses / Expenditure
Page 71 of 137
Page 34
Capital Project Detail Sheet Project Information Project Name: Tom Watson Road
Type of Project: Local Roadway
Project Number: 24-39
Basis for Activity: Asset Renewal
Department: 3100 - Structures
Relationship to Strategic Plan: N/A
Description: ASSET # 46240 Road Reconstruction - Double Surface Treatment Reconstruction of 0.6km section of Tom Watson Road from Watson Road to the west end. Construction to include full depth reclamation, placement of granular A materials, culvert renewals and double surface treatment (chip seal). Project will also include roadside drainage improvements.
Rationale: The reconstruction of Tom Watson Road has been identified as a priority road project for 2024 within the 5 year plan received by Council on May 2, 2023. Road was last constructed in 2004. Surface conditions are poor and unplanned maintenance demands continue to be a concern for meeting service level requirements.
Staff Contact: Troy Dunlop (tdunlop)
Project Finances
Actuals Description
Budget
Expensed to Current Year
Total Project
Prior Approved
2024
2025
2026
2027
2028
50100 - Wages
Expenses / Expenditure
0
15,400
0
15,400
0
0
0
0
53310 - Materials
Expenses / Expenditure
0
26,200
0
26,200
0
0
0
0
55290 - Contracted Services Expenses / Expenditure
0
54,800
0
54,800
0
0
0
0
58001 - Internal Equipment
0
28,000
0
28,000
0
0
0
0
0
124,400
0
124,400
0
0
0
0
Total
Expenses / Expenditure
Page 72 of 137
Page 35
Capital Project Detail Sheet Project Information Project Name: Devil Lake Road - Gravel Road Program
Type of Project: Local Roadway
Project Number: 24-43
Basis for Activity: Service Level Change
Department: 3100 - Structures
Relationship to Strategic Plan: N/A
Description: 2024 Gravel Road Program - Devil Lake Road ASSETS # 41875 and 41890 Dedicated funding for improvements for a 6.6km section of Devil Lake Road from Centreville Road to West Devil Lake Lane. Construction to include extensive rock ditching, rock cut removal (roadside hazards), localized widenings (hills/corners) and re-gravelling (100mm) Granular M.
Rationale: The development of dedicated capital towards gravel road improvements is one of the key findings of the 2022 Road Needs Study. Investments in drainage improvements will improve road performance, customer service levels and reduced unplanned maintenance costs over time.
Staff Contact: Troy Dunlop (tdunlop)
Project Finances
Actuals Description
Budget
Expensed to Current Year
Total Project
Prior Approved
2024
2025
2026
2027
2028
50100 - Wages
Expenses / Expenditure
0
33,600
0
33,600
0
0
0
0
53310 - Materials
Expenses / Expenditure
0
152,300
0
152,300
0
0
0
0
55290 - Contracted Services Expenses / Expenditure
0
88,100
0
88,100
0
0
0
0
58001 - Internal Equipment
0
72,600
0
72,600
0
0
0
0
0
346,600
0
346,600
0
0
0
0
Total
Expenses / Expenditure
Page 73 of 137
Page 36
Capital Project Detail Sheet Project Information Project Name: Surface Treatment (LCB) Preservation
Type of Project: Local Roadway
Project Number: 24-40
Basis for Activity: Asset Renewal
Department: 3100 - Structures
Relationship to Strategic Plan: N/A
Description: Rehabilitation of approximately 22km of surface treated roadways with localized repairs and application of a final Low Class Bituminous (LCB) single surface treatment (chip seal). A priority list has been attached as a project document with additional details on forecasted roadways.
Rationale: The application of a single surface treatment (chip seal) is a key maintenance strategy for long term performance of the Township’s road network of LCB roadways. Single surface treatments can add 5 to 7 years of added service life at a low cost and help manage unplanned maintenance expenses (potholes, cracking and edge break-up). The commitment to an annual LCB preservation plan is reflected in the 5 year plan received by Council on May 2, 2023.
Staff Contact: Troy Dunlop (tdunlop)
Project Finances
Actuals Description
Budget
Expensed to Current Year
Total Project
Prior Approved
2024
2025
2026
2027
2028
50100 - Wages
Expenses / Expenditure
0
5,000
0
5,000
0
0
0
0
53310 - Materials
Expenses / Expenditure
0
79,500
0
79,500
0
0
0
0
55290 - Contracted Services Expenses / Expenditure
0
808,000
0
808,000
0
0
0
0
58001 - Internal Equipment
0
7,500
0
7,500
0
0
0
0
0
900,000
0
900,000
0
0
0
0
Total
Expenses / Expenditure
Page 74 of 137
Page 37
TOWNSHIP OF SOUTH FRONTENAC - SURFACE TREATMENT PROGRAM SURFACE TREATEMENT - 2024 Preliminary Budget Overview Public Services Department
2024 Single Surface Treatment Program - Preliminary List Section ID 40810 50875 42010 40930 46750 44440 57785
Street Burnt Hills Road Battersea Road Duff Road Camden Portland Boundary Road Wolfe Swamp Road Morrison Road Westport Road
From Street Battersea Road Bradden Lane Greenfield Road Yarker Road Bradford Road Wilmer Road Buck Bay Road
To Street Osborne Lane East End of Road 4236 Duff Road Colebrook Road Petworth Road West End of Morrison Road New Road Total :
Length (Km)
AADT
PCI
1.8 6.1 1.0 2.9 1.2 1.2 7.7 21.9
556 173 281 711 422 221 606
71 62 63 79 58 60 62
- The above road list is preliminary. Each road section will undergo a final condition review in the spring
Page 75 of 137
Page 38
Capital Project Detail Sheet Project Information Project Name: 12th Concession Bridge (B32) Repair
Type of Project: Bridge
Project Number: 22-17
Basis for Activity: Asset Renewal
Department: 3100 - Structures
Relationship to Strategic Plan: N/A
Description: Repairs to 4m long bridge structure on Concession 12.
Rationale: Failure to address erosion and undermining of abutment could have major impacts on integrity of structure. Repairs are being advanced as part of 2021 OSIM inspection works underway in fall of 2021. BCI Score of 75 (2019)
Staff Contact: Troy Dunlop (tdunlop)
Project Finances
Actuals Description
Expensed to Current Year
55290 - Contracted Services Expenses / Expenditure 55330 - Consultant
Expenses / Expenditure
Total 40000 - Taxation Total
Budget
Revenues / Funding Source
Total Project
Prior Approved
2024
2025
2026
2027
2028
5,749
75,000
40,000
35,000
0
0
0
0
0
13,500
10,000
3,500
0
0
0
0
5,749
88,500
50,000
38,500
0
0
0
0
0
50,000
50,000
0
0
0
0
0
0
50,000
50,000
0
0
0
0
0
Page 76 of 137
Page 39
Capital Project Detail Sheet Project Information Project Name: Sydenham Lake Bridge and Dam
Type of Project: Bridge
Project Number: 24-44
Basis for Activity: Asset Renewal
Department: 3100 - Structures
Relationship to Strategic Plan: N/A
Description: ASSET # 63080 The Sydenham Lake Bridge / Dam Control structure crosses Millhaven Creek on George Street in the Village of Sydenham. The structure was originally built in 1978. Dam components and controls are owned and operated by the Cataraqui Region Conservation Authority. The CRCA and the Township are looking to do a joint rehabilitation contract. Repairs to the bridge include: waterproofing and new wear surface, sidewalk repairs, barrier wall (north side), railing upgrade and repair spalling concrete throughout. Repairs to the dam will focus on repair of cracks and spalling concrete.
Rationale: The Sydenham Lake Bridge / Dam was last inspected in 2021 and the bridge received a BCI rating of 71.2. The rehabilitation of the bridge has been identified as a priority within the 5 year plan presented to Council on May 2, 2023. The CRCA also has identified that rehabilitation of the dam is also a priority for the coming year.
Staff Contact: Troy Dunlop (tdunlop)
Project Finances
Actuals Description 55290 - Contracted Services Expenses / Expenditure Total
Budget
Expensed to Current Year
Total Project
Prior Approved
2024
2025
2026
2027
2028
0
534,000
0
534,000
0
0
0
0
0
534,000
0
534,000
0
0
0
0
Page 77 of 137
Page 40
Capital Project Detail Sheet Project Information Project Name: Bracken Culvert (Yarker Road)
Type of Project: Culvert
Project Number: 24-45
Basis for Activity: Asset Renewal
Department: 3100 - Structures
Relationship to Strategic Plan: N/A
Description: Bracken Culvert (Yarker Road) ASSET # 63120 The Bracken Culvert is located on Yarker Road approximately 0.5km west of Wilton Road. The structure is comprised of a 4.4m wide arch culvert approximately 21m in length. Records indicate the arch structure was installed in 1966.
Rationale: The structure was last assessed in 2021 and was assigned a BCI rating of 38.1 which is Very Poor. The replacement of this structure has been identified as a priority within the 5 year plan presented to Council on May 2, 2023.
Staff Contact: Troy Dunlop (tdunlop)
Project Finances
Actuals Description 55290 - Contracted Services Expenses / Expenditure Total
Budget
Expensed to Current Year
Total Project
Prior Approved
2024
2025
2026
2027
2028
0
527,200
0
527,200
0
0
0
0
0
527,200
0
527,200
0
0
0
0
Page 78 of 137
Page 41
Capital Project Detail Sheet Project Information Project Name: Long Swamp Bridge Study
Type of Project: Plans/Studies
Project Number: 24-46
Basis for Activity: Asset Renewal
Department: 3100 - Structures
Relationship to Strategic Plan: N/A
Description: Long Swamp Bridge Study ASSET # 63350 Completion of Municipal Class EA Study work for the Long Swamp Road Bridge (closed to traffic in 2020). Additional study work is required under the new MCEA regulation passed in March of 2023. The original 2015 MCEA Study was not concluded and a Notice of Completion was not filed with the Ministry of Environment.
Rationale: The Municipal Class EA Process was amended by the province in March of 2023 and bridge projects require additional screening work. A Cultural Heritage and Archaeological Screening Process is required as part of project review. A geotechnical report would also provide insight on the 2020 bridge failure and better inform project costs for the crossing.
Staff Contact: Troy Dunlop (tdunlop)
Project Finances
Actuals Description 55290 - Contracted Services Expenses / Expenditure Total
Budget
Expensed to Current Year
Total Project
Prior Approved
2024
2025
2026
2027
2028
0
35,000
0
35,000
0
0
0
0
0
35,000
0
35,000
0
0
0
0
Page 79 of 137
Page 42
Capital Project Detail Sheet Project Information Project Name: Transportation Master Plan
Type of Project: Plans/Studies
Project Number: 23-49
Basis for Activity: Growth Related
Department: 3000 - Overhead
Relationship to Strategic Plan: Priority #2 - Promote and support growth that meets the community’s needs
Description: Complete a Transportation Master Plan to determine transportation network needs (capacity) to support both current (existing) and future residential and commercial growth through the forecasted growth period of the new Official Plan. The TMP would also provide policy guidance and direction on Active Transportation needs.
Rationale: The Transportation Master Plan is identified as a strategic study within the Long Term Financial Plan and is intended to provide guidance for infrastructure planning for transportation systems to support the capacity needs within the study horizon of the Official Plan. The TMP also provides background study work to support the determination of Development Charge fees to help recover the costs of new infrastructure needs driven by growth. Extensive background traffic count work was carried out across the Township in the spring and summer of 2022 in anticipation of this study in 2024.
Staff Contact: Troy Dunlop (tdunlop)
Project Finances
Actuals Description 55330 - Consultant
Expensed to Current Year Expenses / Expenditure
Total 49651 - Reserve - Obligatory Revenues / Funding Source Total
Budget Total Project
Prior Approved
2024
2025
2026
2027
2028
0
125,000
50,000
75,000
0
0
0
0
0
125,000
50,000
75,000
0
0
0
0
0
50,000
50,000
0
0
0
0
0
0
50,000
50,000
0
0
0
0
0
Page 80 of 137
Page 43
Capital Project Detail Sheet Project Information Project Name: Pre-Engineering Roads 2025
Type of Project: Plans/Studies
Project Number: 24-41
Basis for Activity: Asset Renewal
Department: 3100 - Structures
Relationship to Strategic Plan: N/A
Description: Geotechnical investigations and field survey work to be initiated in 2024 in support of 2025 road construction projects shown within the 5 year plan received by Council on May 2, 2023. Includes the following: ASSET # 58015 Westport Road (Burridge Road to Wolfe Lake)
- 2.5km ASSET # 41575 Craig Road (Road 38 to 3.75km North to boundary) - 3.75km ASSET # 42235 Florida Road (Henderson Road to 1.3km south of Henderson Road) - 1.3km
Rationale: The design process for road reconstruction projects requires a 2 to 3 year timeframe to address pre-engineering activiites, topographic surveys, stakeholder engagement, drainage permits, utility relocation and property acquisition (where necessary). The endorsement of the 5 year plan will help refine pre-engineering allocations to be set year over year.
Staff Contact: Troy Dunlop (tdunlop)
Project Finances
Actuals Description 55290 - Contracted Services Expenses / Expenditure Total
Budget
Expensed to Current Year
Total Project
Prior Approved
2024
2025
2026
2027
2028
0
75,000
0
75,000
0
0
0
0
0
75,000
0
75,000
0
0
0
0
Page 81 of 137
Page 44
Capital Project Detail Sheet Project Information Project Name: Road 38 Detailed Design
Type of Project: Plans/Studies
Project Number: 24-47
Basis for Activity: Asset Renewal
Department: 3100 - Structures
Relationship to Strategic Plan: Priority #3 - Ensure the organizational capacity to deliver costeffective services
Description: Road 38 Reconstruction - preparation of Detailed Designs
Rationale: Preparation of Detailed Engineering Designs to inform the contract for Road 38 Reconstruction to commence in 2025.
Staff Contact: Troy Dunlop (tdunlop)
Project Finances
Actuals Description 55290 - Contracted Services Expenses / Expenditure Total
Budget
Expensed to Current Year
Total Project
Prior Approved
2024
2025
2026
2027
2028
0
100,000
0
100,000
0
0
0
0
0
100,000
0
100,000
0
0
0
0
Page 82 of 137
Page 45
Capital Project Detail Sheet Project Information Project Name: Pleasant Valley Municipal Drain - Drainage Act Maintenance
Type of Project: Plans/Studies
Project Number: 23-51
Basis for Activity: Other
Department: 3100 - Structures
Relationship to Strategic Plan: N/A
Description: Consulting fees for landowner consultation, tender preparations and contract administration as Drainage Superintendent for the Pleasant Valley Municipal Drain Maintenance work. Project also includes funding for the Township’s levied drainage costs (as a benefitting property owner).
Rationale: The Pleasant Valley Municipal Drain which was constructed in 1985 has been determined to be in need of maintenance based on current reviews of the system against the original Engineer’s report. Various vegetation removals, clean outs and channel obstructions are in need of removal The rational for the project was provided to Council in a presentation by Robinson Consultants on November 14th, 2023 along with the supporting Maintenance Report dated October 2023.
Staff Contact: Troy Dunlop (tdunlop)
Project Finances
Actuals Description
Budget
Expensed to Current Year
Total Project
Prior Approved
2024
2025
2026
2027
2028
55330 - Consultant
Expenses / Expenditure
0
34,350
16,500
17,850
0
0
0
0
80000 - Capital Levy
Expenses / Expenditure
0
900
0
900
0
0
0
0
0
35,250
16,500
18,750
0
0
0
0
Total
Page 83 of 137
Page 46
Capital Project Detail Sheets Sydenham Water Projects
Page 84 of 137
Page 47
Capital Project Detail Sheet Project Information Project Name: SCADA and Programmable Logic Control Replacements
Type of Project: Water Main
Project Number: 22-53
Basis for Activity: Other
Department: 4000 - Water Treatment
Relationship to Strategic Plan: N/A
Description: The scope of the project includes the purchase and installation of replacement of existing Supervisory Control, Alarms and Data Acquisition System (SCADA) and Programmable Logic Controller (PLC) System hardware at the Sydenham Water Treatment Plant on Point Road.
Rationale: The SCADA and Programmable Logic Controller systems at the water treatment plant provide 24/7 remote monitoring of operations and provide communications and automation for electrical and mechanical systems that support the water treatment process. These systems also include alarm systems that protect water quality and minimize the probability of water quality incidents, and system failures. The current systems are approaching redundancy and are in need of replacement. Eligible funds on this project are being provided by Province of Ontario (33.3%) and Government of Canada (40%) through the 2021 Intake of the Investing in Canada Infrastructure Program Green Infrastructure Stream.
(Pre-approved in 2022)
Staff Contact: Troy Dunlop (tdunlop)
Project Finances
Actuals Description 55290 - Contracted Services Expenses / Expenditure Total
Expensed to Current Year
Budget Total Project
Prior Approved
2024
2025
2026
2027
2028
33,636
275,000
0
275,000
0
0
0
0
33,636
275,000
0
275,000
0
0
0
0
Page 85 of 137
Page 48
Capital Project Detail Sheet Project Information Project Name: Sydenham Drinking Water System
Type of Project: Other
Project Number: 24-61
Basis for Activity: Asset Renewal
Department: 4000 - Water Treatment
Relationship to Strategic Plan: N/A
Description: Upgrades to the Sydenham Drinking Water System in accordance with the long term capital plan forecast by Utilities Kingston. Projects for 2024 include: Water Plant - Process Mechanical - Pump Assessments and Repairs - $7,500 Water Plant - Health and Safety - Chemical drum lift improvements (ammonium sulfate/coagulant) - $5,000 Water Distribution - Compliance/Monitoring - Replace two water sampling stations and add a new station on Morgan Drive - $25,000
Rationale: All of the Capital Works activities are in support of operations, compliance and asset management needs for the Sydenham Drinking Water System.
Staff Contact: Troy Dunlop (tdunlop)
Project Finances
Actuals Description 55290 - Contracted Services Expenses / Expenditure Total
Budget
Expensed to Current Year
Total Project
Prior Approved
2024
2025
2026
2027
2028
0
37,500
0
37,500
0
0
0
0
0
37,500
0
37,500
0
0
0
0
Page 86 of 137
Page 49
Capital Project Detail Sheets Facilities Projects
Page 87 of 137
Page 50
Capital Project Detail Sheet Project Information Project Name: Town Hall Expansion
Type of Project: Facilities
Project Number: 24-02
Basis for Activity: Growth Related
Department: 1200 - Administrative Facilities
Relationship to Strategic Plan: Priority #2 - Promote and support growth that meets the community’s needs
Description: Expansion of George Street Administration Offices
Rationale: Current building space is at capacity and does not provide any space for future staff. Current building provides limited meeting space to meet with public. Expansion will provide more offices along with restructure reception points at both levels, public and staff washrooms, a large meeting space along with other smaller meeting spaces. The expansion also provides for a dedicated staff parking lot to improve the parking in current parking lot. Budget costs includes temporary relocation costs of staff during construction.
Staff Contact: Louise Fragnito (lfragnito)
Project Finances
Actuals Description 55290 - Contracted Services Expenses / Expenditure Total
Budget
Expensed to Current Year
Total Project
Prior Approved
2024
2025
2026
2027
2028
0
3,500,000
0
3,500,000
0
0
0
0
0
3,500,000
0
3,500,000
0
0
0
0
Page 88 of 137
Page 51
Capital Project Detail Sheet Project Information Project Name: Storrington Centre Upgrades
Type of Project: Facilities
Project Number: 24-51
Basis for Activity: Asset Renewal
Department: 3100 - Structures
Relationship to Strategic Plan: Priority #4 - Be a catalyst for the creation of vibrant, complete communities
Description: A. Replace Shingled Roof with Steel on Old Firehall portion. $35,000 B. Re-paving of parking lot that is in poor condition. Include additional gravel parking area on the south end of the parking lot. $400,000
Rationale: Existing shingled roof is in poor condition and has been patched due to leaks. Replacing with new steel roof aligns with building condition assessment. Existing front parking lot is in poor condition and re-paving would complete the front renewal now that the Storrington Centre is completed. The project includes paving the back parking lot now that the dome fabric replacement and new fuel tank system is completed. A paved asphalt surface in the back would allow for clean stockpiling of winter sand material into the dome.
Staff Contact: Tim Laprade (tlaprade)
Project Finances
Actuals Description 55290 - Contracted Services Expenses / Expenditure Total
Budget
Expensed to Current Year
Total Project
Prior Approved
2024
2025
2026
2027
2028
0
435,000
0
435,000
0
0
0
0
0
435,000
0
435,000
0
0
0
0
Page 89 of 137
Page 52
Capital Project Detail Sheet Project Information Project Name: Bedford Garage Equipment Upgrades
Type of Project: Equipment
Project Number: 24-52
Basis for Activity: Other
Department: 3100 - Structures
Relationship to Strategic Plan: Priority #3 - Ensure the organizational capacity to deliver costeffective services
Description: A. Replace heated pressure washer system B. Replacement of the Oil Separator
Rationale: The existing pressure washer requires has failed and requires replacement. The buildings oil and grit interceptor structure had deteriorated and is damaged beyond repair. The structure needs to be replaced to protect potential contaminants from entering the storm system.
Staff Contact: Tim Laprade (tlaprade)
Project Finances
Actuals Description
Budget
Expensed to Current Year
Total Project
Prior Approved
2024
2025
2026
2027
2028
55290 - Contracted Services Expenses / Expenditure
0
40,000
0
40,000
0
0
0
0
80100 - Equipment
0
8,500
0
8,500
0
0
0
0
0
48,500
0
48,500
0
0
0
0
Total
Expenses / Expenditure
Page 90 of 137
Page 53
Capital Project Detail Sheet Project Information Project Name: Keeley Patrol Yard Waste Oil Disposal
Type of Project: Equipment
Project Number: 24-54
Basis for Activity: Asset Renewal
Department: 3000 - Overhead
Relationship to Strategic Plan: Priority #3 - Ensure the organizational capacity to deliver costeffective services
Description: Installation of Waste Oil Disposal trough that pump to outside tank. Relocation of waste oil tank.
Rationale: The fleet garage needs a proper set up to drain waste oil and filters from vehicles and equipment. Waste oil tank is outside and fluid is currently carted outside and pumped into the tank which can pose problems in the winter. Existing waste oil tank needs to be reviewed and potentially relocated for regulatory requirements.
Staff Contact: Tim Laprade (tlaprade)
Project Finances
Actuals Description 80100 - Equipment Total
Budget
Expensed to Current Year Expenses / Expenditure
Total Project
Prior Approved
2024
2025
2026
2027
2028
0
25,000
0
25,000
0
0
0
0
0
25,000
0
25,000
0
0
0
0
Page 91 of 137
Page 54
Capital Project Detail Sheet Project Information Project Name: Sydenham Point Accessible Washroom Upgrades
Type of Project: Facilities
Project Number: 24-55
Basis for Activity: Service Level Change
Department: 8000 - Parks & Recreation
Relationship to Strategic Plan: Priority #4 - Be a catalyst for the creation of vibrant, complete communities
Description: Complete Accessibility upgrades on Ball Diamond Washrooms
Rationale: The washroom building in Sydenham Point park will be upgraded to an accessible washroom to meet AODA and building codes. The para ramp had been previously installed at this location in preparation for future upgrades.
Staff Contact: Tim Laprade (tlaprade)
Project Finances
Actuals Description 55290 - Contracted Services Expenses / Expenditure Total
Budget
Expensed to Current Year
Total Project
Prior Approved
2024
2025
2026
2027
2028
0
30,000
0
30,000
0
0
0
0
0
30,000
0
30,000
0
0
0
0
Page 92 of 137
Page 55
Capital Project Detail Sheet Project Information Project Name: Centennial Park New Accessible Washrooms Design and Build
Type of Project: Facilities
Project Number: 24-56
Basis for Activity: Growth Related
Department: 8000 - Parks & Recreation
Relationship to Strategic Plan: Priority #2 - Promote and support growth that meets the community’s needs
Description: Design Plans for a ‘new’ AODA compliant Washroom closer to Grand Pavilion. Budget for 2024 is design and construction is in 2025.
Rationale: Additional washrooms are required at Centennial Park as it is becoming the most frequented park in SFT and a destination location for many events. The use of the washrooms would be from attendees at the Pavilion and Soccer Fields where we are currently renting portable toilets. New washroom building would be separate from the existing building to increase the amount of washrooms and provide another location in the park.
Staff Contact: Tim Laprade (tlaprade)
Project Finances
Actuals Description 55290 - Contracted Services Expenses / Expenditure Total
Budget
Expensed to Current Year
Total Project
Prior Approved
2024
2025
2026
2027
2028
0
530,000
0
30,000
500,000
0
0
0
0
530,000
0
30,000
500,000
0
0
0
Page 93 of 137
Page 56
Capital Project Detail Sheet Project Information Project Name: Centennial Park Renovations to existing Canteen/Washrooms
Type of Project: Facilities
Project Number: 24-57
Basis for Activity: Service Level Change
Department: 8000 - Parks & Recreation
Relationship to Strategic Plan: Priority #2 - Promote and support growth that meets the community’s needs
Description: Renovations to existing Canteen/Washrooms to install accessible washrooms that meet AODA/Universal design requirements.
Rationale: The 2023 budget had a project to design accessible washrooms for the existing washroom building in Centennial park. This project will renovate the existing washrooms and canteen space to install accessible washrooms that are AODA compliant.
Staff Contact: Tim Laprade (tlaprade)
Project Finances
Actuals Description 55290 - Contracted Services Expenses / Expenditure Total
Budget
Expensed to Current Year
Total Project
Prior Approved
2024
2025
2026
2027
2028
0
150,000
0
150,000
0
0
0
0
0
150,000
0
150,000
0
0
0
0
Page 94 of 137
Page 57
Capital Project Detail Sheet Project Information Project Name: Harris Park Hall Flooring Replacement
Type of Project: Facilities
Project Number: 24-58
Basis for Activity: Asset Renewal
Department: 8000 - Parks & Recreation
Relationship to Strategic Plan: Priority #4 - Be a catalyst for the creation of vibrant, complete communities
Description: Flooring replacement in Harris Park Hall.
Rationale: The flooring is in poor condition beyond repair due to its age and water damage.
Staff Contact: Tim Laprade (tlaprade)
Project Finances
Actuals Description 55290 - Contracted Services Expenses / Expenditure Total
Budget
Expensed to Current Year
Total Project
Prior Approved
2024
2025
2026
2027
2028
0
29,000
0
29,000
0
0
0
0
0
29,000
0
29,000
0
0
0
0
Page 95 of 137
Page 58
Capital Project Detail Sheet Project Information Project Name: Glendower Hall Interior Design Plans
Type of Project: Facilities
Project Number: 24-59
Basis for Activity: Asset Renewal
Department: 8000 - Parks & Recreation
Relationship to Strategic Plan: Priority #4 - Be a catalyst for the creation of vibrant, complete communities
Description: Design plans for interior renovations on the Glendower Hall building.
Rationale: Glendower Hall is identified as a recreation hub in the Rec master plan and is the next facility due for renovations & upgrades due to it’s age and building condition assessment. Project would prepare design plans for a future renovation.
Staff Contact: Tim Laprade (tlaprade)
Project Finances
Actuals Description 55290 - Contracted Services Expenses / Expenditure Total
Budget
Expensed to Current Year
Total Project
Prior Approved
2024
2025
2026
2027
2028
0
20,000
0
20,000
0
0
0
0
0
20,000
0
20,000
0
0
0
0
Page 96 of 137
Page 59
Capital Project Detail Sheet Project Information Project Name: Station 5 Exterior Upgrades
Type of Project: Facilities
Project Number: 24-82
Basis for Activity: Asset Renewal
Department: 3100 - Structures
Relationship to Strategic Plan: Priority #4 - Be a catalyst for the creation of vibrant, complete communities
Description: Replace front of building exterior including exterior front metal cladding, replacement of front entrance door, and repainting eves and facia.
Rationale: Improve the exterior condition of the building including exterior wall replacement and painting of external metal to preserve useful life.
Staff Contact: Tim Laprade (tlaprade)
Project Finances
Actuals Description 55290 - Contracted Services Expenses / Expenditure Total
Budget
Expensed to Current Year
Total Project
Prior Approved
2024
2025
2026
2027
2028
0
15,000
0
15,000
0
0
0
0
0
15,000
0
15,000
0
0
0
0
Page 97 of 137
Page 60
Capital Project Detail Sheet Project Information Project Name: Station 4 Flooring
Type of Project: Facilities
Project Number: 24-83
Basis for Activity: Asset Renewal
Department: 3100 - Structures
Relationship to Strategic Plan: Priority #4 - Be a catalyst for the creation of vibrant, complete communities
Description: Replace flooring in Staff Area (20’x30’)
Rationale: Current floor is over 20 years old and badly worn and requires replacement.
Staff Contact: Tim Laprade (tlaprade)
Project Finances
Actuals Description 55290 - Contracted Services Expenses / Expenditure Total
Budget
Expensed to Current Year
Total Project
Prior Approved
2024
2025
2026
2027
2028
0
8,000
0
8,000
0
0
0
0
0
8,000
0
8,000
0
0
0
0
Page 98 of 137
Page 61
Capital Project Detail Sheets Recreation Projects
Page 99 of 137
Page 62
Capital Project Detail Sheet Project Information Project Name: Sydenham Point Field Scoreclock Power
Type of Project: Park
Project Number: 24-60
Basis for Activity: Asset Renewal
Department: 8000 - Parks & Recreation
Relationship to Strategic Plan: Priority #3 - Ensure the organizational capacity to deliver costeffective services
Description: Re-route the Sydenham Point Field Scoreclock electrical that is currently being fed by a building on private property and instead feed it from SFT asset.
Rationale: Electrical power for the score board and clock at the Point field is currently supplied from private property. Providing electricity to the board from our site would allow staff to troubleshoot and repair as required.
Staff Contact: Tim Laprade (tlaprade)
Project Finances
Actuals Description 55290 - Contracted Services Expenses / Expenditure Total
Budget
Expensed to Current Year
Total Project
Prior Approved
2024
2025
2026
2027
2028
0
10,000
0
10,000
0
0
0
0
0
10,000
0
10,000
0
0
0
0
Page 100 of 137
Page 63
Capital Project Detail Sheet Project Information Project Name: Centennial Park Walkway Connections
Type of Project: Park
Project Number: 24-66
Basis for Activity: Growth Related
Department: 8000 - Parks & Recreation
Relationship to Strategic Plan: Priority #4 - Be a catalyst for the creation of vibrant, complete communities
Description: Installation of hard surface walkways to connect all park amenities and provide AODA accessible access throughout the park.
Rationale: In 2023 accessible rubber playground surfaces were installed in the park but there isn’t an accessible access to the playground from the parking lot. Project will install accessible hard surface walkways throughout the park to connect all amenities and improve walkability.
Staff Contact: Tim Laprade (tlaprade)
Project Finances
Actuals Description
Budget
Expensed to Current Year
Total Project
Prior Approved
2024
2025
2026
2027
2028
55290 - Contracted Services Expenses / Expenditure
0
240,000
0
240,000
0
0
0
0
80100 - Equipment
Expenses / Expenditure
0
0
0
0
0
0
0
0
80300 - Land Improvements
Expenses / Expenditure
0
0
0
0
0
0
0
0
0
240,000
0
240,000
0
0
0
0
Total
Page 101 of 137
Page 64
Capital Project Detail Sheet Project Information Project Name: Centennial Park Courts and Electrical Improvements
Type of Project: Park
Project Number: 24-80
Basis for Activity: Growth Related
Department: 8000 - Parks & Recreation
Relationship to Strategic Plan: Priority #2 - Promote and support growth that meets the community’s needs
Description: Upgrade and improvements to the Centennial Park site: A. Installation of electrical receptacles throughout park B. Net sport Court alterations C. Installation of basketball system
Rationale: Installation of electrical receptacles throughout the park required to support program and events in the park. Now that the McMullen tennis courts are completed the lines at the Centennial courts will be changed to pickle ball which will clean up the courts and increase the playing surface. Basketball net system will be installed on the courts which is consistent with the Gerald Ball court setup.
Staff Contact: Tim Laprade (tlaprade)
Project Finances
Actuals Description 55290 - Contracted Services Expenses / Expenditure Total
Budget
Expensed to Current Year
Total Project
Prior Approved
2024
2025
2026
2027
2028
0
49,000
0
49,000
0
0
0
0
0
49,000
0
49,000
0
0
0
0
Page 102 of 137
Page 65
Capital Project Detail Sheet Project Information Project Name: McMullen Park - Parking Lot paving & storage bunker
Type of Project: Park
Project Number: 24-67
Basis for Activity: Asset Renewal
Department: 8000 - Parks & Recreation
Relationship to Strategic Plan: Priority #4 - Be a catalyst for the creation of vibrant, complete communities
Description: McMullen Park court parking lot paving, barrier for basketball court, and storage bunker for sports equipment.
Rationale: Project will pave the parking lot at the new McMullen courts and install a barrier to separate the parking lot from the basketball court. A storage bunker will be installed to store the basketball and shuffle board equipment for the public to rent/use on the new courts.
Staff Contact: Tim Laprade (tlaprade)
Project Finances
Actuals Description
Budget
Expensed to Current Year
Total Project
Prior Approved
2024
2025
2026
2027
2028
55290 - Contracted Services Expenses / Expenditure
0
36,000
0
36,000
0
0
0
0
80100 - Equipment
0
10,000
0
10,000
0
0
0
0
0
46,000
0
46,000
0
0
0
0
Total
Expenses / Expenditure
Page 103 of 137
Page 66
Capital Project Detail Sheet Project Information Project Name: McMullen Park Beach and Washroom Building Upgrades
Type of Project: Park
Project Number: 24-75
Basis for Activity: Asset Renewal
Department: 8000 - Parks & Recreation
Relationship to Strategic Plan: Priority #3 - Ensure the organizational capacity to deliver costeffective services
Description: McMullen Park beach upgrades as permitted by Conservation Authority and upgrades to the existing building.
Rationale: Upgrades to the existing building at McMullen park are required to support operating a summer camp at this location. The beach was reviewed with the conservation authority in 2023 and a plan was developed for improvements in 2024.
Staff Contact: Tim Laprade (tlaprade)
Project Finances
Actuals Description 80100 - Equipment
Budget
Expensed to Current Year
Total Project
Prior Approved
2024
2025
2026
2027
2028
Expenses / Expenditure
0
0
0
0
0
0
0
0
80115 - Building-Renovations Expenses / Expenditure
0
10,000
0
10,000
0
0
0
0
80300 - Land Improvements
0
6,000
0
6,000
0
0
0
0
0
16,000
0
16,000
0
0
0
0
Total
Expenses / Expenditure
Page 104 of 137
Page 67
Capital Project Detail Sheet Project Information Project Name: Keeley/Bowes Diamond Upgrades
Type of Project: Park
Project Number: 24-68
Basis for Activity: Asset Renewal
Department: 8000 - Parks & Recreation
Relationship to Strategic Plan: Priority #4 - Be a catalyst for the creation of vibrant, complete communities
Description: A. Accessible Parking/Walkway/connectivity to all amenities B. Upgrade Backstop netting and posts or replace with extended fencing C. Bleacher Replacement (4) D. Player Bench Upgrades
Rationale: The Keeley/Bowes site currently has accessible washrooms and a playground with an accessible surface but does not have an accessible way to access the two amenities. Project would install paved accessible parking spots and hard surface walkways connecting the washrooms, diamonds, and playground. The baseball diamonds at this facility are well used but the bleachers, benches, and backstop poles are in poor condition and require replacement.
Staff Contact: Tim Laprade (tlaprade)
Project Finances
Actuals Description
Budget
Expensed to Current Year
Total Project
Prior Approved
2024
2025
2026
2027
2028
55290 - Contracted Services Expenses / Expenditure
0
153,000
0
153,000
0
0
0
0
80100 - Equipment
0
55,000
0
55,000
0
0
0
0
0
208,000
0
208,000
0
0
0
0
Total
Expenses / Expenditure
Page 105 of 137
Page 68
Capital Project Detail Sheet Project Information Project Name: Glendower Court Basketball nets
Type of Project: Equipment
Project Number: 24-69
Basis for Activity: Service Level Change
Department: 8000 - Parks & Recreation
Relationship to Strategic Plan: Priority #4 - Be a catalyst for the creation of vibrant, complete communities
Description: Installation of Basketball Systems on existing court.
Rationale: Glendower court was re-surfaced in 2023 and intended for multisports use. The old court layouts had basketball nets inside the court area that posed a risk to those playing racket sports. The new basketball nets will be installed outside the court and hang inside over the fence for use which is consistent with the layout installed at Gerald Ball court.
Staff Contact: Tim Laprade (tlaprade)
Project Finances
Actuals Description 55290 - Contracted Services Expenses / Expenditure Total
Budget
Expensed to Current Year
Total Project
Prior Approved
2024
2025
2026
2027
2028
0
11,000
0
11,000
0
0
0
0
0
11,000
0
11,000
0
0
0
0
Page 106 of 137
Page 69
Capital Project Detail Sheet Project Information Project Name: Bellrock & Petworth Parkette Conceptual Design
Type of Project: Park
Project Number: 24-70
Basis for Activity: Other
Department: 8000 - Parks & Recreation
Relationship to Strategic Plan: Priority #4 - Be a catalyst for the creation of vibrant, complete communities
Description: Conceptual designs for the Bellrock and Petworth Mill sites. Design will include conceptual options for parkettes with displays and information boards to be used to advance detailed design.
Rationale: Next step for the sites now that demolition is complete. Supported by the Recreation, Leisure and Parks Master Plan
Staff Contact: Tim Laprade (tlaprade)
Project Finances
Actuals Description 55290 - Contracted Services Expenses / Expenditure Total
Budget
Expensed to Current Year
Total Project
Prior Approved
2024
2025
2026
2027
2028
0
15,000
0
15,000
0
0
0
0
0
15,000
0
15,000
0
0
0
0
Page 107 of 137
Page 70
Capital Project Detail Sheet Project Information Project Name: Petworth Mill wall cap and repairs
Type of Project: Park
Project Number: 24-71
Basis for Activity: Other
Department: 8000 - Parks & Recreation
Relationship to Strategic Plan: Priority #4 - Be a catalyst for the creation of vibrant, complete communities
Description: Installation of concrete cap on remaining south and west walls for preservation. Project include two repairs to the existing stone wall.
Rationale: Capping the walls is required to prevent water from damaging remaining wall sections.
Staff Contact: Tim Laprade (tlaprade)
Project Finances
Actuals Description 55290 - Contracted Services Expenses / Expenditure Total
Budget
Expensed to Current Year
Total Project
Prior Approved
2024
2025
2026
2027
2028
0
200,000
0
200,000
0
0
0
0
0
200,000
0
200,000
0
0
0
0
Page 108 of 137
Page 71
Capital Project Detail Sheet Project Information Project Name: Shipyards Boat Ramp Rehabilitation
Type of Project: Land
Project Number: 24-72
Basis for Activity: Growth Related
Department: 8000 - Parks & Recreation
Relationship to Strategic Plan: Priority #2 - Promote and support growth that meets the community’s needs
Description: Rehabilitation of the Shipyards boat launch ramp.
Rationale: This boat launch is one of the busiest in SFT. The old metal grate launch failed in 2023 and trailer tires were getting caught on broken pieces of metal off the ramp. The ramp was removed in 2023 but could not be welded or repaired. Proposal is to replace with the concrete mat ramp system at this location which should have a long life expectancy and reduce liability and risk.
Staff Contact: Tim Laprade (tlaprade)
Project Finances
Actuals Description 55290 - Contracted Services Expenses / Expenditure Total
Budget
Expensed to Current Year
Total Project
Prior Approved
2024
2025
2026
2027
2028
0
110,000
0
110,000
0
0
0
0
0
110,000
0
110,000
0
0
0
0
Page 109 of 137
Page 72
Capital Project Detail Sheet Project Information Project Name: New Picnic Tables
Type of Project: Equipment
Project Number: 24-74
Basis for Activity: Growth Related
Department: 8000 - Parks & Recreation
Relationship to Strategic Plan: Priority #2 - Promote and support growth that meets the community’s needs
Description: Addition of 10 new picnic tables to our inventory.
Rationale: The township purchased 20 new picnic tables in 2023 and has approximately 30 in its inventory. The increase in events and programs and more people frequenting parks has increased the demand for tables at sites where there wasn’t previously tables like sport courts. An additional 10 picnic tables would allow for permanent placement of tables at parks and facilities with enough remaining to support events.
Staff Contact: Tim Laprade (tlaprade)
Project Finances
Actuals Description 53310 - Materials Total
Budget
Expensed to Current Year Expenses / Expenditure
Total Project
Prior Approved
2024
2025
2026
2027
2028
0
10,000
0
10,000
0
0
0
0
0
10,000
0
10,000
0
0
0
0
Page 110 of 137
Page 73
Capital Project Detail Sheets Development Services Projects
Page 111 of 137
Page 74
Capital Project Detail Sheet Project Information Project Name: Economic Development Strategic Plan
Type of Project: Plans/Studies
Project Number: 24-76
Basis for Activity: Other
Department: 9800 - Development
Relationship to Strategic Plan: Priority #4 - Be a catalyst for the creation of vibrant, complete communities
Description: Economic Development Strategic Plan
Rationale: The purpose of the Economic Development Strategy is to provide a roadmap to strengthen the economic base of the Township. The strategy is expected to identify specific needs for South Frontenac related to small business support, agricultural and employment lands. The study will help identify the type of Community Improvement Plans that can be developed to improve agricultural, commercial and industrial investment in the Township.
Staff Contact: Brad Wright (bwright)
Project Finances
Actuals Description 80100 - Equipment Total
Budget
Expensed to Current Year Expenses / Expenditure
Total Project
Prior Approved
2024
2025
2026
2027
2028
0
50,000
0
50,000
0
0
0
0
0
50,000
0
50,000
0
0
0
0
Page 112 of 137
Page 75
Capital Project Detail Sheet Project Information Project Name: Replacement Building Vehicle
Type of Project: Light Weight
Project Number: 24-77
Basis for Activity: Asset Renewal
Department: 2605 - Building
Relationship to Strategic Plan: Priority #3 - Ensure the organizational capacity to deliver costeffective services
Description: Replacement of 2015 GMC - Building Light Duty Vehicle.
Rationale: Part of the South Frontenac Asset Management Plan. Vehicles are renewed every 9 years.
Staff Contact: Rebecca Roy (rroy)
Project Finances
Actuals Description 80105 - Fleet Total
Budget
Expensed to Current Year Expenses / Expenditure
Total Project
Prior Approved
2024
2025
2026
2027
2028
0
50,000
0
50,000
0
0
0
0
0
50,000
0
50,000
0
0
0
0
Page 113 of 137
Page 76
Capital Project Detail Sheet Project Information Project Name: Development Charge Study and Population Study
Type of Project: Plans/Studies
Project Number: 24-78
Basis for Activity: Growth Related
Department: 9800 - Development
Relationship to Strategic Plan: Priority #2 - Promote and support growth that meets the community’s needs
Description: Development Charges Study and By-law Update and Population Study
Rationale: The Township’s Development Charges Study expires in 2024 and the updating of the by-law and the associated charges is required to meet new legislation as well as ensure charges meet the new services that is related to growth. Due to Growth in the Township, the Population Study completed in 2019 by Watson & Associates, the expected projections for population have been exceeded. A new study to help prepare for projects in the future is necessary to ensure proper planning.
Staff Contact: Brad Wright (bwright)
Project Finances
Actuals Description 55330 - Consultant Total
Budget
Expensed to Current Year Expenses / Expenditure
Total Project
Prior Approved
2024
2025
2026
2027
2028
0
95,000
0
95,000
0
0
0
0
0
95,000
0
95,000
0
0
0
0
Page 114 of 137
Page 115 of 137
TOWNSHIP OF SOUTH FRONTENAC 2024 Draft Budget
Including: ■ High Level Summary of Changes ■ Summary ■ Departmental Operating Budgets ■ Capital Budget ■ Reserve & Reserve Funds Note: The Capital Detailed Sheets are available on Engage South Frontenac Website and also on the Township’s website from the December 12, 2023 Budget Day Agenda
For presentation: Tuesday December 12, 2023 9:00 AM Council Chambers
Hard copies distributed to Council on Tuesday, December 5, 2023 Please bring handout with you to Tuesday’s session
Page 116 of 137
TOWNSHIP OF SOUTH FRONTENAC 2024 Draft Budget High Level Summary of Changes Below is a high level summary of key changes from last year’s budget excluding transfers to Reserves, transfers to Capital and inter-departmental transfers. The listing below incorporates all items directed by Council, originally requested by staff and recommended by committees. Notable Variances in presented budget Costs Savings Hartington Parking Lot - Reduced Monitoring One Time Software Costs Hardware Replacements
-8,000 -11,500 -22,055
-41,555
Reduced Revenues OCIF
159,062
159,062
Increased Revenues OMPF AMP Revenues Bank Interest and Investment Interest Swim/Daycamp Fees * Planning Fees
-7,500 -15,500 -290,000 -94,300 -153,000
-560,300
Increased Costs Capital Taxation Requisition Current Year Asset Investment Reserve Impact (1% of current year levy) Conservation Authorities Insurance (4% overall) Pavement Marking Mowing Local Roads Recycling Collection Computer Maintenance Contracts Staff Complement Annual Adjustments
96,750 222,579 56,778 13,598 110,000 30,000 28,552 22,353 364,099
944,709
Public Services Reorganization Annualization Development Services Reorganization Annualization Human Resources Advisor (May - Dec) Remove P/T HR Asst Public Services LEO Facilities (May - Dec)
35,404 96,077 57,599 51,111
240,191
Enhanced Services included in Budget McMullen Beach - Swim/Daycamps - Net Fees and Student Costs * Summer Students (Swim/Daycamp) * By-law Enforcement Contract Parks - Tree Planting to replace dead Ash trees
0 95,500 7,100 20,000
122,600
Organizational Development Plan Assessment Growth = .99% or $218,284
Enhanced Services / Positions not in Budget LEO - Public Services (May - Dec) Fire Prevention Officer - Contract extension July - Dec. Arborist for Tree Removal Tub Grinder Contract Frontenac Arch Biosphere Request Previously Capital Transfer to Reserve - will now be allocated to identified projects Sidewalks Guiderails Streetlights
51,111 51,020 40,000 34,000 17,000 50,000 50,000 30,000 323,131
Total Increase to be raised by Taxation Assessment Growth
864,707 0.99%
219,780
Enhanced Services included in Budget - Self Funded or Funded from Reserves Building Inspector - Annualization 61,447 Utilities Kingston Fees 35,131 Compensation Review 35,000
131,578
Reduced Revenues included in Budget - Self Funded Sewage Permits No Longer Inspecting other Municipalities
135,000
135,000
Council Direction - No specific target - but focus on priorities. Staff kept in mind the historical
Page 117 of 137
TOWNSHIP OF SOUTH FRONTENAC 2024 Draft Budget High Level Summary of Changes target of 2% along with known inflationary costs in the current economy. The proposed budget meets an overall 2.77% increase in the average taxpayer impact. This represents an overall $864,707 overall Township levy increase. Several expenses in comparing 2023 budget to forecasted 2024 expenses go beyond a 2% increase requiring changes to existing activities to meet this target. The capital budget, which was presented on November 21, 2023, includes total projected costs of $17,766,740 including a transfer to reserve for Road 38. The listing of projects including proposed funding is attached to this budget document.
Page 118 of 137
TOWNSHIP OF SOUTH FRONTENAC 2024 Draft Budget Summary of Revenue and Expense
Actuals
2023-2024 Budget
2023 Budget
27-Nov-23
2024 Budget
$
$
$
Variance $
%
REVENUE
Property Taxation- Supplementary & PIL
249,500
145,181
249,500
0
0.00%
User Charges
1,252,744
988,849
1,541,807
289,063
23.07%
Licenses, Permits and Rents
1,702,635
1,330,532
1,560,838
-141,797
-8.33%
Government Grants
3,185,516
2,802,164
3,315,611
130,095
4.08%
Grants from Other Municipalities
495,252
0
495,000
-252
-0.05%
Investment Income
359,000
928,665
649,000
290,000
80.78%
Penalties and interest on taxes
370,000
336,280
370,000
0
0.00%
Donations
Other
Transfers From Reserves/Reserve Funds
TOTAL Revenue
OPERATING EXPENSE
General Government
Protection to Persons and Property
0
38,851
6,725
6,725
82,000
166,907
63,000
-19,000
8,069,584
0
13,827,642
5,558,058
68.88%
15,766,231
6,737,429
22,079,123
6,312,892
40.04%
6,404,592
5,334,078
10,334,822
3,930,230
61.37%
-118,908
-3.96%
-23.17%
Fire
3,003,241
3,045,735
2,884,333
Police
2,865,302
2,652,577
2,873,290
7,988
0.28%
Conservation Authorities
271,271
296,557
528,049
256,778
94.66%
Protective Inspections and Control
133,173
124,327
148,753
15,579
11.70%
Emergency Measures
2,750
47
3,500
750
27.27%
Building Department
1,431,660
969,394
1,343,983
-87,677
-6.12%
Transportation Services
Roadway Maintenance
14,746,726
10,444,491
16,184,205
1,437,479
9.75%
Winter Control
2,369,180
1,885,528
2,361,009
-8,171
-0.34%
Environmental Services 411,312
249,009
731,930
320,618
77.95%
Water System
Solid Waste Management
3,140,655
2,344,257
3,110,649
-30,007
-0.96%
Parks, Recreation and Cemeteries
1,659,707
2,482,002
3,032,146
1,372,439
82.69%
Planning and Development
967,858
748,614
1,022,964
55,106
5.69%
TOTAL Expense
37,407,428
30,576,616
44,559,632
7,152,205
19.12%
TO BE RAISED BY TAXATION
21,641,197
22,480,509
839,312
3.88%
IMPACT ON TAXPAYER: BASED ON AVERAGE PHASE-IN ASSESSMENT THE TOWNSHIP’S SHARE OF THE TAX BILL ON A 278,126 PROPERTY WILL INCREASE 2.77% WHICH EQUALS $47.53
Page 119 of 137
TOWNSHIP OF SOUTH FRONTENAC 2024 Draft Budget General Government Detail
2023-2024 Budget
Actuals 2023 Budget
27-Nov-23
2024 Budget
$
$
$
Variance $
%
GENERAL MUNICIPAL ACTIVITY
Revenue
Taxation - Supplementary & PIL
249,500
145,181
249,500
0
0.00%
Government Grants
1,602,000
1,602,000
1,609,500
7,500
0.47%
Investment Income
345,000
911,161
635,000
290,000
84.06%
Penalties and interest on taxes
370,000
336,280
370,000
0
0.00%
Other
0
70,906
0
0
0.00%
Transfer from Reserves
0
0
0
0
0.00%
Total Revenue
2,566,500
3,065,529
2,864,000
297,500
11.59%
0
0
0
0
0.00%
- Transfer to Reserves
3,045,336
3,037,621
3,267,916
222,579
7.31%
- Total Expense
3,045,336
3,037,621
3,267,916
222,579
7.31%
478,836
-27,907
403,916
-74,921
-15.65%
0
0
0
0
0.00%
- Transfer from Reserves
100,000
0
100,000
0
0.00%
- Total Revenue
100,000
0
100,000
0
0.00%
185,763
162,941
197,398
11,635
6.26%
- Benefits
6,423
6,313
7,685
1,262
19.65%
- Memberships, Training and Travel
26,000
19,403
25,900
-100
-0.38%
- Communications
15,900
13,081
18,900
3,000
18.87%
- Council Operations
130,555
20,372
134,693
4,138
3.17%
- Grants * (see details bottom of next page)
229,109
200,948
229,109
0
0.00%
0
320
0
0
0.00%
- Transfer to Reserves
10,000
10,000
10,000
0
0.00%
- Total Expense
603,750
433,379
623,685
19,935
3.30%
- TOTAL COUNCIL
503,750
433,379
523,685
19,935
3.96%
- User Charges
0
-400
0
0
0.00%
- Transfer from Reserves
0
0
0
0
0.00%
- Total Revenue
0
-400
0
0
100.00%
0
0
0
0
0.00%
Expense
Operations
TOTAL GENERAL MUNCIPAL ACTIVITY
COUNCIL
Revenue
Grants from Other Municipalities
Expense
Remuneration
Transfer to Capital
ELECTIONS 32 Revenue
Expense
Remuneration
Benefits
0
0
0
0
0.00%
- Memberships, Training and Travel
0
0
0
0
0.00%
- Communications
0
0
0
0
0.00%
- Elections Operations
0
0
0
0
0.00%
- Transfer to Reserves
25,000
25,000
25,000
0
0.00%
- Total Expense
25,000
25,000
25,000
0
0.00%
- TOTAL ELECTIONS
25,000
25,400
25,000
0
0.00%
Page 120 of 137
TOWNSHIP OF SOUTH FRONTENAC 2024 Draft Budget General Government Detail
Actuals
2023-2024 Budget
2023 Budget
27-Nov-23
2024 Budget
$
$
$
Variance $
%
- CORPORATE SERVICES
- Revenue
- User Charges
40,100
19,794
- Licenses, Permits and Rents
1,800
1,364
1,800
0
0.00%
0
0
80,000
80,000
100.00%
3,000
8,906
3,000
0
0.00%
- Government Grants
- Other
40,500
400
1.00%
- Transfer from Reserves
145,000
0
504,230
359,230
247.74%
- Total Revenue
189,900
30,063
629,530
439,630
231.51%
1,144,507
1,008,540
1,218,804
74,297
6.49%
387,040
322,930
432,609
45,569
11.77%
0
0
0
0
0.00%
- Memberships, Training and Travel
59,804
18,836
78,177
18,373
30.72%
- Communications
54,678
50,759
56,178
1,500
2.74%
- Professional and Consulting Fees
44,267
8,328
82,000
37,733
85.24%
- Administrative Operations
225,652
239,155
204,057
-21,595
-9.57%
- Transfer to Capital
145,000
458
538,190
393,190
271.17%
- Total Expense
2,060,948
1,649,006
2,610,015
549,067
26.64%
- TOTAL CORPORATE SERVICES
1,871,048
1,618,943
1,980,485
109,437
5.85%
223,135
166,402
224,375
1,240
0.56%
Expense
Remuneration
Benefits
Inter Departmental Transfer
ADMINISTRATIVE FACILITIES
Revenue
Facilities Revenue
Government Grants
0
0
0
0
0.00%
- Donations
0
0
0
0
0.00%
- Transfer from Reserves
360,000
0
3,500,000
3,140,000
872.22%
- Total Revenue
583,135
166,402
3,724,375
3,141,240
538.68%
- Expense
- Remuneration
0
7,088
0
0
0.00%
- Inter Departmental Transfer
1,291
2,971
1,291
0
0.00%
- Professional and Consulting Fees
5,610
4,366
6,920
1,310
23.35%
- Facilities Operating Costs
198,027
123,625
182,422
-15,605
-7.88%
- Transfer to Capital
360,000
46,021
3,500,000
3,140,000
872.22%
- Transfer to Reserves
104,631
5,000
117,574
12,943
12.37%
- Total Expense
669,558
189,072
3,808,207
3,138,649
468.76%
- TOTAL ADMINISTRATIVE FACILITIES
86,423
22,669
83,832
-2,592
-3.00%
2,965,057
2,072,484
3,016,917
51,860
1.75%
- Total General Government Explanation of Significant Variances
Line 4
OMPF confirmed Funding
Line 5
Investment Bank Interest
Line 12
In year Asset Investment Reserve (AIR) contribution
Line 54/55
Human Resource Advisor/ Annualization of Deputy Clerk
Line 59
Compensation Review
Line 76
Admnistration Offices Construction
Council - Grants to Organizations/Individuals (line 26) Private Lanes
100,000
Bradshaw School Visits
2,000
South Frontenac Community Services (SFCS)
20,200
Inverary Youth
1,650
Community Grants
35,000
High School - Graduation
500
Seniors & Law Enforcement Together (SALT)
7,500
Trails - Work in kind - CRCA
5,219
Lake Study Grants
30,000
Heritage Committee Grant
15,000
Non-Township Facilities (Verona Mini-Park/ Lion’s Hall)
7,040
Miscellaneous
5,000
Total
229,109
Page 121 of 137
TOWNSHIP OF SOUTH FRONTEN NAC 2024 Draft Budget Protection to Persons and Property Detail
2023-2024 Budget
Actuals 2023 Budget
27-Nov-23
2024 Budget
$
$
$
Variance $
%
FIRE
Revenue
User Charges
Grants from Other Municipalities
0
0
0
0
0.00%
Other
0
28,943
0
0
0.00%
Transfer from Reserves
950,500
0
865,021
-85,479
-8.99%
Total Revenue
1,006,500
48,942
920,771
-85,729
-8.52%
Expense
Remuneration
56,000
19,999
55,750
-250
-0.45%
749,790
576,377
811,005
61,215
8.16%
- Benefits
143,306
130,078
173,720
30,414
21.22%
- Memberships, Training and Travel
30,750
14,698
30,750
0
0.00%
- Communications & Public Education
70,174
56,693
69,900
-274
-0.39%
- Professional and Consulting Fees
6,250
3,196
6,250
0
0.00%
- Fire Operations
336,329
367,710
347,458
11,129
3.31%
- Transfer to Capital
1,005,500
1,246,553
784,000
-221,500
-22.03%
- Transfer to Reserves
452,182
466,684
452,182
0
0.00%
- Total Expense
2,794,281
2,861,989
2,675,265
-119,016
-4.26%
- TOTAL FIRE
1,787,781
2,813,047
1,754,494
-33,287
-1.86%
- Facilities Operating Costs
198,280
173,286
198,608
328
0.17%
- Total Expense
198,280
173,286
198,608
328
0.17%
- TOTAL FIRE FACILITIES
198,280
173,286
198,608
328
0.17%
- 911 Operations
10,680
10,460
10,460
-220
-2.06%
- Total Expense
10,680
10,460
10,460
-220
-2.06%
- TOTAL 911 SERVICE
10,680
10,460
10,460
-220
-2.06%
1,996,741
2,996,793
1,963,562
-33,179
-1.66%
FIRE FACILITIES
Expense
911 SERVICE
Expense
TOTAL FIRE
Explanation of Significant Variances Line 9/12
VFF Wage Adjustment/ FPO 6 Months
Line 14
Insurance, Vehicle Maintenace
Page 122 of 137
TOWNSHIP OF SOUTH FRONT TENAC 2024 Draft Budget Protection to Persons and Property Detail
2023-2024 Budget
Actuals 2023 Budget
27-Nov-23
2024 Budget
$
$
$
Variance $
%
POLICE
Revenue
User Charges
8,000
15,469
8,000
0
0.00%
Government Grants
9,300
0
9,300
0
0.00%
Transfer from Reserves
0
0
0
0
0.00%
Total Revenue
17,300
15,469
17,300
0
0.00%
Expense
Remuneration
1,350
1,250
1,350
0
0.00%
Memberships, Training and Travel
900
811
1,200
300
33.33%
- Communications
1,214
1,044
1,214
0
0.00%
- Police Operations
2,852,998
2,647,403
2,860,686
7,688
0.27%
- Total Expense
2,856,462
2,650,508
2,864,450
7,988
0.28%
- TOTAL POLICE
2,839,162
2,635,040
2,847,150
7,988
0.28%
- Government Grants
8,840
0
8,840
0
0.00%
- Total Revenue
8,840
0
8,840
0
0.00%
- Ride Operations
8,840
2,068
8,840
0
0.00%
- Total Expense
8,840
2,068
8,840
0
0.00%
0
2,068
0
0
100.00%
2,839,162
2,637,108
2,847,150
7,988
0.28%
- Transfer from Reserves
0
0
200,000
0
100.00%
- Total Revenue
0
0
200,000
0
100.00%
RIDE PROGRAM
Revenue
Expense
TOTAL RIDE PROGRAM
Total Police
CONSERVATION AUTHORITIES
Revenues
Expense
Remuneration
2,000
1,900
2,000
0
0.00%
269,271
294,657
326,049
56,778
21.09%
0
0
200,000
0
100.00%
- Total Expense
271,271
296,557
528,049
56,778
20.93%
- TOTAL CONSERVATION AUTHORITIES
271,271
296,557
328,049
56,778
20.93%
- Conservation Authority Transfers
- Transfer to Capital
Explanation of Significant Variances
Line 26
Conservation Authorities increases Cataraqui Region Conservation Authority $8,985 or 5.61 increase Quinte Conservation $47,009 or 57% increase, inc. $6,173 14 Island Dam maintenance special levy Rideau Valley Conservation Authority $784 or 2.93% increase
Page 123 of 137
TOWNSHIP OF SOUTH FRONT TENAC 2024 Draft Budget Protection to Persons and Property Detail
2023-2024 Budget
Actuals 2023 Budget
27-Nov-23
2024 Budget
$
$
$
Variance $
%
PROTECTIVE INSPECTIONS AND CONTROL
Revenue
User Charges
10,500
29,700
24,000
13,500
128.57%
Licenses, Permits and Rents
47,000
37,710
42,000
-5,000
-10.64%
Government Grants
9,000
7,880
9,000
0
0.00%
Other
0
0
0
0
0.00%
Total Revenue
66,500
75,290
75,000
8,500
12.78%
Expense
Inter Departmental Transfer
0
0
0
0
0.00%
- Memberships, Training and Travel
13,000
10,245
15,500
2,500
19.23%
- Communications
2,100
521
2,100
0
0.00%
- Professional and Consulting Fees
18,000
41,073
23,000
5,000
27.78%
- Protective Operations
100,073
72,488
108,153
8,079
8.07%
- Transfer to Reserves
0
0
0
0
0.00%
- Total Expense
133,173
124,327
148,753
15,579
11.70%
- TOTAL PROTECTIVE INSPECTIONS AND CONTROL
66,673
49,037
73,753
7,079
10.62%
- Transfer from Reserves
0
0
0
0
0.00%
- Total Revenue
0
0
0
0
100.00%
- Remuneration
500
0
500
0
0.00%
- Memberships, Training and Travel
250
0
1,000
750
300.00%
1,500
47
1,000
-500
-33.33%
EMERGENCY MANAGEMENT
Revenue
Expense
Communications
Emg Management Operations
500
0
1,000
500
100.00%
- Total Expense
2,750
47
3,500
750
27.27%
- TOTAL EMERGENCY MANAGEMENT
2,750
47
3,500
750
27.27%
Explanation of Significant Variances Line 3
Administrative Monetary Penalties (AMP’s)
Line 12
By-law Legal
Line 13
By-law Enforcement Contract
Page 124 of 137
TOWNSHIP OF SOUTH FRONTE ENAC 2024 Draft Budget Protection to Persons and Property Detail
BUILDING
Revenue
User Charges
Licenses, Permits and Rents
Actuals
2023-2024 Budget
2023 Budget
27-Nov-23
2024 Budget
$
$
$
Variance $
%
19,500
7,801
19,500
0
0.00%
1,315,600
1,052,209
1,181,183
-134,417
-10.22%
Government Grants
0
0
0
0
0.00%
Other
0
13,200
0
0
0.00%
45,000
0
90,600
45,600
101.33%
1,380,100
1,073,209
1,291,283
-88,817
-6.44%
739,343
601,103
788,377
49,034
6.63%
277,557
209,640
273,614
-3,944
-1.42%
0
0
0
0
0.00%
- Memberships, Training and Travel
31,300
27,294
31,300
0
0.00%
- Communications
6,639
4,637
6,639
0
0.00%
- Professional and Consulting Fees
10,000
3,618
10,000
0
0.00%
- Building Operations
97,377
78,509
91,354
-6,023
-6.19%
Transfer from Reserves Total Revenue
Expense
Remuneration
Benefits
Inter Departmental Transfer
Transfer to Capital
45,000
0
50,000
5,000
11.11%
- Transfer to Reserves
172,884
40,000
40,000
-132,884
-76.86%
1,380,100
964,801
1,291,283
-88,817
-6.44%
0
-108,408
0
0
-69.37%
- User Charges
10,000
5,150
10,000
0
0.00%
- Total Revenue
10,000
5,150
10,000
0
0.00%
0
2,401
0
0
0.00%
Total Expense
TOTAL BUILDING
CIVIC NUMBERS
Revenue
Expense
Remuneration
0
0
0
0
0.00%
- Civic Numbers Operations
51,560
2,192
52,700
1,140
2.21%
- Total Expense
51,560
4,593
52,700
1,140
2.21%
- TOTAL CIVIC NUMBERS
41,560
-557
42,700
1,140
2.74%
- TOTAL BUILDING
41,560
-108,965
42,700
1,140
2.74%
5,218,157
5,870,577
5,258,713
40,556
0.78%
Benefits
Total Protection to Persons and Property Detail
Explanation of Significant Variances Line 4
Part 8 - NF/CF/FI - Contract ended 2023
Line 9/10
New Building Inspector Annualization
Page 125 of 137
TOWNSHIP OF SOUTH FRONTENAC 2024 Draft Budget Transportation Services Detail
Actuals
2023-2024 Budget
2023 Budget
27-Nov-23
2024 Budget
$
$
$
Variance $
%
ROADS
Revenue
User Charges
8,500
7,600
8,500
0
0.00%
Licenses, Permits and Rents
99,500
60,348
99,500
0
0.00%
Government Grants
1,060,414
883,678
901,352
-159,062
-15.00%
Grants from Other Municipalities Other
495,252 76,500
0 44,953
495,000 60,000
-252 -16,500
-0.05% -21.57%
Transfer from Reserve
5,690,684
0
6,702,948
1,012,264
17.79%
Total Revenue
7,430,850
996,579
8,267,300
836,450
11.26%
1,634,293
1,601,700
1,724,297
90,004
5.51% 5.04%
Expense
Remuneration
Benefits
606,923
803,994
637,485
30,562
Inter Departmental Transfer
-779,726
-641,637
-799,178
-19,453
2.49%
Memberships, Training and Travel
43,070
45,131
39,464
-3,606
-8.37%
Communications
55,657
33,023
58,502
2,845
5.11%
Professional and Consulting Fees
33,070
15,700
38,542
5,472
16.55%
Roads Operations * (see details below)
3,011,589
2,626,321
3,252,925
241,336
8.01%
Transfer to Capital
9,541,850
5,276,754
10,628,050
1,086,200
11.38%
Transfer to Reserves
600,000
683,509
604,118
4,118
0.69%
Total Expense
14,746,726
10,444,493
16,184,205
1,437,479
9.75%
TOTAL ROADS
7,315,876
9,447,915
7,916,905
601,029
8.22%
WINTER CONTROL
288,215
567,561
51,252
9.93%
Expense
Remuneration
516,309
Benefits
184,381
0
199,706
15,325
8.31%
Inter Departmental Transfer
662,958
594,804
622,009
-40,949
-6.18%
Winter Control Operations
1,005,532
1,002,509
971,733
-33,799
-3.36%
Transfer to Capital
0
0
0
0
0.00%
Total Expense
2,369,180
1,885,528
2,361,009
-8,171
-0.34%
TOTAL WINTER CONTROL
2,369,180
1,885,528
2,361,009
-8,171
-0.34%
Total Transportation Services
9,685,056
11,333,443
10,277,914
592,858
6.12%
*Roads Operations Breakdown (line 16)
2023-2024 Budget
YTD Actual 2023 Budget $
27-Nov-23 $
2024 Budget $
Variance $
%
Maintenance - Structures
19,518
14,915
20,018
501
2.57%
Roadside Maintenance
416,993
292,081
497,356
80,363
19.27%
Hardtop Maintenance
459,873
418,321
471,855
11,982
2.61%
Loose Top Maintenance
326,442
322,118
334,071
7,629
2.34%
Safety Devices
338,165
389,508
478,419
140,254
41.48%
Street Lights
43,985
37,066
47,500
3,515
7.99%
Overhead
1,406,614
1,152,311
1,403,705
-2,909
-0.21%
TOTAL ROADS MAINTENANCE
3,011,589
2,626,321
3,252,925
241,335
8.01%
Explanation of Significant Variances
Line 5
OCIF Funding Confirmed and is was reduced by 15% - $159,062
Line 8
CCBF (former Gas Tax) not yet confirmed
Line 10/11
PS Operations Additional PT and annualization of positions
Line 29
5 year average + 2%
Page 126 of 137
TOWNSHIP OF SOUTH FRONT TENAC 2024 Draft Budget Environmental Services Detail
2023-2024 Budget
Actuals
Variance
2023 Budget
27-Nov-23
2024 Budget
$
$
$
408,912
287,778
417,030
$
%
WATER SYSTEM
Revenue
User Charges
Licenses, Permits and Rents
2,400
2,200
2,400
0
0.00%
Government Grants
0
11,385
201,657
201,657
100.00%
Other
0
0
0
0
0.00%
Transfer from Reserves
Total Revenue
8,118
1.99%
0
0
110,843
110,843
100.00%
411,312
301,363
731,930
320,618
77.95%
0
0
0
0
0.00%
704
0
704
0
0.00%
Expense
Remuneration
Inter Departmental Transfer
Communications
5,450
2,949
5,600
150
2.75%
Professional and Consulting Fees
158,569
174,051
193,700
35,131
22.15%
Water System Operations
91,454
74,553
92,845
1,391
1.52%
Transfer to Reserves
155,135
0
126,582
-28,553
-18.41%
Transfer to Capital
0
-2,543
312,500
312,500
Total Expense
411,312
249,009
731,930
8,118
1.97%
TOTAL WATER SYSTEM
0
-52,354
0
0
0.00%
SOLID WASTE AND FACILITIES MANAGEMENT
Revenue
User Charges
401,382
284,490
420,377
18,995
4.73%
Government Grants
487,962
246,991
487,962
0
0.00%
Other
0
0
0
0
0.00%
Transfer from Reserves
115,000
0
0
-115,000
-100.00%
Total Revenue
1,004,344
531,481
908,339
-96,005
-9.56%
Expense
Remuneration
375,660
378,335
396,163
20,503
5.46%
Benefits
127,740
65,343
127,506
-234
-0.18%
Inter Departmental Transfer
132,606
131,692
132,606
0
0.00%
Memberships, Training and Travel
3,178
1,526
3,925
747
23.51%
Communications
15,832
9,687
13,056
-2,776
-17.53%
Professional and Consulting Fees
91,100
61,770
96,000
4,900
5.38%
Solid Waste Management Operations
2,239,540
1,810,107
2,301,393
61,853
2.76%
Transfer to Capital
115,000
-219,794
0
-115,000
-100.00%
Transfer to Reserves
40,000
105,591
40,000
0
0.00%
Total Expense
3,140,655
2,344,257
3,110,649
-30,007
-0.96%
TOTAL SOLID WASTE MANAGEMENT
2,136,312
1,812,777
2,202,310
65,998
3.09%
Total Environmental Services
2,136,312
1,760,423
2,202,310
65,998
3.09%
Explanation of Significant Variances Line 5
Green Funding (ICIP) for SCADA
Line 13
Utilities Kingston Fees
Line 21
Tipping Fees/ Bagtag Revenue
Line 33
Garbage/Recycling contracts
Page 127 of 137
TOWNSHIP OF SOUTH FRONT 2024 Draft Budget Parks, Recreation and Cemeteries Detail
2023-2024 Budget
Actuals 2023 Budget
27-Nov-23
2024 Budget
$
$
$
Variance $
%
PARKS AND RECREATION PROGRAMS
Revenue
User Charges
71,650
143,546
165,950
94,300
Government Grants
8,000
8,000
8,000
0
0.00%
Donations
0
28,851
6,725
6,725
100.00%
Other
2,500
0
0
-2,500
-100.00%
Transfers From Reserves/Reserve Funds
70,000
0
30,000
-40,000
-57.14%
Total Revenue
152,150
180,397
210,675
58,525
38.47%
Expense
Remuneration
247,492
231,268
413,160
165,668
66.94%
Benefits
50,855
76,100
83,718
32,862
64.62%
Inter Departmental Transfer
2,582
131
2,582
0
0.00%
Memberships, Training and Travel
17,050
7,955
17,850
800
4.69%
Communications
27,600
27,602
29,785
2,185
7.92%
Professional and Consulting Fees
200
234
300
100
0.00%
Parks and Recreation Programs - Operations
157,926
184,939
180,661
22,735
14.40%
Grants
0
0
0
0
0.00%
70,000
43,656
30,000
-40,000
-57.14%
0
7,715
0
0
0.00%
131.61%
Transfer to Capital
Transfer to Reserves
Total Expense
573,705
579,601
758,055
184,350
32.13%
TOTAL PARKS AND RECREATION PROGRAMS
421,555
399,204
547,380
125,825
29.85%
PARKS AND RECREATION FACILITIES
BUILDINGS
Revenue
User Charges
1,000
0
1,000
0
0.00%
Licenses, Permits and Rents
13,200
10,015
9,310
-3,890
-29.47%
Government Grants
0
42,231
0
0
0.00%
Grants from Other Municipalities
0
0
0
0
0.00%
Donations/Contributions
0
0
0
0
100.00%
Transfer from Reserves
215,000
0
455,000
240,000
111.63%
Total Revenue
229,200
52,246
465,310
236,110
103.01%
Expense 0.00%
Remuneration
0
48,270
0
0
Benefits
0
0
0
0
0.00%
Inter Departmental Transfer
9,504
15,582
9,504
0
0.00%
835
685
900
65
7.78%
5,090
3,054
8,365
3,275
64.34%
Communications
Professional and Consulting Fees
Building Operations
196,693
156,121
234,161
37,468
19.05%
Transfer to Capital
98,000
144,771
464,000
366,000
373.47%
Total Expense
310,123
368,482
716,931
406,808
131.18%
TOTAL BUILDINGS
80,923
316,236
251,621
170,698
210.94%
Page 128 of 137
TOWNSHIP OF SOUTH FRONT 2024 Draft Budget Parks, Recreation and Cemeteries Detail
Actuals
2023-2024 Budget
2023 Budget
27-Nov-23
2024 Budget
$
$
$
Variance $
%
PARKS
Revenue
User Charges
2,000
2,946
3,000
1,000
50.00%
Licenses, Permits and Rents
0
284
270
270
100.00%
Government Grants
0
0
0
0
0.00%
Donations/Contributions
0
10,000
0
0
0.00%
Other
0
0
0
0
0.00%
Transfer from Reserves
148,500
0
1,124,000
975,500
656.90%
Total Revenue
150,500
13,231
1,127,270
976,770
649.02%
Expense
Remuneration
11,000
50,856
843
-10,157
-92.33%
Benefits
Inter Departmental Transfer
Professional and Consulting Fees
4,285
1,637
Parks Operations
149,896
126,165
Transfer to Capital
368,500
1,088,448
1,115,000
Total Expense
563,564
1,310,749
TOTAL PARKS
413,064
1,297,519
ARENA
Revenue
User Charges
0
Transfer from Reserves
0
Total Revenue
0
Expense
Remuneration
Transfer to Others
0
308
323
323
100.00%
29,883
43,335
29,883
0
0.00%
5,500
1,215
28.35%
193,016
43,120
28.77%
746,500
202.58%
1,344,566
781,002
138.58%
217,296
-195,768
-47.39%
0
0
0
0.00%
0
0
0
100.00%
0
0
0
100.00%
0
200
250
250
100.00%
141,381
141,381
140,985
-396
-0.28%
Transfer to Reserves
0
0
0
0
0.00%
Total Expense
141,381
141,581
141,235
-146
-0.10%
TOTAL ARENA
141,381
141,581
141,235
-146
-0.10%
TOTAL PARKS AND RECREATION FACILITIES
635,368
1,755,336
610,152
-25,216
-3.97%
TOTAL PARKS AND RECREATION
1,056,923
2,154,540
1,157,531
100,608
9.52%
CEMETERIES
Revenue
User Charges
40,200
18,308
40,200
0
0.00%
Investment Income
14,000
17,503
14,000
0
0.00%
Donations
0
0
0
0
100.00%
Transfer From Reserves
Total Revenue
Expense
Cemetery Operations
Transfer to Capital
0
0
0
0
100.00%
54,200
35,811
54,200
0
0.00%
70,934
81,589
71,360
426
0.60%
0
0
0
0
100.00%
Transfer to Reserves
0
0
0
0
100.00%
Total Expense
70,934
81,589
71,360
426
0.60%
TOTAL CEMETERIES
16,734
45,778
17,160
426
2.54%
86
Total Parks, Recreation and Cemeteries
1,073,657
2,200,318
1,174,691
101,034
9.41%
Explanation of Significant Variances Line 3
Swim/ Daycamp Program Fees
Line 10/11
Recreation Program Staffing/ LEO Facilities
Line 16
Swim /Day Camp and Events
Line 38
Recreation Facilities Maintenance and Insurance
Line 56
Parks Maintnance/ Tree Planting in Parks
Page 129 of 137
TOWNSHIP OF SOUTH FRONTENAC 2024 Draft Budget Development Services
2023-2024 Budget
Actuals
Variance
2023 Budget
27-Nov-23
2024 Budget
$
$
$
$
%
175,000
146,669
328,000
153,000
87.43%
0
0
0
0
0.00%
Development Services
Revenue
User Charges
Government Grants
Grants from Other Municipalities
0
0
0
0
0.00%
Transfer from Reserves
229,900
0
145,000
-84,900
-36.93%
Total Revenue
404,900
146,669
473,000
68,100
16.82%
Expense
Remuneration
448,925
376,967
530,011
81,086
18.06%
Benefits
151,753
123,478
177,292
25,539
16.83%
Inter Departmental Transfer
0
0
0
0
0.00%
Memberships, Training and Travel
30,000
13,555
49,400
19,400
64.67%
Communications
7,445
8,116
8,315
870
11.68%
Professional and Consulting Fees
37,200
4,624
37,200
0
0.00%
Operations
62,634
50,358
75,746
13,111
20.93%
Transfer to Capital
229,900
171,515
145,000
-84,900
-36.93%
Transfer to Reserves
0
0
0
0
0.00%
Total Expense
967,858
748,614
1,022,964
55,106
5.69%
TOTAL Planning and Development
562,958
601,945
549,964
-12,994
-2.31%
Explanation of Significant Variances Line 3
Revised Planning Fees - 2023
Line 9-10
Annualized cost for Development Services Positions
Line 12
Committee of Adjustment Mileage
Line 15
Computer Replacements
Page 1 of 2 2023-12-05
Township of South Frontenac 2024 Capital Budget with Financing
Detailed Project # Project * Sheet page # 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 38 39 40 41 42 43 44 45 46 47 48
22-02 23-12 24-01 24-03 24-04 24-05
24-11 24-12 24-13 24-14 24-15 24-16 24-17 24-18
24-21 24-22 24-23 24-24 24-25 24-26
21-R09 24-31 24-32 24-33 24-34 24-35 24-36 24-37 24-38 24-39 24-43 24-40 22-17 24-44 24-45 24-46 23-49 24-41 24-47 23-51
22-53 24-61
49
CORPORATE SERVICES Gateway Signage (2022-2025 Project) Wayfinding Sign Fabrication and Installation (2022-2025 Project) Website Redesign Cloud Server Records Management 14 Island Lake Dam Refurbishment subtotal FIRE Hoses and Appliances Electric Portable Fans Vehicle Replacement - Deputy Fire Chief Pumper Replacement Gas Detectors & Docking Stations Mobile Gear Racks - Station 5 & 7 Specialized Equipment for Squads Radio Communications Study subtotal PUBLIC SERVICES FLEET Tandem Plow Truck Tandem Roller-Pro Truck Two (2) 1-Ton Trucks with plow and sander attachments 1-Ton Truck with Dump Box and power lift Front Broom Attachment AVL - Light Duty Installs subtotal ROADS INFRASTRUCTURE Arterial Reserve (Road 38 - Reserve Transfer) Perth Road Reconstruction (at Loughborough Lake) Microsurfacing - Bellrock Road Orser Road Spooner Road Bedford Road Ormsbee Road Greenfield Road Kerr Road Tom Watson Road Devil Lake Road Surface Treatment (LCB) Preservation 12th Con Bridge (B32) Repair Sydenham Lake Bridge and Dam Bracken Culvert (Yarker Road) Long Swamp Bridge Study Transportation Master Plan Pre-Engineering Roads 2025 Road 38 Detailed Design Pleasant Valley Municipal Drain subtotal SYDENHAM WATER SCADA Software Upgrade Sydenham Drinking Water System Upgrades subtotal FACILITIES
2024 Budget
Tax)
53,333 266,667 33,190 85,000 100,000 200,000 738,190 18,000 30,000 75,000 550,000 40,000 18,000 20,000 10,000 761,000
430,000 625,000 230,000 120,000 40,000 20,000 1,465,000 2,450,000 520,000 495,000 157,500 64,100 1,432,000 819,100 215,900 161,500 124,400 346,600 900,000 38,500 534,000 527,200 35,000 75,000 75,000 100,000 18,750 9,089,550 275,000 37,500 312,500
24-02
Town Hall Expansion
3,500,000
24-51 24-52 24-54 24-55 24-56 24-57 24-58 24-59 24-82 24-83
Storrington Centre Roof and Parking Lot Upgrades Bedford Garage Equipment Upgrades Keeley Patrol Yard Waste Oil Disposal Sydenham Point Accessible Washroom Upgrades Centennial Park New Accessible Washrooms Design and Build Centennial Park Renovations to existing Canteen/Washrooms Harris Park Hall Flooring Replacement Glendower Hall Interior Design Plans Station 5 Exterior Upgrades Station 4 Flooring subtotal RECREATION Sydenham Point Field Score clock Power Centennial Park Walkway Connections Centennial Park Courts and Electrical Improvements McMullen Park - Parking Lot paving & storage bunker McMullen Park Beach and Washroom Building Upgrades Keeley/Bowes Diamond Upgrades Glendower Court Basketball nets Bellrock & Petworth Parkette Conceptual Design
435,000 48,500 25,000 30,000 30,000 150,000 29,000 20,000 15,000 8,000 4,290,500
24-60 24-66 24-80 24-67 24-75 24-68 24-69 24-70
10,000 240,000 49,000 46,000 16,000 208,000 11,000 15,000
0
0
0
Working Funds
Asset Invesment Reserve
53,333 186,667 33,190 85,000 100,000 200,000 658,190
Infrastructure
Landfill Climate Change Public Services Building Building Equipment Equipment Closure Reserve
Fire Equipment
Facilities
Sydenham Water Reserve
OPP Reserve
Wages-Fire Department (Stabilization)
Taxation
Other
Notes
Red Grant Program - 186k *3 + 80k * 3 grant =
80,000
0
0
0
0
0
0
0
0
0
0
0
0
0
80,000
0
0
0
0
0
0
0
0
0
10,000 10,000
0
761,000
0
40,000 20,000 60,000
0
1,465,000
18,000 30,000 75,000 550,000 40,000 18,000 20,000 0
0
0
0
0
0
0
751,000
430,000 625,000 230,000 120,000
0
0
0
0
0
0
0
0
1,405,000
0
0
0
0
0
0
2,450,000 495,000
25,000 495,000
157,500 64,100 500,000
County FGT
530,648
401,352 OCIF
819,100 215,900 161,500 124,400 346,600 400,000 38,500 179,500
500,000 OCIF 354,500
527,200 35,000 75,000 75,000 100,000 2,056,300
0
1,530,000
0
0
0
0
1,248,000
0
0
485,000
2,765,000
885,148
0
0
0
0
0
0
0
0
0
0
0
0
201,658
312,500
0
0
0
0
4,290,500
0
0
0
0
0
0
73,343 37,500 110,843
0
0
0
0
0
0
0
0
0
18,750 2,468,750
0
901,352
9,089,550
201,658 ICIP Grant Funding
250,000 435,000 48,500 25,000 30,000
30,000 150,000 29,000 20,000
50,000
0
0
485,000
2,765,000
0
15,000 8,000 990,500
10000 240,000 49,000 46000 16,000 208,000 11000 15,000
Page 130 of 137
50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69
Community Building Development Fund (formerly Federal Gas Parkland Charges
Page 2 of 2 2023-12-05
Township of South Frontenac 2024 Capital Budget with Financing
Detailed Project # Project * Sheet page # 70 71 72 73 74 75 76
24-71 24-72 24-74
24-76 24-77 24-78
Petworth Mill wall cap and repairs Shipyards Boat Ramp Rehabilitation New Picnic Tables subtotal DEVELOPMENT SERVICES Economic Development Strategy Replacement Building Vehicle Development Charge Study and Population Study subtotal Total
2024 Budget
Community Building Development Fund (formerly Federal Gas Parkland Charges Tax)
200,000 110,000 10,000 915,000 50,000 50,000 95,000 195,000 17,766,740
448,000
0
200,000 110,000 10,000 467,000
Working Funds
0
Asset Invesment Reserve
Infrastructure
0
0
Landfill Climate Change Public Services Building Building Equipment Equipment Closure Reserve
Fire Equipment
Facilities
0
0
0
0
0
0
Sydenham Water Reserve
OPP Reserve
0
0
0
0
0 110,843
Wages-Fire Department (Stabilization)
Taxation
Other
Notes
0
0
0
915,000
0
0 2,538,750
0 1,183,010
195,000 17,766,740
50,000 50,000 95,000 95,000 2,649,300
0 1,530,000
0 467,000
50,000 1,193,190
0 4,013,000
0 885,148
0 990,500
0 751,000
0 1,405,000
50,000 50,000
0
0
0
Page 131 of 137
Page 132 of 137 RESERVES & RESERVE FUNDS FORECAST - 2024 Draft Budget PROJECTED BALANCE
Contribution to Reserve in PROJECTED BALANCE 2024 Budget
2024 Budgeted Expenditures
END OF CAPITAL REVENUE YEAR -2023 FUND FUND RESERVES & RESERVE FUNDS FORECAST - 2024 Budget Final Fiscal Working Funds 2,590,558 1,193,190 146,040 COVID/ Safe Restart 209,515 Council - Accessibiilty 10,000 Equipment and Infrastructure General Asset Investment Reserve 1,789,772 4,013,000 Infrastructure 613,023 885,148 Climate Change 0 Vertical Facilities/Property 888,121 990,500 Recreation 12,813 Rolling Capital - Building Department 26,741 50,000 Capital - Fire Department 547,546 751,000 Capital - Roads Department 857,633 1,405,000 Capital - Solid Waste Dept 51,000 Linear Cemetery Lot Addition 43,538 Roads - Const/Imp 1,920,000 Stabilization Wages-Fire Department 212,641 91,021 Building Department 1,824,955 40,000 Part 8 Septic 0 Policing Costs 740,880 Winter Control - Roads Dept. 819,847 Recycling 273,641 Planning 66,784 Revenue-Severance Appl. 20,000 Water Reserve Fund 1,562,158 110,843 Sub-total 15,086,165 9,398,681 277,061 OBLIGATORY RESERVE FUNDS 5% Parkland 284,218 467,000 Development Charges 2,790,741 2,649,300 Environmental Enhancement 150,919 1,017,645 Community Building Fund (formerly Federal Gas Tax) Subdivider Contributions 37,171 796,527 Ontario Community Infrastruct 42,740 Cannabis Legalization Fund-O Sub-total 5,119,960 RESERVE FUNDS & TRUSTS Election 55,429 Highway #38 Reconstruction 927,391 Landfill Closure 379,797 0 Trusts Fire Donations 22,029 Portland Historical 28,001 Grant Memorial 27,526 OHRP 4,175 Cemetery - PC 565,671 Cemetery M. Burns Trust 25,000 Cemetery - Monument PC 77,758 Cemetery - Monument PC Inc 31,542 Sub-total 2,144,319 22,350,444 TOTAL
TAXATION BDGTD
OTHER REVENUES
473,320
END OF YEAR -2024
10,000
1,724,648 209,515 20,000
2,329,595 275,000
106,367 2,875 0 92,621 12,813 0 16,741 248,728 56,751 51,000 0 43,538 4,370,000
195,000
40,000 452,182 604,118
2,450,000
112,574
6,941,789
0
121,620 1,784,955 0 853,454 819,847 273,641 66,784 20,000 1,451,315 12,352,212
350,000 1,342,110
167,218 1,483,551 150,919
1,530,000
1,112,072
599,717
1,697,879
901,352
6,344,179
0
0
3,705,534
37,171 0 42,740 2,481,315
0 3,705,534
80,429 927,391 419,797 0 22,029 28,001 27,526 4,175 565,671 25,000 77,758 31,542 2,209,319 17,042,846
25,000 40,000
0 15,742,860
0 277,061
65,000 7,006,789
Page 133 of 137
To: Council Prepared by: Office of the Chief Administrative Officer Date of Meeting: December 12, 2023 Subject: Appointment of Treasurer
Summary Staff recommend that Council approve By-law 2023-98 in order to appoint Louise Fragnito as Treasurer of the Corporation of the Township of South Frontenac.
Recommendation
- That By-law 2023-98 being a By-law to appoint Louise Fragnito as Treasurer be given first and second reading.
- That By-law 2023-98 be given third reading, signed and sealed.
Background The Municipal Act, 2021 states as follows: “286 (1) A municipality shall appoint a treasurer who is responsible for handling all of the financial affairs of the municipality on behalf of and in the manner directed by the council of the municipality, including, (a) collecting money payable to the municipality and issuing receipts for those payments; (b) depositing all money received on behalf of the municipality in a financial institution designated by the municipality; (c) paying all debts of the municipality and other expenditures authorized by the municipality; (d) maintaining accurate records and accounts of the financial affairs of the municipality; (e) providing the council with such information with respect to the financial affairs of the municipality as it requires or requests; (f) ensuring investments of the municipality are made in compliance with the regulations made under section 418, if applicable; and www.southfrontenac.net Natural, Vibrant and Growing – a Progressive, Rural Leader.
Page 134 of 137 Township of South Frontenac Staff Report - Appointment of Treasurer
(g) complying with any requirements applicable to the treasurer under section 418.1. 2001, c. 25, s. 286 (1); 2017, c. 10, Sched. 1, s. 35.”
Discussion/Analysis Due to the resignation of Shelley Stedall, Director of Corporate Services and Treasurer, staff recommend that Louise Fragnito, Chief Administrative Officer be appointed as Treasurer effective December 18, 2023.
Financial Implications None
Relationship to Strategic Plans ☒ Not applicable to this report. ☐ This initiative is supported by the following priorities of the 2019-2022 Strategic Plan. •
Priority: Choose an item.
Climate Considerations ☒ Not applicable to this report. ☐ This initiative supports climate change mitigation/adaption efforts in South Frontenac; and/or impacts the Township’s resilience to climate change.
Notice/Consultation Not applicable
Attachments By-law 2023-98 – A By-law to Appoint a Treasurer
www.southfrontenac.net Natural, Vibrant and Growing – a Progressive, Rural Leader.
Page 135 of 137 Township of South Frontenac Staff Report - Appointment of Treasurer
Approvals Approved By:
Louise Fragnito, CPA, CGA Chief Administrative Officer
www.southfrontenac.net Natural, Vibrant and Growing – a Progressive, Rural Leader.
Page 136 of 137
TOWNSHIP OF SOUTH FRONTENAC BY-LAW 2023-98 A BY-LAW TO APPOINT A TREASURER WHEREAS Section 286 (1) of the Municipal Act, 2001, as amended, provides that Council shall appoint a Treasurer who is responsible for handling all of the financial affairs of the municipality on behalf of and in the manner directed by the council of the municipality, including, (a) collecting money payable to the municipality and issuing receipts for those payments; (b) depositing all money received on behalf of the municipality in a financial institution designated by the municipality; (c) paying all debts of the municipality and other expenditures authorized by the municipality; (d) maintaining accurate records and accounts of the financial affairs of the municipality; (e) providing the council with such information with respect to the financial affairs of the municipality as it requires or requests; (f) ensuring investments of the municipality are made in compliance with the regulations made under section 418, if applicable; and (g) complying with any requirements applicable to the treasurer under section 418.1. 2001, c. 25, s. 286 (1); 2017, c. 10, Sched. 1, s. 35. NOW THEREFORE THE CORPORATION OF THE TOWNSHIP OF SOUTH FRONTENAC, BY ITS COUNCIL, HEREBY ENACTS AS FOLLOWS:
- That Louise Fragnito is hereby appointed as Treasurer for the Corporation of the Township of South Frontenac effective December 18, 2023.
- That By-law 2022-45 and all other by-laws, resolutions that are not consistent with or which are contrary to the provisions of this by-law are hereby repealed.
- That this By-law shall come into force and take effect on December 18,
Dated at the Township of South Frontenac this 12 day of December, 2023. Read a first and second time this 12 day of December, 2023. Read a third time and finally passed this 12 day of December, 2023. THE CORPORATION OF THE TOWNSHIP OF SOUTH FRONTENAC
Ron Vandewal, Mayor
James Thompson, Clerk
Page 137 of 137
TOWNSHIP OF SOUTH FRONTENAC BY-LAW 2023-99 A BY-LAW TO CONFIRM GENERALLY ALL ACTIONS AND PROCEEDINGS OF THE SPECIAL COUNCIL MEETING OF THE CORPORATION OF THE TOWNSHIP OF SOUTH FRONTENAC ON DECEMBER 12, 2023 Whereas Section 8 of the Municipal Act, S.O. 2001 c. 25 and amendments thereto provides that a municipality has the capacity, rights powers and privileges of a natural person for the purpose of exercising its authority under the Municipal Act of any other Act; and; Whereas Subsection 2 of Section 11 of the Municipal Act S.O. 2001, c. 25 and amendments thereto provides that a lower-tier municipality and an upper-tier municipality may pass by-laws respecting matters within the spheres of the jurisdiction described in the Table to Subsection 2, subject to certain provisions, and; Whereas Section 5 of the Municipal Act, S.O 2001 c. 25 and amendments thereto provides that a municipal power, including a municipality’s capacity, rights, powers and privileges under Section 8 shall be exercised by its council and by by-law unless the municipality is specifically authorized to do otherwise, and Whereas the Council of the Township of South Frontenac deems it expedient to confirm its actions and proceedings; NOW THEREFORE BE IT RESOLVED THAT THE COUNCIL CORPORATION OF THE TOWNSHIP OF SOUTH FRONTENAC, HEREBY ENACTS AS FOLLOWS: 1.
The all actions and proceedings of the Council of the Corporation of the Township of South Frontenac taken at its regular meeting held on December 12, 2023 be confirmed as actions for which the municipality has the capacity, rights, powers and privileges of a natural person.
That all actions and proceedings of the Council of the Corporation of the Township of South Frontenac held December 12, 2023 be confirmed as being matters within the spheres of jurisdiction described in Subsection 2 of Section 11 of the Municipal Act, S.O. 2001, c.25 and amendments thereto.
That all actions and proceedings of the Council of the Corporation of the Township of South Frontenac taken at its regular meeting held on December 5, 2023 except those taken by by-law and those required by bylaw to be done by resolution are hereby sanctioned, ratified and confirmed as though set out within and forming part of this by-law.
Execution by the Mayor and the Clerk of all Deeds, Instruments and other Documents necessary to give effect to any such Resolution, Motion or other action and the affixing of the Corporate Seal to any such Deed, Instruments or other Documents is hereby authorized and confirmed.
This By-law shall come into force and take effect on the date of its passage.
Read a first and second time this 12th day of December 2023. Read a third time and finally passed this 12th day of December 2023. THE CORPORATION OF THE TOWNSHIP OF SOUTH FRONTENAC
Ron Vandewal, Mayor
James Thompson, Clerk