Body: Council Type: Agenda Meeting: Regular Date: December 13, 2024 Collection: Council Agendas Municipality: South Frontenac
[View Document (PDF)](/docs/south-frontenac/Agendas/Council/2024/Council - 13 Dec 2024 - Agenda.pdf)
Document Text
Page 1 of 203
Township of South Frontenac Special Council Meeting Agenda TIME: DATE: PLACE:
9:00 AM, Friday, December 13, 2024 3910 Battersea Road/Virtual Via Zoom .
Call to Order
a)
That the Special Council meeting of December 13, 2024 be called to order at ___ a.m.
Declaration of pecuniary interest and the general nature thereof
Approval of Agenda and Addendum
a)
That the agenda be approved, as presented.
Reports for Information
a)
Departmental Presentations
b)
Budget Summary Presentation and Deliberation
Communications
a)
Correspondence received from the Recreation & Leisure Services Advisory Committee regarding 2025 Capital Budget & Long-Term Plan.
Notice of Motions
Confirmatory By-law
a)
That By-law 2024-79, being a by-law to confirm generally all actions and proceedings of the Council of the Township of South Frontenac, be given first and second reading. That By-law 2024-79, being the confirmatory by-law, be given third reading, signed and sealed.
Adjournment
a)
That the Special Council meeting of December 13, 2024 be adjourned at ___ p.m. South Frontenac is a welcoming and thriving rural community
2 - 87 88 201
202
203
Human Resources 2024 Year End Report Page 2 of 203
Presented by: Jan Minaker Manager of Human Resources December 13, 2024
Page 3 of 203
Human Resources Management Talent Management HR Data & Analytics
Health & Safety
Areas of Focus Employee Engagement
Organizational Development
Policy & Procedure
Page 4 of 203
Compensation & Benefits
Our 188 Staff 48 Public Services
9 Council Members
56 Unionized Staff 28 Non-union Staff
95 Paid On-call Firefighters
15 Development Services 18 Corporate Services
98 Fire Services
Page 5 of 203
2024 Accomplishments Hiring an HR Advisor Dedicated Support to SFFR Implementation of HRdownloads Developed Policies & Procedures Develop Key HR Metrics Page 6 of 203
5
Hiring an HR Advisor Sarah Hayer, our new HR Advisor joined South Frontenac at the end of April and hit the ground running She came to us from Queen’s University where she was fulfilling the same role Sarah handles most of our competitions, assists Managers with professional development of their staff, addresses labour relations matters and assists with day-to-day administrative tasks Page 7 of 203
6
Dedicated Support to SFFR
7
Page 8 of 203
HR manages all SFFR employee documentation Creation of Firefighter Advisory Committee, submitting recommendations to the CAO and Fire Chief Supports all internal and external recruitment processes HR provides initial Onboarding to all hires Provides advice & support for performance management Provides training to Firefighters and Officers Research into effective mental health supports for Firefighters
Implementation of HRdownloads
8
Page 9 of 203
Subscription to a web-based training platform and policy & procedure distribution and sign-off Activation of HRdownloads accounts for all inside staff Outside staff will receive the same training information from the webinars, presented in-person by HR Distribution of legislated training requirements for all staff Will be utilized to distribute all South Frontenac current Policies for review and sign-off for all employee groups Will also be utilized for SFFR Standard Operating Procedures (SOPs) distribution and sign-off
Developed Policies & Procedures
9
Page 10 of 203
Accommodation Policy developed to address requests made under the protected grounds identified in the Ontario Human Rights Act to provide a consistent and unbiased approach to consideration of requests Revision to the Respect in the Workplace Policy, Schedule A to By-law 2021-07 amended by By-law 2024-60, which now identifies training for staff Policy is being reviewed with staff by HR at team meetings
Develop Key HR Metrics Average time to fill a Vacancy – 64 days Turnover rate for full-time employees – 9% Average sick days per full-time employee – 6.5 days Short-term disability claims in 2024 – 8 Average length of employment – 8 years and 2 months
Page 11 of 203
10
Develop Key HR Metrics Average length of employment for current employees
Employee Count
30
25
20
15
10
5
0
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
19
20
21
22
24
26
28
32
33
35
Years of Service 11
Page 12 of 203
0
Develop Key HR Metrics Age distribution of all employees
Page 13 of 203
12
2025 Priorities
Page 14 of 203
- Implement Leadership Professional Develop Program
- Negotiate renewal Collective Agreement – Expires March 31st, 2025
- Implement NU Compensation Review results
- Revise Legislated PTSD Prevention Plan from 2017 for SFFR
- Develop & implement SFFR Officer HR Training Program
- Staff Engagement Survey & develop Action Plans for propriety areas
- Update Annual Training Plan
- Identify additional HR Metrics and create Quarterly Reports
- Equity, Diversity & Inclusion – Revision of Job Descriptions & Posting Templates
South Frontenac Township Communications Analytics July 1, 2024 – November 20, 2024
Page 15 of 203
2024 Accomplishments Climate Change Action Plan • Staff interviews • Action Workshop • Survey & Results
•
Website Redesign
•
Launch of new email newsletter, eNewsFlash
•
Communications assistance on such projects as the Pleasant Valley Drain project, the boat launch survey, 2025 budget, new wayfinding signage, updated brand assets, and Fire & Rescue Recruitment.
•
Successful training of new Communications staff (end of July)
•
Successfully raised the highest United Way Campaign funds to date through our Silent Auction.
Page 16 of 203
•
Key Metrics - Website
Total page views: 177,217
July 1, 2024 – November 20, 2024
Average page views per user: 2.61 Average engagement time: 59 seconds Getting to Website: Direct (over 35K) Top Cities Who Visit: Kingston, Toronto, Ottawa, Montreal
Redesigned in July 2024
Page 17 of 203
Top Pages Visited: Events Calendar, Garbage & Recycling, Careers, Property Taxes, & Building
Key Metrics – Social Media - Facebook July 1, 2024 – November 20, 2024
Total followers: 3.9K Total page views: 142.5K Reach: 97K Content interaction: 3.8K Audience: 74% women, 26% men
Age Demographic: 35-44 & 45-54
Page 18 of 203
Top Cities: Kingston (35.5%), South Frontenac (22.4%), Ottawa (13.1%), Sharbot Lake (2.2%)
Key Metrics – Social Media - Instagram July 1, 2024 – November 20, 2024
Total Followers: 678 (2.8%+) Contact Interactions: 1.3K (113.2%+) Reach: 5.5K (14.3%+) Content Interaction: 3.8K Audience: 74.6% women, 25.4% men
Age Demographic: 35-44 & 45-54
Page 19 of 203
Top Cities: South Frontenac (26%), Kingston (28.9%), Ottawa (5.6%), Sharbot Lake (4%)
Key Metrics – Social Media – X July 1, 2024 – November 20, 2024
Total followers: 1,299 Post impressions: Typically range between 90-200 per post Engagement per post: Typically, under 50 per post Define engagement: Total number of times a user has interacted with a post. This includes all clicks anywhere on the post (including hashtags, links, avatar, username, and post expansion), reposts, replies, follows, and likes Page 20 of 203
Note: Many businesses and verified people have left Twitter since Elon Musk bought the social channel, and more since the 2024 US Presidential election.
Key Metrics – Threads July 23, 2024 – November 20, 2024
Total followers: 113 Total views: 700 (521 followers/179 nonfollowers) Total interactions: 13 Note: Still a growing field. Many people switching from X to Threads.
Page 21 of 203
Key Metrics – Social Media - LinkedIN July 1, 2024 – November 19, 2024
Total Followers: 517 Total impressions: 25,109 Reations: 625 Follower demographics: Greater Kingston Area (46.6%), GTA (10.1%), Ottawa area (3.9%)
Page 22 of 203
Key Metrics – eNewsFlash Sent once a month, and for special communication circumstances (ie, Climate Change Survey). Total subscribers: 605 New subscribers (Oct. 22-Nov.21): 37 Average Open Rate (July 1-Nov.21): 77.6% Average Click Rate (July 1-Nov.21): 16.43% Page 23 of 203
Clicks per unique open: 40% (+6.7%)
Key Metrics – Frontenac News Total Reach: Over 12,000 households 50 papers per calendar year 2024 Ad Banner Price: $690 per issue 2025 Ad Banner Price: $702 per issue
Page 24 of 203
Main Sources of Information Question from budget: Where do you go to receive Township information?
#1: Website #2: Social media #3: Local newspaper
80.00% 70.00% 60.00% 50.00% 40.00% 30.00% 20.00%
0.00% Local Newspaper
Website
Social Media
Council In person open Digital Signs Meetings or houses and Agendas information sessions
Other
Page 25 of 203
10.00%
The Communiation Mix The way we communicate has evolved. We embrace digital methods and combine these methods with print and face-to-face engagement to meet the needs of our residents. The benefits of digital communication include: -We can reach more residents across larger geographies like we have in South Frontenac, plus cottagers who live in other areas of Province (or country).
Digital tools are often very cost effective, saving taxpayers money.
Residents can access information when it’s convenient to them, using different types of technologies (ex, mobile phone, computer, tablet).
Residents can consume information in their chosen digital circles (social sites, email, etc.).
Digital tools can help with accessibility through features like closed captioning and screen readers.
While we encourage open and transparent feedback, we understand that some may prefer anonymous feedback, and digital tools may encourage residents to share more freely. Page 26 of 203
The Communication Mix
Page 27 of 203
Goals of the Communications Department 1
2
4
To provide opportunities for residents to engage with topics important to them. Increase our understanding of who our community members are in each hamlet/village.
5
Contribute to higher resident satisfaction and foster community pride.
Persuade people to take action and change behaviours (eg, recycling, climate change, visit our region). Maximize Township-wide strategic information and outreach to increase public participation without causing outreach fatigue. Strengthen community partnerships. Help to build the local economy by promoting local events and helping small businesses.
South
Page 28 of 203
3
To provide open, transparent, accurate information in a timely basis on the channels residents most prefer. Communication will use plain language that does not include government jargon. 1
The Future Climate Change Action Plan • Final Report
•
Continue to tweak the look of the new website so it best suits our needs
•
Increase social media ad campaigns & create a more detailed social media plan with input from each department
•
Start using Curbex ads for high profile projects to increase awareness
•
Increase tourism/event promotions
•
Build our emergency preparedness materials (for Clerk’s department)
•
Build our climate change awareness materials
Page 29 of 203
•
Questions?
Page 30 of 203
CAO/Treasury
Page 31 of 203
CAO 2025 Priorities
Page 32 of 203
• Verona Housing including ongoing participation with Frontenac Municipal Service Corporation meetings • Strategic Plan – update on 2024 action items accomplished and action items for 2025/26 • Finalizing Climate Change Plan and implementing 2025 recommendations • Continued advocacy for the Township at AMO/ROMA, provincial MPP and others • Continued lens on process improvements and customer service
Treasury Department Staffing Complement
Page 33 of 203
Core Functions
Page 34 of 203
§ Processing and Payment of vendor invoices (7,000+ invoices processed) § Accounts Receivable for Taxation, Utilities and other receivables § Sydenham Water: § Quarterly billing and collection of 292 utility accounts § Payment Plans and ownership changes § Property Taxation: § Approximately 26,000 bills/year § 2,600 payment plans administered § Tax sale process § Adjustment and supplementary billings 4 § Ownership changes
Core Functions
§ Investment and cash flow management § Budget and long-range financial planning § Asset management and legislated asset reporting on financial statements § Insurance management and renewal § Financial reporting to departments, council and legislated requirements including audit, Financial Information returns Page 35 of 203
5
Core Functions
6
Page 36 of 203
§ Grant applications submission and reporting § Payroll Services § Payroll for up to 259 employees including students, council, full-time staff and paid on call firefighters § Pension plan for 94 employees § Other Services: § Provide support services to 9 committee of councils and payroll, bill payment and remittance support for Arena § Distribution of 11,000+ bag tags with Tax Notices
2025 Priorities
- Digital submission of payroll timesheets
- Update of Procurement Policy
- Asset Management legislated requirements
- Questica implementation for operating budget and actuals including reporting and staff online access
Page 37 of 203
Clerk’s Department Update December 13, 2024
Page 38 of 203
Staff Complement: Township Staff: • Clerk/Community Emergency Management Coordinator • Deputy Clerk (Position created 2022) • Records Analyst (Position created 2024) Contracted Services: • Frontenac Municipal Law Enforcement
Page 39 of 203
Areas of Responsibility: • Legislated responsibilities under, for example, Municipal Act, Municipal Freedom of Information and Protection of Privacy Act (MFIPPA) • Cemetery Management • Lottery and By-law Enforcement Licensing • Provide advice/direction regarding policy and procedural matters to Staff and Council. • Preparation of Council and advisory committee agenda and minutes • Coordination of Insurance Claims • By-law Enforcement • Emergency Management • Unopened Road Allowances
Page 40 of 203
• Records Management
2023 - 2024 Accomplishments Policy and Procedural Improvements • Development and implementation of new Committee By-law, Trailer Regulation By-law, Lottery Licensing By-law, Unopened Road Allowance Policy By-law and Fees and Charges By-law. • Numerous amendments to various enforcement and administrative monetary penalty by-laws. • Several updates to both Council Procedure By-law and related processes. Page 41 of 203
2023 - 2024 Accomplishments Additional Clerk’s Department Highlights: • Coordinated procurement and installation of Council Chamber Audio/Visual Equipment. • Facilitated process regarding appointment of vacant Bedford District Councillor position. • Refinement of Records Management program
Page 42 of 203
Committee and Council Meeting Metrics: (As of November 21) Council
Heritage Advisory Committee
Lake Ecosystem Advisory Committee
Recreation & Leisure Advisory Committee
23
4
3
4
Page 43 of 203
Additional Metrics: (As of November 21) 2023
2024 (Jan. to Nov. 21)
MFIPPA (FOI) Requests:
18
24
21
Burial Permit/Death Registrations:
Not applicable.
78
58
Lottery Licenses Issued:
13
12
8
Unopened Road Allowance Applications Processed:
8
2
7 Page 44 of 203
2022
2023 - 2024 Accomplishments
Additional By-law Enforcement Highlights:
• Strengthened relationship between the Township of South Frontenac and O.P.P. regarding By-law enforcement. • Implementation of Noise By-law Exemption Process. • Completed a successful Enforcement Survey. • Ongoing implementation/refinement of Administrative Monetary Penalty Program
Page 45 of 203
• Comprehensive review of remaining licensed trailers.
By-law Enforcement Metrics: 2022
2023
(June – Dec. 31)
Property Complaint Investigations:
55
Total Complaints Not available Received: AMPs Issued:
(Jan. to Dec. 11)
75
105
Approximately 780
Approximately 600
Sept. to Dec. 31
(Jan. to Nov. 21)
7
85
69
Not applicable
10
10 Page 46 of 203
Noise By-law Exemptions Issued:
2024
Cemetery Management Next Steps: • Develop new harmonized Cemetery By-law. • Development of processes and workplan related to Cemetery Management. • Continue organization of cemetery records including digitizing and building database for all plots. • Bring forward information on columbarium’s including suitability, costs and appropriate locations. Page 47 of 203
Records Management Next Steps: • Updating physical records management including audit/devise plan for records stored in Township facilities. • Review and implementation of best practices regarding the management of electronic records including staff training. • Explore electronic records management options related to By-law Enforcement.
Page 48 of 203
Emergency Management Update: • Updated Emergency Response Plan and supporting By-law. • Facilitate quarterly Emergency Management Program Committee meetings. • Ongoing outreach to external stakeholders to strengthen emergency response partnerships.
Page 49 of 203
Frontenac O.P.P. Detachment Board Update:
• Prepared new Frontenac O.P.P. Detachment Board Procedure By-law. • Provide administrative and legislative support to Frontenac O.P.P. Detachment Board. • Commence development of various policies/by-laws as required by the Community Safety and Policing Act.
Page 50 of 203
2025 Department Priorities Process Improvement Cemetery Management – Consideration of Cemetery By-law Process Improvement By-law Enforcement – Consideration of Property Standards By-law Process Improvement – Consideration of new Council Procedure By-law Process Improvement Various By-laws (Delegated Authority, Notice By-law, Disposition of Land By-law) Development of Frontenac O.P.P. Detachment Board policies and procedures Physical records management and Electronic Records Management Processes Conduct training regarding Records Management and Report Drafting Page 51 of 203
14
Questions
Page 52 of 203
South Frontenac Fire & Rescue Council Briefing December 2024
Page 53 of 203
Our Key Services 3 Lines of Defense: Public Education, Fire Prevention, Fire Suppression - Rescue - Medical Support other Township Departments: Planning/Building, By Law, Public Works, Communications, HR Liaison with External Stakeholders: OFM, EMO, ESA, TSSA, MOL, MOE, MNR, KFLA Mutual Aid Training: Mandatory Certification based on levels of service prescribed in the E&R By Law Facility, Fleet, and Equipment Maintenance
Page 54 of 203
2
2024 Department Priorities Community Risk Assessment: Comprehensive review of community public safety needs Implementation of Firefighter Advisory Committee, Health & Safety Committee and team meetings. Strategic Planning for replacement of aging Fire Stations and Fleet 2024 – 2025 Policy Development: Develop Policies, Standard Operating Procedures and Operating Guidelines Review of Establishing & Regulating by-law, By-law updates and creation of a Master Fire Plan. Legislative Compliance.
Page 55 of 203
3
2024 Accomplishments • Health & Safety Committee – Implemented • Firefighter Advisory Committee– Implemented and communication improvements implemented. • Revised Pay Structure – Implemented • Station Inspections – Completed and actions underway for legislative compliance with Fire Code and Occupational Health & Safety Act. • Standardization – Vehicles, Squads, Medical Bags, Station Supplies – Ongoing • Filing and Digitization – Completed • Purge old fleet – Completed
• Community Risk Assessment – Completed- to be presented with Master Fire Plan • New Marine Unit– Outfitted, staff trained and in service at Bradshaw Station. • Mandatory Certification – We continue to certify our personnel as prescribed in their job descriptions. This is a result of O. Reg 343/22 • Staff SharePoint Page – We’ve gone paperless for incident reports, training records, inspection records. Created a central area for training lessons and key documents. • Long Term Fleet & Equipment Plan – Updated the 25-year plan. Page 56 of 203
2025 Department Priorities Replace Deputy Fire Chief and Recruit Firefighters
Complete Master Fire Plan
Improve Two-way Radio Communications
Develop Standard Operating Procedures
Standardization of Vehicles and Equipment Page 57 of 203
5
2025 Department Priorities Fire Prevention and Code Enforcement Public Education Mandatory Certification Cancer Prevention Driver Shortage
Burn Permit System Page 58 of 203
6
Replace Deputy Chief of Operations and Training • Job posting to close in January and fill position in February.
Complete Master Fire Plan
• Contract signed and project to be completed by end of April
Improve Two-way Communications • Current System using 30-year-old equipment on two tower sites. Various companies to provide proposals to upgrade towers and equipment.
• Bringing in additional support in January for six weeks to create a starting point.
Page 59 of 203
Develop Standard Operating Procedures
Standardization of Vehicles and Equipment • This will be an ongoing project over a few years. The goal for 2025 are standardization of the Marine Units and Squads so that when a vehicle is called the equipment and functionality are the same. Example adding the drone which is used for search and rescue, fire investigations, search unsafe structures for bodies, and wildland fires to observe threats, predict fire spread and source water.
Fire Prevention and Code Enforcement Page 60 of 203
• Enforcement currently done by Fire Chief. Will implement programs following Master Fire Plan recommendations
Public Education
• Review community events versus public education. Will implement programs following Master Fire Plan recommendations.
Mandatory Certification • O. Reg 343/22. All personnel must be certified by 2026 to meet the requirements of this legislation. This will include extensive dedicated staff resources primarily through the Deputy Fire Chief to meet this requirement, and a full Council review of services provided that are prescribed in the E&R By-Law
Cancer Prevention
Page 61 of 203
Implement policies to prevent cancer. Support with sufficient cleaning resources for staff and equipment.
Driver Shortage • Partner with the Ontario Fire Association of Fire Chiefs to use their Ministry of Transportation Driver Certification program to streamline and expedite existing program
Burn Permit System
• Propose a new open-air burning by-law and permit system to reduce the risk of wildfire and reduce responses to neighbour complaints.
Other Discussion Points • Wildland firefighting and rescue equipment • Wildland firefighter training requirements • Dry Hydrants Page 62 of 203
• Fees by-law.
Questions
Page 63 of 203
Development Services Department 2024 Briefing December 13, 2024
Page 64 of 203
Staffing Complement Director of Development Services
Manager of Planning
Chief Building Official Deputy CBO (2)
Planner (2)
Building Inspectors (3)
Planning Coordinator
Building Inspector – on-site Sewage
Planning Clerk
Permit Intake Coordinator Administrative Assistant Page 65 of 203
2
2024 Accomplishments Planning • Development Charges and Growth Study Update • Official Plan – close to completion – early 2025 • Additional Dwelling Units (educational materials developed for public – handouts & website) • Planning First established for development approval process (ensuring planning compliance at start) • Amendments to planning application fee schedule • Amendments to Comprehensive Zoning By-law (e.g. add penalties for contravening Zoning By-law) Collaboration with County: • Community Planning Permit System (in progress) Page 66 of 203
• Environmental Impact Statement Guidelines (in progress)
2024 Accomplishments Building Services •Providing comprehensive training for both new and existing staff •Regular staff meetings to enhance consistency within enforcement and regulations •Full compliment of building staff within the department •Creating processes within the department for closure of historic building permit files •Proactively addressing Building Without Permit Construction(BWPs) and the creation of a standardized procedure Page 67 of 203
Current Changes That Impact The Way We Do Business Bill 185, the Cutting Red Tape to Build More Homes Act (April 2024) Changes to the Provincial Planning Statement (October 2024) New National Construction Codes and new Ontario Building Code will come into effect on January 1, 2025
Planning First process established for building permit applications (November 2024)
Development Services
5
Page 68 of 203
12/03/2024
2025 Goals Finalize Official Plan Initiate Review of Comprehensive Zoning By-law Implement Community Planning Permit System for Waterfront Properties Initiate Economic Development Strategy Study Continuous Improvement of Processes and Customer Service
Page 69 of 203
6
Questions
Page 70 of 203
Public Services Department 2025 Budget Briefing
Page 71 of 203
Funding & Reserves • Funding Options:
• Development Charges • Government Funding and Grants • Reserve Accounts • Taxation
• Reserve Accounts:
Page 72 of 203
• Asset Investment • Arterial • Facilities • Parkland • Public Services Equipment
Long Range Financial Plan (LRFP) • Current Programs
• Roads • Bridges & Structures • Facilities • Parkland • Public Services Equipment
Page 73 of 203
2025 LRFP Targets *Arterial Culverts Facilities, $811,824 Parks & Rec, $219,524 (NEW), $250,000 Fleet, $1,215,000
*Gravel Roads (NEW), $350,000
Bridges & Structures, $1,157,000 Roads (Hard Surface), $6,983,000
Page 74 of 203
- New programs not phased into LRFP until 2029-2030
Long Range Financial Plan (LRFP) • New Programs
• Culverts – Funding in 2029 • Gravel Roads – Funding in 2030
• Future Programs
• Sidewalks – Funding in 2026 • Boat Launches – Funding in 2030 • Guiderails – Funding in 2031 • Storm Sewers – Not established in LRFP Page 75 of 203
Long Range Financial Plan (LRFP) • Target is to build capital budgets within the LRFP values. • Council has established a strong program for Roads and Bridges in the LRFP. • The 1% increase to Asset Investment Reserve is a good start to help fund future programs and keep reserves up (Now a total of 2% of the total levy to AIR).
Page 76 of 203
Page 77 of 203
Page 78 of 203
2025 Public Services Capital Budget Breakdown Facilities 6% Solid Waste 3% Sydenham Water 5%
Parks & Rec 5%
Fleet 8%
Bridges & Structures 14%
Roads 59% Page 79 of 203
2025 Roads and Bridges Budget Gravel Roads (NEW to LRFP), $340,000
Pavement Preservation, $950,000
Hard Surface Roads Breakdown Pre-…
$136,400
Florida Rd
$291,100
Westport Rd Craig Rd
Hards Surface Roads, $7,189,200
$1,351,700 $1,095,000
Road 38
Arterial Culverts (NEW to LRFP), $250,000
$4,315,000
Arterial Culverts (NEW to LRFP)
Pavement Preservation
Hards Surface Roads
Page 80 of 203
Gravel Roads (NEW to LRFP)
Asset Management Plan (AMP) • Asset management plan update for non-core assets was due July 1, 2024. • Non-core assets include: -Culverts -Guide Rails -Sidewalks -Fire assets
-Facilities -Playgrounds -Street Lights -IT assets
-Fleet -Gravel Roads -Rec Amenities -Storm Sewers
Page 81 of 203
• AMP is an important tool to ensure adequate funding to maintain current assets and to develop technically informed LTFP and capital plans.
Parks and Rec Capital Projects Strategy
Page 82 of 203
• Recreation, Parks, and Leisure Master Plan • Rejuvenation of net sport courts • Revitalizing baseball diamonds • Site plans for parks
2025 Major Projects • Town hall office renovation • Road 38 reconstruction • Sydenham water treatment plant upgrades Page 83 of 203
Special Projects • Verona Servicing • Wayfinding Signage • Joint Fire & OPP facility design
Page 84 of 203
Legislative Requirements • Asset Management Plan – Overdue and may impact future Provincial funding. • Blue Box Transition – Transition date is July 1, 2025 • Consolidated Linear ECA
Page 85 of 203
2025 Department Priorities • Waste Diversion
• Portland landfill capacity preservation • Loughborough landfill expansion • Recycle options for non-eligible sources
Page 86 of 203
• Update winter operations plan • Update minimum maintenance standards (MMS) road patrol inspections • Implement online recreation booking option • Health & Safety policies
Questions?
Page 87 of 203
2025 Budget Day Presentation Special Council Meeting December 13, 2024 Page 88 of 203
Agenda
- Property Tax Primer
- 2025 Budget Background
- Overall Financial Impact
- Project and Program Highlights
- Reserves and Obligatory Reserve Funds
- Next Steps
- Questions? Page 89 of 203
Property Tax Primer Tax Bill is made up of 3 components: • Township share set by Council • County Share set by County Council • Education Share set by the Province • We only have control over the Township share Page 90 of 203
Property Tax Primer Tax Bill = Township + County + Education Rates X Property Assessment + Local Improvement Charge (including Trailer Licence, Water Debenture) Page 91 of 203
Assessment values are set by MPAC
Property Tax Primer SF to be raised by taxes = $ Expenses - $ Revenues Township Rate =
SF to be raised by taxes Total Weighted Assessment
SF Share of Taxes = Township Rate X Property Assessment Page 92 of 203
Property Tax Primer The Target increase is based Taxpayer impact looking at the Township share of the Tax bill % Target = 2025 SF Taxes – 2024 SF Taxes 2024 SF Taxes
Page 93 of 203
Property Tax Primer • Due to the COVID-19 pandemic, the Ontario government postponed the 2020 Assessment Update. They have indicated that property assessments for the 2025 property tax years will continue to be based on the fully phased-in January 1, 2016 current values. • There has been no announcement at this time by the province as to when reassessments will be completed. It is unknown if this base valuation date will be updated for 2026. • MPAC continues to review properties during non-Assessment Update years as new homes are built, owners renovate, structures are demolished, and properties change use. Page 94 of 203
Property Taxes - Additional Resources • How Your Municipal Budget Works Video • How will my property assessment impact my property taxes?
Page 95 of 203
Budget Background • The 2025 Budget Schedule was originally approved by Council on September 3, 2024. • Budget Delegations were heard on November 12, 2024. One presentation was made by the Royal Canadian Legion – Sydenham Branch. • The Budget Survey Results based on a public survey were released on November 12, 2024. • On November 19th, 2024 the 2025 Budget Direction and the 2025-2034 Long Range Financial Plan were presented. • On December 3rd, 2024, the proposed 2025 Capital Budget was presented. Included with the presentation was the Project Summary with the Detailed Budget Sheets of the proposed 2025 projects. Page 96 of 203
• This is the third budget for this term of Council.
Budget Background
• The annual budget operationalizes the Strategic Plan • The budget should clearly show:
• What the community values • What priorities are to be accomplished with an alignment to the strategic plan • Where the Township wants to be in the future Page 97 of 203
Budget Background • The 2025 Budget address important ongoing priorities including: Road and Bridge Infrastructure upgrades
Road Surface Treatment Program
Housing
Facilities Upgrades and Repairs
Fleet Renewal
Recreation and Parks Improvements
Landfill improvements
AM non-core asset planning –gravel, arterial culverts, facilities, etc
Changes in technology
Labour supply and wage pressures Page 98 of 203
Budget Background • The Budget Survey results indicated:
• 77% of 413 responses preferred a reasonable increase to property taxes to maintain or enhance services. • Approximately 90% of responses indicated Roads/Winter Control and Fire Services were cited as most important day-to day operations. • Roads, Emergency preparedness, Waste Diversion and Affordable housing were identified as the top 4 most important capital projects.
Page 99 of 203
• This budget conforms to Council’s long range financial plan which considers the Township’s ability to fund capital and operations over a 10-year period while observing strategic priorities and maintaining tax rate targets and reserve balances. • And as always, it maintains a strong financial position for the Township
Budget Background Items of Note:
• The Capital budget does NOT include carry-over projects (projects approved and funded in prior year budgets); however, work may continue those projects in 2025. A separate summary of carryovers will be provided to Council early in the new year. • Throughout the operating budget, you will see references to Transfer from Reserves and Transfer to Capital. • Transfer from Reserves fund expenditures and are primarily driven from the Capital budget as identified. These can vary significantly year over year. These amounts are largely driven by annual capital requirements. • Transfer to Capital is the way we move capital expenditures identified in the Capital Budget into the Operating Budget. Page 100 of 203
Overall Financial Impact • Total proposed Budget Expenditures: $44,453,961 • Operating budget of $28,350,620 • Capital budget of $16,103,341
• Represents 4.41% impact on average assessed property • Taxes (Township share) of $1,842.16 on average assessment of $278,126 • Properties valued at $278,126 or lower represent 34% of the assessment base • Represents an annual increase of $77.74/year over 2024
Page 101 of 203
and 45% of the households in the Township
Overall Financial Impact continued • Assessment growth of 1.23% which is lower than the growth from 2024 of 0.99% and lower the long-range financial plan forecast of 1.75% . • The Consumer Price Index (CPI) leveled down to 1.6 in September 2024 compared to 3.9% in 2023,
Page 102 of 203
• The continued impact of the cost of living increases experienced are seen throughout the 2025 Budget. Other expenses, where possible, have been flatlined from 2024 in order to achieve the 4.41% taxpayer impact.
Inflationary Impacts Specific items that are affected by inflation in the proposed budget are:
Page 103 of 203
• Corporate Insurance (Property and General Liability) – 10% • Utilities (Heat, Hydro, Telephone) – 4% • Fuel – 3% • Wage and Benefits – 2% • Conservation authorities 7.39% • Policing 3.55% • Arena 48% (due to capital levy)
Overall Financial Impact continued
High Level Summary of Changes Cost Savings Service Area
Amount
Capital Tax Requisition
-$509,550
Winter Control ( 5 year average + 2%)
-$125,700
Reduced Revenues Service Area
Amount $23,000
Swim/Day Camp Revenues
$24,900
Ontario Community Infrastructure Fund (OCIF)
$135,203
Negative (-) amounts indicate a reduction of cost from the bottom line
Page 104 of 203
Planning Revenues
Overall Financial Impact continued
High Level Summary of Changes Increased Revenues Service Area OMPF Funding
Amount -$7,500
Increased Costs Service Area
$465,757 $51,611 $58,172 $23,600 $488,642
Negative (-) amounts indicate a reduction of cost from the bottom line
Page 105 of 203
Current Year Asset Investment Reserve (AIR) impact (2% of levy) OPP Billing* (see next slide) Insurance +10% Conservation Authorities Staff Complement Annual Adjustments
Amount
Overall Financial Impact continued
High Level Summary of Changes OPP Billing
Page 106 of 203
• Originally the OPP billing statement received reflected an increase of $426,134 or 14.89%. • The province has since advised they will be subsidizing 10% of the 2025 billing or $328,732 (estimated) • Current budget shows a net increase of $51,611. 2025 costs are going up $101,611 netted with an offsetting reserve transfer of $50,000 • It is unknown what the 2026 billing will be but anticipate that the original 2025 amount will be a minimum. • Township has a Policing Stabilization reserve. At the end of 2025, the balance is estimated to be $798,773.
Overall Financial Impact continued
High Level Summary of Changes Fire Paid on call wages
• The 2025 budget provides for $541,730 for paid on-call firefighters based on the updated pay grid phased over 3 years, approved by Council in 2024. This reflects an increase of $44,730 or 9%. • Below is the wage grid approved by Council:
Page 107 of 203
• The 2025 net fire wages show a decrease overall as 2024 included a Fire Prevention Officer for 6 months which is not included in 2025.
Overall Financial Impact continued
High Level Summary of Changes Increased Costs
Service Area
$31,100 $13,500 $68,000 $130,200 $59,044 $11,500 $43,008 $82,825 $7,950 $57,250
Page 108 of 203
Arena Catch basins- CCTV/cleaning Insurance +10% Increased Reserve Transfer – Public Services Fleet Increased Reserve Transfer – Fire Pavement Markings Gravel Roads - Calcium Computer Maintenance Contracts Audit Fees Fire – Fleet Maintenance
Amount
Overall Financial Impact continued
High Level Summary of Changes Organization Development Plan Assessment Growth= 1.23% or $287,611 Service Area
Amount $28,800
Public Services – Facilities LEO annualization – 2024 position
$25,556
Asset Management Coordinator (July to Dec) – new 2025
$49,508
Public Services LEO – PT to FT (May to Dec)- new 2025
- Records Analyst annualization – 2024 addition post budget (net of Cemetery administration contract)
$1,738
Negative (-) amounts indicate a reduction of cost from the bottom line
$50,313
Page 109 of 203
Human Resources Advisor annualization – 2024 position
Overall Financial Impact continued
High Level Summary of Changes Enhanced Services Service Area
Catch Basins – Consulting – Consolidated Linear Infrastructure ECA Changes Drainage – Add one week to drainage plan
Amount
Lakes and Trail Festival
$20,000 $6,000
Page 110 of 203
Negative (-) amounts indicate a reduction of cost from the bottom line
$20,000
Overall Financial Impact continued
High Level Summary of Changes Capital Projects Deferred – not in Budget Service Area
Amount
Road 38/Boyce Road Sidewalk and Storm Sewers
$873,000
Harris Park – Playground rehabilitation/Accessibility Upgrades
$104,000
Centennial Park Upgrades – Tree Planting
$20,000 Page 111 of 203
Negative (-) amounts indicate a reduction of cost from the bottom line
Reserves and Obligatory Reserve Funds • Overall the Township will be drawing down on reserves and reserve funds in 2025, however this is for specific projects, not to reduce the tax rate. • 2024 Estimated year end balance is $15.3 million • Contributions to Reserves from Taxation, Federal funding (CCBF), Building fees, Development Charges and Parkland will be $8.4 million • Projects to be funded from Reserves and reserve funds total $12.4 million
• The projected balance at the end of 2025 will be $11.1 million Page 112 of 203
Next Steps • Go over Budget Package pages for feedback or comments • December 17th Council – Report to Amend/Adopt 2025 Budget based on minor revisions
Page 113 of 203
Questions during Capital Budget presentation How much revenue to we collect from Motor Vehicle Accidents?
• The 2024 and 2025 budgets have an amount of $35,000 in the Fire Budget. There is no budget allocation within Public Services. • Fire bills insurance companies quarterly based on approved bylaw. • Chargebacks through Public Services based on incidents where they need to respond. ie Buck Lake accident 2023/24 $103,117 • Actuals for last 3 years average to $40,943 for Fire Page 114 of 203
Questions?
Page 115 of 203
Page 116 of 203
TOWNSHIP OF SOUTH FRONTENAC 2025 Budget
Including: ■ High Level Summary of Changes ■ Summary ■ Departmental Operating Budgets ■ Capital Budget ■ Reserve & Reserve Funds Note: The Capital Detailed Sheets are available on Engage South Frontenac Website and also on the Township’s website from the December 3, 2024 Agenda
As presented with amendments made on: Friday December 13, 2023 9:00 AM Storrington Centre
Page 1117 of 203
TOWNSHIP OF SOUTH FRONTENAC 2025 Budget High Level Summary of Changes Below is a high level summary of key changes from last year’s budget excluding transfers to Reserves, transfers to Capital and inter-departmental transfers. The listing below incorporates all items directed by Council, originally requested by staff and recommended by committees. Notable Variances in presented budget Costs Savings Capital Tax Requisition Winter Control (5 year average + 2%)
-509,550 -125,700
-635,250
Reduced Revenues Planning Revenues Swim/Daycamp Fees OCIF
23,000 24,900 135,203
183,103
Increased Revenues OMPF
-95,700
-95,700
Increased Costs OPP Billing Conservation Authorities Insurance (10% overall) Arena Landfill Export Current Year Asset Investment Reserve Impact (2% of current year levy) Catch Basins-CCTV/Cleaning Pavement Marking Increased Reserve Transfer - Public Services Fleet Increased Reserve Transfer - Fire Fleet Gravel Roads - Calcium Audit Fees Computer Maintenance Contracts Staff Complement Annual Adjustments Fire - Fleet Maintenance Other
51,611 23,600 58,172 68,000 31,100 465,757 13,500 11,500 130,200 59,044 43,008 7,950 82,825 488,642 57,250 83,401
1,675,560
Human Resources Advisor Annualization Public Services LEO Facilities Annualization Asset Management Coordinator (July - Dec) Public Services LEO - PT to FT (May - Dec)
28,800 25,556 49,508 1,738
105,602
Enhanced Services included in Budget Catch Basins - Consulting - Consolidated Linear Infrastructure ECA changes Drainage - Add One Week to Drainage Plan Lakes and Trails Festival
20,000 20,000 6,000
46,000
Organizational Development Plan Assessment Growth =1.23% or $287,611
Capital Projects Deferred - not in Budget Road 38/Boyce Road Sidewalk and Storm Sewers Harris Park - Playground Rehabilitation/Accessibility Upgrades Centennial Park Upgrades - Tree Planting
873,000 104,000 20,000 997,000
Total Increase to be raised by Taxation Assessment Growth
1,279,315 1.23%
Reduced Revenues included in Budget - Self Funded Sewage/Building Permits Forecast
287,611 70,583
Council Direction - No specific target - but focus on priorities and affordability. The proposed budget meets an overall 4.41% increase in the average taxpayer impact. This represents an overall $1,279,315 overall Township levy increase. Several expenses in comparing 2024 budget to forecasted 2025 expenses go beyond current inflation The capital budget, which was presented on December 3, 2024, includes total projected costs of $16,013,341. The listing of projects including proposed funding is attached to this budget document.
70,583
Page 2118 of 203
TOWNSHIP OF SOUTH FRONTENAC 2025 Draft Budget Summary of Revenue and Expense
REVENUE
Property Taxation- Supplementary & PIL
Actuals
2024-2025 Budget
2024 Budget
22-Nov-24
2025 Budget
$
$
$
249,500
22,733,465
Variance $
%
249,200
-300
-0.12%
User Charges
1,541,807
1,209,576
1,492,873
-48,934
-3.17%
Licenses, Permits and Rents
1,562,338
1,227,289
1,516,416
-45,922
-2.94%
Government Grants
3,315,611
2,663,446
3,528,628
213,017
6.42%
Grants from Other Municipalities
495,000
0
562,137
67,137
13.56%
Investment Income
649,000
567,917
649,000
0
0.00%
Penalties and interest on taxes
370,000
377,541
380,000
10,000
2.70%
Donations
6,725
57,045
10,000
3,275
Other
67,400
233,716
100,200
32,800
48.66%
Transfers From Reserves/Reserve Funds
13,827,642
313,578
12,211,918
-1,415,724
-10.24%
TOTAL Revenue
22,085,023
29,383,573
20,700,372
-1,384,651
-6.27%
OPERATING EXPENSE
General Government
10,334,761
7,744,171
8,111,999
-2,222,762
-21.51%
Protection to Persons and Property
Fire
2,884,333
2,372,629
3,385,879
501,546
17.39%
Police
2,873,290
2,604,287
2,972,947
99,657
3.47%
Conservation Authorities
521,876
320,327
345,029
-176,847
-33.89%
Protective Inspections and Control
148,753
121,818
161,299
12,547
8.43%
Emergency Measures
3,500
33
4,000
500
14.29%
Building Department
1,343,983
1,119,843
1,362,436
18,453
1.37%
Transportation Services
Roadway Maintenance
16,184,205
15,354,257
18,268,112
2,083,906
12.88%
Winter Control
2,361,009
1,487,288
2,235,275
-125,734
-5.33%
Environmental Services 731,930
316,667
1,193,211
461,280
63.02%
Water System
Solid Waste Management
3,110,649
2,894,037
3,137,736
27,087
0.87%
Parks, Recreation and Cemeteries
3,038,045
2,409,806
2,351,275
-686,770
-22.61%
Planning and Development
1,022,964
807,053
924,763
-98,200
-9.60%
TOTAL Expense
44,559,297
37,552,215
44,453,961
-105,337
-0.24%
TO BE RAISED BY TAXATION
22,474,274
23,753,588
1,279,315
5.69%
IMPACT ON TAXPAYER: BASED ON AVERAGE PHASE-IN ASSESSMENT THE TOWNSHIP’S SHARE OF THE TAX BILL ON A 278,126 PROPERTY WILL INCREASE 4.41% WHICH EQUALS $77.74
Page 3119 of 203
TOWNSHIP OF SOUTH FRONTENAC 2025 Draft Budget General Government Detail
GENERAL MUNICIPAL ACTIVITY
Revenue
Taxation - Supplementary & PIL
Actuals
2024-2025 Budget
2024 Budget
22-Nov-24
2025 Budget
$
$
$
Variance $
%
249,500
22,733,465
249,200
-300
-0.12%
Government Grants
1,609,500
1,609,500
1,705,200
95,700
5.95%
Investment Income
625,000
499,079
625,000
0
0.00%
Penalties and interest on taxes
370,000
377,541
380,000
10,000
2.70%
Other
0
19,840
25,000
0
100.00%
Transfer from Reserves
0
0
0
0
0.00%
Total Revenue
2,854,000
25,239,425
2,984,400
105,400
4.57%
0
22,559
0
0
0.00%
- Transfer to Reserves
3,267,854
3,267,915
3,733,611
465,757
14.25%
- Total Expense
3,267,854
3,290,474
3,733,611
465,757
14.25%
413,854
-21,948,951
749,211
335,357
81.03%
0
0
0
0
0.00%
- Transfer from Reserves
100,000
315,349
15,000
-85,000
-85.00%
- Total Revenue
100,000
315,349
15,000
-85,000
-85.00%
Expense
Operations
TOTAL GENERAL MUNCIPAL ACTIVITY
COUNCIL
Revenue
Grants from Other Municipalities
Expense 197,398
181,731
203,106
5,708
2.89%
Benefits
Remuneration
7,685
7,098
8,421
736
9.57%
- Memberships, Training and Travel
25,900
20,809
26,600
700
2.70%
- Communications
18,900
13,388
18,900
0
0.00%
- Council Operations
134,693
19,827
31,340
-103,352
-76.73%
- Grants * (see details bottom of next page)
229,109
463,622
244,109
15,000
6.55%
0
100,000
0
0
0.00%
- Transfer to Capital
- Transfer to Reserves
10,000
10,000
10,000
0
0.00%
- Total Expense
623,685
816,475
542,476
-81,209
-13.02%
- TOTAL COUNCIL
523,685
501,126
527,476
3,791
0.72%
- User Charges
0
0
0
0
0.00%
- Transfer from Reserves
0
0
0
0
0.00%
- Total Revenue
0
0
0
0
100.00%
- Remuneration
0
0
0
0
0.00%
- Benefits
0
0
0
0
0.00%
- Memberships, Training and Travel
0
0
0
0
0.00%
ELECTIONS 32 Revenue
Expense
Communications
0
0
0
0
0.00%
- Elections Operations
0
0
0
0
0.00%
- Transfer to Reserves
25,000
25,000
25,000
0
0.00%
- Total Expense
25,000
25,000
25,000
0
0.00%
- TOTAL ELECTIONS
25,000
25,000
25,000
0
0.00%
Page 4120 of 203
TOWNSHIP OF SOUTH FRONTENAC 2025 Draft Budget General Government Detail
Actuals
2024-2025 Budget
2024 Budget
22-Nov-24
2025 Budget
$
$
$
Variance $
%
- CORPORATE SERVICES
- Revenue
- User Charges
40,500
29,987
43,300
2,800
6.91%
- Licenses, Permits and Rents
1,800
1,146
1,600
-200
-11.11%
- Government Grants
80,000
28,641
80,000
0
0.00%
- Other
3,000
31,540
3,000
0
0.00%
- Transfer from Reserves
504,230
0
394,438
-109,792
-21.77%
- Total Revenue
629,530
91,314
522,338
-107,192
-17.03%
1,218,804
1,047,143
1,412,270
193,466
15.87%
432,609
354,658
482,672
50,063
11.57%
- Expense
- Remuneration
- Benefits
0
0
0
0
0.00%
Memberships, Training and Travel
Inter Departmental Transfer
78,177
21,459
103,093
24,916
31.87%
- Communications
56,178
58,709
47,600
-8,578
-15.27%
- Professional and Consulting Fees
42,000
61,706
53,450
11,450
27.26%
- Administrative Operations
204,057
338,744
266,062
62,005
30.39%
- Transfer to Capital
538,190
337,848
420,001
-118,189
-21.96%
- Total Expense
2,570,015
2,220,267
2,785,148
215,133
8.37%
- TOTAL CORPORATE SERVICES
1,940,485
2,128,952
2,262,810
322,325
16.61%
- ADMINISTRATIVE FACILITIES
- Revenue
- Facilities Revenue
224,375
231,238
255,706
31,331
13.96%
- Government Grants
0
0
225,000
225,000
100.00%
- Donations
0
0
0
0
0.00%
- Transfer from Reserves
3,500,000
0
175,000
-3,325,000
-95.00%
- Total Revenue
3,724,375
231,238
430,706
-3,293,669
-88.44%
- Expense
- Remuneration
0
7,080
0
0
0.00%
- Inter Departmental Transfer
1,291
1,658
2,414
1,123
87.04%
- Professional and Consulting Fees
6,920
2,949
8,220
1,300
18.79%
182,422
1,023,968
217,436
35,015
19.19%
Transfer to Capital
Facilities Operating Costs
3,540,000
351,299
683,393
-2,856,607
-80.70%
- Transfer to Reserves
117,574
5,000
114,301
-3,273
-2.78%
3,848,207
1,391,955
1,025,764
-2,822,442
-73.34%
123,832
1,160,717
595,058
471,227
380.54%
3,026,856
-18,133,155
4,159,555
1,132,699
37.42%
- Total Expense
- TOTAL ADMINISTRATIVE FACILITIES
- Total General Government Explanation of Significant Variances
Line 4
OMPF confirmed Funding
Line 12
In year Asset Investment Reserve (AIR) contribution
Line 54/55
Annualization of Human Resource Advisor, Records Analyst, Band changes
Line 59
Audit Fees
Line 60
Computer Maintenance Contracts
Line 66/75
New Campbell Road/Stage Coach properties
Council - Grants to Organizations/Individuals (line 26) Private Lanes
100,000
Bradshaw School Visits
2,000
South Frontenac Community Services (SFCS)
20,200
Inverary Youth
1,650
Community Grants
35,000
High School - Graduation
500
Seniors & Law Enforcement Together (SALT)
7,500
Trails - Work in kind - CRCA
5,219
Lake Study Grants
30,000
Heritage Committee Grant (15k prior year carryover)
30,000
Non-Township Facilities (Verona Mini-Park/ Lion’s Hall)
7,040
Miscellaneous
5,000
Total
244,109
Page 5121 of 203
TOWNSHIP OF SOUTH FRONTEN NAC 2025 Draft Budget Protection to Persons and Property Detail
2024-2025 Budget
Actuals 2024 Budget
22-Nov-24
2025 Budget
$
$
$
Variance $
%
FIRE
Revenue
User Charges
Grants from Other Municipalities
0
0
0
0
0.00%
Other
0
37,363
0
0
0.00%
55,750
23,955
48,600
-7,150
-12.83%
Transfer from Reserves
865,021
0
1,053,240
188,219
21.76%
Total Revenue
920,771
61,318
1,101,840
181,069
19.66%
Expense
Remuneration
811,005
837,206
842,397
31,392
3.87%
- Benefits
173,720
137,153
163,231
-10,490
-6.04%
- Memberships, Training and Travel
30,750
11,515
31,250
500
1.63%
- Communications & Public Education
69,900
62,043
68,650
-1,250
-1.79%
- Professional and Consulting Fees
6,250
5,586
5,250
-1,000
-16.00%
- Fire Operations
347,458
362,455
446,669
99,210
28.55%
- Transfer to Capital
784,000
284,025
1,106,740
322,740
41.17%
- Transfer to Reserves
452,182
489,545
511,226
59,044
13.06%
- Total Expense
2,675,265
2,189,527
3,175,412
500,147
18.70%
- TOTAL FIRE
1,754,494
2,128,209
2,073,572
319,078
18.19%
- Facilities Operating Costs
198,608
172,641
199,967
1,359
0.68%
- Total Expense
198,608
172,641
199,967
1,359
0.68%
- TOTAL FIRE FACILITIES
198,608
172,641
199,967
1,359
0.68%
- 911 Operations
10,460
10,460
10,500
40
0.38%
- Total Expense
10,460
10,460
10,500
40
0.38%
- TOTAL 911 SERVICE
10,460
10,460
10,500
40
0.38%
1,963,562
2,311,311
2,284,039
320,477
16.32%
FIRE FACILITIES
Expense
911 SERVICE
Expense
TOTAL FIRE
Explanation of Significant Variances Line 9/12
VFF Wage Adjustment
Line 14
Insurance, Vehicle Maintenance, Fuel, Computer Maintenance Contracts
Page 6122 of 203
TOWNSHIP OF SOUTH FRONT TENAC 2025 Draft Budget Protection to Persons and Property Detail
Actuals
2024-2025 Budget
2024 Budget
22-Nov-24
2025 Budget
$
$
$
Variance $
%
POLICE
Revenue
User Charges
8,000
10,825
10,000
2,000
25.00%
Government Grants
9,300
2,165
8,000
-1,300
-13.98%
Investment Income
10,000
26,914
10,000
0
0.00%
Transfer from Reserves
Total Revenue
0
0
50,000
50,000
100.00%
27,300
39,903
78,000
50,700
185.71%
Expense
Remuneration
1,350
600
1,600
250
18.52%
Memberships, Training and Travel
1,200
792
2,550
1,350
112.50%
- Communications
1,214
847
1,500
286
23.57%
- Police Operations
2,860,686
2,601,128
2,962,297
101,611
3.55%
- Total Expense
2,864,450
2,603,368
2,967,947
103,497
3.61%
- TOTAL POLICE
2,837,150
2,563,464
2,889,947
52,797
1.86%
- Government Grants
8,840
7,661
5,000
-3,840
-43.44%
- Total Revenue
8,840
7,661
5,000
-3,840
-43.44%
RIDE PROGRAM
Revenue
Expense
Ride Operations
8,840
919
5,000
-3,840
-43.44%
- Total Expense
8,840
919
5,000
-3,840
-43.44%
0
-6,742
0
0
100.00%
2,837,150
2,556,723
2,889,947
52,797
1.86%
TOTAL RIDE PROGRAM
Total Police
CONSERVATION AUTHORITIES
Revenues
Transfer from Reserves
200,000
0
0
0
-100.00%
- Total Revenue
200,000
0
0
0
-100.00%
- Expense 2,000
450
1,500
-500
-25.00%
- Conservation Authority Transfers
319,876
319,877
343,529
23,653
7.39%
- Transfer to Capital
200,000
0
0
0
-100.00%
- Total Expense
521,876
320,327
345,029
23,153
4.44%
- TOTAL CONSERVATION AUTHORITIES
321,876
320,327
345,029
23,153
7.19%
- Remuneration
Explanation of Significant Variances
Line 11
OPP Policing
Line 29
Conservation Authorities increases Cataraqui Region Conservation Authority $9,225 or 5.45% increase Quinte Conservation $13,418 or 10.9% increase. Rideau Valley Conservation Authority $1,010 or 3.66% increase
Page 7123 of 203
TOWNSHIP OF SOUTH FRONT TENAC 2025 Draft Budget Protection to Persons and Property Detail
Actuals
2024-2025 Budget
2024 Budget
22-Nov-24
2025 Budget
$
$
$
Variance $
%
PROTECTIVE INSPECTIONS AND CONTROL
Revenue
User Charges
24,000
27,549
32,000
8,000
33.33%
Licenses, Permits and Rents
42,000
33,575
34,000
-8,000
-19.05%
Government Grants
9,000
14,837
9,000
0
0.00%
Other
0
0
0
0
0.00%
Total Revenue
75,000
75,961
75,000
0
0.00%
Expense
Inter Departmental Transfer
0
0
0
0
0.00%
- Memberships, Training and Travel
15,500
10,083
20,500
5,000
32.26%
- Communications
2,100
447
2,100
0
0.00%
- Professional and Consulting Fees
23,000
25,974
23,000
0
0.00%
- Protective Operations
108,153
85,314
115,699
7,547
6.98%
- Transfer to Reserves
0
0
0
0
0.00%
- Total Expense
148,753
121,818
161,299
12,547
8.43%
- TOTAL PROTECTIVE INSPECTIONS AND CONTROL
73,753
45,857
86,299
12,547
17.01%
- Transfer from Reserves
0
0
0
0
0.00%
- Total Revenue
0
0
0
0
100.00%
EMERGENCY MANAGEMENT
Revenue
Expense 500
33
500
0
0.00%
- Memberships, Training and Travel
1,000
0
1,000
0
0.00%
- Communications
1,000
0
1,500
500
50.00%
- Emg Management Operations
1,000
0
1,000
0
0.00%
- Total Expense
3,500
33
4,000
500
14.29%
- TOTAL EMERGENCY MANAGEMENT
3,500
33
4,000
500
14.29%
- Remuneration
Explanation of Significant Variances Line 10
By-law Mileage
Line 13
By-law Enforcement Contract/ Humane Society Services
Page 8124 of 203
TOWNSHIP OF SOUTH FRONTE ENAC 2025 Draft Budget Protection to Persons and Property Detail
BUILDING
Revenue
User Charges
Licenses, Permits and Rents
Government Grants
Investment Income
Other
Transfer from Reserves Total Revenue
Expense
Remuneration
- Benefits
- Inter Departmental Transfer
- Memberships, Training and Travel
Actuals
2024-2025 Budget
2024 Budget
22-Nov-24
2025 Budget
$
$
$
Variance $
%
19,500
25,611
19,500
0
0.00%
1,181,183
895,737
1,110,600
-70,583
-5.98%
0
0
0
0
0.00%
0
30,133
0
0
0.00%
0
3,600
0
0
0.00%
90,600
0
177,736
87,136
96.18%
1,291,283
955,080
1,307,836
16,553
1.28%
788,377
633,275
819,359
30,982
3.93%
273,614
208,389
274,078
464
0.17%
0
0
0
0
0.00%
31,300
19,276
33,200
1,900
6.07%
- Communications
6,639
4,026
6,100
-539
-8.12%
- Professional and Consulting Fees
10,000
10,777
10,000
0
0.00%
- Building Operations
91,354
111,801
125,100
33,746
36.94%
- Transfer to Capital
50,000
83,753
0
-50,000
-100.00%
40,000
40,000
40,000
0
0.00%
1,291,283
1,111,296
1,307,836
16,553
1.28%
0
156,216
0
0
-35.45%
- User Charges
10,000
5,762
6,500
-3,500
-35.00%
- Total Revenue
10,000
5,762
6,500
-3,500
-35.00%
- Remuneration
0
5,440
0
0
0.00%
- Benefits
0
0
0
0
0.00%
- Civic Numbers Operations
52,700
3,107
54,600
1,900
3.61%
- Total Expense
52,700
8,547
54,600
1,900
3.61%
- TOTAL CIVIC NUMBERS
42,700
2,785
48,100
5,400
12.65%
- TOTAL BUILDING
42,700
159,001
48,100
5,400
12.65%
5,242,540
5,393,251
5,657,414
414,874
7.91%
Transfer to Reserves
Total Expense
TOTAL BUILDING
CIVIC NUMBERS
Revenue
Expense
Total Protection to Persons and Property Detail
Explanation of Significant Variances Line 4
Part 8 -& Building Permit Fees
Line 9/10
Annualization Deputy CBO
Line 15
Banking Service Charges, Vehicle Maintenance, Insurance, Computer Maintenance Contracts
Page 9125 of 203
TOWNSHIP OF SOUTH FRONTENAC 2025 Draft Budget Transportation Services Detail
ROADS
Revenue
Actuals
2024-2025 Budget
2024 Budget
22-Nov-24
2025 Budget
$
$
$
Variance $
%
User Charges
8,500
4,550
8,500
0
0.00%
Licenses, Permits and Rents
99,500
52,029
99,500
0
0.00%
Government Grants
901,352
751,127
766,149
-135,203
-15.00%
Grants from Other Municipalities Other
495,000 60,000
0 141,373
562,137 67,800
67,137 7,800
13.56% 13.00%
Transfer from Reserve
6,702,948
-1,771
9,139,314 2,436,366
36.35%
Total Revenue
8,267,300
947,308
10,643,400 2,376,100
28.74%
1,724,297
1,780,111
1,940,376
216,079
12.53%
Expense
Remuneration
Benefits
637,485
872,308
679,221
41,736
6.55%
Inter Departmental Transfer
-799,178
-65,002
-840,446
-41,268
5.16%
Memberships, Training and Travel
39,464
42,991
39,919
455
1.15%
Communications
58,502
42,703
59,492
990
1.69%
Professional and Consulting Fees
58,542
30,058
78,692
20,150
34.42%
Roads Operations * (see details below)
3,232,925
2,714,947
3,400,757
167,832
5.19%
Transfer to Capital
10,628,050
9,504,220
12,210,100 1,582,050
14.89%
Transfer to Reserves
604,118
431,924
95,882
15.87%
Total Expense
16,184,205
15,354,259
18,268,112 2,083,906
700,000
12.88%
TOTAL ROADS
7,916,905
14,406,951
7,624,712
-292,194
-3.69%
WINTER CONTROL
Expense
Remuneration
567,561
331,148
578,896
11,335
2.00%
Benefits
199,706
0
205,928
6,221
3.12%
Inter Departmental Transfer
622,009
329,830
634,669
12,660
2.04%
Winter Control Operations
971,733
826,310
815,783
-155,951
-16.05%
Transfer to Capital
0
0
0
0
0.00%
Total Expense
2,361,009
1,487,288
2,235,275
-125,734
-5.33%
TOTAL WINTER CONTROL
2,361,009
1,487,288
2,235,275
-125,734
-5.33%
Total Transportation Services
10,277,914
15,894,239
9,859,987
-417,928
-4.07%
*Roads Operations Breakdown (line 16)
2024-2025 Budget
YTD Actual 2024 Budget $
22-Nov-24 $
2025 Budget $
Variance $
%
Maintenance - Structures
20,018
59,556
30,000
9,982
49.86%
Roadside Maintenance
492,073
562,840
540,506
48,433
9.84%
Hardtop Maintenance
471,855
403,817
482,320
10,465
2.22%
Loose Top Maintenance
334,071
359,507
377,079
43,008
12.87%
Safety Devices
478,419
394,880
498,271
19,852
4.15%
Street Lights
47,500
25,148
49,500
2,000
4.21%
Overhead
1,388,988
909,201
1,423,082
34,094
2.45%
TOTAL ROADS MAINTENANCE
3,232,925
2,714,947
3,400,757
167,832
5.19%
Explanation of Significant Variances
Line 5
OCIF Funding Confirmed and is was reduced by 15% - $135,203
Line 6
County CCBF (former Gas Tax) - confirmed
Line 10/11
LEO PT to FT, Asset Management Coordinator, Reallocation of positions
Line 15
Catch Basin Consulting - ECA changes
Line 29
5 year average + 2%
Line 33
Catch Basin Maintenance and Drainage
Line 35
Calcium contract
Page10126 of 203
TOWNSHIP OF SOUTH FRONT TENAC 2025 Draft Budget Environmental Services Detail
WATER SYSTEM
Revenue
User Charges
Licenses, Permits and Rents
Government Grants
Actuals
2024-2025 Budget
2024 Budget
22-Nov-24
2025 Budget
$
$
$
Variance $
%
417,030
324,904
425,311
8,280
1.99%
2,400
2,000
2,400
0
0.00%
201,657
18,064
513,310
311,653
154.55%
Other
0
0
0
0
0.00%
Transfer from Reserves
110,843
0
252,190
141,347
127.52%
Total Revenue
731,930
344,968
1,193,211
461,280
63.02%
Expense
Remuneration
0
0
0
0
0.00%
Inter Departmental Transfer
Communications
Professional and Consulting Fees
704
0
207
-497
-70.66%
5,600
3,277
6,500
900
16.07%
193,700
172,144
239,900
46,200
23.85%
Water System Operations
92,845
68,734
93,000
156
0.17%
Transfer to Reserves
126,582
0
88,104
-38,478
-30.40%
Transfer to Capital
312,500
72,511
765,500
-312,500
Total Expense
731,930
316,667
1,193,211
8,280
1.13%
TOTAL WATER SYSTEM
0
-28,301
0
0
0.00%
SOLID WASTE AND FACILITIES MANAGEMENT
Revenue
User Charges
420,377
316,075
374,033
-46,344
-11.02%
Government Grants
487,962
218,755
210,969
-276,993
-56.77%
Other
0
0
0
0
0.00%
Transfer from Reserves
Total Revenue
Expense
0
0
415,000
415,000
100.00%
908,339
534,830
1,000,002
91,663
10.09%
Remuneration
396,163
388,236
266,569
-129,594
-32.71%
Benefits
127,506
62,571
105,991
-21,514
-16.87%
Inter Departmental Transfer
132,606
165,942
153,897
21,292
16.06%
Memberships, Training and Travel
3,925
1,617
3,975
50
1.27%
Communications
13,056
7,309
12,982
-74
-0.57%
Professional and Consulting Fees
96,000
80,313
94,505
-1,495
-1.56%
Solid Waste Management Operations
2,301,393
2,031,476
1,938,235
-363,158
-15.78%
0
5,088
415,000
415,000
100.00%
40,000
151,484
146,582
106,582
266.45%
Total Expense
3,110,649
2,894,037
3,137,736
27,087
0.87%
TOTAL SOLID WASTE MANAGEMENT
2,202,310
2,359,207
2,137,734
-64,575
-2.93%
Total Environmental Services
2,202,310
2,330,906
2,137,734
-64,575
-2.93%
Transfer to Capital
Transfer to Reserves
Explanation of Significant Variances Line 5
Green Funding (ICIP) for Serpentine Piping
Line 13
Utilities Kingston Fees
Line 27/28
Reallocation of Wages/positions to Facilities
Line 22/33/35
Blue Box Changes
Page11127 of 203
TOWNSHIP OF SOUTH FRONT TENAC 2025 Draft Budget Parks, Recreation and Cemeteries Detail
PARKS AND RECREATION PROGRAMS
Revenue
User Charges
Actuals
2024-2025 Budget
2024 Budget
22-Nov-24
2025 Budget
$
$
$
Variance $
%
165,950
207,761
143,600
-22,350
-13.47%
Government Grants
8,000
12,696
6,000
-2,000
-25.00%
Donations
6,725
40,995
5,000
-1,725
-25.65%
Other
0
0
0
0
0.00%
Transfers From Reserves/Reserve Funds
30,000
0
60,000
30,000
100.00%
Total Revenue
210,675
261,452
214,600
3,925
1.86%
Expense
Remuneration
413,160
302,894
440,511
27,352
6.62%
Benefits
83,718
84,127
91,151
7,433
8.88%
Inter Departmental Transfer
2,582
529
248
-2,334
-90.40%
Memberships, Training and Travel
17,850
10,431
16,950
-900
-5.04%
Communications
29,785
25,410
29,025
-760
-2.55%
Professional and Consulting Fees
Parks and Recreation Programs - Operations
Grants
Transfer to Capital
300
0
300
0
0.00%
180,661
285,671
198,190
17,529
9.70%
0
0
0
0
0.00%
30,000
60,943
60,000
30,000
100.00%
Transfer to Reserves
0
0
0
0
0.00%
Total Expense
758,055
770,004
836,375
78,320
10.33%
TOTAL PARKS AND RECREATION PROGRAMS
547,380
508,553
621,775
74,395
13.59%
PARKS AND RECREATION FACILITIES
BUILDINGS
Revenue
User Charges
1,000
1,590
0
-1,000
-100.00%
Licenses, Permits and Rents
10,810
11,196
12,310
1,500
13.88%
Government Grants
0
0
0
0
0.00%
Grants from Other Municipalities
0
0
0
0
0.00%
Donations/Contributions
0
50
5,000
5,000
100.00%
Other
4,400
0
4,400
0
0.00%
Transfer from Reserves
455,000
0
0
-455,000
-100.00%
Total Revenue
471,210
12,836
21,710
-449,500
-95.39%
Expense
Remuneration
0
52,110
0
0
0.00%
Benefits
0
0
0
0
0.00%
9,504
17,616
12,687
3,183
33.49%
900
1,129
1,700
800
88.89%
8,365
0
5,000
-3,365
-40.23%
Inter Departmental Transfer
Communications
Professional and Consulting Fees
Building Operations
226,161
189,253
203,392
-22,769
-10.07%
Transfer to Capital
464,000
461,665
206,000
-258,000
-55.60%
Total Expense
708,931
721,773
428,779
-280,152
-39.52%
TOTAL BUILDINGS
237,721
708,937
407,069
169,348
71.24%
Page12128 of 203
TOWNSHIP OF SOUTH FRONT TENAC 2025 Draft Budget Parks, Recreation and Cemeteries Detail
PARKS
Revenue
User Charges
Licenses, Permits and Rents
Government Grants
Actuals
2024-2025 Budget
2024 Budget
22-Nov-24
2025 Budget
$
$
$
Variance $
%
3,000
5,031
5,000
2,000
66.67%
270
368
300
30
11.11%
0
0
0
0
0.00%
Donations/Contributions
0
16,000
0
0
0.00%
Other
0
0
0
0
0.00%
Transfer from Reserves
1,124,000
0
455,000
-669,000
-59.52%
Total Revenue
1,127,270
21,400
460,300
-666,970
-59.17%
Expense
Remuneration
843
115,823
56,669
55,826
6619.61%
Benefits
323
963
6,883
6,560
2028.02%
Inter Departmental Transfer
29,883
70,139
35,011
5,128
17.16%
Professional and Consulting Fees
5,500
0
3,200
-2,300
-41.82%
Parks Operations
206,916
145,506
194,965
-11,950
-5.78%
Transfer to Capital
1,115,000
350,538
495,000
-620,000
-55.61%
Total Expense
1,358,466
682,968
791,729
-566,737
-41.72%
TOTAL PARKS
231,196
661,568
331,429
100,233
43.35%
ARENA
Revenue
User Charges
0
0
0
0
0.00%
Transfer from Reserves
0
0
0
0
100.00%
Total Revenue
0
0
0
0
100.00%
Expense
Remuneration
Transfer to Others
250
400
0
-250
-100.00%
140,985
156,587
209,144
68,159
48.35%
Transfer to Reserves
0
0
0
0
0.00%
Total Expense
141,235
156,987
209,144
67,909
48.08%
TOTAL ARENA
141,235
156,987
209,144
67,909
48.08%
TOTAL PARKS AND RECREATION FACILITIES
610,151
1,527,493
947,642
337,491
55.31%
TOTAL PARKS AND RECREATION
1,157,531
2,036,045
1,569,417
411,886
35.58%
CEMETERIES
Revenue
User Charges
40,200
26,251
71,530
31,330
77.94%
Investment Income
14,000
11,791
14,000
0
0.00%
Donations
0
0
0
0
100.00%
Transfer From Reserves
0
0
0
0
100.00%
Total Revenue
54,200
38,042
85,530
31,330
57.80%
Expense
Cemetery Operations
71,360
78,073
85,249
13,889
19.46%
Transfer to Capital
0
0
0
0
100.00%
Transfer to Reserves
0
0
0
0
100.00%
Total Expense
71,360
78,073
85,249
13,889
19.46%
TOTAL CEMETERIES
17,160
40,031
-281
-17,441
-101.64%
86
Total Parks, Recreation and Cemeteries
1,174,691
2,076,077
1,569,135
394,444
33.58%
Explanation of Significant Variances Line 3
Swim/ Daycamp Program Fees
Line 10/11
Annualize LEO-Facilities
Line 16
Lakes and Trails, Music Festival, Canada Day, Insurance
Line 52/53
Reallocation of Positions
Line 67
Arena preliminary budget
Line 75/81
Forecasted Fee adjustment/Interment cost contract increase
Page13129 of 203
TOWNSHIP OF SOUTH FRONTENAC 2025 Draft Budget Development Services
2024-2025 Budget
Actuals
Variance
2024 Budget
22-Nov-24
2025 Budget
$
$
$
$
%
328,000
199,727
305,000
-23,000
-7.01%
Development Services
Revenue
User Charges
Government Grants
0
0
0
0
0.00%
Grants from Other Municipalities
0
0
0
0
0.00%
Transfer from Reserves
145,000
0
25,000
-120,000
-82.76%
Total Revenue
473,000
199,727
330,000
-143,000
-30.23%
Expense
Remuneration
530,011
452,491
558,421
28,410
5.36%
Benefits
177,292
147,465
182,353
5,061
2.85%
Inter Departmental Transfer
0
0
0
0
0.00%
Memberships, Training and Travel
49,400
12,705
40,400
-9,000
-18.22%
Communications
8,315
7,892
8,750
435
5.23%
Professional and Consulting Fees
37,200
52,267
37,200
0
0.00%
Operations
75,746
50,678
72,639
-3,106
-4.10%
Transfer to Capital
145,000
83,555
25,000
-120,000
-82.76%
Transfer to Reserves
0
0
0
0
0.00%
Total Expense
1,022,964
807,053
924,763
-98,200
-9.60%
TOTAL Planning and Development
549,964
607,326
594,763
44,800
8.15%
Explanation of Significant Variances Line 3
Adjusted Forecasted Planning Fees
Township of South Frontenac 2025 Capital Budget with Financing
Detailed Sheet page # 1 2 3
4 5 6 7 8 9 10 11 12 13 14
Project #
22-02 23-12 22-06
25-11 25-12 25-14 25-16 25-18 25-90 25-91 25-92 25-93 25-94 25-95
2025 PreApproved
Project * CORPORATE SERVICES Gateway Signage (2022-2025 Project) Wayfinding Sign Fabrication and Installation (2022-2025 Project) Verona Housing - Design and studies TOTAL CORPORATE SERVICES FIRE Hoses and Appliances ATV w Trailer replacement x 2 Rapid Response Unit Replacement x 2 Wildland Truck Replacement Fire Chief Vehicle Replacement Marine 361 Equipment Bunker Gear Replacement x 8 Mobile Gear Racks x 3 Drone - new Dry-Hydrant Replacement Paid on Call Firefighter Recruitment (up to 30)
Yes Yes
TOTAL FIRE
Yes
Previous Year Budget Approved towards Project
2025 Budget
14
Community Building Development Fund (formerly Federal Gas Charges
2026 Budget
Working Funds
Parkland
Tax)
166,666 533,334 175,000 875,000
53,334 266,667 100,000 420,001
0
20,000 50,000 180,000 90,000 75,000 22,000 38,240 21,000 10,500 35,000 280,000 821,740
0
210,000 600,000 340,000 15,000 10,000 40,000 1,215,000
Asset Invesment Reserve
Infrastructure
Road 38
Arterial
53,334 186,667 0
0
0
0
100,000 100,000
0
240,001
0
35,000
0
0
0
40,000 40,000
0
0
2,190,368
1,062,495
20,000
20,000
0
0
0
280,000 280,000
0
0
0
0
0
35,000
PUBLIC SERVICES 25-21 25-23 25-24 25-25 25-26 25-27
21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38
23-92 22-18 23-46A 23-51 23-56 24-41A 24-41B 24-41C 25-31 25-32 25-33 25-34 25-35 25-36 25-37 25-38 25-39 25-40
FLEET Three (3) 1/2 Ton Trucks Replacement Grader Replacement Wheel Loader Replacement Tools and Equipment for Service Vehicle Diagnostic tool for vehicles and heavy equipment Towable gravel compactor subtotal - Fleet ROADS INFRASTRUCTURE *Road 38/Boyce Road Sidewalk and Storm Sewers Eagle Creek Bridge (B31) Reconstruction Shale Road Culvert Pleasant Valley Municipal Drain - Drainage Act Maintenance Road 38 Design and Construction (Kingston Rd to Murton Road) Craig Road Westport Road Florida Road Surface Treatment (LCB) Preservation Pre-Engineering Roads 2026 Gravel Road Reconstruction Program 2025 Murvale Creek Culvert Buck Bay Road - Unnamed Bridge Repair Buck Lake Culvert (OSIM) Design Detailed Assessment Petworth Bridge Detailed Assessment Opinicon Bridge Pre-Engineering Bridges 2026 Arterial Road Culvert Replacement Program subtotal - Roads Infrastructure SYDENHAM WATER
- Deferred Project
14,800 50,000 20,000 35,250 220,000 54,900 10,800 9,300
415,050
873,000 1,053,500 22,000 7,800 4,315,000 1,095,000 1,351,700 291,100 950,000 136,400 340,000 831,000 49,000 35,000 19,500 14,000 50,000 250,000 10,811,000
275,000
1,485,000
778,500
500,000 600,000 300,000
285,551 950,000 136,400
625,000
831,000
17,000
2,127,000
1,400,000
275,000
0
0
2,150,451
0
3,021,368
1,062,495
Page 130 of 203
15 16 17 18 19 20
Township of South Frontenac 2025 Capital Budget with Financing
Detailed Sheet page # 1 2 3
4 5 6 7 8 9 10 11 12 13 14
Project #
Project *
22-02 23-12 22-06
CORPORATE SERVICES Gateway Signage (2022-2025 Project) Wayfinding Sign Fabrication and Installation (2022-2025 Project) Verona Housing - Design and studies TOTAL CORPORATE SERVICES
25-11 25-12 25-14 25-16 25-18 25-90 25-91 25-92 25-93 25-94 25-95
FIRE Hoses and Appliances ATV w Trailer replacement x 2 Rapid Response Unit Replacement x 2 Wildland Truck Replacement Fire Chief Vehicle Replacement Marine 361 Equipment Bunker Gear Replacement x 8 Mobile Gear Racks x 3 Drone - new Dry-Hydrant Replacement Paid on Call Firefighter Recruitment (up to 30)
2025 PreApproved Yes Yes
TOTAL FIRE
Yes
Previous Year Budget Approved towards Project
2025 Budget
166,666 533,334 175,000 875,000
53,334 266,667 100,000 420,001
0
20,000 50,000 180,000 90,000 75,000 22,000 38,240 21,000 10,500 35,000 280,000 821,740
0
210,000 600,000 340,000 15,000 10,000 40,000 1,215,000
15
Fire Equipment
Facilities
Public Services Equipment
Landfill Closure
Sydenham Water Reserve
Other
Taxation
Notes
80,000 Red Grant Program - 80k per year 2023-2025 0
0
0
0
0
20,000 50,000 180,000 90,000 75,000
453,240
80,000
22,000
38,240
0
0
21,000 10,500
0
0
0
53,500
0
PUBLIC SERVICES 25-21 25-23 25-24 25-25 25-26 25-27
21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38
23-92 22-18 23-46A 23-51 23-56 24-41A 24-41B 24-41C 25-31 25-32 25-33 25-34 25-35 25-36 25-37 25-38 25-39 25-40
FLEET Three (3) 1/2 Ton Trucks Replacement Grader Replacement Wheel Loader Replacement Tools and Equipment for Service Vehicle Diagnostic tool for vehicles and heavy equipment Towable gravel compactor subtotal - Fleet ROADS INFRASTRUCTURE *Road 38/Boyce Road Sidewalk and Storm Sewers Eagle Creek Bridge (B31) Reconstruction Shale Road Culvert Pleasant Valley Municipal Drain - Drainage Act Maintenance Road 38 Design and Construction (Kingston Rd to Murton Road) Craig Road Westport Road Florida Road Surface Treatment (LCB) Preservation Pre-Engineering Roads 2026 Gravel Road Reconstruction Program 2025 Murvale Creek Culvert Buck Bay Road - Unnamed Bridge Repair Buck Lake Culvert (OSIM) Design Detailed Assessment Petworth Bridge Detailed Assessment Opinicon Bridge Pre-Engineering Bridges 2026 Arterial Road Culvert Replacement Program subtotal - Roads Infrastructure SYDENHAM WATER
14,800 50,000 20,000 35,250 220,000 54,900 10,800 9,300
415,050
873,000 1,053,500 22,000 7,800 4,315,000 1,095,000 1,351,700 291,100 950,000 136,400 340,000 831,000 49,000 35,000 19,500 14,000 50,000 250,000 10,811,000
210,000 600,000 340,000 15,000 10,000 0
0
1,150,000
0
0
25,000
22,000
495,000 291,100
0
7,800 562,137 County-FGT 766,149 OCIF
340,000
0
0
0
0
0
49,000 35,000 19,500 14,000 50,000 250,000 1,565,600
1,336,086
Page 131 of 203
15 16 17 18 19 20
Township of South Frontenac 2025 Capital Budget with Financing
Detailed Sheet page #
Project #
Project *
2025 PreApproved
Previous Year Budget Approved towards Project
Yes
2025 Budget
22-54 25-61 25-62
42 43
25-86 25-87
44 45
23-08 25-50
Replace Serpentine Piping Sydenham Drinking Water System - Treatment Sydenham Drinking Water System - Storage subtotal - Sydenham Water SOLID WASTE Loughborough WDS - New Waste Transfer Facilities Landfill Compactor - Used subtotal - Solid Waste FACILITIES Townhall Expansion - Furniture Station 7 - Washroom - Cinderella Toilet and shower
46
25-51
Joint Fire Hall & OPP Station-Design
47 48 49 50 51
25-52 25-54 25-56 25-57 25-58
Bedford Garage Site Works Station 2- Burridge - Exterior Upgrades Keeley Garage Pressure Washer Portland Garage Steel Roof Replacement Storrington Garage Oil/Grit Seperator
25-59
Townhall - Charging Stations
350,000
25-60
Cenotaph landscaping - Sydenham subtotal - Facilities RECREATION Sydenham Point Accessible Washroom Upgrades Centennial Park - New Accessible Washrooms Design and Build Keeley/Bowes Diamond Upgrades Bellrock & Petworth Parkette Conceptual Design Shipyards Boat Ramp Rehabilitation Battersea Ball Park Pavillion Centennial Park - Baseball Diamond Rehabilitation *Harris Park - Playground Rehabilitation and Accessibility Upgrades Bleachers - 7 sets - Gerald Ball (2), Point Park(3), Inverary(2) Centennial Park Upgrades (Tree Planting $20,000 deferred to 2026) subtotal - Recreation TOTAL PUBLIC SERVICES
60,000 929,100
54 55 56 57 58 59 60 61 62 63
24-55 24-56 24-68 24-70 24-72 25-55 25-66 25-67 25-69 25-70
64
25-78
DEVELOPMENT SERVICES Collins / Glenvale Creek flood hazard mapping project - CRCA joint project TOTAL DEVELOPMENT SERVICES Total
Community Building Development Fund (formerly Federal Gas Charges
2026 Budget
Parkland
Tax)
39 40 41
52 53
16
Working Funds
Asset Invesment Reserve
Infrastructure
Road 38
Arterial
0
700,000 58,500 7,000 765,500
0
0
0
0
0
0
0
0
0
0
65,000 350,000 415,000
0
0
0
0
0
350,000 350,000
0
0
0
250,000
150,000
250,000
64,100 15,000 20,000 60,000 40,000
95,000
125,000
0
0
0
0
3,825,000
3,825,000 30,000 30,000 208,000 15,000 110,000
50,000 20,000
125,000 245,000
250,000
0
0
550,000
150,000
393,000 4,633,050
20,000 150,000 37,000 15,000 25,000 95,000 250,000 104,000 91,000 18,000 701,000 14,836,600
20,000 570,000 2,942,000
150,000 1,800,000
0 275,000
18,000 55,000 55,000
0 125,000
0 2,500,451
0 40,000
0 3,021,368
0 1,062,495
0 5,508,050
25,000 25,000 16,103,341
0 2,962,000
0 1,800,000
0 275,000
0 55,000
25,000 25,000 670,001
0 2,500,451
0 175,000
0 3,021,368
0 1,062,495
37,000
- Deferred Projects
Page 132 of 203
Township of South Frontenac 2025 Capital Budget with Financing
Detailed Sheet page #
Project #
Project *
39 40 41
22-54 25-61 25-62
42 43
25-86 25-87
44 45
23-08 25-50
Replace Serpentine Piping Sydenham Drinking Water System - Treatment Sydenham Drinking Water System - Storage subtotal - Sydenham Water SOLID WASTE Loughborough WDS - New Waste Transfer Facilities Landfill Compactor - Used subtotal - Solid Waste FACILITIES Townhall Expansion - Furniture Station 7 - Washroom - Cinderella Toilet and shower
2025 PreApproved
Previous Year Budget Approved towards Project
Yes
2025 Budget
0
0
65,000 350,000 415,000
0
50,000 20,000
50,000 20,000
46
25-51
Joint Fire Hall & OPP Station-Design
250,000
47 48 49 50 51
25-52 25-54 25-56 25-57 25-58
Bedford Garage Site Works Station 2- Burridge - Exterior Upgrades Keeley Garage Pressure Washer Portland Garage Steel Roof Replacement Storrington Garage Oil/Grit Seperator
64,100 15,000 20,000 60,000 40,000
52 53
25-59
Townhall - Charging Stations
350,000
25-60
Cenotaph landscaping - Sydenham subtotal - Facilities RECREATION Sydenham Point Accessible Washroom Upgrades Centennial Park - New Accessible Washrooms Design and Build Keeley/Bowes Diamond Upgrades Bellrock & Petworth Parkette Conceptual Design Shipyards Boat Ramp Rehabilitation Battersea Ball Park Pavillion Centennial Park - Baseball Diamond Rehabilitation *Harris Park - Playground Rehabilitation and Accessibility Upgrades Bleachers - 7 sets - Gerald Ball (2), Point Park(3), Inverary(2) Centennial Park Upgrades (Tree Planting $20,000 deferred to 2026) subtotal - Recreation TOTAL PUBLIC SERVICES
60,000 929,100
54 55 56 57 58 59 60 61 62 63
24-55 24-56 24-68 24-70 24-72 25-55 25-66 25-67 25-69 25-70
64
25-78
DEVELOPMENT SERVICES Collins / Glenvale Creek flood hazard mapping project - CRCA joint project TOTAL DEVELOPMENT SERVICES Total
Fire Equipment
Facilities
700,000 58,500 7,000 765,500
3,825,000
3,825,000 30,000 30,000 208,000 15,000 110,000
17
0
Public Services Equipment
0
0
Landfill Closure
Sydenham Water Reserve
0
Other
Taxation
Notes
186,690 58,500 7,000 252,190
513,310 Green Funding 73.33%
0
513,310
0
0
0
65,000 0
0
65,000
64,100 15,000
20,000 60,000
40,000
225,000 ChargeON funding $225,000, ZEVIP $90,000 pending 60,000 185,000
0
0
0
0
144,100
225,000
393,000 4,633,050
20,000 150,000 37,000 15,000 25,000 95,000 250,000 104,000 91,000 18,000 701,000 14,836,600
250,000 435,000
0 0
0 1,150,000
0 65,000
0 252,190
241,000 1,975,700
5,000 2,079,396
0 5,508,050
25,000 25,000 16,103,341
0 435,000
0 453,240
0 1,150,000
0 65,000
0 252,190
0 2,029,200
0 2,159,396
20,000
15,000 25,000 90,000
250,000
5,000 Fundraising $5,000 Applied for grant 50% funding
91,000
Page 133 of 203
Page18134 of 203 RESERVES & RESERVE FUNDS FORECAST - 2025 Budget PROJECTED BALANCE
END OF YEAR 2024 Fiscal Working Funds COVID/ Safe Restart Equipment and Infrastructure General Asset Investment Reserve Infrastructure Climate Change Vertical Facilities/Property Recreation Rolling Capital - Building Department Capital - Fire Department Capital - Roads Department Linear Cemetery Lot Addition Arterial Stabilization Wages-Fire Department Building Department Policing Costs Winter Control - Roads Dept. Recycling Planning Revenue-Severance Appl. Water Reserve Fund Sub-total OBLIGATORY RESERVE FUNDS 5% Parkland Development Charges Environmental Enhancement Community Building Fund (formerly Federal Gas Tax) Subdivider Contributions Cannabis Legalization Fund-OCLIF Sub-total RESERVE FUNDS & TRUSTS Election Highway #38 Reconstruction Landfill Closure Trusts Fire Donations Portland Historical Grant Memorial OHRP Cemetery - PC Cemetery M. Burns Trust Cemetery - Monument PC Cemetery - Monument PC Inc Sub-total TOTAL
2025 Budgeted Expenditures
CAPITAL FUND
573,739 219,515
670,001
541,051 4,101 23,877 439,579 3,026
REVENUE FUND
PROJECTED BALANCE
TAXATION BDGTD
END OF YEAR 2025
OTHER REVENUES
373,320
207,621 219,515
2,500,451 175,000
2,794,341 275,000 100,000
834,941 104,101 123,877
435,000
344,329
348,908 3,026
29,650 191,917 472,181
453,240 1,150,000
40,000 511,226 700,000
69,650 249,903 22,181
43,538 4,370,000
3,021,368
250,000
43,538 1,598,632
34,976 1,844,550 848,773 866,337 273,641 66,784 20,000 1,707,902 12,475,138
69,437
Contribution to Reserve in 2025 Budget
177,736 50,000 106,582
252,190 8,657,250
297,173
88,104 5,582,902
0
34,976 1,666,814 798,773 866,337 380,223 66,784 20,000 1,543,816 9,203,617
-46,132 668,025 150,919
55,000 1,800,000
150,000 1,355,266
48,868 223,291 150,919
-363,832
837,137
1,223,297
22,328
2,728,563
37,171 46,294 528,870
37,171 46,294 453,244
2,692,137
84,450 1,062,495 434,548
1,062,495 65,000
0
0
25,000
109,450 0 409,548
40,000
23,239 40,584 28,975
23,239 40,584 28,975
4,175 602,205 25,000 82,758 36,335 2,424,764 15,353,146
4,175 602,205 25,000 82,758 36,335 1,362,269 11,094,756
1,127,495 12,476,882
0 297,173
65,000 8,376,465
0 0
Township of South Frontenac 2024 Capital Budget with Financing
Detailed Project # Project * Sheet page # 1 2 3
4 5 6 7 8 9 10 11 12 13 14
22-02 23-12 22-06
CORPORATE SERVICES Gateway Signage (2022-2025 Project) Wayfinding Sign Fabrication and Installation (2022-2025 Project) Verona Housing - Design and studies TOTAL CORPORATE SERVICES
25-11 25-12 25-14 25-16 25-18 25-90 25-91 25-92 25-93 25-94 25-95
FIRE Hoses and Appliances ATV w Trailer replacement x 2 Rapid Response Unit Replacement x 2 Wildland Truck Replacement Fire Chief Vehicle Replacement Marine 361 Equipment Bunker Gear Replacement x 8 Mobile Gear Racks x 3 Drone - new Dry-Hydrant Replacement Paid on Call Firefighter Recruitment (up to 30) TOTAL FIRE
25-21 25-23 25-24 25-25 25-26 25-27
21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38
23-92 22-18 23-46A 23-51 23-56 24-41A 24-41B 24-41C 25-31 25-32 25-33 25-34 25-35 25-36 25-37 25-38 25-39 25-40
Yes Yes
Yes
Previous Year Budget Approved towards Project
2025 Budget
166,666 533,334 175,000 875,000
53,334 266,667 100,000 420,001
0
20,000 50,000 180,000 90,000 75,000 22,000 38,240 21,000 10,500 35,000 280,000 821,740
0
210,000 600,000 340,000 15,000 10,000 40,000 1,215,000
14,800 50,000 20,000 35,250 220,000 54,900 10,800 9,300
873,000 1,053,500 22,000 7,800 4,315,000 1,095,000 1,351,700 291,100 950,000 136,400 340,000 831,000 49,000 35,000 19,500 14,000 50,000 250,000
2026 Budget
Notes
Red Grant Program - 80k per year 2023-2025 0 20,000
20,000
0
0
0
1,485,000
625,000 17,000
Page 135 of 203
15 16 17 18 19 20
PUBLIC SERVICES FLEET Three (3) 1/2 Ton Trucks Replacement Grader Replacement Wheel Loader Replacement Tools and Equipment for Service Vehicle Diagnostic tool for vehicles and heavy equipment Towable gravel compactor subtotal - Fleet ROADS INFRASTRUCTURE *Road 38/Boyce Road Sidewalk and Storm Sewers Eagle Creek Bridge (B31) Reconstruction Shale Road Culvert Pleasant Valley Municipal Drain - Drainage Act Maintenance Road 38 Design and Construction (Kingston Rd to Murton Road) Craig Road Westport Road Florida Road Surface Treatment (LCB) Preservation Pre-Engineering Roads 2026 Gravel Road Reconstruction Program 2025 Murvale Creek Culvert Buck Bay Road - Unnamed Bridge Repair Buck Lake Culvert (OSIM) Design Detailed Assessment Petworth Bridge Detailed Assessment Opinicon Bridge Pre-Engineering Bridges 2026 Arterial Road Culvert Replacement Program
2025 PreApproved
Page 1 of 2 2024-12-02
Township of South Frontenac 2024 Capital Budget with Financing
Detailed Project # Project * Sheet page #
2025 PreApproved
Page 2 of 2 2024-12-02
Previous Year Budget Approved towards Project
2025 Budget
2026 Budget
Notes
39 40 41
22-54 25-61 25-62
42 43
25-86 25-87
44 45
23-08 25-50
subtotal - Roads Infrastructure SYDENHAM WATER Replace Serpentine Piping Sydenham Drinking Water System - Treatment Sydenham Drinking Water System - Storage subtotal - Sydenham Water SOLID WASTE Loughborough WDS - New Waste Transfer Facilities Landfill Compactor - Used subtotal - Solid Waste FACILITIES Townhall Expansion - Furniture Station 7 - Washroom - Cinderella Toilet and shower
46
25-51
Joint Fire Hall & OPP Station-Design
250,000
150,000
47 48 49 50 51
25-52 25-54 25-56 25-57 25-58
Bedford Garage Site Works Station 2- Burridge - Exterior Upgrades Keeley Garage Pressure Washer Portland Garage Steel Roof Replacement Storrington Garage Oil/Grit Seperator
64,100 15,000 20,000 60,000 40,000
95,000
25-59
Townhall - Charging Stations
350,000
25-60
Cenotaph landscaping - Sydenham subtotal - Facilities RECREATION Sydenham Point Accessible Washroom Upgrades Centennial Park - New Accessible Washrooms Design and Build Keeley/Bowes Diamond Upgrades Bellrock & Petworth Parkette Conceptual Design Shipyards Boat Ramp Rehabilitation Battersea Ball Park Pavillion Centennial Park - Baseball Diamond Rehabilitation *Harris Park - Playground Rehabilitation and Accessibility Upgrades Bleachers - 7 sets - Gerald Ball (2), Point Park(3), Inverary(2) Centennial Park Upgrades (Tree planting $20,000 deferred to 2026) subtotal - Recreation TOTAL PUBLIC SERVICES
52 53
54 55 56 57 58 59 60 61 62 63
24-55 24-56 24-68 24-70 24-72 25-55 25-66 25-67 25-69 25-70
64
25-78
DEVELOPMENT SERVICES Collins / Glenvale Creek flood hazard mapping project - CRCA joint project TOTAL DEVELOPMENT SERVICES Total
415,050
10,811,000
0
700,000 58,500 7,000 765,500
0
0
0
65,000 350,000 415,000
0
0
Yes
3,825,000
3,825,000 30,000 30,000 208,000 15,000 110,000
2,127,000
0 Green Funding 73.33%
50,000 20,000
60,000 929,100
ChargeON funding $225,000, ZEVIP $90,000 pending 245,000
0
393,000 4,633,050
20,000 150,000 37,000 15,000 25,000 95,000 250,000 104,000 91,000 18,000 701,000 14,836,600
20,000 570,000 2,942,000
0 0
0 5,508,050
25,000 25,000 16,103,341
0 2,962,000
0 0
550,000
Fundraising $5,000 Applied for grant 50% funding
Page 136 of 203
Capital Project Detail Sheet
1
Project Information Project Name: Gateway Signage
Type of Project: Other
Project Number: 22-02
Basis for Activity: Growth Related
Department: 1210 - CAO
Relationship to Strategic Plan: Old Priority #4 - Be a catalyst for the creation of vibrant, complete communities
Description: Installation of gateway signage at Township border entry points.
Rationale: Gateway signs are important beacons where visitors and residents will easily recognize they are entering South Frontenac and what it represents.
(Pre-approved in 2022) The use of updated gateway signage with South Frontenac’s new brand will promote attention to the natural assets and opportunities the Township provides. Staff Contact: Louise Fragnito (lfragnito)
Project Finances
Actuals Description 80100 - Equipment Total
Expensed to Current Year Expenses / Expenditure
Budget Total Project
Prior Approved
2025
2026
2027
2028
2029
12,703
220,000
166,666
53,334
0
0
0
0
12,703
220,000
166,666
53,334
0
0
0
0
Page 137 of 203
Capital Project Detail Sheet
2
Project Information Project Name: Wayfinding Sign Fabrication & Installation
Type of Project: Other
Project Number: 23-12
Basis for Activity: Other
Department: 1220 - Communications
Relationship to Strategic Plan: Old Priority #4 - Be a catalyst for the creation of vibrant, complete communities
Description: Wayfinding Signage Fabrication and Installation.
Rationale: Wayfinding signage will be prepared and installed in critical locations that will provide a clear, consistent and highly navigable system that will inform and direct visitors and residents to local businesses, services, attractions and recreational amenities and assets.
(Pre-approved in 2022)
The signage will use the new branding that will provide continuity in linking tourism and economic development in the Township. Staff Contact: Louise Fragnito (lfragnito)
Project Finances
Actuals Description 53310 - Materials
Budget
Expensed to Current Year
Total Project
Prior Approved
2025
2026
2027
2028
2029
Expenses / Expenditure
97,658
0
0
0
0
0
0
0
55290 - Contracted Services Expenses / Expenditure
0
800,000
533,333
266,667
0
0
0
0
97,658
800,000
533,333
266,667
0
0
0
0
Total 41500 - Grnts-Prov
Revenues / Funding Source
0
0
0
0
0
0
0
0
49650 - Reserve
Revenues / Funding Source
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Total
Page 138 of 203
Capital Project Detail Sheet
3
Project Information Project Name: Seniors & Affordable Housing - Project Design & Management Consultant
Type of Project: Other
Project Number: 22-06
Basis for Activity: Service Level Change
Department: 1210 - CAO
Relationship to Strategic Plan: Old Priority #2 - Promote and support growth that meets the community’s needs
Description: Continue to advance work on the Verona Housing including architectural plans, zoning changes, public communication and other items in parallel to the servicing project.
Rationale: Continue to work in parallel with the servicing project for the Verona site.
Staff Contact: Louise Fragnito (lfragnito)
Project Finances
Actuals Description 55330 - Consultant Total
Expensed to Current Year Expenses / Expenditure
Budget Total Project
Prior Approved
2025
2026
2027
2028
2029
65,139
275,000
175,000
100,000
0
0
0
0
65,139
275,000
175,000
100,000
0
0
0
0
Page 139 of 203
Capital Project Detail Sheet
4
Project Information Project Name: Hoses and Appliances
Type of Project: Equipment
Project Number: 25-11
Basis for Activity: Other
Department: 2100 - Fire
Relationship to Strategic Plan: Priority #2 - Municipal Service Excellence
Description: Replacement Hoses and Appliances
Rationale: Part of the SFFR Fleet and Equipment Asset Management Plan includes the annual replacement hoses and appliances for structural firefighting operations. Annual costs and investments are spread out to reduce significant one time costs.
Staff Contact: Del Blakney (dblakney)
Project Finances
Actuals Description 80100 - Equipment Total
Budget
Expensed to Current Year Expenses / Expenditure
Total Project
Prior Approved
2025
2026
2027
2028
2029
0
100,000
0
20,000
20,000
20,000
20,000
20,000
0
100,000
0
20,000
20,000
20,000
20,000
20,000
Page 140 of 203
Capital Project Detail Sheet
5
Project Information Project Name: Replacement of Two (2) ATV’s and Trailers
Type of Project: Light Weight
Project Number: 25-12
Basis for Activity: Asset Renewal
Department: 2100 - Fire
Relationship to Strategic Plan: Priority #2 - Municipal Service Excellence
Description: Replace existing 2003 Yamaha 400cc ATV and Trailer.
Rationale: Ensure the organizational capacity to deliver cost-effective service with reliable equipment.
Replace existing 2007 Can Am 500 ATV and Trailer.
Staff Contact: Del Blakney (dblakney)
Project Finances
Actuals Description 80105 - Fleet Total
Budget
Expensed to Current Year Expenses / Expenditure
Total Project
Prior Approved
2025
2026
2027
2028
2029
0
50,000
0
50,000
0
0
0
0
0
50,000
0
50,000
0
0
0
0
Page 141 of 203
Capital Project Detail Sheet
6
Project Information Project Name: Replacement of Two (2) Rapid Response Units
Type of Project: Light Weight
Project Number: 25-14
Basis for Activity: Asset Renewal
Department: 2100 - Fire
Relationship to Strategic Plan: Priority #2 - Municipal Service Excellence
Description: Replacement of two (2) rapid response units, Unit U351 -2015 and Unit U381 -2011 pick up trucks.
Rationale: Scheduled replacement based on lifecycle. The existing vehicle (U351) will become a platoon chief vehicle replacing the 2002 pick-up truck (PC304). The existing vehicle (U381) will become a second platoon chief for the north end of the township (PC304A).
Staff Contact: Del Blakney (dblakney)
Project Finances
Actuals Description 80105 - Fleet Total
Budget
Expensed to Current Year Expenses / Expenditure
Total Project
Prior Approved
2025
2026
2027
2028
2029
0
180,000
0
180,000
0
0
0
0
0
180,000
0
180,000
0
0
0
0
Page 142 of 203
Capital Project Detail Sheet
7
Project Information Project Name: Wildland Truck Replacement
Type of Project: Light Weight
Project Number: 25-16
Basis for Activity: Asset Renewal
Department: 2100 - Fire
Relationship to Strategic Plan: Priority #2 - Municipal Service Excellence
Description: 2003 3/4 Ton Pick-up Truck (U342 )used for wildland firefighting. It also pulls an enclosed trailer and ATV with wildland firefighting equipment and rescue equipment for Frontenac Park.
Rationale: Long term plan is to have this truck replace the rapid response unit at station 6 is 2031 and replace the wildland truck with the mini pumper from station 1.
Staff Contact: Del Blakney (dblakney)
Project Finances
Actuals Description 80105 - Fleet Total
Budget
Expensed to Current Year Expenses / Expenditure
Total Project
Prior Approved
2025
2026
2027
2028
2029
0
90,000
0
90,000
0
0
0
0
0
90,000
0
90,000
0
0
0
0
Page 143 of 203
Capital Project Detail Sheet
8
Project Information Project Name: Replacement of Fire Chief vehicle.
Type of Project: Light Weight
Project Number: 25-18
Basis for Activity: Asset Renewal
Department: 2100 - Fire
Relationship to Strategic Plan: Priority #2 - Municipal Service Excellence
Description: Replacement of Fire Chief vehicle.
Rationale: Provide a vehicle that is suitable for transportation of equipment and that can transport contaminated hose and bunker gear.
Staff Contact: Del Blakney (dblakney)
Project Finances
Actuals Description 80105 - Fleet Total
Budget
Expensed to Current Year Expenses / Expenditure
Total Project
Prior Approved
2025
2026
2027
2028
2029
0
75,000
0
75,000
0
0
0
0
0
75,000
0
75,000
0
0
0
0
Page 144 of 203
Capital Project Detail Sheet
9
Project Information Project Name: Marine 361 Equipment
Type of Project: Equipment
Project Number: 25-90
Basis for Activity: Asset Renewal
Department: 2100 - Fire
Relationship to Strategic Plan: Priority #2 - Municipal Service Excellence
Description: Replace aging equipment and standardize the fire boats for consistency.
Rationale: Goal is to standardize equipment by vehicle/asset type. Ensure the two main fire boats have the same equipment for immediate response to north and south areas of township.
Staff Contact: Del Blakney (dblakney)
Project Finances
Actuals Description 80100 - Equipment Total
Budget
Expensed to Current Year Expenses / Expenditure
Total Project
Prior Approved
2025
2026
2027
2028
2029
0
22,000
0
22,000
0
0
0
0
0
22,000
0
22,000
0
0
0
0
Page 145 of 203
Capital Project Detail Sheet
10
Project Information Project Name: Bunker Gear Replacement - 8 Suits
Type of Project: Equipment
Project Number: 25-91
Basis for Activity: Asset Renewal
Department: 2100 - Fire
Relationship to Strategic Plan: Priority #1 - Sustainable Long-Term Prosperity
Description: Annual Bunker Gear Replacement - 8 Suits.
Rationale: Annual replacement and renewal ensures SFFR is meeting the requirements of NFPA 1851 for 10 year lifespan of Structural Firefighting Bunker Gear.
Staff Contact: Del Blakney (dblakney)
Project Finances
Actuals Description 80100 - Equipment Total
Budget
Expensed to Current Year Expenses / Expenditure
Total Project
Prior Approved
2025
2026
2027
2028
2029
0
38,240
0
38,240
0
0
0
0
0
38,240
0
38,240
0
0
0
0
Page 146 of 203
Capital Project Detail Sheet
11
Project Information Project Name: Mobile Gear Racks
Type of Project: Equipment
Project Number: 25-92
Basis for Activity: Other
Department: 2100 - Fire
Relationship to Strategic Plan: Priority #2 - Municipal Service Excellence
Description: Mobile Gear Racks for stations 2, 3, 4.
Rationale: Station 2, 3 and 4 currently are using hooks off the wall. This provides updated racks similar to Station 1, 5, 6, 7 & 8 for firefighter use.
Staff Contact: Del Blakney (dblakney)
Project Finances
Actuals Description 80100 - Equipment Total
Budget
Expensed to Current Year Expenses / Expenditure
Total Project
Prior Approved
2025
2026
2027
2028
2029
0
21,000
0
21,000
0
0
0
0
0
21,000
0
21,000
0
0
0
0
Page 147 of 203
Capital Project Detail Sheet
12
Project Information Project Name: Drone
Type of Project: Equipment
Project Number: 25-93
Basis for Activity: Service Level Change
Department: 2100 - Fire
Relationship to Strategic Plan: Priority #2 - Municipal Service Excellence
Description: Drone for Squad 381.
Rationale: Provide a drone on each squad as currently only one available for the entire township. Goal is to standardize squad equipment for immediate response to north and south areas of township.
Staff Contact: Del Blakney (dblakney)
Project Finances Expense Type 80100 - Equipment
Operating Impact Description
FTE
Annual Batteries and Service
0.00
2025
2026 0
Actuals Description 80100 - Equipment Total
100
2028 100
2029 100
100
Budget
Expensed to Current Year Expenses / Expenditure
2027
Total Project
Prior Approved
2025
2026
2027
2028
2029
0
10,500
0
10,500
0
0
0
0
0
10,500
0
10,500
0
0
0
0
Page 148 of 203
Capital Project Detail Sheet
13
Project Information Project Name: Dry-Hydrant Replacement
Type of Project: Other
Project Number: 25-94
Basis for Activity: Asset Renewal
Department: 2100 - Fire
Relationship to Strategic Plan: Priority #2 - Municipal Service Excellence
Description: Replacement of dry hydrant as current one is not operational.
Rationale: Dry hydrants provide quick efficient access to high volumes of water to support the filling of tankers for firefighting. Dry hydrants are important assets needed to maintain our water tanker shuttle accreditation and provide residents and business with the best possible rural fire insurance rates.
Staff Contact: Del Blakney (dblakney)
Project Finances
Actuals Description 80300 - Land Improvements Total
Budget
Expensed to Current Year Expenses / Expenditure
Total Project
Prior Approved
2025
2026
2027
2028
2029
0
35,000
0
35,000
0
0
0
0
0
35,000
0
35,000
0
0
0
0
Page 149 of 203
Capital Project Detail Sheet
14
Project Information Project Name: Paid on call Fire Fighter Recruitment (30)
Type of Project: Other
Project Number: 25-95
Basis for Activity: Asset Renewal
Department: 2100 - Fire
Relationship to Strategic Plan: Priority #2 - Municipal Service Excellence
Description: Recruitment for up to (30) Paid on Call Firefighters for South Frontenac Fire & Rescue (SFFR)
Rationale: Currently level of service is set at 110 (firefighters, captains, platoon chiefs). Currently we have 96 of which 14 persons attend less than 20% of the time and 4 are on a leave. Minimum commitment for employment is 33%.
Staff Contact: Del Blakney (dblakney)
Project Finances
Actuals Description 80500 - Non-PSAB Total
Budget
Expensed to Current Year Expenses / Expenditure
Total Project
Prior Approved
2025
2026
2027
2028
2029
0
280,000
0
280,000
0
0
0
0
0
280,000
0
280,000
0
0
0
0
Page 150 of 203
Capital Project Detail Sheet
15
Project Information Project Name: Three (3) 1/2 Ton Trucks
Type of Project: Equipment
Project Number: 25-21
Basis for Activity: Asset Renewal
Department: 3000 - Overhead
Relationship to Strategic Plan: Priority #1 - Sustainable Long-Term Prosperity
Description: Three (3) 1/2 Ton truck replacements for units:
Rationale: Asset renewal in accordance with 9 year life cycle replacement schedule in long term financial plan.
16-34 (Asset ID 33110) 16-09 (Asset ID 33111) 17-51 (Asset ID 33112). Staff Contact: Brian Kirk (bkirk)
Project Finances
Actuals Description 80105 - Fleet Total
Budget
Expensed to Current Year Expenses / Expenditure
Total Project
Prior Approved
2025
2026
2027
2028
2029
0
210,000
0
210,000
0
0
0
0
0
210,000
0
210,000
0
0
0
0
Page 151 of 203
Capital Project Detail Sheet
16
Project Information Project Name: Grader Replacement
Type of Project: Equipment
Project Number: 25-23
Basis for Activity: Asset Renewal
Department: 3000 - Overhead
Relationship to Strategic Plan: Priority #1 - Sustainable Long-Term Prosperity
Description: Replacement for unit FG24 (Asset ID 23204) 2012 772 John Deere Grader.
Rationale: Asset renewal in accordance with the long range financial plan.
Staff Contact: Brian Kirk (bkirk)
Project Finances
Actuals Description 80105 - Fleet Total
Budget
Expensed to Current Year Expenses / Expenditure
Total Project
Prior Approved
2025
2026
2027
2028
2029
0
600,000
0
600,000
0
0
0
0
0
600,000
0
600,000
0
0
0
0
Page 152 of 203
Capital Project Detail Sheet
17
Project Information Project Name: Wheel Loader Replacement
Type of Project: Equipment
Project Number: 25-24
Basis for Activity: Asset Renewal
Department: 3000 - Overhead
Relationship to Strategic Plan: Priority #1 - Sustainable Long-Term Prosperity
Description: Replacement for unit FT94 (Asset ID 23401) 2006 CAT 930 loader.
Rationale: Asset renewal in accordance with 18 year life cycle replacement schedule in long range financial plan.
Staff Contact: Brian Kirk (bkirk)
Project Finances
Actuals Description 80105 - Fleet Total
Budget
Expensed to Current Year Expenses / Expenditure
Total Project
Prior Approved
2025
2026
2027
2028
2029
0
340,000
0
340,000
0
0
0
0
0
340,000
0
340,000
0
0
0
0
Page 153 of 203
Capital Project Detail Sheet
18
Project Information Project Name: Tools and Equipment for Service Vehicle
Type of Project: Equipment
Project Number: 25-25
Basis for Activity: Service Level Change
Department: 3000 - Overhead
Relationship to Strategic Plan: Priority #2 - Municipal Service Excellence
Description: Tools and equipment required for mechanics service vehicle.
Rationale: The vehicle requires a permanent set of tools to improve efficiency of roadside repairs and limit downtime.
Staff Contact: Brian Kirk (bkirk)
Project Finances
Actuals Description 80105 - Fleet Total
Budget
Expensed to Current Year Expenses / Expenditure
Total Project
Prior Approved
2025
2026
2027
2028
2029
0
15,000
0
15,000
0
0
0
0
0
15,000
0
15,000
0
0
0
0
Page 154 of 203
Capital Project Detail Sheet
19
Project Information Project Name: Diagnostic tool for vehicles and heavy equipment
Type of Project: Equipment
Project Number: 25-26
Basis for Activity: Service Level Change
Department: 3000 - Overhead
Relationship to Strategic Plan: Priority #2 - Municipal Service Excellence
Description: Universal diagnostic tool for reading engine control module codes on vehicles and heavy equipment.
Rationale: New vehicles and equipment have more complex electronic systems that we currently can’t diagnose. Tool will allow mechanics to efficiently diagnose and limit the amount of vehicles sent out for repair.
Staff Contact: Brian Kirk (bkirk)
Project Finances
Actuals Description 80105 - Fleet Total
Budget
Expensed to Current Year Expenses / Expenditure
Total Project
Prior Approved
2025
2026
2027
2028
2029
0
10,000
0
10,000
0
0
0
0
0
10,000
0
10,000
0
0
0
0
Page 155 of 203
Capital Project Detail Sheet
20
Project Information Project Name: Towable gravel compactor
Type of Project: Auxiliary Attachment
Project Number: 25-27
Basis for Activity: Service Level Change
Department: 3200 - Roadside Maintenance
Relationship to Strategic Plan: Priority #2 - Municipal Service Excellence
Description: Towable gravel compactor attachment for the motor grader.
Rationale: Attachment for the grader to improve the process on the gravel roads and shoulders.
Staff Contact: Brian Kirk (bkirk)
Project Finances
Actuals Description 80100 - Equipment Total
Budget
Expensed to Current Year Expenses / Expenditure
Total Project
Prior Approved
2025
2026
2027
2028
2029
0
40,000
0
40,000
0
0
0
0
0
40,000
0
40,000
0
0
0
0
Page 156 of 203
Capital Project Detail Sheet
21
Project Information Project Name: Road 38/Boyce Road Sidewalk and Storm Sewers
Type of Project: Roadside
Project Number: 23-92
Basis for Activity: Asset Renewal
Department: 3100 - Structures
Relationship to Strategic Plan: N/A
Description: Removal and replacement of sidewalk facilities in Hartington Village on Road 38 (100m), Holleford Road (100m) and Boyce Road (200m).
Rationale: On September 5th, 2023 Township Council approved funding in the amount of $14,800 to advance detailed designs for the replacement of sidewalks on Boyce Road and Road 38 along with design work for sidewalk extensions to (Bittersweet Drive) Hartington Subdivision.
Addition of sidewalk extension on Boyce Road (165m) to Bittersweet Drive (Hartington Subdivision)
All of the existing sidewalks in Hartington are currently rated poor and do not meet AODA standards for minimum width. In order to expedite the sidewalk replacements - extensive storm sewer work will be required in the village including numerous storm crossings on Boyce Road.
Removal, replacement and upgrade of existing storm sewers (185m) within area of sidewalk upgrades. Addition of new water quality treatment as required under the Township’s Environmental Compliance Approval.
Many of the drainage systems in Hartington were constructed in the 70’s and are operating well beyond their useful service life. Stormwater treatment will also have to be incorporated into the project to be compliant under the Township’s Consolidated Linear ECA approval from the Ministry. Staff Contact: Troy Dunlop (tdunlop)
Project Finances
Actuals Description
Budget
Expensed to Current Year
Total Project
Prior Approved
2025
2026
2027
2028
2029
5,434
858,800
14,800
844,000
0
0
0
0
55330 - Consultant
4,477
29,000
0
29,000
0
0
0
0
9,911
887,800
14,800
873,000
0
0
0
0
Total
Expenses / Expenditure
Page 157 of 203
55290 - Contracted Services Expenses / Expenditure
Capital Project Detail Sheet
22
Project Information Project Name: Eagle Creek Bridge (B31) Reconstruction
Type of Project: Bridge
Project Number: 22-18
Basis for Activity: Asset Renewal
Department: 3100 - Structures
Relationship to Strategic Plan: N/A
Description: ASSET # 63290 (OSIM Structure)
Rationale: The reconstruction of the Eagle Creek Bridge has been identified as a priority bridge project for 2025 within the 5 year plan received by Council on May 2, 2023.
The Eagle Creek bridge an OSIM structure located on Bob’s Lake Road approximately 2.2km north of Buck Bay Road.
The bridge is believed to have been constructed in the mid 1940’s.
The rigid frame concrete structure has a span of 5.4m and a deck width of 3.9m
The structure was last inspected in 2023 and has a Bridge Condition Index rating of 36.1 (very poor).
The structure will be removed and replaced with a new 2 lane bridge structure complete with upgraded traffic approaches and roadside barrier systems. Staff Contact: Troy Dunlop (tdunlop)
Project Finances
Actuals Description
Expensed to Current Year
55290 - Contracted Services Expenses / Expenditure 55330 - Consultant Total
Budget
Expenses / Expenditure
Total Project
Prior Approved
2025
2026
2027
2028
2029
0
998,900
0
998,900
0
0
0
0
17,261
104,600
50,000
54,600
0
0
0
0
17,261
1,103,500
50,000
1,053,500
0
0
0
0
Page 158 of 203
Capital Project Detail Sheet
23
Project Information Project Name: Shale Road Culvert
Type of Project: Bridge
Project Number: 23-46A
Basis for Activity: Asset Renewal
Department: 3100 - Structures
Relationship to Strategic Plan: N/A
Description: ASSET # 63360 (OSIM Structure)
Rationale: The reconstruction of the Shales Road Culvert has been identified as a priority project for replacement in 2024 within the 5 year plan received by Council on May 2, 2023 however the project was deferred in part due to funding pressures from the Wilmer Culvert failure and additional investigations needed at the crossing.
The Shales Road Culvert is an OSIM structure located on Shales Road approximately 2.5km west of Perth Road. The structure is a rigid frame structure with an open bottom that has a span of 3m and is approximately 5.5m long. The non-navigable structure is will be rehabilitated or replaced with a new structure with updated roadside barrier systems. Design work was advanced in 2023/2024 and additional road widenings are currently being explored.
The Shales Road OSIM Structure is believed to have been constructed in 1955. The structure was last inspected in 2023 and has a Bridge Condition Index rating of 33.37 (Very Poor). Additional road widenings will be necessary to facilitate the project recommendations.
Design work for OSIM bridge and culvert structures originally planned for 2024 and currently forecasted to be replaced in 2026. An allowance has been added to the original project in 2025 to support necessary legal surveys and road widenings to support the advancement of the project. Staff Contact: Troy Dunlop (tdunlop)
Project Finances
Actuals Description
Budget
Expensed to Current Year
Total Project
Prior Approved
2025
2026
2027
2028
2029
15,925
0
0
0
0
0
0
0
55330 - Consultant
Expenses / Expenditure
4,732
27,000
20,000
7,000
0
0
0
0
80200 - Land
Expenses / Expenditure
0
15,000
0
15,000
0
0
0
0
20,657
42,000
20,000
22,000
0
0
0
0
Total
Page 159 of 203
55290 - Contracted Services Expenses / Expenditure
Capital Project Detail Sheet
24
Project Information Project Name: Pleasant Valley Municipal Drain - Drainage Act Maintenance
Type of Project: Plans/Studies
Project Number: 23-51
Basis for Activity: Other
Department: 3100 - Structures
Relationship to Strategic Plan: N/A
Description: Consulting fees for landowner consultation, tender preparations and contract administration as Drainage Superintendent for the Pleasant Valley Municipal Drain Maintenance work.
Rationale: The Pleasant Valley Municipal Drain which was constructed in 1985 has been determined to be in need of maintenance based on current reviews of the system against the original Engineer’s report.
Project also includes funding for the Township’s levied drainage costs (as a benefitting property owner).
Various vegetation removals, clean outs and channel obstructions are in need of removal.
Original 2023 estimates for funding have been re-adjusted to reflect a fall 2025 project following outcomes of public consultation in August 2024.
The rational for the project was provided to Council in a presentation by Robinson Consultants on November 14th, 2023 along with the supporting Maintenance Report dated October 2023. Project will be scheduled in Fall of 2025 as a result of outcomes from Public Consultation carried out in August 2024.
Staff Contact: Troy Dunlop (tdunlop)
Project Finances
Actuals Description
Budget
Expensed to Current Year
Total Project
Prior Approved
2025
2026
2027
2028
2029
55290 - Contracted Services Expenses / Expenditure
1,424
26,550
18,750
7,800
0
0
0
0
55330 - Consultant
15,957
16,500
16,500
0
0
0
0
0
17,380
43,050
35,250
7,800
0
0
0
0
Total
Expenses / Expenditure
Page 160 of 203
Capital Project Detail Sheet
25
Project Information Project Name: Road 38 Design and Construction (Kingston Rd to Murton Road)
Type of Project: Arterial Roadway
Project Number: 23-56
Basis for Activity: Asset Renewal
Department: 3300 - Hardtop
Relationship to Strategic Plan: N/A
Description: Asset # 54910
Rationale: The reconstruction of Road 38 has been identified as a priority road project for 2025 within the 5 year plan received by Council on May 2, 2023.
Project will include the detailed design and reconstruction of approximately 5.8km of Road 38 from Kingston Road to Murton Road.
Council accepted the recommendations of the Preliminary Design and provided staff direction to advance the Detailed Design Phase on August 13th, 2024.
Recommended design will include full depth reconstruction of the roadway complete with two lanes and two paved shoulders (11.0m width) and shoulder roundings.
This section of Road 38 was last constructed in 1993. Surface conditions are poor and unplanned maintenance demands continue to be a concern for meeting service levels.
Work on the corridor will be phased over 2025 and 2026. Additional related works at Murvale Creek can be found under project # 25-34.
Current AADT is 9,205 vehicles per year. PCI rating of 60 (Fair) in 2022.
Staff Contact: Troy Dunlop (tdunlop)
Project Finances
Actuals Description 53310 - Materials
Budget
Expensed to Current Year
Total Project
Prior Approved
2025
2026
2027
2028
2029
Expenses / Expenditure
145
0
0
0
0
0
0
0
55290 - Contracted Services Expenses / Expenditure
82,226
250,000
100,000
75,000
75,000
0
0
0
55330 - Consultant
16,127
5,770,000
120,000
4,240,000
1,410,000
0
0
0
98,498
6,020,000
220,000
4,315,000
1,485,000
0
0
0
Total
Expenses / Expenditure
Page 161 of 203
Capital Project Detail Sheet
26
Project Information Project Name: Craig Road
Type of Project: Local Roadway
Project Number: 24-41A
Basis for Activity: Asset Renewal
Department: 3300 - Hardtop
Relationship to Strategic Plan: N/A
Description: ASSET # 41575
Rationale: The reconstruction of Craig Road has been identified as a priority road project for 2025 within the 5 year plan received by Council on May 2, 2023.
Road Reconstruction - Double Surface Treatment Reconstruction of 3.75km section of Craig Road from Road 38 northerly to the Township boundary.
Road was last constructed in 2004. Surface conditions are poor and unplanned maintenance demands continue to be a concern for meeting service levels.
Construction to include full depth reclamation, placement of granular A materials, culvert renewals and double surface treatment (chip seal).
Current AADT is 325 vehicles per year.
Project will also include select tree removals, roadside rock excavation and drainage improvements.
PCI rating of 23 (very poor) in 2022.
Staff Contact: Troy Dunlop (tdunlop)
Project Finances
Actuals Description
Budget
Expensed to Current Year
Total Project
Prior Approved
2025
2026
2027
2028
2029
55290 - Contracted Services Expenses / Expenditure
0
1,095,900
54,900
1,041,000
0
0
0
0
55330 - Consultant
0
54,000
0
54,000
0
0
0
0
0
1,149,900
54,900
1,095,000
0
0
0
0
Total
Expenses / Expenditure
Page 162 of 203
Capital Project Detail Sheet
27
Project Information Project Name: Westport Road
Type of Project: Arterial Roadway
Project Number: 24-41B
Basis for Activity: Asset Renewal
Department: 3300 - Hardtop
Relationship to Strategic Plan: N/A
Description: ASSET # 57900 and 58015
Rationale: The reconstruction of Westport Road has been identified as a priority road project for 2025 within the 5 year plan received by Council on May 2, 2023.
Road Reconstruction - Double Surface Treatment Reconstruction of 4.0km section of Westport Road from Garret Road to Devil Lake.
Sections of road were last constructed in 2000 and 2008. Surface conditions are poor and unplanned maintenance demands continue to be a concern for meeting service levels.
Construction to include full depth reclamation, placement of granular A materials, 2 major culvert crossings, culvert renewals, guide rail replacements and double surface treatment (chip seal).
Current AADT is 371 & 750 vehicles per year. PCI rating of 54 and 53 (Poor) in 2022.
Project will also include roadside drainage improvements. Staff Contact: Troy Dunlop (tdunlop)
Project Finances
Actuals Description
Budget
Expensed to Current Year
Total Project
Prior Approved
2025
2026
2027
2028
2029
50100 - Wages
Expenses / Expenditure
0
50,200
0
50,200
0
0
0
0
53310 - Materials
Expenses / Expenditure
0
419,000
0
419,000
0
0
0
0
55290 - Contracted Services Expenses / Expenditure
0
803,800
10,800
793,000
0
0
0
0
58001 - Internal Equipment
0
89,500
0
89,500
0
0
0
0
0
1,362,500
10,800
1,351,700
0
0
0
0
Total
Expenses / Expenditure
Page 163 of 203
Capital Project Detail Sheet
28
Project Information Project Name: Florida Road
Type of Project: Local Roadway
Project Number: 24-41C
Basis for Activity: Asset Renewal
Department: 3300 - Hardtop
Relationship to Strategic Plan: N/A
Description: ASSET # 49375
Rationale: The reconstruction of Florida Road has been identified as a priority road project for 2025 within the 5 year plan received by Council on May 2, 2023.
Road Reconstruction - Double Surface Treatment Reconstruction of 1.3km section of Florida Road from Henderson Road to the Township boundary.
This is the same horizon year that the City of Kingston will be doing their section.
Construction to include full depth reclamation, placement of granular A materials, culvert renewals and double surface treatment (chip seal).
Florida Road was last constructed in 2007. Surface conditions are poor and unplanned maintenance demands continue to be a concern for meeting service levels.
Project will also include roadside drainage improvements. Current AADT is 243 vehicles per year. PCI rating of 33 (very poor) in 2022. Staff Contact: Troy Dunlop (tdunlop)
Project Finances
Actuals Description
Budget
Expensed to Current Year
Total Project
Prior Approved
2025
2026
2027
2028
2029
Expenses / Expenditure
0
29,200
0
29,200
0
0
0
0
53310 - Materials
Expenses / Expenditure
0
70,000
0
70,000
0
0
0
0
55290 - Contracted Services Expenses / Expenditure
0
169,300
9,300
160,000
0
0
0
0
58001 - Internal Equipment
0
31,900
0
31,900
0
0
0
0
0
300,400
9,300
291,100
0
0
0
0
Total
Expenses / Expenditure
Page 164 of 203
50100 - Wages
Capital Project Detail Sheet
29
Project Information Project Name: Surface Treatment (LCB) Preservation
Type of Project: Local Roadway
Project Number: 25-31
Basis for Activity: Asset Renewal
Department: 3300 - Hardtop
Relationship to Strategic Plan: N/A
Description: Rehabilitation of approximately TBD km of surface treated roadways with localized repairs and application of a final Low Class Bituminous (LCB) single surface treatment (chip seal).
Rationale: The application of a single surface treatment (chip seal) is a key maintenance strategy for long term performance of the Township’s road network of LCB roadways.
A priority list has been attached as a project document with additional details on forecasted roadways.
Single surface treatments can add 5 to 7 years of added service life at a low cost and help manage unplanned maintenance expenses (potholes, cracking and edge break-up). The commitment to an annual LCB preservation plan is reflected in the 5 year plan received by Council on May 2, 2023.
Staff Contact: Troy Dunlop (tdunlop)
Project Finances
Actuals Description
Budget
Expensed to Current Year
Total Project
Prior Approved
2025
2026
2027
2028
2029
50100 - Wages
Expenses / Expenditure
0
47,500
0
47,500
0
0
0
0
53310 - Materials
Expenses / Expenditure
0
47,500
0
47,500
0
0
0
0
55290 - Contracted Services Expenses / Expenditure
0
807,500
0
807,500
0
0
0
0
58001 - Internal Equipment
0
47,500
0
47,500
0
0
0
0
0
950,000
0
950,000
0
0
0
0
Total
Expenses / Expenditure
Page 165 of 203
29a
TOWNSHIP OF SOUTH FRONTENAC Surface Treatment (LCB) Preservation Public Services Department
Surface Treatment (LCB) Preservation - 2025 Preliminary Road List Section ID 45340 46420 43600/43585 41230/41245 41905 40615/40630 42640 57900 46735 45985 44800/44815 51575 41335
Street Randy Clark Road Washburn Road Lakefield Drive Centreville Road Devil Lake Road Bradshaw Road Green Bay Road Westport Road Wolfe Lake Road* Stage Coach Road Opinicon Road Bedford Road Clark Road
From Street West End of Road 2562 Washburn Road 1.30km South of Holmes Road Devil Lake Road Centreville Road Road 38 Burns Road New Road Westport Road Railton Road Perth Road 10 Salmon Lake Road McConnell Road
To Street
Length (Km)
Battersea Road Factory Road To End of Road To Rideau Boundary Westport Road Steele Road Burridge Road Garrett Road North End of Road Campbell Road 7.70km East of Perth Road 10 at Petworth Bridge 1.00km North of Salmon Lake Road East End of Road Total :
2.2 1.3 1.3 0.8 1.7 2.2 2.9 1.9 2.2 2.2 7.7 1.2 0.9 28.4
AADT PCI** 201 792 643 226 243 393 199 371 257 1184 550 220 125
82 80 77 70 65 74 65 55 77 73 73 77 82
- Boundary road to be completed with Rideau Lakes Township **2022 PCI Data ***The above road list is preliminary. Each road section will undergo a final condition review in the spring
Page 166 of 203
Capital Project Detail Sheet
30
Project Information Project Name: Pre-Engineering Roads 2026
Type of Project: Plans/Studies
Project Number: 25-32
Basis for Activity: Asset Renewal
Department: 3300 - Hardtop
Relationship to Strategic Plan: N/A
Description: Geotechnical investigations and field survey work to be initiated in 2025 in support of 2026 road construction projects shown within the 5 year plan received by Council on May 2, 2023. Includes the following:
Rationale: The design process for road reconstruction projects requires a 1 to 2 year timeframe to address pre-engineering activiites, topographic surveys, stakeholder engagement, drainage permits, utility relocation and property acquisition (where necessary).
ASSET # 56520 Rutledge Road (2.2km east of Sydenham Road to Perth Road 10) - 5.85km.
The endorsement of the 5 year plan helps refine pre-engineering allocations to be set year over year.
ASSET # 46360 Walker Street (Verona Street to Road 38) 100m. ASSET # 42025 Easy Street (Road 38 to West End of Road) 100m. ASSET # 52495 Desert Lake Road (Road 38 to 0.15km West of High Falls Road) - 2.95km. ASSET # 45595 Round Lake Road (4.1km East of Latimer Road to Battersea Road) - 2.2km. ASSET # 43975 - Loughborough Portland Boundary Road (Harrowsmith Road to Alton Road) - 1.4km. Staff Contact: Troy Dunlop (tdunlop)
Project Finances
Actuals Description
Total
Expensed to Current Year
Total Project
Prior Approved
2025
2026
2027
2028
2029
0
136,400
0
136,400
0
0
0
0
0
136,400
0
136,400
0
0
0
0
Page 167 of 203
55290 - Contracted Services Expenses / Expenditure
Budget
Capital Project Detail Sheet
31
Project Information Project Name: Gravel Road Reconstruction Program 2025
Type of Project: Local Roadway
Project Number: 25-33
Basis for Activity: Asset Renewal
Department: 3100 - Structures
Relationship to Strategic Plan: N/A
Description: ASSET # 42175 First Lake Road (1.7km North of Bellrock Mill Street to Snider Road) - 3.7km.
Rationale: The development of dedicated capital towards gravel road improvements is one of the key findings of the 2022 Road Needs Study.
ASSET # 46585 White Lake Road (Glenford Lane to 2 km east of Glenford Lane) - 2.0km.
Investments in drainage improvements will improve road performance, customer service levels and reduced unplanned maintenance costs over time.
Reconstruction to include extensive rock ditching, rock cut removal (roadside hazards), localized widenings (hills/corners) and placement of new gravel wear surface (100mm) Granular A. Staff Contact: Troy Dunlop (tdunlop)
Project Finances
Actuals Description
Budget
Expensed to Current Year
Total Project
Prior Approved
2025
2026
2027
2028
2029
50100 - Wages
Expenses / Expenditure
0
29,925
0
29,925
0
0
0
0
53310 - Materials
Expenses / Expenditure
0
133,950
0
133,950
0
0
0
0
55290 - Contracted Services Expenses / Expenditure
0
111,430
0
111,430
0
0
0
0
58001 - Internal Equipment
0
64,695
0
64,695
0
0
0
0
0
340,000
0
340,000
0
0
0
0
Total
Expenses / Expenditure
Page 168 of 203
Capital Project Detail Sheet
32
Project Information Project Name: Murvale Creek Culvert (B12) Reconstruction
Type of Project: Bridge
Project Number: 25-34
Basis for Activity: Asset Renewal
Department: 3100 - Structures
Relationship to Strategic Plan: N/A
Description: ASSET # 63110 (OSIM Structure)
Rationale: The reconstruction of the Murvale Creek Culvert has been identified as a priority project for 2025 within the 5 year plan received by Council on May 2, 2023.
The Murvale Creek Culvert is an OSIM structure located on Road 38 just 0.7km north of Murton Road.
The OSIM Structure is believed to have been constructed in the 1980’s and last rehabilitated in the 1990’s.
The structure is a 3.66m diameter Structural Plate Corrugated Steel Pipe (SPCSP) that is approximately 30m long .
The structure was last inspected in 2023 and has a Bridge Condition Index rating of 60.2 (Fair).
The navigable structure is located within a Provincially Significant Westland and will be removed and replaced with a new structure with updated roadside barrier systems.
It is currently recommended that the structure be completed with the Road 38 reconstruction from Kingston Road to Murton Road.
The configuration of the new structure will be confirmed through Detailed Design in consultation with Quinte Conservation and Transport Canada. Staff Contact: Troy Dunlop (tdunlop)
Project Finances
Actuals Description
Budget
Expensed to Current Year
Total Project
Prior Approved
2025
2026
2027
2028
2029
55290 - Contracted Services Expenses / Expenditure
0
1,400,000
0
800,000
600,000
0
0
0
55330 - Consultant
0
56,000
0
31,000
25,000
0
0
0
0
1,456,000
0
831,000
625,000
0
0
0
Total
Expenses / Expenditure
Page 169 of 203
Capital Project Detail Sheet
33
Project Information Project Name: Buck Bay Road - Unnamed Bridge Repair
Type of Project: Bridge
Project Number: 25-35
Basis for Activity: Other
Department: 3100 - Structures
Relationship to Strategic Plan: N/A
Description: ASSET # 63460 (OSIM Structure)
Rationale: The OSIM Structure was damaged as part of an unreported collision in 2024 and requires significant concrete repairs on the deck and abutment wall.
The Buck Bay Road Unnamed Bridge is located on Buck Bay Road approximately 1.5km north of White Lake Road.
The structure was last inspected in 2023 and has a Bridge Condition Index rating of 32.1 (Very Poor).
The bridge structure was built in 1965 and is a rigid frame concrete structure with vertical legs that has as span of 3.8m and a width of 5.1m. Staff Contact: Troy Dunlop (tdunlop)
Project Finances
Actuals Description
Budget
Expensed to Current Year
Total Project
Prior Approved
2025
2026
2027
2028
2029
55290 - Contracted Services Expenses / Expenditure
0
44,000
0
44,000
0
0
0
0
55330 - Consultant
0
5,000
0
5,000
0
0
0
0
0
49,000
0
49,000
0
0
0
0
Total
Expenses / Expenditure
Page 170 of 203
Capital Project Detail Sheet
34
Project Information Project Name: Buck Lake Culvert (OSIM) Design
Type of Project: Bridge
Project Number: 25-36
Basis for Activity: Asset Renewal
Department: 3100 - Structures
Relationship to Strategic Plan: N/A
Description: ASSET # 63040 (OSIM Structure)
Rationale: The reconstruction of the Buck Lake Culvert has been identified as a priority project for replacement in 2027 within the 5 year plan received by Council on May 2, 2023.
The Buck Lake Culvert is an OSIM structure located on Perth Road approximately 7.8km north of Opinicon Road at Buck Lake.
The OSIM Structure is believed to have been constructed in 1970.
The structure is a 3.2m diameter Structural Plate Corrugated Steel Pipe (SPCSP) that is approximately 17.2m long.
The structure was last inspected in 2023 and has a Bridge Condition Index rating of 49.35 (Poor).
The navigable structure is located within the Buck Lake Causeway and will be rehabilitated or replaced with a new structure with updated roadside barrier systems.
It is recommended that designs and consultations for this crossing move forward 2 years in advance of project delivery due to the social impacts (lake access), Federal approvals (Fisheries/Transport Canada) and possible detour considerations.
Staff Contact: Troy Dunlop (tdunlop)
Project Finances
Actuals Description 55330 - Consultant Total
Budget
Expensed to Current Year Expenses / Expenditure
Total Project
Prior Approved
2025
2026
2027
2028
2029
0
52,000
0
35,000
17,000
0
0
0
0
52,000
0
35,000
17,000
0
0
0
Page 171 of 203
Capital Project Detail Sheet
35
Project Information Project Name: Detailed Assessment Petworth Bridge
Type of Project: Bridge
Project Number: 25-37
Basis for Activity: Asset Renewal
Department: 3100 - Structures
Relationship to Strategic Plan: N/A
Description: ASSET # 63561 (OSIM Structure)
Rationale: The structure was last inspected in 2023 and was assigned a Bridge Condition Index rating of 75.2 (Good).
The Petworth Bridge is an OSIM structure located on Petworth Road approximately 100m west of Camden Portland Boundary Road.
The OSIM Inspection completed in 2023 has recommended that a more detailed investigation of all existing steel elements be carried out within 1 to 5 years.
The single lane steel truss bridge is 4.2m wide and 23.3m long.
Completion of this detailed survey in 2025 will provide greater understanding of the future rehabilitation scope and cost.
The OSIM Structure is believed to have been constructed in 1920 and last rehabilitated in 2013.
The Petworth Bridge has been identified as a priority project for rehabilitation in 2027 within the 5 year plan received by Council on May 2, 2023.
Ownership of the bridge was transferred from the County of Lennox & Addington to South Frontenac in 2014 (Bylaw 201430). Staff Contact: Troy Dunlop (tdunlop)
Project Finances
Actuals Description 55330 - Consultant Total
Budget
Expensed to Current Year Expenses / Expenditure
Total Project
Prior Approved
2025
2026
2027
2028
2029
0
19,500
0
19,500
0
0
0
0
0
19,500
0
19,500
0
0
0
0
Page 172 of 203
Capital Project Detail Sheet
36
Project Information Project Name: Detailed Assessment Opinicon Bridge
Type of Project: Bridge
Project Number: 25-38
Basis for Activity: Other
Department: 3100 - Structures
Relationship to Strategic Plan: N/A
Description: ASSET # 63440 (OSIM Structure)
Rationale: The structure was last inspected in 2023 and was assigned a Bridge Condition Index rating of 56.79 (Poor).
The Opinicon Lake Bridge is an OSIM structure located on Opinicon Road approximately 7.6km east of Perth Road. The bridge is comprised of steel I-beams and a concrete deck.
The OSIM Inspection completed in 2023 has recommended that a more detailed structural investigation be carried out on the deck and original abutments be carried out within 1 to 5 years.
Bridge deck is 5.7m wide and 12.0m long. The OSIM Structure is believed to have been constructed in 1928 and the superstructure was replaced in 2002.
Completion of this detailed survey in 2025 will provide greater understanding of the scope of future rehabilitation and anticipated cost.
Staff Contact: Troy Dunlop (tdunlop)
Project Finances
Actuals Description 55330 - Consultant Total
Budget
Expensed to Current Year Expenses / Expenditure
Total Project
Prior Approved
2025
2026
2027
2028
2029
0
14,000
0
14,000
0
0
0
0
0
14,000
0
14,000
0
0
0
0
Page 173 of 203
Capital Project Detail Sheet
37
Project Information Project Name: Pre-Engineering for Bridges 2026
Type of Project: Plans/Studies
Project Number: 25-39
Basis for Activity: Asset Renewal
Department: 3100 - Structures
Relationship to Strategic Plan: N/A
Description: ASSET # 63190
Rationale: The Bedford Mills Bridge was last inspected in 2023 and the bridge received a BCI rating of 63.26 (Fair).
The Bedford Mills Bridge is located on Perth Road approximately 0.3km north of Massassauga Road.
The rehabilitation of the bridge has been identified as a priority for 2026 within the 5 year plan presented to Council on May 2, 2023.
The structure is a T-Beam bridge with a span of 9.9m and an overall bridge length of 19.1m.
Work on the structure will be focused on the rehabilitation and repair of key concrete components of the structure such as the deck, curbs, barrier walls, wing walls, abutments, T-Beams, and soffits.
The structure was originally built in 1962 and records indicate the last rehabilitation was in 1997. Staff Contact: Troy Dunlop (tdunlop)
Project Finances
Actuals Description 55330 - Consultant Total
Budget
Expensed to Current Year Expenses / Expenditure
Total Project
Prior Approved
2025
2026
2027
2028
2029
0
50,000
0
50,000
0
0
0
0
0
50,000
0
50,000
0
0
0
0
Page 174 of 203
Capital Project Detail Sheet
38
Project Information Project Name: Arterial Road Culvert Replacement Program
Type of Project: Culvert
Project Number: 25-40
Basis for Activity: Service Level Change
Department: 3300 - Hardtop
Relationship to Strategic Plan: N/A
Description: The arterial road culvert replacement program targets the renewal of cross culvert assets on the Township’s major roadways that have bear a poor or very poor condition condition rating.
Rationale: Public Services launched a cross culvert assessment program using internal technical staff in the spring of 2024. Records indicate that there has not been a similar broad based program carried out since 2018.
The program has been developed as part of the continued investments in Asset Management planning.
Currently, 490 detailed assessments have been completed using a risk based approach focusing on the major road groups. Data collection indicates that 37% (57 of 153) of the arterial road crossings inventoried to date are in poor or very poor condition. The new program will target approximately 10 crossings per year. The 2025 focus will be directed to Perth Road (north of Rutledge) in the initial year.
Staff Contact: Troy Dunlop (tdunlop)
Project Finances
Actuals Description 55290 - Contracted Services Expenses / Expenditure Total
Budget
Expensed to Current Year
Total Project
Prior Approved
2025
2026
2027
2028
2029
0
250,000
0
250,000
0
0
0
0
0
250,000
0
250,000
0
0
0
0
Page 175 of 203
Capital Project Detail Sheet
39
Project Information Project Name: Replace Serpentine Piping
Type of Project: Other
Project Number: 22-54
Basis for Activity: Other
Department: 4000 - Water Treatment
Relationship to Strategic Plan: N/A
Description: Replacement of Serpentine Piping at the Sydenham Water Treatment Plant - Investing in Canada Infrastructure Green Stream Project which provides 73.33% funding.
Rationale: Stainless steel piping used to achieve chlorine contact time for disinfection in the water treatment process is failing. Piping systems in place continue to experience failures (leaks) at welded connections.
Deadline of March 31, 2026. Staff Contact: Troy Dunlop (tdunlop)
Project Finances
Actuals Description
Budget
Expensed to Current Year
Total Project
Prior Approved
2025
2026
2027
2028
2029
55290 - Contracted Services Expenses / Expenditure
0
600,000
0
600,000
0
0
0
0
55330 - Consultant
0
100,000
0
100,000
0
0
0
0
0
700,000
0
700,000
0
0
0
0
Total
Expenses / Expenditure
Page 176 of 203
Capital Project Detail Sheet
40
Project Information Project Name: Sydenham Drinking Water System - Treatment
Type of Project: Other
Project Number: 25-61
Basis for Activity: Asset Renewal
Department: 4000 - Water Treatment
Relationship to Strategic Plan: N/A
Description: Upgrades to the Sydenham Drinking Water Water Treatment in accordance with capital plan forecast by Utilities Kingston.
Rationale: All of the Capital Works activities are in support of operations, compliance, and asset management needs for the Sydenham Drinking Water System. Projects are identified in the updated 10 year capital forecast from Utilities Kingston and/or the 2023 Core Asset Management Plan.
Projects for 2025 include: Replace exterior door to chemical room with roll-up door for drum handling - $15,000.
Replace exterior door to chemical room - for chemical drum handling - Health and Safety Item.
Replace Ultra Violet Light Bulbs (24 lamps) - $15,000. Rebuild and refurbish High Lift Pump # 3, Low Lift Pump and Backwash Pump - $22,500.
Replace Ultra Violet Light Bulbs (24 lamps) - Change every 12,000 hours - Supports Water Treatment Process / Water Quality Compliance.
Inspection and assessment of Water Plant Intake - Sydenham Lake - $6,000.
Rebuild pumps - extend pump life, efficiency and reliability Asset Management. Inspection and assessment of Water Plant Intake - Sydenham Lake -Assess on 3 to 5 year cycle. - Asset Management.
Staff Contact: Troy Dunlop (tdunlop)
Project Finances
Actuals Description 53310 - Materials
Budget
Expensed to Current Year
Total Project
Prior Approved
2025
2026
2027
2028
2029
0
0
0
0
0
0
0
0
55290 - Contracted Services Expenses / Expenditure
0
6,000
0
6,000
0
0
0
0
80100 - Equipment
Expenses / Expenditure
0
37,500
0
37,500
0
0
0
0
80115 - Building-Renovations Expenses / Expenditure
0
15,000
0
15,000
0
0
0
0
0
58,500
0
58,500
0
0
0
0
Total
Page 177 of 203
Expenses / Expenditure
Capital Project Detail Sheet
41
Project Information Project Name: Sydenham Drinking Water System - Storage
Type of Project: Other
Project Number: 25-62
Basis for Activity: Asset Renewal
Department: 4000 - Water Treatment
Relationship to Strategic Plan: N/A
Description: Upgrades to the Sydenham Drinking Water System in accordance with the long term capital plan forecast by Utilities Kingston.
Rationale: All of the Capital Works activities are in support of operations, compliance, and asset management needs for the Sydenham Drinking Water System.
Projects for 2025 include:
Projects are identified in the 10 year capital forecast from Utilities Kingston.
Water Storage - Process Mechanical (Analyzers x 2) - $7,000. Staff Contact: Troy Dunlop (tdunlop)
Project Finances
Actuals Description 80100 - Equipment Total
Budget
Expensed to Current Year Expenses / Expenditure
Total Project
Prior Approved
2025
2026
2027
2028
2029
0
7,000
0
7,000
0
0
0
0
0
7,000
0
7,000
0
0
0
0
Page 178 of 203
Capital Project Detail Sheet
42
Project Information Project Name: Loughborough WDS - New Waste Transfer Facilities
Type of Project: Facilities
Project Number: 25-86
Basis for Activity: Service Level Change
Department: 3000 - Overhead
Relationship to Strategic Plan: N/A
Description: Site alterations at the Loughborough Waste Disposal site to support service level change to implement new waste transfer operations.
Rationale: On August 13th, 2024, Council provided direction to staff to apply to the MECP for ECA approval to move the waste site into full waste transfer operations. This direction was provided with the understanding that Phase 2A was nearing capacity heading into 2024. Phase 2B landfilling activities are currently on hold pending review from the Ministry on active groundwater and surface water monitoring programs.
Staff Contact: Troy Dunlop (tdunlop)
Project Finances
Actuals Description 53310 - Materials
Budget
Expensed to Current Year
Total Project
Prior Approved
2025
2026
2027
2028
2029
Expenses / Expenditure
0
35,000
0
35,000
0
0
0
0
55290 - Contracted Services Expenses / Expenditure
0
30,000
0
30,000
0
0
0
0
0
65,000
0
65,000
0
0
0
0
Total
Page 179 of 203
Capital Project Detail Sheet
43
Project Information Project Name: Landfill Compactor
Type of Project: Equipment
Project Number: 25-87
Basis for Activity: Service Level Change
Department: 5100 - Garbage
Relationship to Strategic Plan: Priority #1 - Sustainable Long-Term Prosperity
Description: Used landfill compactor for the waste disposal sites.
Rationale: Investment to increase compaction of curbside waste in the landfills to maximize remaining capacity.
Staff Contact: Kyle Bolton (kbolton)
Project Finances
Actuals Description 80100 - Equipment Total
Budget
Expensed to Current Year Expenses / Expenditure
Total Project
Prior Approved
2025
2026
2027
2028
2029
0
350,000
0
350,000
0
0
0
0
0
350,000
0
350,000
0
0
0
0
Page 180 of 203
Capital Project Detail Sheet
44
Project Information Project Name: Town Hall Expansion Design and Construction
Type of Project: Facilities
Project Number: 23-08
Basis for Activity: Growth Related
Department: 1210 - CAO
Relationship to Strategic Plan: Priority #1 - Sustainable Long-Term Prosperity
Description: Design and construction for Townhall renovation.
Rationale: Provide additional space required for administrative staff and updated facilities by integrating existing and new facilities.
2025 budget addition for chattels/furniture - $50,000
Staff Contact: Louise Fragnito (lfragnito)
Project Finances
Actuals Description 53310 - Materials
Budget
Expensed to Current Year
Total Project
Prior Approved
2025
2026
2027
2028
2029
Expenses / Expenditure
0
50,000
0
50,000
0
0
0
0
80115 - Building-Renovations Expenses / Expenditure
182,748
3,825,000
3,825,000
0
0
0
0
0
182,748
3,875,000
3,825,000
50,000
0
0
0
0
Total
Page 181 of 203
Capital Project Detail Sheet
45
Project Information Project Name: Station 7- Washrooms - Cinderella Toilet and Shower
Type of Project: Facilities
Project Number: 25-50
Basis for Activity: Other
Department: 2100 - Fire
Relationship to Strategic Plan: N/A
Description: Creation of washroom with Cinderella toilet and shower for Station 7. There are currently no washrooms available in the building.
Rationale: Provide indoor facilities
Staff Contact: Del Blakney (dblakney)
Project Finances
Actuals Description 80115 - Building-Renovations Expenses / Expenditure Total
Budget
Expensed to Current Year
Total Project
Prior Approved
2025
2026
2027
2028
2029
0
20,000
0
20,000
0
0
0
0
0
20,000
0
20,000
0
0
0
0
Page 182 of 203
Capital Project Detail Sheet
46
Project Information Project Name: Joint Fire Hall & OPP Station
Type of Project: Facilities
Project Number: 25-51
Basis for Activity: Asset Renewal
Department: 1200 - Administrative Facilities
Relationship to Strategic Plan: Priority #1 - Sustainable Long-Term Prosperity
Description: Architectural design for new joint Fire Hall and OPP station on Road 38.
Rationale: Next Fire Hall asset renewal in the long range financial plan. Existing OPP facility does not meet the current or future needs for the department.
Staff Contact: Kyle Bolton (kbolton)
Project Finances
Actuals Description 80110 - Building-New Total
Budget
Expensed to Current Year Expenses / Expenditure
Total Project
Prior Approved
2025
2026
2027
2028
2029
0
400,000
0
250,000
150,000
0
0
0
0
400,000
0
250,000
150,000
0
0
0
Page 183 of 203
Capital Project Detail Sheet
47
Project Information Project Name: Bedford Garage Site Works
Type of Project: Facilities
Project Number: 25-52
Basis for Activity: Asset Renewal
Department: 3010- PS
Relationship to Strategic Plan: Priority #1 - Sustainable Long-Term Prosperity
Description: Multi-year site works project for the Bedford Garage.
Rationale: The site is currently supplied water from the Glendower Hall and required a dedicated water source for that property.
Scope includes the installation of a water service and parking lot drainage work in 2025 and planning for asphalt paving in 2026.
The site is low and requires drainage improvements in advance of a new paved parking lot proposed for 2026. The storm water drainage work will be done in conjunction with the installation of a new oil & grit separator (previously approved project 24-52).
Staff Contact: Tim Laprade (tlaprade)
Project Finances
Actuals Description
Budget
Expensed to Current Year
Total Project
Prior Approved
2025
2026
2027
2028
2029
50100 - Wages
Expenses / Expenditure
0
6,800
0
6,800
0
0
0
0
53310 - Materials
Expenses / Expenditure
0
10,000
0
10,000
0
0
0
0
55290 - Contracted Services Expenses / Expenditure
0
128,000
0
33,000
95,000
0
0
0
55330 - Consultant
Expenses / Expenditure
0
5,000
0
5,000
0
0
0
0
58001 - Internal Equipment
Expenses / Expenditure
0
9,300
0
9,300
0
0
0
0
0
159,100
0
64,100
95,000
0
0
0
Total
Page 184 of 203
Capital Project Detail Sheet
48
Project Information Project Name: Station 2 Burridge Exterior Upgrades
Type of Project: Facilities
Project Number: 25-54
Basis for Activity: Asset Renewal
Department: 2100 Fire
Relationship to Strategic Plan: Priority #2 - Municipal Service Excellence
Description: Replace front of building exterior including exterior front metal cladding, replacement of front entrance door, and repainting eves and facia.
Rationale: Improve the exterior condition of the building including exterior wall replacement and painting of external metal to preserve useful life and decrease pests from entering.
Add additional lighting off building to illuminate parking area.
Provide increased lighting to support safer use of parking areas.
Staff Contact: Tim Laprade (tlaprade)
Project Finances
Actuals Description 80115 - Building-Renovations Expenses / Expenditure Total
Budget
Expensed to Current Year
Total Project
Prior Approved
2025
2026
2027
2028
2029
0
15,000
0
15,000
0
0
0
0
0
15,000
0
15,000
0
0
0
0
Page 185 of 203
Capital Project Detail Sheet
49
Project Information Project Name: Keeley Garage Pressure Washer
Type of Project: Equipment
Project Number: 25-56
Basis for Activity: Other
Department: 3010 - PS
Relationship to Strategic Plan: Priority #2 - Municipal Service Excellence
Description: Keeley Garage Pressure Washer System.
Rationale: Existing pressure washer system due for replacement. The unit has frequent issues/repairs due to its age and amount of use.
Staff Contact: Tim Laprade (tlaprade)
Project Finances
Actuals Description 80100 - Equipment Total
Budget
Expensed to Current Year Expenses / Expenditure
Total Project
Prior Approved
2025
2026
2027
2028
2029
0
20,000
0
20,000
0
0
0
0
0
20,000
0
20,000
0
0
0
0
Page 186 of 203
Capital Project Detail Sheet
50
Project Information Project Name: Portland garage Steel Roof Replacement
Type of Project: Facilities
Project Number: 25-57
Basis for Activity: Asset Renewal
Department: 3010 -PS
Relationship to Strategic Plan: Priority #2 - Municipal Service Excellence
Description: Steel roof replacement on Portland Garage main building.
Rationale: Existing roof leaks and requires replacement as per current Facility Condition Assessment.
Staff Contact: Tim Laprade (tlaprade)
Project Finances
Actuals Description 80115 - Building-Renovations Expenses / Expenditure Total
Budget
Expensed to Current Year
Total Project
Prior Approved
2025
2026
2027
2028
2029
0
60,000
0
60,000
0
0
0
0
0
60,000
0
60,000
0
0
0
0
Page 187 of 203
Capital Project Detail Sheet
51
Project Information Project Name: Storrington Garage Oil/Grit Separator
Type of Project: Facilities
Project Number: 25-58
Basis for Activity: Asset Renewal
Department: 3010 - PS
Relationship to Strategic Plan: Priority #2 - Municipal Service Excellence
Description: Oil & Grit separator for the Storrington Garage.
Rationale: During the 2024 Storrington Centre site works project it was determined there was no existing oil & girt separator for the garage floor drains. The parking lot work design installed new storm sewer that will now require treatment. A new oil & grit separator on the main storm sewer to control the garage floor drains and parking lot storm water is the preferred option.
Staff Contact: Tim Laprade (tlaprade)
Project Finances
Actuals Description 80115 - Building-Renovations Expenses / Expenditure Total
Budget
Expensed to Current Year
Total Project
Prior Approved
2025
2026
2027
2028
2029
0
40,000
0
40,000
0
0
0
0
0
40,000
0
40,000
0
0
0
0
Page 188 of 203
Capital Project Detail Sheet
52
Project Information Project Name: Town Hall - Public EV Charging Stations (2)
Type of Project: Facilities
Project Number: 25-59
Basis for Activity: Other
Department: 1200 - Administrative Facilities
Relationship to Strategic Plan: Priority #1 - Sustainable Long-Term Prosperity
Description: For the purchase and installation of Two (2) Level 3 fast charger port(s) 100 - 199 kW for South Frontenac Township Office and Public Library.
Rationale: Provide EV charging stations in the community.
On January 16, 2024 Council approved applying for grant funding through ChargeON and ZEVIP for Public EV Charging Stations with the Township contribution being $35,000. The Township received funding approval from ChargeON for Town Hall in the amount of $225,000. The ZEVIP funding request for $90,000 remains pending. Staff Contact: Kyle Bolton (kbolton)
Project Finances
Actuals Description 55290 - Contracted Services Expenses / Expenditure Total
Budget
Expensed to Current Year
Total Project
Prior Approved
2025
2026
2027
2028
2029
0
350,000
0
350,000
0
0
0
0
0
350,000
0
350,000
0
0
0
0
Page 189 of 203
Capital Project Detail Sheet
53
Project Information Project Name: Cenotaph landscaping - Sydenham
Type of Project: Land
Project Number: 25-60
Basis for Activity: Other
Department: 8000 - Parks & Recreation
Relationship to Strategic Plan: Priority #3 - People and Partnerships
Description: Request received from the Sydenham Legion for walkway upgrade, replace flag pole, cut down side hill around the monument.
Rationale: Requested improvement will make accessing the monument easier along with improving the visual appeal of the monument area. The legion will be responsible to update the monument.
Staff Contact: Kyle Bolton (kbolton)
Project Finances
Actuals Description 80500 - Non-PSAB Total
Budget
Expensed to Current Year Expenses / Expenditure
Total Project
Prior Approved
2025
2026
2027
2028
2029
0
60,000
0
60,000
0
0
0
0
0
60,000
0
60,000
0
0
0
0
Page 190 of 203
Capital Project Detail Sheet
54
Project Information Project Name: Sydenham Point Accessible Washroom Upgrades
Type of Project: Facilities
Project Number: 24-55
Basis for Activity: Service Level Change
Department: 8000 - Parks & Recreation
Relationship to Strategic Plan: Old Priority #4 - Be a catalyst for the creation of vibrant, complete communities
Description: Complete Accessibility upgrades on Ball Diamond Washrooms.
Rationale: The washroom building in Sydenham Point park will be upgraded to an accessible washroom to meet AODA and building codes.
Increase in budget to reflect actual costs, building permits and results of Facility Condition Assessment.
The para ramp had been previously installed at this location in preparation for future upgrades.
Staff Contact: Tim Laprade (tlaprade)
Project Finances
Actuals Description 80115 - Building-Renovations Expenses / Expenditure Total
Budget
Expensed to Current Year
Total Project
Prior Approved
2025
2026
2027
2028
2029
0
50,000
30,000
20,000
0
0
0
0
0
50,000
30,000
20,000
0
0
0
0
Page 191 of 203
Capital Project Detail Sheet
55
Project Information Project Name: Centennial Park New Accessible Washrooms Design and Build
Type of Project: Facilities
Project Number: 24-56
Basis for Activity: Growth Related
Department: 8000 - Parks & Recreation
Relationship to Strategic Plan: Old Priority #2 - Promote and support growth that meets the community’s needs
Description: New Centennial Park Accessible Washroom and Park Building.
Rationale: Additional washrooms are required at Centennial Park as it is becoming the most frequented park in SFT and a destination location for many events.
AODA compliant Washroom closer to Grand Pavilion. The use of the washrooms would be from attendees at the Pavilion and Soccer Fields where we are currently renting portable toilets. New washroom building would be separate from the existing building to increase the amount of washrooms and provide another location in the park. Staff Contact: Tim Laprade (tlaprade)
Project Finances
Actuals Description 80110 - Building-New Total
Budget
Expensed to Current Year Expenses / Expenditure
Total Project
Prior Approved
2025
2026
2027
2028
2029
0
730,000
30,000
150,000
550,000
0
0
0
0
730,000
30,000
150,000
550,000
0
0
0
Page 192 of 203
Capital Project Detail Sheet
56
Project Information Project Name: Keeley/Bowes Diamond Upgrades
Type of Project: Park
Project Number: 24-68
Basis for Activity: Asset Renewal
Department: 8000 - Parks & Recreation
Relationship to Strategic Plan: Old Priority #4 - Be a catalyst for the creation of vibrant, complete communities
Description: Baseball diamond backstop and fence replacement.
Rationale: The baseball diamonds at this facility are well used but the backstop poles/netting and the diamond fencing are in poor condition and require replacement.
Upgrade Backstop netting and posts or replace with extended fencing (Carry over to 2025)
The backstops are a netting material and the posts are leaning out of plumb. New backstop would be all fencing which would reduce maintenance on the nets.
Replacement of diamond Fencing (new for 2025)
A 2024 project to pave hard surface walkways, replace bleachers, and replace one of the backstops was approved but upon further investigation into the backstop the fence work was put on hold to reconsider both backstops and fencing due to their condition. 2025 funds to replace the remaining fencing would update both diamonds and complete the entire project. Staff Contact: Tim Laprade (tlaprade)
Project Finances
Actuals Description
Budget
Expensed to Current Year
Total Project
Prior Approved
2025
2026
2027
2028
2029
55290 - Contracted Services Expenses / Expenditure
0
37,000
0
37,000
0
0
0
0
80115 - Building-Renovations Expenses / Expenditure
63,121
208,000
208,000
0
0
0
0
0
63,121
245,000
208,000
37,000
0
0
0
0
Total
Page 193 of 203
Capital Project Detail Sheet
57
Project Information Project Name: Bellrock & Petworth Parkette Conceptual Design
Type of Project: Park
Project Number: 24-70
Basis for Activity: Other
Department: 8000 - Parks & Recreation
Relationship to Strategic Plan: Old Priority #4 - Be a catalyst for the creation of vibrant, complete communities
Description: Detailed design for Mill sites.
Rationale: Advancement of detailed design based on conceptual drawings and public consultation to be completed in 2025.
Staff Contact: Tim Laprade (tlaprade)
Project Finances
Actuals Description 80300 - Land Improvements Total
Budget
Expensed to Current Year Expenses / Expenditure
Total Project
Prior Approved
2025
2026
2027
2028
2029
0
30,000
15,000
15,000
0
0
0
0
0
30,000
15,000
15,000
0
0
0
0
Page 194 of 203
Capital Project Detail Sheet
58
Project Information Project Name: Shipyards Boat Ramp Rehabilitation
Type of Project: Land
Project Number: 24-72
Basis for Activity: Growth Related
Department: 8000 - Parks & Recreation
Relationship to Strategic Plan: Old Priority #2 - Promote and support growth that meets the community’s needs
Description: Rehabilitation of the Shipyards boat launch ramp.
Rationale: This boat launch is one of the busiest in SFT. The old metal grate launch failed in 2023 and trailer tires were getting caught on broken pieces of metal off the ramp.
Increase in budget to reflect actual costs, conservation and Federal permits and results of Boat launch Condition Assessment
The ramp was removed in 2023 but could not be welded or repaired. Proposal is to replace with the concrete mat ramp system at this location which should have a long life expectancy and reduce liability and risk.
Staff Contact: Tim Laprade (tlaprade)
Project Finances
Actuals Description 80300 - Land Improvements Total
Budget
Expensed to Current Year Expenses / Expenditure
Total Project
Prior Approved
2025
2026
2027
2028
2029
0
135,000
110,000
25,000
0
0
0
0
0
135,000
110,000
25,000
0
0
0
0
Page 195 of 203
Capital Project Detail Sheet
59
Project Information Project Name: Battersea Ball Park Pavilion
Type of Project: Facilities
Project Number: 25-55
Basis for Activity: Growth Related
Department: 8000 - Parks & Recreation
Relationship to Strategic Plan: Priority #2 - Municipal Service Excellence
Description: Construction of a pavilion to support current user groups, including minor ball, lob ball, and the Battersea Pumpkin Festival.
Rationale: The project has been identified by community members as a desired amenity at the park. The project will use the remaining funds of the Battersea Playground Revitalization community fundraising initiative that took place in 2017, of which there is approximately $5,000.
This will be a bookable space and available for community use on a drop-in basis. Staff Contact: Tim Laprade (tlaprade)
Project Finances
Actuals Description 80110 - Building-New
Expensed to Current Year Expenses / Expenditure
Total 46100 - Fundraising Total
Budget
Revenues / Funding Source
Total Project
Prior Approved
2025
2026
2027
2028
2029
0
95,000
0
95,000
0
0
0
0
0
95,000
0
95,000
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Page 196 of 203
Capital Project Detail Sheet
60
Project Information Project Name: Centennial Park baseball diamond rehabilitation
Type of Project: Park
Project Number: 25-66
Basis for Activity: Asset Renewal
Department: 8000 - Parks & Recreation
Relationship to Strategic Plan: Priority #2 - Municipal Service Excellence
Description: Centennial Park Large Diamond rehabilitation including grading, new fencing, and backstop.
Rationale: The Centennial Park Large Diamond is in much need of rehabilitation. The outfield is no longer playable for Youth and Adult Ball due to the fact that it drops off on the first base line side. Frontenac Minor Ball has requested to have this diamond brought up to a playable standard in order to use the diamond for Youth and Adult Ball.
Staff Contact: Tim Laprade (tlaprade)
Project Finances
Actuals Description 80300 - Land Improvements Total
Budget
Expensed to Current Year Expenses / Expenditure
Total Project
Prior Approved
2025
2026
2027
2028
2029
0
250,000
0
250,000
0
0
0
0
0
250,000
0
250,000
0
0
0
0
Page 197 of 203
Capital Project Detail Sheet
61
Project Information Project Name: Harris Park Playground rehabilitation and accessibility upgrades
Type of Project: Park
Project Number: 25-67
Basis for Activity: Asset Renewal
Department: 8000 - Parks & Recreation
Relationship to Strategic Plan: Priority #2 - Municipal Service Excellence
Description: Playground rehabilitation including replacement of play structure and upgrading play surface to a rubberized pad.
Rationale: Playground due for asset renewal and upgrade to current standards. In order to meet A.O.D.A Built Environment standards we need to schedule the annual replacement of playground surfaces with the approved rubber material and play structure needs to be replaced as per playground safety standards.
Staff Contact: Tim Laprade (tlaprade)
Project Finances
Actuals Description 55290 - Contracted Services Expenses / Expenditure Total
Budget
Expensed to Current Year
Total Project
Prior Approved
2025
2026
2027
2028
2029
0
104,000
0
104,000
0
0
0
0
0
104,000
0
104,000
0
0
0
0
Page 198 of 203
Capital Project Detail Sheet
62
Project Information Project Name: Bleacher replacements
Type of Project: Park
Project Number: 25-69
Basis for Activity: Asset Renewal
Department: 8000 - Parks & Recreation
Relationship to Strategic Plan: Priority #2 - Municipal Service Excellence
Description: Bleacher replacements at the following locations in the annual bleacher replacement program:
Rationale: Older bleachers have become a hazard and also don’t meet the Building Code requirements.
Gerald Ball Park Soccer field x2.
The new bleachers have a much longer life expectancy and meet the Building Code Requirements.
Sydenham Point Park Diamond x3. Inverary Ball Diamond x2. Staff Contact: Tim Laprade (tlaprade)
Project Finances
Actuals Description 80115 - Building-Renovations Expenses / Expenditure Total
Budget
Expensed to Current Year
Total Project
Prior Approved
2025
2026
2027
2028
2029
0
91,000
0
91,000
0
0
0
0
0
91,000
0
91,000
0
0
0
0
Page 199 of 203
Capital Project Detail Sheet
63
Project Information Project Name: Centennial Park Upgrades
Type of Project: Equipment
Project Number: 25-70
Basis for Activity: Service Level Change
Department: 8000 - Parks & Recreation
Relationship to Strategic Plan: Priority #2 - Municipal Service Excellence
Description: Purchase of two concrete bunkers to be used as storage sheds for both Baseball and Soccer at Centennial park ($8,000).
Rationale: The current storage in the Canteen is being reduced to support the construction of an accessible washroom, therefore Baseball and Soccer will require storage elsewhere at the park.
Creation of new disc golf recreation course ($10,000).
The concrete bunkers are pre-cast and do not require a building permit. They will be located in closer proximity to the fields, thus being more accessible.
Tree planting program ($20,000).
New disc golf recreation amenity for Centennial park due to strong community interest. Over the past few years over 30 trees have had to be removed from Centennial Park as they were a risk to patrons given their condition. The cause was from the health of the tree being compromised due to the Emerald Ash Borer. This replacement also supports the Townships plans for Climate Action. Staff Contact: Tim Laprade (tlaprade)
Project Finances
Actuals Description
Budget
Expensed to Current Year
Total Project
Prior Approved
2025
2026
2027
2028
2029
Expenses / Expenditure
0
8,000
0
8,000
0
0
0
0
80300 - Land Improvements
Expenses / Expenditure
0
30,000
0
30,000
0
0
0
0
0
38,000
0
38,000
0
0
0
0
Total
Page 200 of 203
80100 - Equipment
Capital Project Detail Sheet
64
Project Information Project Name: Collins / Glenvale Creek flood hazard mapping project
Type of Project: Other
Project Number: 25-78
Basis for Activity: Other
Department: 9800 - Development
Relationship to Strategic Plan: Priority #1 - Sustainable Long-Term Prosperity
Description: Collaborative study (City of Kingston, Frontenac County, and CRCA) to provide updated flood hazard mapping. The last flood hazard mapping in this area was in 1981.
Rationale: This project has been initiated and funding requested by CRCA. The Conservation Authority would provide overall project management. Flood hazard mapping identifies areas at risk of flooding and assists with guiding new development away from these areas.
Total Budget $213,500. 50% provincial Grant. Remainder: 22% City of Kingston, 12% CRCA, 11% SF, 6% County Staff Contact: Brad Wright (bwright)
Project Finances
Actuals Description 55290 - Contracted Services Expenses / Expenditure Total
Budget
Expensed to Current Year
Total Project
Prior Approved
2025
2026
2027
2028
2029
0
25,000
0
25,000
0
0
0
0
0
25,000
0
25,000
0
0
0
0
Page 201 of 203
Page 202 of 203 Office of the Clerk 4432 George St, Box 100 Sydenham ON, K0H 2T0 613-376-3027 hwoodland@southfrontenac.net Memo:
2025 Capital Budget & Long-Term Plan
At the Township of South Frontenac, Recreation and Leisure Services Advisory Committee meeting held on November 28, 2024, the following resolution was approved: Resolution No. 2024:04:04 Moved by Councillor Roberts Seconded by Shane Peters That the Recreation and Leisure Services Advisory Committee support the proposed 2025 Capital Budget and Long-Term Plan outlined in Report Number 2024-012. Should you require further information please do not hesitate to contact me. Heather Woodland Deputy Clerk Township of South Frontenac p: +613-376-3027 e: hwoodland@southfrontenac.net a: 4432 George St., Box 100, Sydenham, ON www.southfrontenac.net
Page 203 of 203 Township of South Frontenac By-Law Number 2024-79 Page 1 of 1 By-Law Number 2024-79 A By-Law to Confirm generally all actions and proceedings of the Special Council meeting of the corporation of the Township of South Frontenac on December 13, 2024 Whereas Section 8 of the Municipal Act, S.O. 2001 c. 25 and amendments thereto provides that a municipality has the capacity, rights powers and privileges of a natural person for the purpose of exercising its authority under the Municipal Act of any other Act and; Whereas Subsection 2 of Section 11 of the Municipal Act S.O. 2001, c. 25 and amendments thereto provides that a lower-tier municipality and an upper-tier municipality may pass by-laws respecting matters within the spheres of the jurisdiction described in the Table to Subsection 2, subject to certain provisions, and; Whereas Section 5 of the Municipal Act, S.O 2001 c. 25 and amendments thereto provides that a municipal power, including a municipality’s capacity, rights, powers and privileges under Section 8 shall be exercised by its council and by by-law unless the municipality is specifically authorized to do otherwise, and; Whereas the Council of the Township of South Frontenac deems it expedient to confirm its actions and proceedings; Therefore, be it resolved that the Council of the Corporation of the Township of South Frontenac hereby enacts as follows:
- The all actions and proceedings of the Council of the Corporation of the Township of South Frontenac taken at its special meeting held on December 13, 2024, be confirmed as actions for which the municipality has the capacity, rights, powers and privileges of a natural person.
- That all actions and proceedings of the Council of the Corporation of the Township of South Frontenac held December 13, 2024, be confirmed as being matters within the spheres of jurisdiction described in Subsection 2 of Section 11 of the Municipal Act, S.O. 2001, c.25 and amendments thereto.
- That all actions and proceedings of the Council of the Corporation of the Township of South Frontenac taken at its special meeting held on December 13, 2024, except those taken by by-law and those required by bylaw to be done by resolution are hereby sanctioned, ratified and confirmed as though set out within and forming part of this bylaw.
- Execution by the Mayor and the Clerk of all Deeds, Instruments and other Documents necessary to give effect to any such Resolution, Motion or other action and the affixing of the Corporate Seal to any such Deed, Instruments or other Documents is hereby authorized and confirmed.
- This By-law shall come into force and take effect on the date of its passage. Given First and Second Readings: Friday, December 13, 2024 Given Third Reading and Passed: Friday, December 13, 2024
James Thompson, Clerk
Ron Vandewal, Mayor