Body: Council Type: Agenda Meeting: Regular Date: December 17, 2024 Collection: Council Agendas Municipality: South Frontenac

[View Document (PDF)](/docs/south-frontenac/Agendas/Council/2024/Council - 17 Dec 2024 - Agenda.pdf)


Document Text

Page 1 of 158

Township of South Frontenac Council Meeting Agenda

TIME: DATE: PLACE:

6:00 PM, Tuesday, December 17, 2024 3910 Battersea Road/Virtual Via Zoom .

Call to Order

a)

That the Council meeting of December 17, 2024 be called to order at ___ p.m.

Declaration of pecuniary interest and the general nature thereof

Approval of Agenda and Addendum

a)

That the agenda be approved, as presented.

Scheduled Closed Session

a)

That Council resolve itself into the Committee of the Whole “Closed Meeting” to consider the following item:

  1. A position, plan, procedure, criteria or instruction to be applied to any negotiations carried on or to be carried on by or on behalf of the municipality or local board - Compensation A position, plan, procedure, criteria or instruction to be applied to any negotiations carried on or to be carried on by or on behalf of the municipality or local board - Compensation

b)

c)

That Council rise from the Committee of the Whole “Closed Meeting” without reporting.

Recess

Public Meeting

a)

That the public meeting regarding PL-ZBA-2024-0127 be called to order.

b)

Notice of Collection

c)

Public Meeting: Zoning By-law Amendment Application PL-ZBA2024-0127, Rosnak, 102903002094800 and 102903002094802, Bob’s Lake, Bedford District

d)

That the public meeting be closed.

Delegations

Briefings

Approval of Minutes

a)

That the minutes of the December 3, 2024 Council meeting be approved.

Reports Requiring Action

a)

Unopened Road Allowance Closure Request RC-24-05

4 - 25

26 - 30

31 - 35

Page 2 of 158

That Council direct staff to proceed with the process of closing, selling and transferring the portion of Unopened Road Allowance shown as Part 2 and Part 3 of Plan 13R19516; and That Council waive the normal process to consider an Unopened Road Allowance closure application to allow the By-law to be considered on the same agenda as the public meeting. b)

Summer Program Registration Fees and Model

36 - 42

That Council endorse the Summer Program Fee Schedule outlined in Exhibit A of Report Number 2024-210 in order to advance a public meeting to held in accordance with By-law 2016-73. c)

Contract Extension - Verona Housing Communal Servicing EA Study

43 - 52

That Council accept the proposal from J. L. Richards & Associates dated October 30th, 2024, for an upset limit of $348,485 plus HST; That Council authorize the execution of a contract extension with J. L. Richards & Associates for the next phases of the Municipal Class Environmental Assessment for water and wastewater solutions for the Verona Housing Project. d)

Request for relief from cash-in-lieu of parkland requirements for consent application PL-BDJ-2024-0032

e)

2025 Budget Approval

53 - 59

60 147

That Council approve the 2025 draft budget provided under Exhibit A of Report 2024212. 11.

Advisory Committee Reports or Minutes

Reports Requiring Approval of By-laws

a)

Zoning By-law Amendment Application PL-ZBA-2024-0127, Rosnak, 102903002094800 and 102903002094802, Bob’s Lake, Bedford District

148 149

That By-law 2024-80 to amend the zoning on lands with Assessment Roll Numbers 102903002094800 and 102903002094802, Part of Lot 36, Concession 8 and Part of Lot 36, Concession 9, District of Bedford, Township of South Frontenac be given first and second reading; and That By-law 2024-80 be given third reading, signed and sealed. 13.

Reports for Information

a)

2024 Year to Date Financial Report

Committee of the Whole

Tabling of Documents

Communications

Notice of Motions

150 157

Page 3 of 158

Rise and Report regarding County Council and External Boards

a)

County Council

b)

Cataraqui Conservation

c)

Quinte Conservation

d)

Frontenac Community Arena Board

Announcements/Statements by Councillors

Closed Session (if requested)

Confirmatory By-law

a)

That By-law 2024-81, being a by-law to confirm generally all actions and proceedings of the Council of the Township of South Frontenac, be given first and second reading. That By-law 2024-81, being the confirmatory by-law, be given third reading, signed and sealed.

Adjournment

a)

That the Council meeting of December 17, 2024 be adjourned at ___ p.m. South Frontenac is a welcoming and thriving rural community

158

Public Meeting under the Planning Act

Zoning By-law Amendment Application PL-ZBA-2024-0127 7:00 p.m. Council Meeting

Page 4 of 158

Tuesday, December 17, 2024

Notice of Collection • Personal information is collected to gather feedback and communicate with interested parties about applications. • This information is collected under the authority of the Planning Act and in accordance with the Municipal Freedom of Information and Protection of Privacy Act. • With the exception of e-mail addresses and telephone numbers, all information and comments will become part of the public record and will appear on the Township’s website. • Meetings are broadcast live over the internet for the public to view. Your voice will be heard in the broadcast if you speak at the meeting. Broadcasts are archived and continue to be publicly available. Page 5 of 158

• Questions regarding the collection, use and disclosure of this personal information should be directed to the Township Clerk.

Public Meeting Statement

Page 6 of 158

• The purpose of this public meeting is to hear comments on Zoning By-Law Amendment Application PL-ZBA-2024-0127. • If you wish to be notified of the decision of Council in respect to the application, you must submit a written request to the Township Clerk by email care of planning@southfrontenac.net. This will also entitle you to be advised of an Ontario Land Tribunal appeal. • Subsection 34(19) of the Planning Act defines the people and public bodies that may appeal the decision to the Ontario Land Tribunal. • Appeals must be filed within 20 days of the notice of decision. They must be filed with the Clerk via the Ontario Land Tribunal’s e-file service at https://olt.gov.on.ca/e-file-service/.

Meeting Format

  1. Mayor introduces application
  2. Staff presents application/reviews proposal
  3. Applicant/agent permitted to address Council
  4. Questions from Council
  5. Members of the public permitted to address Council
  6. Council discussion
  7. Close meeting Page 7 of 158

How to Speak to an Application • The Mayor will open the floor to public comments • You will have five minutes to address Council • In person

• Raise your hand and wait for the Mayor to acknowledge you • Move to the table, turn on microphone, and clearly state your name for the record

• On Zoom

• Click “Raise Hand” button to request to speak or dial *9 (star nine) when participating by telephone • The Mayor will acknowledge you, and the Meeting Host will unmute you • Once you are done speaking or Council has no further questions, the Meeting Host will mute your microphone Page 8 of 158

PL-ZBA-2024-0127

Applicant: Brad and Shannon Rosnak Properties: 102903002094800 and 102903002094802, Bob’s Lake

Page 9 of 158

Location Central Frontenac Township

Tay Valley Township

Page 10 of 158

Location

Crow Lake Road

Properties Page 11 of 158

Bob’s Lake

Proposal • Designation – Rural • Existing Zone – RU • Proposed Zone – RLSW • To allow building permits to be issued for the properties

Page 12 of 158

Page 13 of 158

Eastern Property

Page 14 of 158

Western Property

Agency Comments • Rideau Valley Conservation Authority – no objection

Page 15 of 158

Planning Analysis • Official Plan and Zoning By-law do not allow a building permit to be issued for a property on a private lane unless it is zoned limited service residential • Two large rural waterfront properties with legal access over right-of-way from Crow Lake Road • Development agreement on title re: private lane policies Page 16 of 158

• Can be developed in compliance with RLSW zone and General Provisions including 30m setback from lake

Next Steps • South Frontenac Council should receive comments from the public • Staff recommendation to make a decision tonight if no concerns raised

Page 17 of 158

Open Discussion 1. 2. 3. 4.

Applicant/agent permitted to address Council Council Questions Public Questions and Comments Council Comments

Page 18 of 158

Adjourn Public Meeting

Page 19 of 158

Page 20 of 158

To:

Council

From:

Director, Development Services

Date of Meeting:

December 17, 2024

Subject:

Zoning By-law Amendment Application PL-ZBA-2024-0127, Rosnak, 102903002094800 and 102903002094802, Bob’s Lake, Bedford District

Report Number:

2024-207

Summary This report provides Council with information about Zoning By-law Amendment Application PL-ZBA-2024-0127 for the properties with Assessment Roll Numbers 102903002094800 and 102903002094802 on Bob’s Lake. If approved, the zone on the subject lands would change from Rural (RU) to Limited Service Residential – Waterfront (RLSW). This would allow building permits to be issued for the properties. Council will review the proposal and invite public input at the statutory public meeting. Staff are recommending that Council pass a by-law during the Council meeting in which the public meeting is held, per Procedural By-law as amended by By-law 2023-44. This planning matter is considered technical in nature. Specifically, it is appropriate to rezone waterfront lands for which it has been demonstrated that there is legal access over a private lane. Recommendation THAT By-law 2024-80 to amend the zoning on lands with Assessment Roll Numbers 102903002094800 and 102903002094802, Part of Lot 36, Concession 8 and Part of Lot 36, Concession 9, District of Bedford, Township of South Frontenac be given first and second reading; and That By-law 2024-80 be given third reading, signed and sealed. Background The application can be accessed through the Township’s CivicWeb Document Center, https://southfrontenac.civicweb.net/filepro/documents/109467/ The purpose of the proposed by-law is to change the zone on the subject properties from Rural (RU) to Limited Service Residential - Waterfront (RLSW). A building permit can only be issued for a lot with frontage on a private lane and/or navigable waterway if the lot is in a www.southfrontenac.net South Frontenac is a welcoming and thriving rural community.

Township of South Frontenac Staff Report Number: 2024-207

Page 21 of 158

limited service residential zone. The effect of the by-law would be to allow a building permit to be issued for each property. Under the Planning Act, a public meeting is required to be held to receive comments from the public on the proposed rezoning. The subject properties are located on a peninsula on Bob’s Lake south of Crow Lake Road. Council may recall that two unopened road allowances abutting these properties were closed and sold in 2023 (file RC-21-08). The properties are accessible via a right-of-way from Crow Lake Road over another property owned by the applicants in the Township of Central Frontenac (files PL-BDJ-2023-0097 and B-37-23-OS). The eastern property is triangular-shaped with approximately 3.5 acres in area and approximately 250 metres frontage on Bob’s Lake. The right-of-way follows an existing driveway in the northwest corner of this property, as far from the lake as possible. The topography is a forested, moderate to gentle slope from the right-of-way to the lake. There are no immediate plans to develop this property. The western property is approximately 13.7 acres in area. It has approximately 230 metres of water frontage measured from side lot line to side lot line, and approximately 760 metres measured around the point. The topography is a high, forested ridge, except where the land levels out at the southeast point. The applicants propose to locate a cottage and sewage system on the southeast point, more than 30 metres from the highwater mark of the lake. There is a trailer, a shed, an outhouse and a sleeping cabin on the property. The trailer would be removed from the property following construction of the cottage. The sleeping cabin will need to be moved so that it is at least 30 metres from the lake. Department and Agency Comments

Rideau Valley Conservation Authority had no objection to the approval of the application. Public Comments

No comments were received at the time this report was written. Planning Analysis The proposed zoning by-law amendment was assessed against the applicable policies of the Provincial Planning Statement 2024, County of Frontenac Official Plan, and Township of South Frontenac Official Plan, as well as the provisions of Zoning By-law No. 2003-75 as amended.

www.southfrontenac.net South Frontenac is a welcoming and thriving rural community.

Township of South Frontenac Staff Report Number: 2024-207

Page 22 of 158

The PPS and County Official Plan permit resource-based recreational uses (e.g. seasonal dwellings) on Rural lands. The Township Official Plan suggests that the type and amount of development on ‘Rural’ lands must maintain the rural character, natural heritage, and cultural landscape in the Township. The Official Plan permits limited service residential development in the form of single detached dwellings and seasonal dwellings on waterfront properties accessed from a private road. The subject properties are currently zoned Rural, which allows a variety of uses and buildings. However, section 6.12 of the Township Official Plan and section 5.25 of Zoning By-law No. 2003-75 do not permit a building permit to be issued for a property on a private lane unless the property is in a limited service residential zone (i.e. RLS, RLSW or RLSI). The properties are lots of record that have been in existence since the original lot and concession survey. The Official Plan and Zoning By-law acknowledge this situation by allowing a lot of record to be rezoned for residential development. The purpose of the requirement for a rezoning is to acknowledge that the property is accessed from a private lane, and to consider the condition of the lane before permitting development. Both properties are subject to development agreements that acknowledge the Township’s policies regarding private lanes, per a condition of approval of application PL-BDJ-20230097. The agreements include acknowledgement that the Township does not maintain the private lane nor provide municipal services, and an indemnity against loss, damage or injury due to the owner’s failure to maintain the lane. The consent approval also required the portion of the right-of-way in South Frontenac to be constructed to the Township’s private lane standards. Staff are satisfied that both properties could be developed in compliance with the RLSW zone and general provision requirements of the Zoning By-law, including achieving a minimum 30 metre setback from the highwater mark of Bob’s Lake. Conclusion It is the opinion of staff that the proposed zoning by-law amendment is consistent and conforms to the Provincial Planning Statement 2024, the County of Frontenac Official Plan, and the South Frontenac Official Plan, and represents good planning for the subject property. Staff are recommending that Council pass a by-law during the Council meeting in which the public meeting is held, per Procedural By-law as Amended by By-law 2023-44, as the planning matter is technical in nature. Specifically, it is appropriate to rezone waterfront lands for which it has been demonstrated that there is legal access over a private lane. www.southfrontenac.net South Frontenac is a welcoming and thriving rural community.

Township of South Frontenac Staff Report Number: 2024-207

Page 23 of 158

Relationship to Strategic Plan ☒ Not applicable to this report. ☐ This initiative adheres to the following strategic pillars and directions of the 2023-2026 Strategic Plan. •

Pillars: Choose an item.

Climate Considerations ☒ Not applicable to this report. Notice/Consultation Notice of the Statutory Public Meeting was given pursuant to the requirements of the Planning Act, 20 days in advance of the Public Meeting. This included notice given: • • • •

by mail to every owner of land within 120 metres of the subject lands by posting notice signs on the subject lands by posting on the Township’s Current Planning Application webpage by e-mail to prescribed persons and public bodies

Attachments Exhibit A. By-law 2024-79 Approvals Prepared By: Christine Woods, RPP, MCIP, Manager of Planning Submitted By:

Brad Wright, RPP, MCIP, AICP, PLE Director of Development Services Approved By:

Louise Fragnito, CGA, CPA Chief Administrative Officer

www.southfrontenac.net South Frontenac is a welcoming and thriving rural community.

Page 24 of 158 Township of South Frontenac By-Law Number 2024-80 Page 1 of 2 By-Law Number 2024-80 A By-Law to amend By-law 2003-75, as amended, to rezone land from Rural (RU) to Limited Service Residential – Waterfront (RLSW) on lands with Assessment Roll Numbers 102903002094800 and 102903002094802, and further described as Part of Lot 36, Concession 8 and Part of Lot 36, Concession 9, District of Bedford Whereas pursuant to the provisions of Section 34 of the Planning Act, RSO 1990 as amended, the Council of a Municipality may enact by-laws regulating the use of land and the erection, location and use of buildings and structures thereon; and Whereas By-law 2003-75 being the Zoning By-law regulates the use of land and the erection, location and use of buildings and structures within the Township of South Frontenac; and Whereas the Council of the Corporation of the Township of South Frontenac considered all written and oral submissions received on this application, the effect of which helped Council make an informed decision; and Whereas there be no further notice pursuant to Section 34 (17) of the Planning Act; Therefore be it resolved that the Council of the Corporation of the Township of South Frontenac hereby enacts as follows:

  1. That Schedule “D” to Zoning By-law Number 2003-75 as amended, is hereby further amended by changing the zoning from Rural (RU) to Limited Service Residential – Waterfront (RLSW) for lands shown on Schedule “1”.
  2. This By-law shall come into force in accordance with Section 34 of the Planning Act, 1990, as amended, either upon the date of passage or as otherwise provided by said Section 34. Given First and Second Readings: Tuesday, December 17, 2024 Given Third Reading and Passed: Tuesday, December 17, 2024

James Thompson, Clerk

Ron Vandewal, Mayor

Page 25 of 158 Township of South Frontenac By-Law Number 2024-80 Page 2 of 2 Schedule 1 of By-law 2024-80

Page 26 of 158 Minutes of Council December, 3, 2024

Township of South Frontenac Council Meeting Minutes

Meeting # Time: 7:00 PM Location: 3910 Battersea Road/Virtual Via Zoom Present: Ray Leonard, Doug Morey, Steve Pegrum, Norm Roberts, Randy Ruttan, Ron Sleeth, Scott Trueman, Adam Turcotte, Mayor Ron Vandewal Staff: Louise Fragnito - Chief Administrative Officer, James Thompson - Clerk, Heather Woodland - Deputy Clerk, Kyle Bolton - Director of Public Services, Delbert Blakney Director of Fire and Emergency Services, Tim Laprade - Manager of Recreation and Facilities, Amanda Pantrey, Recreation and Events Coordinator, Ronnie Joslin Construction Technologist, Stephanie Kuca - Deputy Treasurer

1

Call to Order

a)

Resolution Resolution No. 2024-20-01 Moved by Councillor Trueman Seconded by Councillor Sleeth That the Council meeting of December 3, 2024 be called to order at 7:02 p.m. Carried

2 a)

Declaration of pecuniary interest and the general nature thereof There were none.

3

Approval of Agenda and Addendum

a)

Resolution Resolution No. 2024-20-02 Moved by Councillor Turcotte Seconded by Councillor Leonard That the agenda be approved, as presented. Carried

4 a)

Scheduled Closed Session There was none.

5

Recess

6

Public Meeting

a)

7 a)

Not applicable. Delegations

Page 27 of 158 Minutes of Council December, 3, 2024 There were none. 8

Briefings

a)

Laurie Hubert from KPMG was present and spoke to the 2023 Audited Financial Statements.

b)

Louise Fragnito, Chief Administrative Officer was present and spoke to Council regarding the 2025 Capital Budget Overview.

9

Approval of Minutes

a)

Resolution Resolution No. 2024-20-03 Moved by Councillor Ruttan Seconded by Deputy Mayor Morey That the minutes of the November 19, 2024 Council meeting be approved. Carried

10

Reports Requiring Action

a)

2023 Audited Financial Statements Resolution No. 2024-20-04 Moved by Councillor Pegrum Seconded by Councillor Roberts That Council receive the 2023 Audited Financial Statements attached as Exhibit A to Report Number 2024-205. Carried

b)

Disposition of Surplus Land Resolution No. 2024-20-05 Moved by Councillor Sleeth Seconded by Councillor Turcotte That staff be directed to dispose and transfer the surplus land described as Roll Number 102904002030450, PT LT 10 CON 13 LOUGHBOROUGH AS IN FR156156; SOUTH FRONTENAC to the Land Conservancy for Kingston, Frontenac, Lennox & Addington subject to the following conditions:

  1. That the boundary of the property be properly defined to prevent trespassing on neighbouring properties;
  2. That the agreement stipulate that the Land Conservancy for Kingston, Frontenac, Lennox & Addington Conservancy agrees that the property would remain in the Conservancy’s ownership, and in the future should it become necessary to transfer the ownership, the property would be transferred to another conservation minded group consistent with clause 9 of the Conservancy’s articles of continuance; and
  3. That the Land Conservancy for Kingston, Frontenac, Lennox & Addington Conservancy be responsible for all legal fees associated with the land transfer; and
  4. That the Land Conservancy for Kingston, Frontenac, Lennox & Addington Conservancy be responsible for the cost of a survey done by an Ontario Land Surveyor, as required. Carried as Amended - See Motion to Amend which Carried

Page 2 of 5

Page 28 of 158 Minutes of Council December, 3, 2024 Resolution No. 2024-20-06 Moved by Councillor Sleeth Seconded by Councillor Pegrum That the recommendation of Councillor Sleeth and Councillor Turcotte regarding Disposition of Surplus Land be amended by including Clause 4 which reads as follows: “4. That the Land Conservancy for Kingston, Frontenac, Lennox & Addington Conservancy be responsible for the cost of a survey done by an Ontario Land Surveyor, as required.” Carried c)

Verona Housing – Architectural Services Resolution No. 2024-20-07 Moved by Councillor Roberts Seconded by Councillor Leonard That Council support awarding the Verona Housing Architectural Services in the amount of $698,200 + HST to RAW Design. Carried

d)

Verona Housing – CHIF Grant Resolution No. 2024-20-08 Moved by Deputy Mayor Morey Seconded by Councillor Ruttan That Council support staff in moving forward with the CHIF grant application submission, and; That Council authorize the Clerk and Mayor to sign off on grant agreements for the CHIF grant, if successful. Carried

e)

Contract Extension – Environmental Monitoring and Reporting Resolution No. 2024-20-09 Moved by Councillor Leonard Seconded by Councillor Trueman That Council approve a three-year extension to the Environmental Monitoring and Reporting contract with Cambium ending on April 30th, 2027; and That the terms and conditions governing the Environmental Monitoring and Reporting contract be subject to the details outlined in the proposal attached as Exhibit A of Report Number 2024-200. Carried

11 a)

Advisory Committee Reports or Minutes There were none.

12

Reports Requiring Approval of By-laws

a)

Proposed By-law to Establish Recreation Service Fees Resolution No. 2024-20-10 Moved by Councillor Pegrum Seconded by Councillor Turcotte That the Recreation Service Fee & Facility Allocation Policy be approved as provided in Exhibit G of Report Number 2024-201.

Page 3 of 5

Page 29 of 158 Minutes of Council December, 3, 2024 Carried Resolution No. 2024-20-11 Moved by Councillor Pegrum Seconded by Councillor Deputy Mayor Morey That By-law 2024-77, attached to the Report Number 2024-201 as Exhibit A, being a By-law to Amend By-Law Number 2024-59, A By-Law to Establish Fees and Charges Collected by The Corporation of the Township of South Frontenac, as amended, be given first and second reading. Carried Resolution No. 2024-20-12 Moved by Councillor Turcotte Seconded by Councillor Leonard That By-Law 2024-77 be given third reading, signed and sealed. Carried b)

c)

13 a)

14 a)

15 a)

Councillor Roberts and Councillor Sleeth were recorded as opposed to the approval of By-law 2024-77.

Council consented to a correction to By-law 2024-77, “Rectangular Fields and Baseball Diamonds”, Category 3, Tournament hourly rate (7am - 7pm) New Users fee to $65 and Phase in fee to $22.10, and Tournament hourly rate (7pm-11pm) New Users fee to $75 and Phase in fee to $25.50 respectively. Reports for Information There were none. Committee of the Whole Not applicable. Tabling of Documents There were none.

16

Communications

a)

Correspondence received from Rachael Mather, Public Health Dietitian, KFL&A Public Health, regarding the 2024 Cost of Healthy Eating Report.

17

Notice of Motions

a)

There were none.

18

Rise and Report regarding County Council and External Boards

a)

County Council Councillor Leonard provided an update regarding the election of the new Warden and Deputy Warden and the approved budget.

b)

Rideau Valley Conservation Authority

Page 4 of 5

Page 30 of 158 Minutes of Council December, 3, 2024 Councillor Turcotte provided an update regarding recent appointments, draft budget and strategic documents that were received at the previous meeting. 19 a)

Announcements/Statements by Councillors Councillor Trueman congratulated the organizers on a successful Community Sydenham and District Lions Club Tree Lighting event which took place on Friday November 29, 2024 and the Sydenham Santa Claus Parade which occurred on Saturday November 30, 2024.

20

Closed Session (if requested)

21

Confirmatory By-law

a)

Resolution Resolution No. 2024-20-13 Moved by Councillor Roberts Seconded by Deputy Mayor Morey That By-law 2024-78, being a by-law to confirm generally all actions and proceedings of the Council of the Township of South Frontenac, be given first and second reading. Carried Resolution No. 2024-20-14 Moved by Councillor Ruttan Seconded by Councillor Sleeth That By-law 2024-78, being the confirmatory by-law, be given third reading, signed and sealed. Carried

22

Adjournment

a)

Resolution Resolution No. 2024-20-15 Moved by Councillor Turcotte Seconded by Councillor Roberts That the Council meeting of December 3, 2024 be adjourned at 8:16 p.m. Carried

Ron Vandewal, Mayor James Thompson, Clerk South Frontenac is a welcoming and thriving rural community

Page 5 of 5

Page 31 of 158

To:

Council

From:

Office of the Clerk

Date of Meeting:

December 17, 2024

Subject:

Unopened Road Allowance Closure Request RC-24-05

Report Number:

2024-206

Summary An application has been received by staff requesting the closure and sale of a portion of Unopened Road Allowance between Concession 11 and Concession 12, Part Lot 22, Loughborough, shown as Part 2 and Part 3 on Plan 13R19516. Recommendation That Council direct staff to proceed with the process of closing, selling and transferring the portion of Unopened Road Allowance shown as Part 2 and Part 3 of Plan 13R19516; and That Council waive the normal process to consider an Unopened Road Allowance closure application to allow the By-law to be considered on the same agenda as the public meeting. Background The Municipal Act, 2001, allows Council to consider the stopping up, closing and transferring of lands that are surplus to the needs of the municipality. The Township Notice By-Law, 2016-73 prescribes the manner in which notice is provided for applications requesting to stop up, close and transfer an unopened road allowance. Discussion/Analysis Staff have received an application requesting the closing of an Unopened Road Allowance lying between Concession 11 and Concession 12, Lot 22, District of Loughborough. The benefitting lands are a waterfront property on Buck Lake near the end of Narrows Lane, municipally addressed as 1173 Narrows Lane. The Unopened Road Allowance is aligned from east to west between Perth Road and Buck Lake. In 2008, an application to close and transfer a portion of the Unopened Road Allowance to be added to 1173 was received and presented to Council. Council agreed that the portions of unopened road allowance on which the cottage and holding tank were located should be closed and sold to the abutting property owner.

www.southfrontenac.net South Frontenac is a welcoming and thriving rural community.

Township of South Frontenac Staff Report Number – 2024-206

Page 32 of 158

The Location Map attached to the Report as Exhibit “A” shows Parcels A, B, C and D for clarification. Parcel A is 1173 Narrows Lane, the benefitting lands of the 2008 application to close and purchase the Unopened Road Allowance and the benefitting lands to this current application. Parcel B is the Unopened Road Allowance that is requesting approval from Council to be closed and sold to be added to Parcel A. On October 1, 2024, Parcel C received approval from Council to close and sell to the benefitting lands located at Parcel D, 1185 Narrows Lane. That sale has been approved by Council and is pending completion. Exhibit “B” to the Report is survey 13R19516. Through Report 2024-162, Council approved the closure of Part 4 Plan 13R19516 to the benefiting lands located at 1185 Narrows Lane. It was through this process that the abutting landowner and current applicant inquired about closing and purchasing the remainder of the Unopened Road Allowance. A review of the satellite imagery on Frontenac Maps shows that the distance between the dwellings located on 1185 and 1173 Narrows Lane are just over 10 metres across which restricts the portion of the Unopened Road Allowance. The survey from the 2008 application will suffice as a legal description, all of Parts 2 and 3 are being proposed to be closed and purchased. The current unopened road access between the two properties is already narrow and this closure and transfer will not create a situation which would further prohibit the public’s already limited access. It should be noted that the applicant submitted their application and paid the application fee and deposit in advance of By-Law 2024-66 A By-Law to Establish Unopened Road Allowance Policies taking effect and is being considered under the terms of the previous process. The area of Parts 2 and 3 Plan 13R19516 is approximately 3,417.67 square feet. The lands are within 300 of a waterbody and therefore will have a purchase price of $2.41 cents a square foot. The total purchase price will be $8,200 plus HST ($1,066) for a total of $9,266.66. The application details will be circulated in accordance with the Township Notice By-law and to Public Services and Development Services staff if Council is amendable to moving forward with the public meeting stage of the application process. Financial Implications The applicant has paid the application fee and a deposit for legal costs incurred. Relationship to Strategic Plan ☒ Not applicable to this report. ☐ This initiative adheres to the following strategic pillars and directions of the 2023-2026 Strategic Plan. • •

Pillar: Choose an item. Action Item (If Applicable): Insert Text

www.southfrontenac.net South Frontenac is a welcoming and thriving rural community.

Township of South Frontenac Staff Report Number – 2024-206

Page 33 of 158

Climate Considerations ☒ Not applicable to this report. ☐ This initiative supports climate change mitigation/adaption efforts in South Frontenac; and/or impacts the Township’s resilience to climate change. Notice/Consultation Public Notice requirements are set out in By-Law Number 2024-66, A By-Law to Establish Unopened Road Allowance Policies. Attachments Exhibit A – Location Map Exhibit B – Survey 13R19516 Approvals Prepared By: Heather Woodland, Deputy Clerk Submitted By:

James Thompson, Clerk Approved By:

Louise Fragnito, Chief Administrative Officer

www.southfrontenac.net South Frontenac is a welcoming and thriving rural community.

KA

Inset Map

a‘k; SOUTH FRONTENAC RC-24—05

(LEVERETTE) 1173 NARROWS LANE m

mug-mg mnummm m um man-mm

mum

El um mm ”mm El Stunt um:

nun-1 y:

um

mum.“

watm

mm

Ala

mm um

:_'|

1m

mmlv

Page 34 of 158

Page 35 of 158

N

"

‘L ?f 5b {a U ,‘\

I"

"

'


_

‘.

.

w

p,

"

n:

n

‘9: L.

..

‘“

'

1 “g

:1

A-

f‘

SB

n

3‘4

1’

‘7

PART

I…1;.

““

3 H«#~0

(3&SK)

(

(

Ms

.

V

D2)

"

(Th/‘1

“08-5730.”

1’

~7579’Oo-w 26.71

I:

INST. No. FR117802 P/N 15252—0200/9/

WM)

7, 47

III

(1376)

Page 36 of 158

To:

Council

From:

Director, Public Services

Date of Meeting:

December 17, 2024

Subject:

Summer Program Registration Fees and Model

Report Number:

2024-210

Summary This report seeks Councils endorsement of the proposed Summer Program Registration Fees and Model and to proceed with a public meeting to update the fee schedule in accordance with By-law 2016-73. Recommendation That Council endorse the Summer Program Fee Schedule outlined in Exhibit A in order to advance a public meeting to held in accordance with By-law 2016-73. Background The municipality’s Summer Programs continue to see high demand, as demonstrated by the registration trends since the return to programming in 2022 after a two-year hiatus due to the pandemic. The demand prompted the reopening of McMullen Beach camp for the 2024 season, offering an additional 280-day camp spaces. Despite the increase in supply, demand outpaced spaces. The Day Camp program filled up at all three sites shortly after registration opened, with most weeks experiencing waitlists. The township’s summer program fee structure has not been reviewed in several years. As such, staff have reviewed the operating budget against the revenue of the day camps to create a fee schedule that ensures the programs sustainability. Discussion/Analysis At the May 25th, 2023, Recreation and Leisure Services Advisory Committee meeting, committee members inquired about standards and practices for other municipal program registration formats, specifically for residents and non-residents. Staff reported back with findings at the August 24th, 2023, meeting. At the November 28th, 2024, Recreation and Leisure Services Advisory Committee meeting, staff presented a report recommending changes to the Summer Program Registration Fees and Model in response to the continued demand for camp. The recommended changes are www.southfrontenac.net South Frontenac is a welcoming and thriving rural community.

Township of South Frontenac Staff Report – 2024-210

Page 37 of 158

also in recognition of the current lack of a sustainable funding model with built-in fee increases to keep up with inflation. The committee made the following motion: Moved by Councillor Roberts Seconded by Shane Peters ‘That the Recreation and Leisure Services Advisory Committee support the proposed changes to the summer program registration model outlined in Report Number 2024-013; and That the Recreation and Leisure Services Advisory Committee support the proposed changes to the summer program funding model outlined in Report Number 2024-013.’ Research and setting program delivery goals After reviewing registration trends, receiving several comments from parents/ guardians, and with inquiries and past direction from this committee, staff developed several program goals:

  1. Achieve a sustainable funding model by 2027.
  2. Establish a funding model that recognizes the tax base subsidy.
  3. Establish a registration model that recognizes the tax base subsidy.
  4. Ensure opportunities for camp are more evenly distributed and give more kids a chance to go to camp. Staff researched several municipal recreation program registration formats, policies, and benchmarking for setting program fees. This research resulted in several options that were considered and weighed against feasibility and the community context. Following the consideration, staff are recommending several changes to the funding and registration models: Recommended changes to the funding model to achieve goals 1 and 2: Programs are currently funded through a registration fee that is subsidized through the recreation operating budget. The funding model has not had a thorough review in several years. Staff have reviewed the operating budget and have developed a cost recovery forecast that aligns with the proposed changes to the registration format and that is sustainable for program development while recognizing the tax base subsidy. •

Differential pricing: •

The non-resident rate should be a full cost recovery fee with no subsidization.

The resident rate should be reduced to reflect the tax base subsidy. Staff are proposing a 20% subsidized rate from the cost recovery fee.

Phased-in price increase to achieve cost recovery: •

Over 2025, 2026 and 2027, non-resident registration rates will increase by $23.31/ year, then rounded to the nearest $5 increment to reach full cost www.southfrontenac.net South Frontenac is a welcoming and thriving rural community.

Township of South Frontenac Staff Report – 2024-210

Page 38 of 158

recovery. Resident rates will increase by $9.82/ year, then rounded to the nearest $5 increment to reach full cost recovery, less 20%. Recommended changes to the registration model to achieve goals 3 and 4: •

Resident and non-resident specific spaces: •

The Point and McMullen – 20 out of 35 spaces to be held initially for residents.

Gilmour Point – 15 out of 25 spaces to be held initially for residents.

Resident spaces will be held for one month. If after one month the spaces are not filled and there is a waitlist for non-residents, the spaces will be filled by non-residents from a first come, first served off the waitlist.

Monetary penalties for withdrawals – Staff will be working with the Treasury Department to establish a refund process that aligns with relevant municipal legislation. The proposed withdrawal schedule includes an advanced notice fee, late notice fee, and in-session cancellation fee. The fees are detailed in Exhibit A.

Note that staff also initially recommended and investigated the possibility of having a cap for the number of weeks a participant can register for camp, but the registration software does not have that functionality. Upon further investigation, staff were alerted to the fact that parents could create multiple profiles for the same child and register them in more programs, rendering the policy ineffective. Financial Implications See Exhibit A – Proposed Summer Program Fee Schedule. Relationship to Strategic Plans ☐ Not applicable to this report. ☐ This initiative adheres to the following guiding principle of the 2023-2026 Strategic Plan. •

Priority: Financial Sustainability

Climate Considerations ☒ Not applicable to this report. ☐ This initiative supports climate change mitigation/adaption efforts in South Frontenac; and/or impacts the Township’s resilience to climate change. Notice/Consultation

Manager, Recreation and Facilities Director of Corporate Services and Treasurer Deputy Treasurer Financial Analyst www.southfrontenac.net South Frontenac is a welcoming and thriving rural community.

Township of South Frontenac Staff Report – 2024-210

Attachments Exhibit A – Proposed Summer Program Fee Schedule Exhibit B – Rec Committee Motion – Summer Program Registration and Fees Model Approvals Prepared By: Amanda Pantrey, Recreation and Events Coordinator Submitted By:

Kyle Bolton, Director of Public Services Approved By:

Louise Fragnito, Chief Administrative Officer

www.southfrontenac.net South Frontenac is a welcoming and thriving rural community.

Page 39 of 158

Page 40 of 158 Public Services 2490 Keeley Road Sydenham ON, K0H 2T0 613-376-3027 recsupport@southfrontenac.net

Recreation and Leisure Services Exhibit A – Proposed Summer Program Fee Schedule •

Over 2025, 2026 and 2027, Day Camp registration fees for non-resident rates will increase by $23.31/ year, then rounded to the nearest $5 increment to reach full cost recovery. Resident rates will increase by $9.82/ year, then rounded to the nearest $5 increment to reach full cost recovery, less 20% in recognition of the tax base subsidy. Swim lessons, before-care, after-care, and the shuttle bus service will be subject to an annual 4% increase, rounded to the nearest dollar. These services will be subject to equal pricing for residents and non-residents. From 2028 and beyond, an automatic 4% registration fee increase will be implemented to account for inflation and to align with the Recreation Facility Fee Rental Schedule. Weeks with holidays will be reduced by 20% for all program registration fees.

Proposed fee schedule: Rates for Programs with Differential Pricing for Residents and Non-Residents

Day Camp

2025 Resident

2025 NonResident

2026 Resident

2026 NonResident

2027 Resident

2027 NonResident

2028 Resident

2028 NonResident

$160

$175

$170

$195

$180

$220

$185

$225

Rates for Programs with Equal Pricing for Residents and Non-Residents Swim Lessons Before Care After Care Shuttle Bus

2025 Rate

2026 Rate

2027 Rate

2028 Rate

$68

$70

$73

$76

$16

$16

$17

$18

$16

$16

$17

$18

$31

$32

$34

$35

www.southfrontenac.net A welcoming and thriving rural community.

Page 41 of 158 Public Services 2490 Keeley Road Sydenham ON, K0H 2T0 613-376-3027 recsupport@southfrontenac.net

Recreation and Leisure Services Proposed program withdrawal fees: Fee name

Fee description

Fee amount

Advanced notice cancellation fee

Cancellation and withdrawal of participant with more than one week prior to the start date. Cancellation and withdrawal of a participant within the week of the program start date. Cancellation and withdrawal of a participant during the program session.

Full refund, less an $15 administrative fee.

Late notice cancellation fee In-session cancellation fee

50% refund of program registration rate, less an $15 administrative fee. No refund will be provided.

In exceptional circumstances, staff reserve the right to apply the advanced notice cancellation fee for late notice or in-session cancellations.

www.southfrontenac.net A welcoming and thriving rural community.

Page 42 of 158 Office of the Clerk 4432 George St, Box 100 Sydenham ON, K0H 2T0 613-376-3027 hwoodland@southfrontenac.net Memo:

Summer Program Registration and Fees Model

At the Township of South Frontenac, Recreation and Leisure Services Advisory Committee meeting held on November 28, 2024, the following resolution was approved: Resolution No. 2024:04:05 Moved by Councillor Roberts Seconded by Shane Peters That the Recreation and Leisure Services Advisory Committee support the proposed changes to the summer program registration model outlined in Report Number 2024-013; and That the Recreation and Leisure Services Advisory Committee support the proposed changes to the summer program funding model outlined in Report Number 2024-013. Should you require further information please do not hesitate to contact me. Heather Woodland Deputy Clerk Township of South Frontenac p: +613-376-3027 e: hwoodland@southfrontenac.net a: 4432 George St., Box 100, Sydenham, ON www.southfrontenac.net

Page 43 of 158

To:

Council

From:

Director, Public Services

Date of Meeting:

December 17, 2024

Subject:

Contract Extension - Verona Housing Communal Servicing EA Study

Report Number:

2024-209

Summary The purpose of this report is to obtain Council approval to extend the consulting services contract with J. L. Richards & Associates for the next phase of the Municipal Class EA for water and wastewater servicing the Verona Housing project. Recommendation That Council accept the proposal from J. L. Richards & Associates dated October 30th, 2024, for an upset limit of $348,485 plus HST; That Council authorize the execution of a contract extension with J. L. Richards & Associates for the next phases of the Municipal Class Environmental Assessment for water and wastewater solutions for the Verona Housing Project.

Background On December 6th, 2022, Council awarded Request for Proposal # PS -P02-2022 to J. L. Richards & Associates for the Verona Housing Communal Servicing Options Study for the amount of $86,081.99 plus HST. The study awarded at that time was carried out using the Master Plan approach (phases 1 and 2) of the Municipal Class Environmental Assessment (MCEA) process. An outline of the MCEA process has been attached to this report as Exhibit A. On May 21st, 2024, Council received the Master Plan findings along with the summary of consultation efforts involving the public, agencies, and other key stakeholders. The report findings were accepted, and Council provided staff direction to place the final report on public record for the required 30-day comment period. A copy of Report 2024-096 has been attached as Exhibit B for reference. On June 27th, 2024, the Notice of Completion for the Master Plan was advertised and placed on the mandatory 30-day public viewing period. Upon conclusion of the notice www.southfrontenac.net South Frontenac is a welcoming and thriving rural community.

Township of South Frontenac Staff Report Number: 2024-209

Page 44 of 158

period, only one set of written comments were received. On June 26th, 2024, the Ministry of Citizenship and Multiculturalism (MCM) provided written comments regarding archaeological resources, built heritage resources and cultural heritage resources. J. L. Richards team responded to MCM with recommended language changes and the final report was subsequently accepted on September 12th, 2024. Discussion/Analysis Over the last two years, staff have been working closely with J. L. Richards & Associates on advancing the mandatory study work for communal servicing to support the Verona housing project. Now that the Master Plan phase has been officially completed the Township may now advance the individual EA projects for water and wastewater as prescribed under the Ontario Environmental Assessment Act. Earlier this fall, the Township requested J. L. Richards to prepare a formal proposal to advance the Schedule C Class EA for water servicing and the corresponding Schedule B Class EA for wastewater servicing. Terms and conditions contained within the existing services contract otherwise allowed for the opportunity for an extension of contract subject to mutually agreed rates and/or fixed costs. On October 30th, the Township received a detailed proposal and workplan for the next phases of the MCEA which examine alternative designs for the preferred solution and compile all findings into a final Environmental Study Report (refer to Exhibit A). Key details and deliverables in this next phase of the project are outlined below: a)

Core Study Activities • Project management including communication plans, monthly reporting, and invoicing • Undertaking all public consultation activities needed for the Municipal Class EA including preparation and issuance of project notices • Coordination with Township-retained natural heritage specialist on findings • Coordination of all field review work for archaeological, built heritage and cultural heritage resources • Organizing and participating in meetings with key stakeholders and regulatory bodies, including MECP, Conservation Authority and First Nation Groups, to discuss project details, address concerns, and ensure compliance with relevant regulations

b)

Wastewater Investigations (Sub-Consultant Cambium) • Coordination of on-site wastewater investigations to assess the site suitability for natural attenuation and dispersal of wastewater • Identification and assessment of native soils, position of shallow water table and surficial slopes across the site • Assessment will include background review, drilling program (10 boreholes), soils analysis, groundwater sampling and testing, conceptual sewage system design and water resources assessment • Conceptual design will be created based on the wastewater strength, volume, site topography, horizontal site clearances and receiving subsurface soil conditions www.southfrontenac.net South Frontenac is a welcoming and thriving rural community.

Township of South Frontenac Staff Report Number: 2024-209

Page 45 of 158

c)

Water Supply Investigations (Sub-Consultant Cambium) • Coordination of a water supply assessment which will include the installation of a new test well within the development area and will include hydraulic testing of this well and associated aquifer to characterize of on-site groundwater resources • Investigation will confirm the areal extent of the aquifer, potability and general geochemistry of the water supplies • Well survey and door to door well reconnaissance will be conducted with adjacent well users within proximity to the site • Hydraulic pump tests will be carried out including a 72-hour pumping test to determine maximum well yield. Information obtained from these investigations may be used to support delineate wellhead protection areas (WHPA) however delineation of the WHPA is not included within the scope • Raw water characterization including all parameters required by the Ministry’s Procedure D-5-5, including comparisons to the Ontario Drinking Water Quality Standard • Complete a water supply assessment report which will determine the properties of the supply aquifer (well yield, transmissivity, hydraulic conductivity etc.) • Results of the hydrogeological study will be communicated directly to residents and comments will be addressed as necessary

d)

Schedule C Class EA – New Municipal Drinking Water System Review and integrate findings from archaeological, built heritage, and natural heritage reports Coordinate with equipment suppliers to obtain quotes, supporting the design and cost estimation process Develop a detailed inventory of natural, social, technical, and economic impacts and identify positive and negative impacts of alternative design solutions along with mitigation measures Develop and evaluate conceptual designs for groundwater supply and treatment systems including site layout options, establishing evaluation criteria, and analyzing the impacts and costs of each design option Hold meetings with the Township to review key milestones, reports, and presentations. Incorporate all findings and the evaluation process into a draft Phase 3 report Hold a combined Public information Centers (PIC), and address public comments during the review period Prepare Environmental Study Report (ESR) and allow for 30-day public review. Present the final report to Council.

• • •

• • • • •

www.southfrontenac.net South Frontenac is a welcoming and thriving rural community.

Township of South Frontenac Staff Report Number: 2024-209

e)

• •

• •

• • • • •

Page 46 of 158

Schedule B Class EA – New Wastewater Treatment System – Subsurface Dispersal Review the built heritage, and natural heritage study reports Develop conceptual designs for the wastewater treatment and subsurface disposal systems, create site layout options, establishing evaluation criteria, and analyzing the impacts and costs of each design option Coordinate with equipment suppliers to obtain quotes for treatment systems Develop a detailed inventory of natural, social, technical, and economic impacts and identify positive and negative impacts of alternative design solutions along with mitigation measures. Evaluate and select the preferred design solution Hold meetings with the Township to review key milestones, reports, and presentations. Incorporate all findings and the evaluation process into a Phase 2 report Hold a combined Public information Centers (PIC), and address public comments during the review period Prepare Phase 2 Report (ESR) allowing for Township and public review. Present the final report to Council.

The J. L. Richards & Associates proposal includes the core team from the Master Plan assignment and introduces new hydrogeological / geotechnical support from Cambium and archaeological and heritage planning support from LHC. The overall assignment will include approximately 2,200 hours of technical work and is forecasted to take 15 months to complete with conclusion in the spring of 2026. It is important to note that the technical reports completed under these project EA’s will help support future permit applications for Permits to Take Water, Environmental Compliance Approvals, and applications for Municipal Drinking Water Licence. The work prescribed in this proposal, does not however, include the source water protection work such as mapping vulnerable areas, identifying vulnerability scores, and mapping impervious areas and land use activities. The future groundwater modelling work for source water may only proceed after the hydrogeological pump testing has confirmed the size of the influence area of the new wellhead. Once this study milestone has been completed, a future and subsequent proposal will be required to initiate parallel source water protection studies to support a Section 34 Amendment of the Quinte Source Water Protection Plan. Discussions with specialists in the source water protection field have indicated that these additional investigations could range anywhere from $150,000 to $200,000. The Frontenac Municipal Services Corporation has previously identified concerns with the Ministry of Environment on the integration issues between the Environmental Assessment Act and Source Water Protection Amendments as these studies are led by different agencies. J. L. Richard’s team and corporate experience with municipal drinking water systems is expected to help navigate these key integration challenges.

www.southfrontenac.net South Frontenac is a welcoming and thriving rural community.

Township of South Frontenac Staff Report Number: 2024-209

Page 47 of 158

Financial Implications The Master Plan report which concluded in May of this year identified that the preferred water and wastewater treatment alternatives carry an estimate of $4.1 million (2024 Dollar Value). The engineering, permits, and approvals portion of these costs break out to an estimate of approximately $600,000. Both of these figures represent Class D estimates and a such may vary by as much as +/- 30%. The greatest financial risks on the servicing project will relate to the future groundwater modelling work in support of source water protection. The costs and scope of this phase of work will inevitably be impacted by the scale of the yet unknown wellhead capture area. The proposal from J. L. Richards and Associates totalling $348,485 plus HST remains consistent with the original project forecasting and the next phase of the EA will help bring further certainty in the scope and cost of the overall project. The engineering costs included in this phase of the study will be funded by existing budget dollars under project 22-06 and existing grants such as the County of Frontenac seniors housing. It is therefore staff’s recommendation that the proposal be accepted. Relationship to Strategic Plans ☒ Not applicable to this report. ☒ This initiative adheres to the following guiding principle of the 2023-2026 Strategic Plan. • •

Priority: Choose an item. Action Item (If Applicable): Insert Text

Climate Considerations ☒ Not applicable to this report. Notice/Consultation J. L. Richards & Associates 2B Developments Inc. Attachments Exhibit A – Municipal Class EA Planning and Design Process Exhibit B – Report # 2024-096 Verona Housing Water and Wastewater Master Plan Update Approvals Prepared By: W. Troy Dunlop, C.E.T., Manager of Engineering and Capital Projects Submitted By:

www.southfrontenac.net South Frontenac is a welcoming and thriving rural community.

Township of South Frontenac Staff Report Number: 2024-209

Kyle Bolton, C.E.T., Director of Public Services Approved By:

Louise Fragnito, CPA CGA, Chief Administrative Officer

www.southfrontenac.net South Frontenac is a welcoming and thriving rural community.

Page 48 of 158

Part A

MCEA Planning Process

Page 49 of 158

Page 41

Page 50 of 158

To:

Council

From:

Director, Public Services

Date of Meeting:

May 21, 2024

Subject:

Verona Housing Water and Wastewater Master Plan Update

Report Number:

2024-096

Summary The purpose of this report is to seek approval from Council to issue the Notice of Completion for the Verona Housing Water and Wastewater Servicing Master Plan and to place the project report on public record for the required 30-day notice period. Recommendation That Council direct staff to issue a Notice of Completion for the Verona Housing Water and Wastewater Servicing Master Plan; and That the Verona Housing Water and Wastewater Servicing Mater Plan Report be placed on public record for the required 30-day comment period Background On December 6, 2022, Township Council awarded RFP # PS-P02-2022 to J. L. Richards and Associates (JLR) for the completion of the Verona Housing Water and Wastewater Master Plan. This follow up study was initiated based on the key recommendations of the approved Verona Housing Master Plan by MHBC Planning Ltd. The key focus of the study was to determine the preferred communal servicing options for water and wastewater though the Municipal Class EA – Master Plan process. J L Richards project team has been actively working on the study over the last year and a half and has completed several milestones including: • • • • •

Initiation of Public and Stakeholder Notifications Natural Heritage Study (Cambium) and Groundwater Assessment (Pinchin) Public Information Meeting # 1 – Verona Lions Hall (April 19th, 2023) Progress Update No. 1 to Council (November 14, 2023), and Public Information Meeting # 2 – Verona Lions Hall (March 27, 2024)

www.southfrontenac.net South Frontenac is a welcoming and thriving rural community.

Township of South Frontenac Staff Report Number – 2024-096

Page 51 of 158

Discussion/Analysis On May 21st, 2024, J. L. Richards and Associates presented its second progress update for the Verona Housing Water and Wastewater Master Plan. This report provided an outline of the water and wastewater alternatives presented to the public along with the screening activities carried out to arrive at a recommended solution. The recommended solution for servicing the lands was presented as Option # 2 which includes an onsite groundwater well and an onsite subsurface sewage disposal system. The Township has not received any major objections to the recommended alternative, and JLR is therefore recommending that the Township proceed to issue a Notice of Completion and to place the Master Plan on public record for 30 days. Once the Master Plan is finalized, the recommendations of the master plan will be valid for 10 years. The Township may proceed with the remaining studies needed to support the preferred solution including the applicable Class EAs for new water supply, water treatment, water distribution, and subsurface sewage disposal. Financial Implications Not applicable to this report. Relationship to Strategic Plan ☒ Not applicable to this report. ☐ This initiative adheres to the following strategic pillars and directions of the 2023-2026 Strategic Plan. • •

Pillar: Choose an item. Action Item (If Applicable): Insert Text

Climate Considerations ☒ Not applicable to this report. ☐ This initiative supports climate change mitigation/adaption efforts in South Frontenac; and/or impacts the Township’s resilience to climate change. Notice/Consultation J L Richards & Associates Attachments None

www.southfrontenac.net South Frontenac is a welcoming and thriving rural community.

Township of South Frontenac Staff Report Number – 2024-096

Approvals Prepared By: W. Troy Dunlop, C.E.T., Manager of Engineering and Capital Projects Submitted By:

Kyle Bolton, C.E.T., Director of Public Services Approved By:

Louise Fragnito, CPA CGA Chief Administrative Officer

www.southfrontenac.net South Frontenac is a welcoming and thriving rural community.

Page 52 of 158

Page 53 of 158

To:

Council

From:

Director, Development Services

Date of Meeting:

December 17, 2024

Subject:

Request for relief from cash-in-lieu of parkland requirements for consent application PL-BDJ-2024-0032

Report Number:

2024-208

Summary The applicants for consent application PL-BDJ-2024-0032 are requesting that Council waive the requirement to pay 5% cash-in-lieu of parkland conveyance that is typically a condition of approval of consent applications, per By-law 2023-104. The consent application is seeking to separate two parcels that had previously been merged on title. Recommendation That Council consider the following options as it relates to the Request for relief from cashin-lieu of parkland requirements for consent application PL-BDJ-2024-0032: Option 1: That Council approve the cash-in-lieu of Parkland relief request on consent application PLBDJ-2024-0032. Option 2: That Council decline the cash-in-lieu of Parkland relief request on consent application PLBDJ-2024-0032.

www.southfrontenac.net South Frontenac is a welcoming and thriving rural community.

Township of South Frontenac Staff Report – 2024-208

Page 54 of 158

Background The property is located at 984 Leland Road, east of Perth Road Village. It is comprised of two lots that inadvertently merged on title. Consent application PL-BDJ-2024-0032 is requesting consent to create a rural lot which would have the effect of separating the merged parcels. The severed parcel, which is vacant, would be approximately 76ha in area with 480m of frontage on Leland Road. The retained lot would be approximately 40ha in area with 100m of frontage on Leland Road and 150m of frontage on Dean Smith Road. It is developed with a single detached dwelling that contains a secondary dwelling unit, as well as an additional dwelling unit in a separate structure. See severance map on Exhibit A. The subject property is primarily designated Rural with some parts designated Environmental Protection in the Township Official Plan. The EP designation corresponds to wetlands on the property. The severed parcel is zoned Rural and the retained parcel is zoned RU-62 in the Township Zoning Bylaw. Township staff are supportive of the consent application and are in a position to process the application through the delegated approval process. However, the applicants raised concerns with the recommended 5% cash-in-lieu of parkland payment that is a standard condition for new lot creation. The applicants state that until 2023 they had been receiving two tax bills for the property, which was how the issue of the properties being merged was discovered. The applicant’s position (outlined in Exhibit B) is that as the application is seeking to separate two parcels that had previously merged, they are requesting Council to waive the 5% cash-in-lieu of parkland payment. Township staff requested that the applicants confirm the date on which the parcels would have merged. The applicant’s solicitor confirmed that the parcels would have merged as a result of the sale of land that occurred on May 5, 1989 (Exhibit C). The parcels would have merged as of this date. The requirement for cash-in-lieu of parkland for consent applications is determined through By-law 2023-104 which is passed under the authority of the Planning Act. The by-law states that the Township may require up to 5% of the land for consent applications or cash-in-lieu thereof. The by-law also details how the value of the land is to be determined in situations where cash-in-lieu of parkland is requested. For large rural lots such as this the valuation of lots can vary significantly. Township staff have seen valuations range from $5000 per acre to $15,000 per acre for large rural parcels. Based on the size of the severed lands, this would result in a potential cash-in-lieu payment ranging from $46,000 to $140,000. The Director of Development Services cannot waive the requirement for the cash-in-lieu of parkland payment through the delegated authority process. The Committee of Adjustment also cannot waive the requirement.

www.southfrontenac.net South Frontenac is a welcoming and thriving rural community.

Township of South Frontenac Staff Report – 2024-208

Page 55 of 158

Discussion Township staff reviewed the matter and determined that the request should be brought to Council for a determination. The language of the Planning Act and By-law 2023-104 states that Council may require the dedication of land or cash-in-lieu, therefore it is discretionary in nature. This condition is typically applied as a standard condition of approval. This allows the Township to acquire parkland, or cash-in-lieu, to allow the creation of new parks or investment in existing park facilities that is needed to provide park amenities for new development. The Official Plan contains policies that speak to requiring parkland, or cash-in-lieu thereof. One of the objectives of the Official Plan is to provide sufficient park, recreational and sport facilities by receiving the maximum parkland dedication permitted under the Planning Act (Section 4.9.(a)(i)). Under the General Consent policies of Section 7.1, the Official Plan states that the Township is entitled to a dedication of land for park purposes as a condition on any division of land. Cash-in-lieu of land may be requested by the Municipality in situations where there is a public park in the area which is adequate for existing and future population. Cash-inlieu may also be requested where the amount of land involved is small and therefore unsuitable for park development. Where lands are dedicated for park purposes, the Municipality will accept only those lands suitable for park use. The applicant’s position is that as the application is to separate previously merged parcels that their application should not be subject to this condition. Staff note that based on the information provided by the applicant’s solicitor that the parcel has been legally merged for 35 years and the merger predated the adoption of the current Township Official Plan. Therefore, the Official Plan policies referenced above have been in effect since the properties were merged. Financial Implications The Township would not collect the payment of 5% cash-in-lieu of parkland should Council waive the requirement. Relationship to Strategic Plans ☒ Not applicable to this report. ☐ This initiative adheres to the following guiding principle of the 2023-2026 Strategic Plan. • •

Priority: Choose an item. Action Item (If Applicable): Insert Text

Climate Considerations ☒ Not applicable to this report. ☐ This initiative supports climate change mitigation/adaption efforts in South Frontenac; www.southfrontenac.net South Frontenac is a welcoming and thriving rural community.

Township of South Frontenac Staff Report – 2024-208

and/or impacts the Township’s resilience to climate change. Notice/Consultation Not applicable. Attachments Exhibit A – Severance Map Exhibit B – Applicant Request Exhibit C – Solicitor Confirmation Approvals Prepared By: Tom Fehr, RPP MCIP, Planner

Submitted By:

Brad Wright, RPP, MCIP, AICP, PLE Director of Development Services Approved By:

Louise Fragnito, CGA, CPA Chief Administrative Officer

www.southfrontenac.net South Frontenac is a welcoming and thriving rural community.

Page 56 of 158

InsetMap

KA

SlSS 5365

’0

OPlNlCON

RD

az‘Z\-.

OPlNICON FD

OP]N\CO/VROPD

SOUTH FRONTENAC

Row LELAND

PL-BDJ-2024-0032 (GREEN) (KENNEDY)

DEAN SMITH ROAD

984 LELAND ROAD Legend

:

Subject Property Proposed Severance

m

Provincially Signi?cant Wetland Wetland

DEAN Sl‘»llTH RD

l 324 LELAND RD

'

W a0

LELAND RD

«

'

l

.

Retained Lands

'

'

,

'

1250

LELAND RD

1220

Wooded Area Lake Trout Lake At Capacity

Lake Trout Lake Not at Capacity

FD LELAND

I LELAND RD

LELANDROW

Non-Lake Trout Lake At Capacity

Waterbody I353

Road

LELAND RD

_ _’ TownshIp. Boundary

[/1 194

l

PLELAND RD Cl l|70

LELAND RD

I / LELANSD

1271 LELAND RD

'

RD

Produced by the County of Frontenac under license with the Ontario Ministry of Natural Resources © King’s Printer for Ontario, 2024.

J "

5532

I104 LELAND RD

PERTH RD CRES

D

a

A

984

:1

I

m

U

oEANS ’V’lTHnROAD

LELAND RD

LELAND RD

912

LELAMBJRD LELAND RD 5582 PERTH RD

LELAND RD

Scale: 1:8,000

I

L

666

LELAND RD

DEAN W RD

0

75

150

—:—

m

908 LELAND RD

300

UTM Zone 18 NAD 83

Page 57 of 158

Q

While the County makes even] effort to insure that the information presented is accurate for the intended uses of this map. there is an inherent error in all mapping products, and accuracy of the mapping cannot be guaranteed for all possible uses. This map displays basic topographic features only.

Date: 2024—03—28

Page 58 of 158

August 20, 2024

.

(nnfh

.v….

.v…-….-

He and his brother My father, Clifford Green, purchased 984 Leland Road in Perth Road in 1965. Leland addrpqs __ A:-::.‘_ pm.“ , , is 1206 u. u wuu. L-_-J


Frnnfpnar

qvuu.

vLuI

purcnaaeu

dn

duluumlg

ly

piupc:

Iluuax.

.. …..

-_-

n.-.

-4.

.-.

Road. In 1989 his brother’s name was removed from the deed. The

._

._u

Ialleu

(0

[Ell

my u.

IdUICI

LlldL

II

In:

uvvncu

L

m…

plug».-

_

lawyer who closed this transaction read in the

w.

“Wyn”..u

same name they would merge on title.

and completed the We severed a lot from 1206 Leland Road around 1999 and again around 2019 of this property and location and size the for applications with the Township showing all information were separate they assumed We were never corrected about the information on the applications. properties and continued getting separate tax bills on both properties. home permission from the Township to add a secondary residence to my parent’s parcel ._;-__-.. y… on m: appuwwu at 984 Leland Road and once again tne lnlUlllIduUII land and was never corrected on this information. we

In

_

,5,

_

._-

w

w…“

..

-v-

-.

r—

the tax bill for 1206 At the beginning of 2023 my mother mentioned to me that she did not receive brought to our was it Lawyer our and Township many telephone calls to the attention that 984 Leland Road and 1206 Leland Road were one property.

…_, w ulc ues uaLn “a, We are now in the process o’I appIyIng tor a severance to 5pm; muse piupcis quite costly for the survey alone. This property is family owned and can were which as q—A hang mu… we are a very Cluau Idllllly dllu Iluvc a .u .5 .m we have no intention of selling the property. large the enjoy and hunters of family a are We within 5km and this will continue. who ‘

you imagine

_

In,

.42,”-

L—

,

,

..__.

I…

members parcel of land we have to use. One or the commons or severance parkland 5% of the value of the parcel to be severed. ,

_:

..-_–

n paying

uu:

luwnalllp

… “cu

u.

already incurred to put these 2 We feel this is a unique situation and given the expenses we have fee be waived. We have no this that asking 1989 we are nrnnnrfipc ..-P. .4… and don’ t feel there IS any change In the use of the property and don’t intention on selling

….t

nu.-

fpp‘ Inna

u..-

.-

theproperty

-.....V__.

We appreciate your consideration,

h:-__

wane

u___-J..

kenneuy

Clifford Green

“CW

Page 59 of 158

“.-

llU

"

UVI‘J

——

Professional Corporation UNIT

623

éNTARIo K7P 0L5 KINGsfoii

e-mail address: yur1@yurilaw.<=a Webslte: www.bamowecky‘aW-°°m

August 20)

–—uu

,.

na?A

2024 Green

Green, Mr. Clifford Green and Ms. Geraldine

Ms Green, nuaa

PerthRoad,Ontario Dea’lMI”.

Grppn "

Re.

V‘VVH,

lVll.

UIWLI

all“

V13.

UIVVIII

Your ?rst mOrtgaze 984 LelandRoédfpenh Road Mv File No.: 2022-2222

7

?

to 1 email correspondence on the above property, page attached, a transfer was registered on May 5, 1989 from Davm rloya ,

and acqun’ea

that as noted on the pm f‘_nA-‘

ureeu

LU mum.“

u”…

of land would have been deemed to have merged when the secondparcel of land was

Pél‘cels 1n me same name

Yoms very truly,

N I vanna Nma Tarnbwecky ll :mv a

as the ?rst.

Page 60 of 158

To:

Council

From:

Office of the Chief Administrative Officer

Date of Meeting:

December 17, 2024

Subject:

2025 Budget Approval

Report Number:

2024-212

Summary The report brings forward the 2025 Budget for Council Approval. Recommendation That Council approve the 2025 draft budget provided under attachment A of Report 2024212. Background At the December 14th Special Council Meeting, the draft 2025 Budget was presented and discussed. Discussion/Analysis No changes or amendments were provided during the budget deliberation and Council provided direction to bring forward the 2025 Budget as presented for approval. Financial Implications The 2025 Budget provides for a tax requisition of $23,753,588 with an overall taxpayer impact of 4.41% on the average assessment of $278,126. Relationship to Strategic Plan ☐ Not applicable to this report. ☒ This initiative adheres to the following strategic pillars and directions of the 2023-2026 Strategic Plan. •

Pillar: Sustainable Long-Term Prosperity

Climate Considerations ☒ Not applicable to this report. www.southfrontenac.net South Frontenac is a welcoming and thriving rural community.

Township of South Frontenac Staff Report Number – 2024-212

Page 61 of 158

☐ This initiative supports climate change mitigation/adaption efforts in South Frontenac; and/or impacts the Township’s resilience to climate change. Attachments Attachment A – 2025 Draft Budget Attachment B – 2025 Budget – Capital Summary with detailed sheets Approvals Approved By:

Louise Fragnito, Chief Administrative Officer

www.southfrontenac.net South Frontenac is a welcoming and thriving rural community.

Page 62 of 158

TOWNSHIP OF SOUTH FRONTENAC 2025 Budget

Including: ■ High Level Summary of Changes ■ Summary ■ Departmental Operating Budgets ■ Capital Budget ■ Reserve & Reserve Funds Note: The Capital Detailed Sheets are available on Engage South Frontenac Website and also on the Township’s website from the December 3, 2024 Agenda

As presented with amendments made on: Friday December 13, 2023 9:00 AM Storrington Centre

Page1 63 of 158

TOWNSHIP OF SOUTH FRONTENAC 2025 Budget High Level Summary of Changes Below is a high level summary of key changes from last year’s budget excluding transfers to Reserves, transfers to Capital and inter-departmental transfers. The listing below incorporates all items directed by Council, originally requested by staff and recommended by committees. Notable Variances in presented budget Costs Savings Capital Tax Requisition Winter Control (5 year average + 2%)

-509,550 -125,700

-635,250

Reduced Revenues Planning Revenues Swim/Daycamp Fees OCIF

23,000 24,900 135,203

183,103

Increased Revenues OMPF

-95,700

-95,700

Increased Costs OPP Billing Conservation Authorities Insurance (10% overall) Arena Landfill Export Current Year Asset Investment Reserve Impact (2% of current year levy) Catch Basins-CCTV/Cleaning Pavement Marking Increased Reserve Transfer - Public Services Fleet Increased Reserve Transfer - Fire Fleet Gravel Roads - Calcium Audit Fees Computer Maintenance Contracts Staff Complement Annual Adjustments Fire - Fleet Maintenance Other

51,611 23,600 58,172 68,000 31,100 465,757 13,500 11,500 130,200 59,044 43,008 7,950 82,825 488,642 57,250 83,401

1,675,560

Human Resources Advisor Annualization Public Services LEO Facilities Annualization Asset Management Coordinator (July - Dec) Public Services LEO - PT to FT (May - Dec)

28,800 25,556 49,508 1,738

105,602

Enhanced Services included in Budget Catch Basins - Consulting - Consolidated Linear Infrastructure ECA changes Drainage - Add One Week to Drainage Plan Lakes and Trails Festival

20,000 20,000 6,000

46,000

Organizational Development Plan Assessment Growth =1.23% or $287,611

Capital Projects Deferred - not in Budget Road 38/Boyce Road Sidewalk and Storm Sewers Harris Park - Playground Rehabilitation/Accessibility Upgrades Centennial Park Upgrades - Tree Planting

873,000 104,000 20,000 997,000

Total Increase to be raised by Taxation Assessment Growth

1,279,315 1.23%

Reduced Revenues included in Budget - Self Funded Sewage/Building Permits Forecast

287,611 70,583

Council Direction - No specific target - but focus on priorities and affordability. The proposed budget meets an overall 4.41% increase in the average taxpayer impact. This represents an overall $1,279,315 overall Township levy increase. Several expenses in comparing 2024 budget to forecasted 2025 expenses go beyond current inflation The capital budget, which was presented on December 3, 2024, includes total projected costs of $16,013,341. The listing of projects including proposed funding is attached to this budget document.

70,583

Page2 64 of 158

TOWNSHIP OF SOUTH FRONTENAC 2025 Draft Budget Summary of Revenue and Expense

REVENUE

Property Taxation- Supplementary & PIL

Actuals

2024-2025 Budget

2024 Budget

22-Nov-24

2025 Budget

$

$

$

249,500

22,733,465

Variance $

%

249,200

-300

-0.12%

User Charges

1,541,807

1,209,576

1,492,873

-48,934

-3.17%

Licenses, Permits and Rents

1,562,338

1,227,289

1,516,416

-45,922

-2.94%

Government Grants

3,315,611

2,663,446

3,528,628

213,017

6.42%

Grants from Other Municipalities

495,000

0

562,137

67,137

13.56%

Investment Income

649,000

567,917

649,000

0

0.00%

Penalties and interest on taxes

370,000

377,541

380,000

10,000

2.70%

Donations

6,725

57,045

10,000

3,275

Other

67,400

233,716

100,200

32,800

48.66%

Transfers From Reserves/Reserve Funds

13,827,642

313,578

12,211,918

-1,415,724

-10.24%

TOTAL Revenue

22,085,023

29,383,573

20,700,372

-1,384,651

-6.27%

OPERATING EXPENSE

General Government

10,334,761

7,744,171

8,111,999

-2,222,762

-21.51%

Protection to Persons and Property

Fire

2,884,333

2,372,629

3,385,879

501,546

17.39%

Police

2,873,290

2,604,287

2,972,947

99,657

3.47%

Conservation Authorities

521,876

320,327

345,029

-176,847

-33.89%

Protective Inspections and Control

148,753

121,818

161,299

12,547

8.43%

Emergency Measures

3,500

33

4,000

500

14.29%

Building Department

1,343,983

1,119,843

1,362,436

18,453

1.37%

Transportation Services

Roadway Maintenance

16,184,205

15,354,257

18,268,112

2,083,906

12.88%

Winter Control

2,361,009

1,487,288

2,235,275

-125,734

-5.33%

Environmental Services 731,930

316,667

1,193,211

461,280

63.02%

Water System

Solid Waste Management

3,110,649

2,894,037

3,137,736

27,087

0.87%

Parks, Recreation and Cemeteries

3,038,045

2,409,806

2,351,275

-686,770

-22.61%

Planning and Development

1,022,964

807,053

924,763

-98,200

-9.60%

TOTAL Expense

44,559,297

37,552,215

44,453,961

-105,337

-0.24%

TO BE RAISED BY TAXATION

22,474,274

23,753,588

1,279,315

5.69%

IMPACT ON TAXPAYER: BASED ON AVERAGE PHASE-IN ASSESSMENT THE TOWNSHIP’S SHARE OF THE TAX BILL ON A 278,126 PROPERTY WILL INCREASE 4.41% WHICH EQUALS $77.74

Page3 65 of 158

TOWNSHIP OF SOUTH FRONTENAC 2025 Draft Budget General Government Detail

GENERAL MUNICIPAL ACTIVITY

Revenue

Taxation - Supplementary & PIL

Actuals

2024-2025 Budget

2024 Budget

22-Nov-24

2025 Budget

$

$

$

Variance $

%

249,500

22,733,465

249,200

-300

-0.12%

Government Grants

1,609,500

1,609,500

1,705,200

95,700

5.95%

Investment Income

625,000

499,079

625,000

0

0.00%

Penalties and interest on taxes

370,000

377,541

380,000

10,000

2.70%

Other

0

19,840

25,000

0

100.00%

Transfer from Reserves

0

0

0

0

0.00%

Total Revenue

2,854,000

25,239,425

2,984,400

105,400

4.57%

0

22,559

0

0

0.00%

  1. Transfer to Reserves

3,267,854

3,267,915

3,733,611

465,757

14.25%

  1. Total Expense

3,267,854

3,290,474

3,733,611

465,757

14.25%

413,854

-21,948,951

749,211

335,357

81.03%

0

0

0

0

0.00%

  1. Transfer from Reserves

100,000

315,349

15,000

-85,000

-85.00%

  1. Total Revenue

100,000

315,349

15,000

-85,000

-85.00%

  1. Expense

  2. Operations

  3. TOTAL GENERAL MUNCIPAL ACTIVITY

  4. COUNCIL

  5. Revenue

  6. Grants from Other Municipalities

  7. Expense 197,398

181,731

203,106

5,708

2.89%

  1. Benefits

  2. Remuneration

7,685

7,098

8,421

736

9.57%

  1. Memberships, Training and Travel

25,900

20,809

26,600

700

2.70%

  1. Communications

18,900

13,388

18,900

0

0.00%

  1. Council Operations

134,693

19,827

31,340

-103,352

-76.73%

  1. Grants * (see details bottom of next page)

229,109

463,622

244,109

15,000

6.55%

0

100,000

0

0

0.00%

  1. Transfer to Capital
  2. Transfer to Reserves

10,000

10,000

10,000

0

0.00%

  1. Total Expense

623,685

816,475

542,476

-81,209

-13.02%

  1. TOTAL COUNCIL

523,685

501,126

527,476

3,791

0.72%

  1. User Charges

0

0

0

0

0.00%

  1. Transfer from Reserves

0

0

0

0

0.00%

  1. Total Revenue

0

0

0

0

100.00%

  1. Remuneration

0

0

0

0

0.00%

  1. Benefits

0

0

0

0

0.00%

  1. Memberships, Training and Travel

0

0

0

0

0.00%

  1. ELECTIONS 32 Revenue

  2. Expense

  3. Communications

0

0

0

0

0.00%

  1. Elections Operations

0

0

0

0

0.00%

  1. Transfer to Reserves

25,000

25,000

25,000

0

0.00%

  1. Total Expense

25,000

25,000

25,000

0

0.00%

  1. TOTAL ELECTIONS

25,000

25,000

25,000

0

0.00%

Page4 66 of 158

TOWNSHIP OF SOUTH FRONTENAC 2025 Draft Budget General Government Detail

Actuals

2024-2025 Budget

2024 Budget

22-Nov-24

2025 Budget

$

$

$

Variance $

%

  1. CORPORATE SERVICES
  2. Revenue
  3. User Charges

40,500

29,987

43,300

2,800

6.91%

  1. Licenses, Permits and Rents

1,800

1,146

1,600

-200

-11.11%

  1. Government Grants

80,000

28,641

80,000

0

0.00%

  1. Other

3,000

31,540

3,000

0

0.00%

  1. Transfer from Reserves

504,230

0

394,438

-109,792

-21.77%

  1. Total Revenue

629,530

91,314

522,338

-107,192

-17.03%

1,218,804

1,047,143

1,412,270

193,466

15.87%

432,609

354,658

482,672

50,063

11.57%

  1. Expense
  2. Remuneration
  3. Benefits

0

0

0

0

0.00%

  1. Memberships, Training and Travel

  2. Inter Departmental Transfer

78,177

21,459

103,093

24,916

31.87%

  1. Communications

56,178

58,709

47,600

-8,578

-15.27%

  1. Professional and Consulting Fees

42,000

61,706

53,450

11,450

27.26%

  1. Administrative Operations

204,057

338,744

266,062

62,005

30.39%

  1. Transfer to Capital

538,190

337,848

420,001

-118,189

-21.96%

  1. Total Expense

2,570,015

2,220,267

2,785,148

215,133

8.37%

  1. TOTAL CORPORATE SERVICES

1,940,485

2,128,952

2,262,810

322,325

16.61%

  1. ADMINISTRATIVE FACILITIES
  2. Revenue
  3. Facilities Revenue

224,375

231,238

255,706

31,331

13.96%

  1. Government Grants

0

0

225,000

225,000

100.00%

  1. Donations

0

0

0

0

0.00%

  1. Transfer from Reserves

3,500,000

0

175,000

-3,325,000

-95.00%

  1. Total Revenue

3,724,375

231,238

430,706

-3,293,669

-88.44%

  1. Expense
  2. Remuneration

0

7,080

0

0

0.00%

  1. Inter Departmental Transfer

1,291

1,658

2,414

1,123

87.04%

  1. Professional and Consulting Fees

6,920

2,949

8,220

1,300

18.79%

182,422

1,023,968

217,436

35,015

19.19%

  1. Transfer to Capital

  2. Facilities Operating Costs

3,540,000

351,299

683,393

-2,856,607

-80.70%

  1. Transfer to Reserves

117,574

5,000

114,301

-3,273

-2.78%

3,848,207

1,391,955

1,025,764

-2,822,442

-73.34%

123,832

1,160,717

595,058

471,227

380.54%

3,026,856

-18,133,155

4,159,555

1,132,699

37.42%

  1. Total Expense
  2. TOTAL ADMINISTRATIVE FACILITIES
  3. Total General Government Explanation of Significant Variances

Line 4

OMPF confirmed Funding

Line 12

In year Asset Investment Reserve (AIR) contribution

Line 54/55

Annualization of Human Resource Advisor, Records Analyst, Band changes

Line 59

Audit Fees

Line 60

Computer Maintenance Contracts

Line 66/75

New Campbell Road/Stage Coach properties

Council - Grants to Organizations/Individuals (line 26) Private Lanes

100,000

Bradshaw School Visits

2,000

South Frontenac Community Services (SFCS)

20,200

Inverary Youth

1,650

Community Grants

35,000

High School - Graduation

500

Seniors & Law Enforcement Together (SALT)

7,500

Trails - Work in kind - CRCA

5,219

Lake Study Grants

30,000

Heritage Committee Grant (15k prior year carryover)

30,000

Non-Township Facilities (Verona Mini-Park/ Lion’s Hall)

7,040

Miscellaneous

5,000

Total

244,109

Page5 67 of 158

TOWNSHIP OF SOUTH FRONTEN NAC 2025 Draft Budget Protection to Persons and Property Detail

2024-2025 Budget

Actuals 2024 Budget

22-Nov-24

2025 Budget

$

$

$

Variance $

%

FIRE

Revenue

User Charges

Grants from Other Municipalities

0

0

0

0

0.00%

Other

0

37,363

0

0

0.00%

55,750

23,955

48,600

-7,150

-12.83%

Transfer from Reserves

865,021

0

1,053,240

188,219

21.76%

Total Revenue

920,771

61,318

1,101,840

181,069

19.66%

Expense

Remuneration

811,005

837,206

842,397

31,392

3.87%

  1. Benefits

173,720

137,153

163,231

-10,490

-6.04%

  1. Memberships, Training and Travel

30,750

11,515

31,250

500

1.63%

  1. Communications & Public Education

69,900

62,043

68,650

-1,250

-1.79%

  1. Professional and Consulting Fees

6,250

5,586

5,250

-1,000

-16.00%

  1. Fire Operations

347,458

362,455

446,669

99,210

28.55%

  1. Transfer to Capital

784,000

284,025

1,106,740

322,740

41.17%

  1. Transfer to Reserves

452,182

489,545

511,226

59,044

13.06%

  1. Total Expense

2,675,265

2,189,527

3,175,412

500,147

18.70%

  1. TOTAL FIRE

1,754,494

2,128,209

2,073,572

319,078

18.19%

  1. Facilities Operating Costs

198,608

172,641

199,967

1,359

0.68%

  1. Total Expense

198,608

172,641

199,967

1,359

0.68%

  1. TOTAL FIRE FACILITIES

198,608

172,641

199,967

1,359

0.68%

  1. 911 Operations

10,460

10,460

10,500

40

0.38%

  1. Total Expense

10,460

10,460

10,500

40

0.38%

  1. TOTAL 911 SERVICE

10,460

10,460

10,500

40

0.38%

1,963,562

2,311,311

2,284,039

320,477

16.32%

  1. FIRE FACILITIES

  2. Expense

  3. 911 SERVICE

  4. Expense

  5. TOTAL FIRE

Explanation of Significant Variances Line 9/12

VFF Wage Adjustment

Line 14

Insurance, Vehicle Maintenance, Fuel, Computer Maintenance Contracts

Page6 68 of 158

TOWNSHIP OF SOUTH FRONT TENAC 2025 Draft Budget Protection to Persons and Property Detail

Actuals

2024-2025 Budget

2024 Budget

22-Nov-24

2025 Budget

$

$

$

Variance $

%

POLICE

Revenue

User Charges

8,000

10,825

10,000

2,000

25.00%

Government Grants

9,300

2,165

8,000

-1,300

-13.98%

Investment Income

10,000

26,914

10,000

0

0.00%

Transfer from Reserves

Total Revenue

0

0

50,000

50,000

100.00%

27,300

39,903

78,000

50,700

185.71%

Expense

Remuneration

1,350

600

1,600

250

18.52%

Memberships, Training and Travel

1,200

792

2,550

1,350

112.50%

  1. Communications

1,214

847

1,500

286

23.57%

  1. Police Operations

2,860,686

2,601,128

2,962,297

101,611

3.55%

  1. Total Expense

2,864,450

2,603,368

2,967,947

103,497

3.61%

  1. TOTAL POLICE

2,837,150

2,563,464

2,889,947

52,797

1.86%

  1. Government Grants

8,840

7,661

5,000

-3,840

-43.44%

  1. Total Revenue

8,840

7,661

5,000

-3,840

-43.44%

  1. RIDE PROGRAM

  2. Revenue

  3. Expense

  4. Ride Operations

8,840

919

5,000

-3,840

-43.44%

  1. Total Expense

8,840

919

5,000

-3,840

-43.44%

0

-6,742

0

0

100.00%

2,837,150

2,556,723

2,889,947

52,797

1.86%

  1. TOTAL RIDE PROGRAM

  2. Total Police

  3. CONSERVATION AUTHORITIES

  4. Revenues

  5. Transfer from Reserves

200,000

0

0

0

-100.00%

  1. Total Revenue

200,000

0

0

0

-100.00%

  1. Expense 2,000

450

1,500

-500

-25.00%

  1. Conservation Authority Transfers

319,876

319,877

343,529

23,653

7.39%

  1. Transfer to Capital

200,000

0

0

0

-100.00%

  1. Total Expense

521,876

320,327

345,029

23,153

4.44%

  1. TOTAL CONSERVATION AUTHORITIES

321,876

320,327

345,029

23,153

7.19%

  1. Remuneration

Explanation of Significant Variances

Line 11

OPP Policing

Line 29

Conservation Authorities increases Cataraqui Region Conservation Authority $9,225 or 5.45% increase Quinte Conservation $13,418 or 10.9% increase. Rideau Valley Conservation Authority $1,010 or 3.66% increase

Page7 69 of 158

TOWNSHIP OF SOUTH FRONT TENAC 2025 Draft Budget Protection to Persons and Property Detail

Actuals

2024-2025 Budget

2024 Budget

22-Nov-24

2025 Budget

$

$

$

Variance $

%

PROTECTIVE INSPECTIONS AND CONTROL

Revenue

User Charges

24,000

27,549

32,000

8,000

33.33%

Licenses, Permits and Rents

42,000

33,575

34,000

-8,000

-19.05%

Government Grants

9,000

14,837

9,000

0

0.00%

Other

0

0

0

0

0.00%

Total Revenue

75,000

75,961

75,000

0

0.00%

Expense

Inter Departmental Transfer

0

0

0

0

0.00%

  1. Memberships, Training and Travel

15,500

10,083

20,500

5,000

32.26%

  1. Communications

2,100

447

2,100

0

0.00%

  1. Professional and Consulting Fees

23,000

25,974

23,000

0

0.00%

  1. Protective Operations

108,153

85,314

115,699

7,547

6.98%

  1. Transfer to Reserves

0

0

0

0

0.00%

  1. Total Expense

148,753

121,818

161,299

12,547

8.43%

  1. TOTAL PROTECTIVE INSPECTIONS AND CONTROL

73,753

45,857

86,299

12,547

17.01%

  1. Transfer from Reserves

0

0

0

0

0.00%

  1. Total Revenue

0

0

0

0

100.00%

  1. EMERGENCY MANAGEMENT

  2. Revenue

  3. Expense 500

33

500

0

0.00%

  1. Memberships, Training and Travel

1,000

0

1,000

0

0.00%

  1. Communications

1,000

0

1,500

500

50.00%

  1. Emg Management Operations

1,000

0

1,000

0

0.00%

  1. Total Expense

3,500

33

4,000

500

14.29%

  1. TOTAL EMERGENCY MANAGEMENT

3,500

33

4,000

500

14.29%

  1. Remuneration

Explanation of Significant Variances Line 10

By-law Mileage

Line 13

By-law Enforcement Contract/ Humane Society Services

Page8 70 of 158

TOWNSHIP OF SOUTH FRONTE ENAC 2025 Draft Budget Protection to Persons and Property Detail

BUILDING

Revenue

User Charges

Licenses, Permits and Rents

Government Grants

Investment Income

Other

Transfer from Reserves Total Revenue

Expense

Remuneration

  1. Benefits
  2. Inter Departmental Transfer
  3. Memberships, Training and Travel

Actuals

2024-2025 Budget

2024 Budget

22-Nov-24

2025 Budget

$

$

$

Variance $

%

19,500

25,611

19,500

0

0.00%

1,181,183

895,737

1,110,600

-70,583

-5.98%

0

0

0

0

0.00%

0

30,133

0

0

0.00%

0

3,600

0

0

0.00%

90,600

0

177,736

87,136

96.18%

1,291,283

955,080

1,307,836

16,553

1.28%

788,377

633,275

819,359

30,982

3.93%

273,614

208,389

274,078

464

0.17%

0

0

0

0

0.00%

31,300

19,276

33,200

1,900

6.07%

  1. Communications

6,639

4,026

6,100

-539

-8.12%

  1. Professional and Consulting Fees

10,000

10,777

10,000

0

0.00%

  1. Building Operations

91,354

111,801

125,100

33,746

36.94%

  1. Transfer to Capital

50,000

83,753

0

-50,000

-100.00%

40,000

40,000

40,000

0

0.00%

1,291,283

1,111,296

1,307,836

16,553

1.28%

0

156,216

0

0

-35.45%

  1. User Charges

10,000

5,762

6,500

-3,500

-35.00%

  1. Total Revenue

10,000

5,762

6,500

-3,500

-35.00%

  1. Remuneration

0

5,440

0

0

0.00%

  1. Benefits

0

0

0

0

0.00%

  1. Civic Numbers Operations

52,700

3,107

54,600

1,900

3.61%

  1. Total Expense

52,700

8,547

54,600

1,900

3.61%

  1. TOTAL CIVIC NUMBERS

42,700

2,785

48,100

5,400

12.65%

  1. TOTAL BUILDING

42,700

159,001

48,100

5,400

12.65%

5,242,540

5,393,251

5,657,414

414,874

7.91%

  1. Transfer to Reserves

  2. Total Expense

  3. TOTAL BUILDING

  4. CIVIC NUMBERS

  5. Revenue

  6. Expense

  7. Total Protection to Persons and Property Detail

Explanation of Significant Variances Line 4

Part 8 -& Building Permit Fees

Line 9/10

Annualization Deputy CBO

Line 15

Banking Service Charges, Vehicle Maintenance, Insurance, Computer Maintenance Contracts

Page9 71 of 158

TOWNSHIP OF SOUTH FRONTENAC 2025 Draft Budget Transportation Services Detail

ROADS

Revenue

Actuals

2024-2025 Budget

2024 Budget

22-Nov-24

2025 Budget

$

$

$

Variance $

%

User Charges

8,500

4,550

8,500

0

0.00%

Licenses, Permits and Rents

99,500

52,029

99,500

0

0.00%

Government Grants

901,352

751,127

766,149

-135,203

-15.00%

Grants from Other Municipalities Other

495,000 60,000

0 141,373

562,137 67,800

67,137 7,800

13.56% 13.00%

Transfer from Reserve

6,702,948

-1,771

9,139,314 2,436,366

36.35%

Total Revenue

8,267,300

947,308

10,643,400 2,376,100

28.74%

1,724,297

1,780,111

1,940,376

216,079

12.53%

Expense

Remuneration

Benefits

637,485

872,308

679,221

41,736

6.55%

Inter Departmental Transfer

-799,178

-65,002

-840,446

-41,268

5.16%

Memberships, Training and Travel

39,464

42,991

39,919

455

1.15%

Communications

58,502

42,703

59,492

990

1.69%

Professional and Consulting Fees

58,542

30,058

78,692

20,150

34.42%

Roads Operations * (see details below)

3,232,925

2,714,947

3,400,757

167,832

5.19%

Transfer to Capital

10,628,050

9,504,220

12,210,100 1,582,050

14.89%

Transfer to Reserves

604,118

431,924

95,882

15.87%

Total Expense

16,184,205

15,354,259

18,268,112 2,083,906

700,000

12.88%

TOTAL ROADS

7,916,905

14,406,951

7,624,712

-292,194

-3.69%

WINTER CONTROL

Expense

Remuneration

567,561

331,148

578,896

11,335

2.00%

Benefits

199,706

0

205,928

6,221

3.12%

Inter Departmental Transfer

622,009

329,830

634,669

12,660

2.04%

Winter Control Operations

971,733

826,310

815,783

-155,951

-16.05%

Transfer to Capital

0

0

0

0

0.00%

Total Expense

2,361,009

1,487,288

2,235,275

-125,734

-5.33%

TOTAL WINTER CONTROL

2,361,009

1,487,288

2,235,275

-125,734

-5.33%

Total Transportation Services

10,277,914

15,894,239

9,859,987

-417,928

-4.07%

*Roads Operations Breakdown (line 16)

2024-2025 Budget

YTD Actual 2024 Budget $

22-Nov-24 $

2025 Budget $

Variance $

%

Maintenance - Structures

20,018

59,556

30,000

9,982

49.86%

Roadside Maintenance

492,073

562,840

540,506

48,433

9.84%

Hardtop Maintenance

471,855

403,817

482,320

10,465

2.22%

Loose Top Maintenance

334,071

359,507

377,079

43,008

12.87%

Safety Devices

478,419

394,880

498,271

19,852

4.15%

Street Lights

47,500

25,148

49,500

2,000

4.21%

Overhead

1,388,988

909,201

1,423,082

34,094

2.45%

TOTAL ROADS MAINTENANCE

3,232,925

2,714,947

3,400,757

167,832

5.19%

Explanation of Significant Variances

Line 5

OCIF Funding Confirmed and is was reduced by 15% - $135,203

Line 6

County CCBF (former Gas Tax) - confirmed

Line 10/11

LEO PT to FT, Asset Management Coordinator, Reallocation of positions

Line 15

Catch Basin Consulting - ECA changes

Line 29

5 year average + 2%

Line 33

Catch Basin Maintenance and Drainage

Line 35

Calcium contract

Page 10 72 of 158

TOWNSHIP OF SOUTH FRONT TENAC 2025 Draft Budget Environmental Services Detail

WATER SYSTEM

Revenue

User Charges

Licenses, Permits and Rents

Government Grants

Actuals

2024-2025 Budget

2024 Budget

22-Nov-24

2025 Budget

$

$

$

Variance $

%

417,030

324,904

425,311

8,280

1.99%

2,400

2,000

2,400

0

0.00%

201,657

18,064

513,310

311,653

154.55%

Other

0

0

0

0

0.00%

Transfer from Reserves

110,843

0

252,190

141,347

127.52%

Total Revenue

731,930

344,968

1,193,211

461,280

63.02%

Expense

Remuneration

0

0

0

0

0.00%

Inter Departmental Transfer

Communications

Professional and Consulting Fees

704

0

207

-497

-70.66%

5,600

3,277

6,500

900

16.07%

193,700

172,144

239,900

46,200

23.85%

Water System Operations

92,845

68,734

93,000

156

0.17%

Transfer to Reserves

126,582

0

88,104

-38,478

-30.40%

Transfer to Capital

312,500

72,511

765,500

-312,500

Total Expense

731,930

316,667

1,193,211

8,280

1.13%

TOTAL WATER SYSTEM

0

-28,301

0

0

0.00%

SOLID WASTE AND FACILITIES MANAGEMENT

Revenue

User Charges

420,377

316,075

374,033

-46,344

-11.02%

Government Grants

487,962

218,755

210,969

-276,993

-56.77%

Other

0

0

0

0

0.00%

Transfer from Reserves

Total Revenue

Expense

0

0

415,000

415,000

100.00%

908,339

534,830

1,000,002

91,663

10.09%

Remuneration

396,163

388,236

266,569

-129,594

-32.71%

Benefits

127,506

62,571

105,991

-21,514

-16.87%

Inter Departmental Transfer

132,606

165,942

153,897

21,292

16.06%

Memberships, Training and Travel

3,925

1,617

3,975

50

1.27%

Communications

13,056

7,309

12,982

-74

-0.57%

Professional and Consulting Fees

96,000

80,313

94,505

-1,495

-1.56%

Solid Waste Management Operations

2,301,393

2,031,476

1,938,235

-363,158

-15.78%

0

5,088

415,000

415,000

100.00%

40,000

151,484

146,582

106,582

266.45%

Total Expense

3,110,649

2,894,037

3,137,736

27,087

0.87%

TOTAL SOLID WASTE MANAGEMENT

2,202,310

2,359,207

2,137,734

-64,575

-2.93%

Total Environmental Services

2,202,310

2,330,906

2,137,734

-64,575

-2.93%

Transfer to Capital

Transfer to Reserves

Explanation of Significant Variances Line 5

Green Funding (ICIP) for Serpentine Piping

Line 13

Utilities Kingston Fees

Line 27/28

Reallocation of Wages/positions to Facilities

Line 22/33/35

Blue Box Changes

Page 11 73 of 158

TOWNSHIP OF SOUTH FRONT TENAC 2025 Draft Budget Parks, Recreation and Cemeteries Detail

PARKS AND RECREATION PROGRAMS

Revenue

User Charges

Actuals

2024-2025 Budget

2024 Budget

22-Nov-24

2025 Budget

$

$

$

Variance $

%

165,950

207,761

143,600

-22,350

-13.47%

Government Grants

8,000

12,696

6,000

-2,000

-25.00%

Donations

6,725

40,995

5,000

-1,725

-25.65%

Other

0

0

0

0

0.00%

Transfers From Reserves/Reserve Funds

30,000

0

60,000

30,000

100.00%

Total Revenue

210,675

261,452

214,600

3,925

1.86%

Expense

Remuneration

413,160

302,894

440,511

27,352

6.62%

Benefits

83,718

84,127

91,151

7,433

8.88%

Inter Departmental Transfer

2,582

529

248

-2,334

-90.40%

Memberships, Training and Travel

17,850

10,431

16,950

-900

-5.04%

Communications

29,785

25,410

29,025

-760

-2.55%

Professional and Consulting Fees

Parks and Recreation Programs - Operations

Grants

Transfer to Capital

300

0

300

0

0.00%

180,661

285,671

198,190

17,529

9.70%

0

0

0

0

0.00%

30,000

60,943

60,000

30,000

100.00%

Transfer to Reserves

0

0

0

0

0.00%

Total Expense

758,055

770,004

836,375

78,320

10.33%

TOTAL PARKS AND RECREATION PROGRAMS

547,380

508,553

621,775

74,395

13.59%

PARKS AND RECREATION FACILITIES

BUILDINGS

Revenue

User Charges

1,000

1,590

0

-1,000

-100.00%

Licenses, Permits and Rents

10,810

11,196

12,310

1,500

13.88%

Government Grants

0

0

0

0

0.00%

Grants from Other Municipalities

0

0

0

0

0.00%

Donations/Contributions

0

50

5,000

5,000

100.00%

Other

4,400

0

4,400

0

0.00%

Transfer from Reserves

455,000

0

0

-455,000

-100.00%

Total Revenue

471,210

12,836

21,710

-449,500

-95.39%

Expense

Remuneration

0

52,110

0

0

0.00%

Benefits

0

0

0

0

0.00%

9,504

17,616

12,687

3,183

33.49%

900

1,129

1,700

800

88.89%

8,365

0

5,000

-3,365

-40.23%

Inter Departmental Transfer

Communications

Professional and Consulting Fees

Building Operations

226,161

189,253

203,392

-22,769

-10.07%

Transfer to Capital

464,000

461,665

206,000

-258,000

-55.60%

Total Expense

708,931

721,773

428,779

-280,152

-39.52%

TOTAL BUILDINGS

237,721

708,937

407,069

169,348

71.24%

Page 12 74 of 158

TOWNSHIP OF SOUTH FRONT TENAC 2025 Draft Budget Parks, Recreation and Cemeteries Detail

PARKS

Revenue

User Charges

Licenses, Permits and Rents

Government Grants

Actuals

2024-2025 Budget

2024 Budget

22-Nov-24

2025 Budget

$

$

$

Variance $

%

3,000

5,031

5,000

2,000

66.67%

270

368

300

30

11.11%

0

0

0

0

0.00%

Donations/Contributions

0

16,000

0

0

0.00%

Other

0

0

0

0

0.00%

Transfer from Reserves

1,124,000

0

455,000

-669,000

-59.52%

Total Revenue

1,127,270

21,400

460,300

-666,970

-59.17%

Expense

Remuneration

843

115,823

56,669

55,826

6619.61%

Benefits

323

963

6,883

6,560

2028.02%

Inter Departmental Transfer

29,883

70,139

35,011

5,128

17.16%

Professional and Consulting Fees

5,500

0

3,200

-2,300

-41.82%

Parks Operations

206,916

145,506

194,965

-11,950

-5.78%

Transfer to Capital

1,115,000

350,538

495,000

-620,000

-55.61%

Total Expense

1,358,466

682,968

791,729

-566,737

-41.72%

TOTAL PARKS

231,196

661,568

331,429

100,233

43.35%

ARENA

Revenue

User Charges

0

0

0

0

0.00%

Transfer from Reserves

0

0

0

0

100.00%

Total Revenue

0

0

0

0

100.00%

Expense

Remuneration

Transfer to Others

250

400

0

-250

-100.00%

140,985

156,587

209,144

68,159

48.35%

Transfer to Reserves

0

0

0

0

0.00%

Total Expense

141,235

156,987

209,144

67,909

48.08%

TOTAL ARENA

141,235

156,987

209,144

67,909

48.08%

TOTAL PARKS AND RECREATION FACILITIES

610,151

1,527,493

947,642

337,491

55.31%

TOTAL PARKS AND RECREATION

1,157,531

2,036,045

1,569,417

411,886

35.58%

CEMETERIES

Revenue

User Charges

40,200

26,251

71,530

31,330

77.94%

Investment Income

14,000

11,791

14,000

0

0.00%

Donations

0

0

0

0

100.00%

Transfer From Reserves

0

0

0

0

100.00%

Total Revenue

54,200

38,042

85,530

31,330

57.80%

Expense

Cemetery Operations

71,360

78,073

85,249

13,889

19.46%

Transfer to Capital

0

0

0

0

100.00%

Transfer to Reserves

0

0

0

0

100.00%

Total Expense

71,360

78,073

85,249

13,889

19.46%

TOTAL CEMETERIES

17,160

40,031

-281

-17,441

-101.64%

86

Total Parks, Recreation and Cemeteries

1,174,691

2,076,077

1,569,135

394,444

33.58%

Explanation of Significant Variances Line 3

Swim/ Daycamp Program Fees

Line 10/11

Annualize LEO-Facilities

Line 16

Lakes and Trails, Music Festival, Canada Day, Insurance

Line 52/53

Reallocation of Positions

Line 67

Arena preliminary budget

Line 75/81

Forecasted Fee adjustment/Interment cost contract increase

Page 13 75 of 158

TOWNSHIP OF SOUTH FRONTENAC 2025 Draft Budget Development Services

2024-2025 Budget

Actuals

Variance

2024 Budget

22-Nov-24

2025 Budget

$

$

$

$

%

328,000

199,727

305,000

-23,000

-7.01%

Development Services

Revenue

User Charges

Government Grants

0

0

0

0

0.00%

Grants from Other Municipalities

0

0

0

0

0.00%

Transfer from Reserves

145,000

0

25,000

-120,000

-82.76%

Total Revenue

473,000

199,727

330,000

-143,000

-30.23%

Expense

Remuneration

530,011

452,491

558,421

28,410

5.36%

Benefits

177,292

147,465

182,353

5,061

2.85%

Inter Departmental Transfer

0

0

0

0

0.00%

Memberships, Training and Travel

49,400

12,705

40,400

-9,000

-18.22%

Communications

8,315

7,892

8,750

435

5.23%

Professional and Consulting Fees

37,200

52,267

37,200

0

0.00%

Operations

75,746

50,678

72,639

-3,106

-4.10%

Transfer to Capital

145,000

83,555

25,000

-120,000

-82.76%

Transfer to Reserves

0

0

0

0

0.00%

Total Expense

1,022,964

807,053

924,763

-98,200

-9.60%

TOTAL Planning and Development

549,964

607,326

594,763

44,800

8.15%

Explanation of Significant Variances Line 3

Adjusted Forecasted Planning Fees

Township of South Frontenac 2025 Capital Budget with Financing

Detailed Sheet page # 1 2 3

4 5 6 7 8 9 10 11 12 13 14

Project #

22-02 23-12 22-06

25-11 25-12 25-14 25-16 25-18 25-90 25-91 25-92 25-93 25-94 25-95

2025 PreApproved

Project * CORPORATE SERVICES Gateway Signage (2022-2025 Project) Wayfinding Sign Fabrication and Installation (2022-2025 Project) Verona Housing - Design and studies TOTAL CORPORATE SERVICES FIRE Hoses and Appliances ATV w Trailer replacement x 2 Rapid Response Unit Replacement x 2 Wildland Truck Replacement Fire Chief Vehicle Replacement Marine 361 Equipment Bunker Gear Replacement x 8 Mobile Gear Racks x 3 Drone - new Dry-Hydrant Replacement Paid on Call Firefighter Recruitment (up to 30)

Yes Yes

TOTAL FIRE

Yes

Previous Year Budget Approved towards Project

2025 Budget

14

Community Building Development Fund (formerly Federal Gas Charges

2026 Budget

Working Funds

Parkland

Tax)

166,666 533,334 175,000 875,000

53,334 266,667 100,000 420,001

0

20,000 50,000 180,000 90,000 75,000 22,000 38,240 21,000 10,500 35,000 280,000 821,740

0

210,000 600,000 340,000 15,000 10,000 40,000 1,215,000

Asset Invesment Reserve

Infrastructure

Road 38

Arterial

53,334 186,667 0

0

0

0

100,000 100,000

0

240,001

0

35,000

0

0

0

40,000 40,000

0

0

2,190,368

1,062,495

20,000

20,000

0

0

0

280,000 280,000

0

0

0

0

0

35,000

PUBLIC SERVICES 25-21 25-23 25-24 25-25 25-26 25-27

21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38

23-92 22-18 23-46A 23-51 23-56 24-41A 24-41B 24-41C 25-31 25-32 25-33 25-34 25-35 25-36 25-37 25-38 25-39 25-40

FLEET Three (3) 1/2 Ton Trucks Replacement Grader Replacement Wheel Loader Replacement Tools and Equipment for Service Vehicle Diagnostic tool for vehicles and heavy equipment Towable gravel compactor subtotal - Fleet ROADS INFRASTRUCTURE *Road 38/Boyce Road Sidewalk and Storm Sewers Eagle Creek Bridge (B31) Reconstruction Shale Road Culvert Pleasant Valley Municipal Drain - Drainage Act Maintenance Road 38 Design and Construction (Kingston Rd to Murton Road) Craig Road Westport Road Florida Road Surface Treatment (LCB) Preservation Pre-Engineering Roads 2026 Gravel Road Reconstruction Program 2025 Murvale Creek Culvert Buck Bay Road - Unnamed Bridge Repair Buck Lake Culvert (OSIM) Design Detailed Assessment Petworth Bridge Detailed Assessment Opinicon Bridge Pre-Engineering Bridges 2026 Arterial Road Culvert Replacement Program subtotal - Roads Infrastructure SYDENHAM WATER

14,800 50,000 20,000 35,250 220,000 54,900 10,800 9,300

415,050

873,000 1,053,500 22,000 7,800 4,315,000 1,095,000 1,351,700 291,100 950,000 136,400 340,000 831,000 49,000 35,000 19,500 14,000 50,000 250,000 10,811,000

275,000

1,485,000

778,500

500,000 600,000 300,000

285,551 950,000 136,400

625,000

831,000

17,000

2,127,000

1,400,000

275,000

0

0

2,150,451

0

3,021,368

1,062,495

Page 76 of 158

15 16 17 18 19 20

Township of South Frontenac 2025 Capital Budget with Financing

Detailed Sheet page # 1 2 3

4 5 6 7 8 9 10 11 12 13 14

Project #

Project *

22-02 23-12 22-06

CORPORATE SERVICES Gateway Signage (2022-2025 Project) Wayfinding Sign Fabrication and Installation (2022-2025 Project) Verona Housing - Design and studies TOTAL CORPORATE SERVICES

25-11 25-12 25-14 25-16 25-18 25-90 25-91 25-92 25-93 25-94 25-95

FIRE Hoses and Appliances ATV w Trailer replacement x 2 Rapid Response Unit Replacement x 2 Wildland Truck Replacement Fire Chief Vehicle Replacement Marine 361 Equipment Bunker Gear Replacement x 8 Mobile Gear Racks x 3 Drone - new Dry-Hydrant Replacement Paid on Call Firefighter Recruitment (up to 30)

2025 PreApproved Yes Yes

TOTAL FIRE

Yes

Previous Year Budget Approved towards Project

2025 Budget

166,666 533,334 175,000 875,000

53,334 266,667 100,000 420,001

0

20,000 50,000 180,000 90,000 75,000 22,000 38,240 21,000 10,500 35,000 280,000 821,740

0

210,000 600,000 340,000 15,000 10,000 40,000 1,215,000

15

Fire Equipment

Facilities

Public Services Equipment

Landfill Closure

Sydenham Water Reserve

Other

Taxation

Notes

80,000 Red Grant Program - 80k per year 2023-2025 0

0

0

0

0

20,000 50,000 180,000 90,000 75,000

453,240

80,000

22,000

38,240

0

0

21,000 10,500

0

0

0

53,500

0

PUBLIC SERVICES 25-21 25-23 25-24 25-25 25-26 25-27

21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38

23-92 22-18 23-46A 23-51 23-56 24-41A 24-41B 24-41C 25-31 25-32 25-33 25-34 25-35 25-36 25-37 25-38 25-39 25-40

FLEET Three (3) 1/2 Ton Trucks Replacement Grader Replacement Wheel Loader Replacement Tools and Equipment for Service Vehicle Diagnostic tool for vehicles and heavy equipment Towable gravel compactor subtotal - Fleet ROADS INFRASTRUCTURE *Road 38/Boyce Road Sidewalk and Storm Sewers Eagle Creek Bridge (B31) Reconstruction Shale Road Culvert Pleasant Valley Municipal Drain - Drainage Act Maintenance Road 38 Design and Construction (Kingston Rd to Murton Road) Craig Road Westport Road Florida Road Surface Treatment (LCB) Preservation Pre-Engineering Roads 2026 Gravel Road Reconstruction Program 2025 Murvale Creek Culvert Buck Bay Road - Unnamed Bridge Repair Buck Lake Culvert (OSIM) Design Detailed Assessment Petworth Bridge Detailed Assessment Opinicon Bridge Pre-Engineering Bridges 2026 Arterial Road Culvert Replacement Program subtotal - Roads Infrastructure SYDENHAM WATER

14,800 50,000 20,000 35,250 220,000 54,900 10,800 9,300

415,050

873,000 1,053,500 22,000 7,800 4,315,000 1,095,000 1,351,700 291,100 950,000 136,400 340,000 831,000 49,000 35,000 19,500 14,000 50,000 250,000 10,811,000

210,000 600,000 340,000 15,000 10,000 0

0

1,150,000

0

0

25,000

22,000

495,000 291,100

0

7,800 562,137 County-FGT 766,149 OCIF

340,000

0

0

0

0

0

49,000 35,000 19,500 14,000 50,000 250,000 1,565,600

1,336,086

Page 77 of 158

15 16 17 18 19 20

Township of South Frontenac 2025 Capital Budget with Financing

Detailed Sheet page #

Project #

Project *

2025 PreApproved

Previous Year Budget Approved towards Project

Yes

2025 Budget

22-54 25-61 25-62

42 43

25-86 25-87

44 45

23-08 25-50

Replace Serpentine Piping Sydenham Drinking Water System - Treatment Sydenham Drinking Water System - Storage subtotal - Sydenham Water SOLID WASTE Loughborough WDS - New Waste Transfer Facilities Landfill Compactor - Used subtotal - Solid Waste FACILITIES Townhall Expansion - Furniture Station 7 - Washroom - Cinderella Toilet and shower

46

25-51

Joint Fire Hall & OPP Station-Design

47 48 49 50 51

25-52 25-54 25-56 25-57 25-58

Bedford Garage Site Works Station 2- Burridge - Exterior Upgrades Keeley Garage Pressure Washer Portland Garage Steel Roof Replacement Storrington Garage Oil/Grit Seperator

25-59

Townhall - Charging Stations

350,000

25-60

Cenotaph landscaping - Sydenham subtotal - Facilities RECREATION Sydenham Point Accessible Washroom Upgrades Centennial Park - New Accessible Washrooms Design and Build Keeley/Bowes Diamond Upgrades Bellrock & Petworth Parkette Conceptual Design Shipyards Boat Ramp Rehabilitation Battersea Ball Park Pavillion Centennial Park - Baseball Diamond Rehabilitation *Harris Park - Playground Rehabilitation and Accessibility Upgrades Bleachers - 7 sets - Gerald Ball (2), Point Park(3), Inverary(2) Centennial Park Upgrades (Tree Planting $20,000 deferred to 2026) subtotal - Recreation TOTAL PUBLIC SERVICES

60,000 929,100

54 55 56 57 58 59 60 61 62 63

24-55 24-56 24-68 24-70 24-72 25-55 25-66 25-67 25-69 25-70

64

25-78

DEVELOPMENT SERVICES Collins / Glenvale Creek flood hazard mapping project - CRCA joint project TOTAL DEVELOPMENT SERVICES Total

Community Building Development Fund (formerly Federal Gas Charges

2026 Budget

Parkland

Tax)

39 40 41

52 53

16

Working Funds

Asset Invesment Reserve

Infrastructure

Road 38

Arterial

0

700,000 58,500 7,000 765,500

0

0

0

0

0

0

0

0

0

0

65,000 350,000 415,000

0

0

0

0

0

350,000 350,000

0

0

0

250,000

150,000

250,000

64,100 15,000 20,000 60,000 40,000

95,000

125,000

0

0

0

0

3,825,000

3,825,000 30,000 30,000 208,000 15,000 110,000

50,000 20,000

125,000 245,000

250,000

0

0

550,000

150,000

393,000 4,633,050

20,000 150,000 37,000 15,000 25,000 95,000 250,000 104,000 91,000 18,000 701,000 14,836,600

20,000 570,000 2,942,000

150,000 1,800,000

0 275,000

18,000 55,000 55,000

0 125,000

0 2,500,451

0 40,000

0 3,021,368

0 1,062,495

0 5,508,050

25,000 25,000 16,103,341

0 2,962,000

0 1,800,000

0 275,000

0 55,000

25,000 25,000 670,001

0 2,500,451

0 175,000

0 3,021,368

0 1,062,495

37,000

Page 78 of 158

Township of South Frontenac 2025 Capital Budget with Financing

Detailed Sheet page #

Project #

Project *

39 40 41

22-54 25-61 25-62

42 43

25-86 25-87

44 45

23-08 25-50

Replace Serpentine Piping Sydenham Drinking Water System - Treatment Sydenham Drinking Water System - Storage subtotal - Sydenham Water SOLID WASTE Loughborough WDS - New Waste Transfer Facilities Landfill Compactor - Used subtotal - Solid Waste FACILITIES Townhall Expansion - Furniture Station 7 - Washroom - Cinderella Toilet and shower

2025 PreApproved

Previous Year Budget Approved towards Project

Yes

2025 Budget

0

0

65,000 350,000 415,000

0

50,000 20,000

50,000 20,000

46

25-51

Joint Fire Hall & OPP Station-Design

250,000

47 48 49 50 51

25-52 25-54 25-56 25-57 25-58

Bedford Garage Site Works Station 2- Burridge - Exterior Upgrades Keeley Garage Pressure Washer Portland Garage Steel Roof Replacement Storrington Garage Oil/Grit Seperator

64,100 15,000 20,000 60,000 40,000

52 53

25-59

Townhall - Charging Stations

350,000

25-60

Cenotaph landscaping - Sydenham subtotal - Facilities RECREATION Sydenham Point Accessible Washroom Upgrades Centennial Park - New Accessible Washrooms Design and Build Keeley/Bowes Diamond Upgrades Bellrock & Petworth Parkette Conceptual Design Shipyards Boat Ramp Rehabilitation Battersea Ball Park Pavillion Centennial Park - Baseball Diamond Rehabilitation *Harris Park - Playground Rehabilitation and Accessibility Upgrades Bleachers - 7 sets - Gerald Ball (2), Point Park(3), Inverary(2) Centennial Park Upgrades (Tree Planting $20,000 deferred to 2026) subtotal - Recreation TOTAL PUBLIC SERVICES

60,000 929,100

54 55 56 57 58 59 60 61 62 63

24-55 24-56 24-68 24-70 24-72 25-55 25-66 25-67 25-69 25-70

64

25-78

DEVELOPMENT SERVICES Collins / Glenvale Creek flood hazard mapping project - CRCA joint project TOTAL DEVELOPMENT SERVICES Total

Fire Equipment

Facilities

700,000 58,500 7,000 765,500

3,825,000

3,825,000 30,000 30,000 208,000 15,000 110,000

17

0

Public Services Equipment

0

0

Landfill Closure

Sydenham Water Reserve

0

Other

Taxation

Notes

186,690 58,500 7,000 252,190

513,310 Green Funding 73.33%

0

513,310

0

0

0

65,000 0

0

65,000

64,100 15,000

20,000 60,000

40,000

225,000 ChargeON funding $225,000, ZEVIP $90,000 pending 60,000 185,000

0

0

0

0

144,100

225,000

393,000 4,633,050

20,000 150,000 37,000 15,000 25,000 95,000 250,000 104,000 91,000 18,000 701,000 14,836,600

250,000 435,000

0 0

0 1,150,000

0 65,000

0 252,190

241,000 1,975,700

5,000 2,079,396

0 5,508,050

25,000 25,000 16,103,341

0 435,000

0 453,240

0 1,150,000

0 65,000

0 252,190

0 2,029,200

0 2,159,396

20,000

15,000 25,000 90,000

250,000

5,000 Fundraising $5,000 Applied for grant 50% funding

91,000

Page 79 of 158

Page 18 80 of 158 RESERVES & RESERVE FUNDS FORECAST - 2025 Budget PROJECTED BALANCE

END OF YEAR 2024 Fiscal Working Funds COVID/ Safe Restart Equipment and Infrastructure General Asset Investment Reserve Infrastructure Climate Change Vertical Facilities/Property Recreation Rolling Capital - Building Department Capital - Fire Department Capital - Roads Department Linear Cemetery Lot Addition Arterial Stabilization Wages-Fire Department Building Department Policing Costs Winter Control - Roads Dept. Recycling Planning Revenue-Severance Appl. Water Reserve Fund Sub-total OBLIGATORY RESERVE FUNDS 5% Parkland Development Charges Environmental Enhancement Community Building Fund (formerly Federal Gas Tax) Subdivider Contributions Cannabis Legalization Fund-OCLIF Sub-total RESERVE FUNDS & TRUSTS Election Highway #38 Reconstruction Landfill Closure Trusts Fire Donations Portland Historical Grant Memorial OHRP Cemetery - PC Cemetery M. Burns Trust Cemetery - Monument PC Cemetery - Monument PC Inc Sub-total TOTAL

2025 Budgeted Expenditures

CAPITAL FUND

573,739 219,515

670,001

541,051 4,101 23,877 439,579 3,026

REVENUE FUND

PROJECTED BALANCE

TAXATION BDGTD

END OF YEAR 2025

OTHER REVENUES

373,320

207,621 219,515

2,500,451 175,000

2,794,341 275,000 100,000

834,941 104,101 123,877

435,000

344,329

348,908 3,026

29,650 191,917 472,181

453,240 1,150,000

40,000 511,226 700,000

69,650 249,903 22,181

43,538 4,370,000

3,021,368

250,000

43,538 1,598,632

34,976 1,844,550 848,773 866,337 273,641 66,784 20,000 1,707,902 12,475,138

69,437

Contribution to Reserve in 2025 Budget

177,736 50,000 106,582

252,190 8,657,250

297,173

88,104 5,582,902

0

34,976 1,666,814 798,773 866,337 380,223 66,784 20,000 1,543,816 9,203,617

-46,132 668,025 150,919

55,000 1,800,000

150,000 1,355,266

48,868 223,291 150,919

-363,832

837,137

1,223,297

22,328

2,728,563

37,171 46,294 528,870

37,171 46,294 453,244

2,692,137

84,450 1,062,495 434,548

1,062,495 65,000

0

0

25,000

109,450 0 409,548

40,000

23,239 40,584 28,975

23,239 40,584 28,975

4,175 602,205 25,000 82,758 36,335 2,424,764 15,353,146

4,175 602,205 25,000 82,758 36,335 1,362,269 11,094,756

1,127,495 12,476,882

0 297,173

65,000 8,376,465

0 0

Township of South Frontenac 2024 Capital Budget with Financing

Detailed Project # Project * Sheet page # 1 2 3

4 5 6 7 8 9 10 11 12 13 14

22-02 23-12 22-06

CORPORATE SERVICES Gateway Signage (2022-2025 Project) Wayfinding Sign Fabrication and Installation (2022-2025 Project) Verona Housing - Design and studies TOTAL CORPORATE SERVICES

25-11 25-12 25-14 25-16 25-18 25-90 25-91 25-92 25-93 25-94 25-95

FIRE Hoses and Appliances ATV w Trailer replacement x 2 Rapid Response Unit Replacement x 2 Wildland Truck Replacement Fire Chief Vehicle Replacement Marine 361 Equipment Bunker Gear Replacement x 8 Mobile Gear Racks x 3 Drone - new Dry-Hydrant Replacement Paid on Call Firefighter Recruitment (up to 30) TOTAL FIRE

25-21 25-23 25-24 25-25 25-26 25-27

21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38

23-92 22-18 23-46A 23-51 23-56 24-41A 24-41B 24-41C 25-31 25-32 25-33 25-34 25-35 25-36 25-37 25-38 25-39 25-40

Yes Yes

Yes

Previous Year Budget Approved towards Project

2025 Budget

166,666 533,334 175,000 875,000

53,334 266,667 100,000 420,001

0

20,000 50,000 180,000 90,000 75,000 22,000 38,240 21,000 10,500 35,000 280,000 821,740

0

210,000 600,000 340,000 15,000 10,000 40,000 1,215,000

14,800 50,000 20,000 35,250 220,000 54,900 10,800 9,300

873,000 1,053,500 22,000 7,800 4,315,000 1,095,000 1,351,700 291,100 950,000 136,400 340,000 831,000 49,000 35,000 19,500 14,000 50,000 250,000

2026 Budget

Notes

Red Grant Program - 80k per year 2023-2025 0 20,000

20,000

0

0

0

1,485,000

625,000 17,000

Page 81 of 158

15 16 17 18 19 20

PUBLIC SERVICES FLEET Three (3) 1/2 Ton Trucks Replacement Grader Replacement Wheel Loader Replacement Tools and Equipment for Service Vehicle Diagnostic tool for vehicles and heavy equipment Towable gravel compactor subtotal - Fleet ROADS INFRASTRUCTURE *Road 38/Boyce Road Sidewalk and Storm Sewers Eagle Creek Bridge (B31) Reconstruction Shale Road Culvert Pleasant Valley Municipal Drain - Drainage Act Maintenance Road 38 Design and Construction (Kingston Rd to Murton Road) Craig Road Westport Road Florida Road Surface Treatment (LCB) Preservation Pre-Engineering Roads 2026 Gravel Road Reconstruction Program 2025 Murvale Creek Culvert Buck Bay Road - Unnamed Bridge Repair Buck Lake Culvert (OSIM) Design Detailed Assessment Petworth Bridge Detailed Assessment Opinicon Bridge Pre-Engineering Bridges 2026 Arterial Road Culvert Replacement Program

2025 PreApproved

Page 1 of 2 2024-12-02

Township of South Frontenac 2024 Capital Budget with Financing

Detailed Project # Project * Sheet page #

2025 PreApproved

Page 2 of 2 2024-12-02

Previous Year Budget Approved towards Project

2025 Budget

2026 Budget

Notes

39 40 41

22-54 25-61 25-62

42 43

25-86 25-87

44 45

23-08 25-50

subtotal - Roads Infrastructure SYDENHAM WATER Replace Serpentine Piping Sydenham Drinking Water System - Treatment Sydenham Drinking Water System - Storage subtotal - Sydenham Water SOLID WASTE Loughborough WDS - New Waste Transfer Facilities Landfill Compactor - Used subtotal - Solid Waste FACILITIES Townhall Expansion - Furniture Station 7 - Washroom - Cinderella Toilet and shower

46

25-51

Joint Fire Hall & OPP Station-Design

250,000

150,000

47 48 49 50 51

25-52 25-54 25-56 25-57 25-58

Bedford Garage Site Works Station 2- Burridge - Exterior Upgrades Keeley Garage Pressure Washer Portland Garage Steel Roof Replacement Storrington Garage Oil/Grit Seperator

64,100 15,000 20,000 60,000 40,000

95,000

25-59

Townhall - Charging Stations

350,000

25-60

Cenotaph landscaping - Sydenham subtotal - Facilities RECREATION Sydenham Point Accessible Washroom Upgrades Centennial Park - New Accessible Washrooms Design and Build Keeley/Bowes Diamond Upgrades Bellrock & Petworth Parkette Conceptual Design Shipyards Boat Ramp Rehabilitation Battersea Ball Park Pavillion Centennial Park - Baseball Diamond Rehabilitation *Harris Park - Playground Rehabilitation and Accessibility Upgrades Bleachers - 7 sets - Gerald Ball (2), Point Park(3), Inverary(2) Centennial Park Upgrades (Tree planting $20,000 deferred to 2026) subtotal - Recreation TOTAL PUBLIC SERVICES

52 53

54 55 56 57 58 59 60 61 62 63

24-55 24-56 24-68 24-70 24-72 25-55 25-66 25-67 25-69 25-70

64

25-78

DEVELOPMENT SERVICES Collins / Glenvale Creek flood hazard mapping project - CRCA joint project TOTAL DEVELOPMENT SERVICES Total

415,050

10,811,000

0

700,000 58,500 7,000 765,500

0

0

0

65,000 350,000 415,000

0

0

Yes

3,825,000

3,825,000 30,000 30,000 208,000 15,000 110,000

2,127,000

0 Green Funding 73.33%

50,000 20,000

60,000 929,100

ChargeON funding $225,000, ZEVIP $90,000 pending 245,000

0

393,000 4,633,050

20,000 150,000 37,000 15,000 25,000 95,000 250,000 104,000 91,000 18,000 701,000 14,836,600

20,000 570,000 2,942,000

0 0

0 5,508,050

25,000 25,000 16,103,341

0 2,962,000

0 0

550,000

Fundraising $5,000 Applied for grant 50% funding

Page 82 of 158

Capital Project Detail Sheet

1

Project Information Project Name: Gateway Signage

Type of Project: Other

Project Number: 22-02

Basis for Activity: Growth Related

Department: 1210 - CAO

Relationship to Strategic Plan: Old Priority #4 - Be a catalyst for the creation of vibrant, complete communities

Description: Installation of gateway signage at Township border entry points.

Rationale: Gateway signs are important beacons where visitors and residents will easily recognize they are entering South Frontenac and what it represents.

(Pre-approved in 2022) The use of updated gateway signage with South Frontenac’s new brand will promote attention to the natural assets and opportunities the Township provides. Staff Contact: Louise Fragnito (lfragnito)

Project Finances

Actuals Description 80100 - Equipment Total

Expensed to Current Year Expenses / Expenditure

Budget Total Project

Prior Approved

2025

2026

2027

2028

2029

12,703

220,000

166,666

53,334

0

0

0

0

12,703

220,000

166,666

53,334

0

0

0

0

Page 83 of 158

Capital Project Detail Sheet

2

Project Information Project Name: Wayfinding Sign Fabrication & Installation

Type of Project: Other

Project Number: 23-12

Basis for Activity: Other

Department: 1220 - Communications

Relationship to Strategic Plan: Old Priority #4 - Be a catalyst for the creation of vibrant, complete communities

Description: Wayfinding Signage Fabrication and Installation.

Rationale: Wayfinding signage will be prepared and installed in critical locations that will provide a clear, consistent and highly navigable system that will inform and direct visitors and residents to local businesses, services, attractions and recreational amenities and assets.

(Pre-approved in 2022)

The signage will use the new branding that will provide continuity in linking tourism and economic development in the Township. Staff Contact: Louise Fragnito (lfragnito)

Project Finances

Actuals Description 53310 - Materials

Budget

Expensed to Current Year

Total Project

Prior Approved

2025

2026

2027

2028

2029

Expenses / Expenditure

97,658

0

0

0

0

0

0

0

55290 - Contracted Services Expenses / Expenditure

0

800,000

533,333

266,667

0

0

0

0

97,658

800,000

533,333

266,667

0

0

0

0

Total 41500 - Grnts-Prov

Revenues / Funding Source

0

0

0

0

0

0

0

0

49650 - Reserve

Revenues / Funding Source

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

Total

Page 84 of 158

Capital Project Detail Sheet

3

Project Information Project Name: Seniors & Affordable Housing - Project Design & Management Consultant

Type of Project: Other

Project Number: 22-06

Basis for Activity: Service Level Change

Department: 1210 - CAO

Relationship to Strategic Plan: Old Priority #2 - Promote and support growth that meets the community’s needs

Description: Continue to advance work on the Verona Housing including architectural plans, zoning changes, public communication and other items in parallel to the servicing project.

Rationale: Continue to work in parallel with the servicing project for the Verona site.

Staff Contact: Louise Fragnito (lfragnito)

Project Finances

Actuals Description 55330 - Consultant Total

Expensed to Current Year Expenses / Expenditure

Budget Total Project

Prior Approved

2025

2026

2027

2028

2029

65,139

275,000

175,000

100,000

0

0

0

0

65,139

275,000

175,000

100,000

0

0

0

0

Page 85 of 158

Capital Project Detail Sheet

4

Project Information Project Name: Hoses and Appliances

Type of Project: Equipment

Project Number: 25-11

Basis for Activity: Other

Department: 2100 - Fire

Relationship to Strategic Plan: Priority #2 - Municipal Service Excellence

Description: Replacement Hoses and Appliances

Rationale: Part of the SFFR Fleet and Equipment Asset Management Plan includes the annual replacement hoses and appliances for structural firefighting operations. Annual costs and investments are spread out to reduce significant one time costs.

Staff Contact: Del Blakney (dblakney)

Project Finances

Actuals Description 80100 - Equipment Total

Budget

Expensed to Current Year Expenses / Expenditure

Total Project

Prior Approved

2025

2026

2027

2028

2029

0

100,000

0

20,000

20,000

20,000

20,000

20,000

0

100,000

0

20,000

20,000

20,000

20,000

20,000

Page 86 of 158

Capital Project Detail Sheet

5

Project Information Project Name: Replacement of Two (2) ATV’s and Trailers

Type of Project: Light Weight

Project Number: 25-12

Basis for Activity: Asset Renewal

Department: 2100 - Fire

Relationship to Strategic Plan: Priority #2 - Municipal Service Excellence

Description: Replace existing 2003 Yamaha 400cc ATV and Trailer.

Rationale: Ensure the organizational capacity to deliver cost-effective service with reliable equipment.

Replace existing 2007 Can Am 500 ATV and Trailer.

Staff Contact: Del Blakney (dblakney)

Project Finances

Actuals Description 80105 - Fleet Total

Budget

Expensed to Current Year Expenses / Expenditure

Total Project

Prior Approved

2025

2026

2027

2028

2029

0

50,000

0

50,000

0

0

0

0

0

50,000

0

50,000

0

0

0

0

Page 87 of 158

Capital Project Detail Sheet

6

Project Information Project Name: Replacement of Two (2) Rapid Response Units

Type of Project: Light Weight

Project Number: 25-14

Basis for Activity: Asset Renewal

Department: 2100 - Fire

Relationship to Strategic Plan: Priority #2 - Municipal Service Excellence

Description: Replacement of two (2) rapid response units, Unit U351 -2015 and Unit U381 -2011 pick up trucks.

Rationale: Scheduled replacement based on lifecycle. The existing vehicle (U351) will become a platoon chief vehicle replacing the 2002 pick-up truck (PC304). The existing vehicle (U381) will become a second platoon chief for the north end of the township (PC304A).

Staff Contact: Del Blakney (dblakney)

Project Finances

Actuals Description 80105 - Fleet Total

Budget

Expensed to Current Year Expenses / Expenditure

Total Project

Prior Approved

2025

2026

2027

2028

2029

0

180,000

0

180,000

0

0

0

0

0

180,000

0

180,000

0

0

0

0

Page 88 of 158

Capital Project Detail Sheet

7

Project Information Project Name: Wildland Truck Replacement

Type of Project: Light Weight

Project Number: 25-16

Basis for Activity: Asset Renewal

Department: 2100 - Fire

Relationship to Strategic Plan: Priority #2 - Municipal Service Excellence

Description: 2003 3/4 Ton Pick-up Truck (U342 )used for wildland firefighting. It also pulls an enclosed trailer and ATV with wildland firefighting equipment and rescue equipment for Frontenac Park.

Rationale: Long term plan is to have this truck replace the rapid response unit at station 6 is 2031 and replace the wildland truck with the mini pumper from station 1.

Staff Contact: Del Blakney (dblakney)

Project Finances

Actuals Description 80105 - Fleet Total

Budget

Expensed to Current Year Expenses / Expenditure

Total Project

Prior Approved

2025

2026

2027

2028

2029

0

90,000

0

90,000

0

0

0

0

0

90,000

0

90,000

0

0

0

0

Page 89 of 158

Capital Project Detail Sheet

8

Project Information Project Name: Replacement of Fire Chief vehicle.

Type of Project: Light Weight

Project Number: 25-18

Basis for Activity: Asset Renewal

Department: 2100 - Fire

Relationship to Strategic Plan: Priority #2 - Municipal Service Excellence

Description: Replacement of Fire Chief vehicle.

Rationale: Provide a vehicle that is suitable for transportation of equipment and that can transport contaminated hose and bunker gear.

Staff Contact: Del Blakney (dblakney)

Project Finances

Actuals Description 80105 - Fleet Total

Budget

Expensed to Current Year Expenses / Expenditure

Total Project

Prior Approved

2025

2026

2027

2028

2029

0

75,000

0

75,000

0

0

0

0

0

75,000

0

75,000

0

0

0

0

Page 90 of 158

Capital Project Detail Sheet

9

Project Information Project Name: Marine 361 Equipment

Type of Project: Equipment

Project Number: 25-90

Basis for Activity: Asset Renewal

Department: 2100 - Fire

Relationship to Strategic Plan: Priority #2 - Municipal Service Excellence

Description: Replace aging equipment and standardize the fire boats for consistency.

Rationale: Goal is to standardize equipment by vehicle/asset type. Ensure the two main fire boats have the same equipment for immediate response to north and south areas of township.

Staff Contact: Del Blakney (dblakney)

Project Finances

Actuals Description 80100 - Equipment Total

Budget

Expensed to Current Year Expenses / Expenditure

Total Project

Prior Approved

2025

2026

2027

2028

2029

0

22,000

0

22,000

0

0

0

0

0

22,000

0

22,000

0

0

0

0

Page 91 of 158

Capital Project Detail Sheet

10

Project Information Project Name: Bunker Gear Replacement - 8 Suits

Type of Project: Equipment

Project Number: 25-91

Basis for Activity: Asset Renewal

Department: 2100 - Fire

Relationship to Strategic Plan: Priority #1 - Sustainable Long-Term Prosperity

Description: Annual Bunker Gear Replacement - 8 Suits.

Rationale: Annual replacement and renewal ensures SFFR is meeting the requirements of NFPA 1851 for 10 year lifespan of Structural Firefighting Bunker Gear.

Staff Contact: Del Blakney (dblakney)

Project Finances

Actuals Description 80100 - Equipment Total

Budget

Expensed to Current Year Expenses / Expenditure

Total Project

Prior Approved

2025

2026

2027

2028

2029

0

38,240

0

38,240

0

0

0

0

0

38,240

0

38,240

0

0

0

0

Page 92 of 158

Capital Project Detail Sheet

11

Project Information Project Name: Mobile Gear Racks

Type of Project: Equipment

Project Number: 25-92

Basis for Activity: Other

Department: 2100 - Fire

Relationship to Strategic Plan: Priority #2 - Municipal Service Excellence

Description: Mobile Gear Racks for stations 2, 3, 4.

Rationale: Station 2, 3 and 4 currently are using hooks off the wall. This provides updated racks similar to Station 1, 5, 6, 7 & 8 for firefighter use.

Staff Contact: Del Blakney (dblakney)

Project Finances

Actuals Description 80100 - Equipment Total

Budget

Expensed to Current Year Expenses / Expenditure

Total Project

Prior Approved

2025

2026

2027

2028

2029

0

21,000

0

21,000

0

0

0

0

0

21,000

0

21,000

0

0

0

0

Page 93 of 158

Capital Project Detail Sheet

12

Project Information Project Name: Drone

Type of Project: Equipment

Project Number: 25-93

Basis for Activity: Service Level Change

Department: 2100 - Fire

Relationship to Strategic Plan: Priority #2 - Municipal Service Excellence

Description: Drone for Squad 381.

Rationale: Provide a drone on each squad as currently only one available for the entire township. Goal is to standardize squad equipment for immediate response to north and south areas of township.

Staff Contact: Del Blakney (dblakney)

Project Finances Expense Type 80100 - Equipment

Operating Impact Description

FTE

Annual Batteries and Service

0.00

2025

2026 0

Actuals Description 80100 - Equipment Total

100

2028 100

2029 100

100

Budget

Expensed to Current Year Expenses / Expenditure

2027

Total Project

Prior Approved

2025

2026

2027

2028

2029

0

10,500

0

10,500

0

0

0

0

0

10,500

0

10,500

0

0

0

0

Page 94 of 158

Capital Project Detail Sheet

13

Project Information Project Name: Dry-Hydrant Replacement

Type of Project: Other

Project Number: 25-94

Basis for Activity: Asset Renewal

Department: 2100 - Fire

Relationship to Strategic Plan: Priority #2 - Municipal Service Excellence

Description: Replacement of dry hydrant as current one is not operational.

Rationale: Dry hydrants provide quick efficient access to high volumes of water to support the filling of tankers for firefighting. Dry hydrants are important assets needed to maintain our water tanker shuttle accreditation and provide residents and business with the best possible rural fire insurance rates.

Staff Contact: Del Blakney (dblakney)

Project Finances

Actuals Description 80300 - Land Improvements Total

Budget

Expensed to Current Year Expenses / Expenditure

Total Project

Prior Approved

2025

2026

2027

2028

2029

0

35,000

0

35,000

0

0

0

0

0

35,000

0

35,000

0

0

0

0

Page 95 of 158

Capital Project Detail Sheet

14

Project Information Project Name: Paid on call Fire Fighter Recruitment (30)

Type of Project: Other

Project Number: 25-95

Basis for Activity: Asset Renewal

Department: 2100 - Fire

Relationship to Strategic Plan: Priority #2 - Municipal Service Excellence

Description: Recruitment for up to (30) Paid on Call Firefighters for South Frontenac Fire & Rescue (SFFR)

Rationale: Currently level of service is set at 110 (firefighters, captains, platoon chiefs). Currently we have 96 of which 14 persons attend less than 20% of the time and 4 are on a leave. Minimum commitment for employment is 33%.

Staff Contact: Del Blakney (dblakney)

Project Finances

Actuals Description 80500 - Non-PSAB Total

Budget

Expensed to Current Year Expenses / Expenditure

Total Project

Prior Approved

2025

2026

2027

2028

2029

0

280,000

0

280,000

0

0

0

0

0

280,000

0

280,000

0

0

0

0

Page 96 of 158

Capital Project Detail Sheet

15

Project Information Project Name: Three (3) 1/2 Ton Trucks

Type of Project: Equipment

Project Number: 25-21

Basis for Activity: Asset Renewal

Department: 3000 - Overhead

Relationship to Strategic Plan: Priority #1 - Sustainable Long-Term Prosperity

Description: Three (3) 1/2 Ton truck replacements for units:

Rationale: Asset renewal in accordance with 9 year life cycle replacement schedule in long term financial plan.

16-34 (Asset ID 33110) 16-09 (Asset ID 33111) 17-51 (Asset ID 33112). Staff Contact: Brian Kirk (bkirk)

Project Finances

Actuals Description 80105 - Fleet Total

Budget

Expensed to Current Year Expenses / Expenditure

Total Project

Prior Approved

2025

2026

2027

2028

2029

0

210,000

0

210,000

0

0

0

0

0

210,000

0

210,000

0

0

0

0

Page 97 of 158

Capital Project Detail Sheet

16

Project Information Project Name: Grader Replacement

Type of Project: Equipment

Project Number: 25-23

Basis for Activity: Asset Renewal

Department: 3000 - Overhead

Relationship to Strategic Plan: Priority #1 - Sustainable Long-Term Prosperity

Description: Replacement for unit FG24 (Asset ID 23204) 2012 772 John Deere Grader.

Rationale: Asset renewal in accordance with the long range financial plan.

Staff Contact: Brian Kirk (bkirk)

Project Finances

Actuals Description 80105 - Fleet Total

Budget

Expensed to Current Year Expenses / Expenditure

Total Project

Prior Approved

2025

2026

2027

2028

2029

0

600,000

0

600,000

0

0

0

0

0

600,000

0

600,000

0

0

0

0

Page 98 of 158

Capital Project Detail Sheet

17

Project Information Project Name: Wheel Loader Replacement

Type of Project: Equipment

Project Number: 25-24

Basis for Activity: Asset Renewal

Department: 3000 - Overhead

Relationship to Strategic Plan: Priority #1 - Sustainable Long-Term Prosperity

Description: Replacement for unit FT94 (Asset ID 23401) 2006 CAT 930 loader.

Rationale: Asset renewal in accordance with 18 year life cycle replacement schedule in long range financial plan.

Staff Contact: Brian Kirk (bkirk)

Project Finances

Actuals Description 80105 - Fleet Total

Budget

Expensed to Current Year Expenses / Expenditure

Total Project

Prior Approved

2025

2026

2027

2028

2029

0

340,000

0

340,000

0

0

0

0

0

340,000

0

340,000

0

0

0

0

Page 99 of 158

Capital Project Detail Sheet

18

Project Information Project Name: Tools and Equipment for Service Vehicle

Type of Project: Equipment

Project Number: 25-25

Basis for Activity: Service Level Change

Department: 3000 - Overhead

Relationship to Strategic Plan: Priority #2 - Municipal Service Excellence

Description: Tools and equipment required for mechanics service vehicle.

Rationale: The vehicle requires a permanent set of tools to improve efficiency of roadside repairs and limit downtime.

Staff Contact: Brian Kirk (bkirk)

Project Finances

Actuals Description 80105 - Fleet Total

Budget

Expensed to Current Year Expenses / Expenditure

Total Project

Prior Approved

2025

2026

2027

2028

2029

0

15,000

0

15,000

0

0

0

0

0

15,000

0

15,000

0

0

0

0

Page 100 of 158

Capital Project Detail Sheet

19

Project Information Project Name: Diagnostic tool for vehicles and heavy equipment

Type of Project: Equipment

Project Number: 25-26

Basis for Activity: Service Level Change

Department: 3000 - Overhead

Relationship to Strategic Plan: Priority #2 - Municipal Service Excellence

Description: Universal diagnostic tool for reading engine control module codes on vehicles and heavy equipment.

Rationale: New vehicles and equipment have more complex electronic systems that we currently can’t diagnose. Tool will allow mechanics to efficiently diagnose and limit the amount of vehicles sent out for repair.

Staff Contact: Brian Kirk (bkirk)

Project Finances

Actuals Description 80105 - Fleet Total

Budget

Expensed to Current Year Expenses / Expenditure

Total Project

Prior Approved

2025

2026

2027

2028

2029

0

10,000

0

10,000

0

0

0

0

0

10,000

0

10,000

0

0

0

0

Page 101 of 158

Capital Project Detail Sheet

20

Project Information Project Name: Towable gravel compactor

Type of Project: Auxiliary Attachment

Project Number: 25-27

Basis for Activity: Service Level Change

Department: 3200 - Roadside Maintenance

Relationship to Strategic Plan: Priority #2 - Municipal Service Excellence

Description: Towable gravel compactor attachment for the motor grader.

Rationale: Attachment for the grader to improve the process on the gravel roads and shoulders.

Staff Contact: Brian Kirk (bkirk)

Project Finances

Actuals Description 80100 - Equipment Total

Budget

Expensed to Current Year Expenses / Expenditure

Total Project

Prior Approved

2025

2026

2027

2028

2029

0

40,000

0

40,000

0

0

0

0

0

40,000

0

40,000

0

0

0

0

Page 102 of 158

Capital Project Detail Sheet

21

Project Information Project Name: Road 38/Boyce Road Sidewalk and Storm Sewers

Type of Project: Roadside

Project Number: 23-92

Basis for Activity: Asset Renewal

Department: 3100 - Structures

Relationship to Strategic Plan: N/A

Description: Removal and replacement of sidewalk facilities in Hartington Village on Road 38 (100m), Holleford Road (100m) and Boyce Road (200m).

Rationale: On September 5th, 2023 Township Council approved funding in the amount of $14,800 to advance detailed designs for the replacement of sidewalks on Boyce Road and Road 38 along with design work for sidewalk extensions to (Bittersweet Drive) Hartington Subdivision.

Addition of sidewalk extension on Boyce Road (165m) to Bittersweet Drive (Hartington Subdivision)

All of the existing sidewalks in Hartington are currently rated poor and do not meet AODA standards for minimum width. In order to expedite the sidewalk replacements - extensive storm sewer work will be required in the village including numerous storm crossings on Boyce Road.

Removal, replacement and upgrade of existing storm sewers (185m) within area of sidewalk upgrades. Addition of new water quality treatment as required under the Township’s Environmental Compliance Approval.

Many of the drainage systems in Hartington were constructed in the 70’s and are operating well beyond their useful service life. Stormwater treatment will also have to be incorporated into the project to be compliant under the Township’s Consolidated Linear ECA approval from the Ministry. Staff Contact: Troy Dunlop (tdunlop)

Project Finances

Actuals Description

Budget

Expensed to Current Year

Total Project

Prior Approved

2025

2026

2027

2028

2029

5,434

858,800

14,800

844,000

0

0

0

0

55330 - Consultant

4,477

29,000

0

29,000

0

0

0

0

9,911

887,800

14,800

873,000

0

0

0

0

Total

Expenses / Expenditure

Page 103 of 158

55290 - Contracted Services Expenses / Expenditure

Capital Project Detail Sheet

22

Project Information Project Name: Eagle Creek Bridge (B31) Reconstruction

Type of Project: Bridge

Project Number: 22-18

Basis for Activity: Asset Renewal

Department: 3100 - Structures

Relationship to Strategic Plan: N/A

Description: ASSET # 63290 (OSIM Structure)

Rationale: The reconstruction of the Eagle Creek Bridge has been identified as a priority bridge project for 2025 within the 5 year plan received by Council on May 2, 2023.

The Eagle Creek bridge an OSIM structure located on Bob’s Lake Road approximately 2.2km north of Buck Bay Road.

The bridge is believed to have been constructed in the mid 1940’s.

The rigid frame concrete structure has a span of 5.4m and a deck width of 3.9m

The structure was last inspected in 2023 and has a Bridge Condition Index rating of 36.1 (very poor).

The structure will be removed and replaced with a new 2 lane bridge structure complete with upgraded traffic approaches and roadside barrier systems. Staff Contact: Troy Dunlop (tdunlop)

Project Finances

Actuals Description

Expensed to Current Year

55290 - Contracted Services Expenses / Expenditure 55330 - Consultant Total

Budget

Expenses / Expenditure

Total Project

Prior Approved

2025

2026

2027

2028

2029

0

998,900

0

998,900

0

0

0

0

17,261

104,600

50,000

54,600

0

0

0

0

17,261

1,103,500

50,000

1,053,500

0

0

0

0

Page 104 of 158

Capital Project Detail Sheet

23

Project Information Project Name: Shale Road Culvert

Type of Project: Bridge

Project Number: 23-46A

Basis for Activity: Asset Renewal

Department: 3100 - Structures

Relationship to Strategic Plan: N/A

Description: ASSET # 63360 (OSIM Structure)

Rationale: The reconstruction of the Shales Road Culvert has been identified as a priority project for replacement in 2024 within the 5 year plan received by Council on May 2, 2023 however the project was deferred in part due to funding pressures from the Wilmer Culvert failure and additional investigations needed at the crossing.

The Shales Road Culvert is an OSIM structure located on Shales Road approximately 2.5km west of Perth Road. The structure is a rigid frame structure with an open bottom that has a span of 3m and is approximately 5.5m long. The non-navigable structure is will be rehabilitated or replaced with a new structure with updated roadside barrier systems. Design work was advanced in 2023/2024 and additional road widenings are currently being explored.

The Shales Road OSIM Structure is believed to have been constructed in 1955. The structure was last inspected in 2023 and has a Bridge Condition Index rating of 33.37 (Very Poor). Additional road widenings will be necessary to facilitate the project recommendations.

Design work for OSIM bridge and culvert structures originally planned for 2024 and currently forecasted to be replaced in 2026. An allowance has been added to the original project in 2025 to support necessary legal surveys and road widenings to support the advancement of the project. Staff Contact: Troy Dunlop (tdunlop)

Project Finances

Actuals Description

Budget

Expensed to Current Year

Total Project

Prior Approved

2025

2026

2027

2028

2029

15,925

0

0

0

0

0

0

0

55330 - Consultant

Expenses / Expenditure

4,732

27,000

20,000

7,000

0

0

0

0

80200 - Land

Expenses / Expenditure

0

15,000

0

15,000

0

0

0

0

20,657

42,000

20,000

22,000

0

0

0

0

Total

Page 105 of 158

55290 - Contracted Services Expenses / Expenditure

Capital Project Detail Sheet

24

Project Information Project Name: Pleasant Valley Municipal Drain - Drainage Act Maintenance

Type of Project: Plans/Studies

Project Number: 23-51

Basis for Activity: Other

Department: 3100 - Structures

Relationship to Strategic Plan: N/A

Description: Consulting fees for landowner consultation, tender preparations and contract administration as Drainage Superintendent for the Pleasant Valley Municipal Drain Maintenance work.

Rationale: The Pleasant Valley Municipal Drain which was constructed in 1985 has been determined to be in need of maintenance based on current reviews of the system against the original Engineer’s report.

Project also includes funding for the Township’s levied drainage costs (as a benefitting property owner).

Various vegetation removals, clean outs and channel obstructions are in need of removal.

Original 2023 estimates for funding have been re-adjusted to reflect a fall 2025 project following outcomes of public consultation in August 2024.

The rational for the project was provided to Council in a presentation by Robinson Consultants on November 14th, 2023 along with the supporting Maintenance Report dated October 2023. Project will be scheduled in Fall of 2025 as a result of outcomes from Public Consultation carried out in August 2024.

Staff Contact: Troy Dunlop (tdunlop)

Project Finances

Actuals Description

Budget

Expensed to Current Year

Total Project

Prior Approved

2025

2026

2027

2028

2029

55290 - Contracted Services Expenses / Expenditure

1,424

26,550

18,750

7,800

0

0

0

0

55330 - Consultant

15,957

16,500

16,500

0

0

0

0

0

17,380

43,050

35,250

7,800

0

0

0

0

Total

Expenses / Expenditure

Page 106 of 158

Capital Project Detail Sheet

25

Project Information Project Name: Road 38 Design and Construction (Kingston Rd to Murton Road)

Type of Project: Arterial Roadway

Project Number: 23-56

Basis for Activity: Asset Renewal

Department: 3300 - Hardtop

Relationship to Strategic Plan: N/A

Description: Asset # 54910

Rationale: The reconstruction of Road 38 has been identified as a priority road project for 2025 within the 5 year plan received by Council on May 2, 2023.

Project will include the detailed design and reconstruction of approximately 5.8km of Road 38 from Kingston Road to Murton Road.

Council accepted the recommendations of the Preliminary Design and provided staff direction to advance the Detailed Design Phase on August 13th, 2024.

Recommended design will include full depth reconstruction of the roadway complete with two lanes and two paved shoulders (11.0m width) and shoulder roundings.

This section of Road 38 was last constructed in 1993. Surface conditions are poor and unplanned maintenance demands continue to be a concern for meeting service levels.

Work on the corridor will be phased over 2025 and 2026. Additional related works at Murvale Creek can be found under project # 25-34.

Current AADT is 9,205 vehicles per year. PCI rating of 60 (Fair) in 2022.

Staff Contact: Troy Dunlop (tdunlop)

Project Finances

Actuals Description 53310 - Materials

Budget

Expensed to Current Year

Total Project

Prior Approved

2025

2026

2027

2028

2029

Expenses / Expenditure

145

0

0

0

0

0

0

0

55290 - Contracted Services Expenses / Expenditure

82,226

250,000

100,000

75,000

75,000

0

0

0

55330 - Consultant

16,127

5,770,000

120,000

4,240,000

1,410,000

0

0

0

98,498

6,020,000

220,000

4,315,000

1,485,000

0

0

0

Total

Expenses / Expenditure

Page 107 of 158

Capital Project Detail Sheet

26

Project Information Project Name: Craig Road

Type of Project: Local Roadway

Project Number: 24-41A

Basis for Activity: Asset Renewal

Department: 3300 - Hardtop

Relationship to Strategic Plan: N/A

Description: ASSET # 41575

Rationale: The reconstruction of Craig Road has been identified as a priority road project for 2025 within the 5 year plan received by Council on May 2, 2023.

Road Reconstruction - Double Surface Treatment Reconstruction of 3.75km section of Craig Road from Road 38 northerly to the Township boundary.

Road was last constructed in 2004. Surface conditions are poor and unplanned maintenance demands continue to be a concern for meeting service levels.

Construction to include full depth reclamation, placement of granular A materials, culvert renewals and double surface treatment (chip seal).

Current AADT is 325 vehicles per year.

Project will also include select tree removals, roadside rock excavation and drainage improvements.

PCI rating of 23 (very poor) in 2022.

Staff Contact: Troy Dunlop (tdunlop)

Project Finances

Actuals Description

Budget

Expensed to Current Year

Total Project

Prior Approved

2025

2026

2027

2028

2029

55290 - Contracted Services Expenses / Expenditure

0

1,095,900

54,900

1,041,000

0

0

0

0

55330 - Consultant

0

54,000

0

54,000

0

0

0

0

0

1,149,900

54,900

1,095,000

0

0

0

0

Total

Expenses / Expenditure

Page 108 of 158

Capital Project Detail Sheet

27

Project Information Project Name: Westport Road

Type of Project: Arterial Roadway

Project Number: 24-41B

Basis for Activity: Asset Renewal

Department: 3300 - Hardtop

Relationship to Strategic Plan: N/A

Description: ASSET # 57900 and 58015

Rationale: The reconstruction of Westport Road has been identified as a priority road project for 2025 within the 5 year plan received by Council on May 2, 2023.

Road Reconstruction - Double Surface Treatment Reconstruction of 4.0km section of Westport Road from Garret Road to Devil Lake.

Sections of road were last constructed in 2000 and 2008. Surface conditions are poor and unplanned maintenance demands continue to be a concern for meeting service levels.

Construction to include full depth reclamation, placement of granular A materials, 2 major culvert crossings, culvert renewals, guide rail replacements and double surface treatment (chip seal).

Current AADT is 371 & 750 vehicles per year. PCI rating of 54 and 53 (Poor) in 2022.

Project will also include roadside drainage improvements. Staff Contact: Troy Dunlop (tdunlop)

Project Finances

Actuals Description

Budget

Expensed to Current Year

Total Project

Prior Approved

2025

2026

2027

2028

2029

50100 - Wages

Expenses / Expenditure

0

50,200

0

50,200

0

0

0

0

53310 - Materials

Expenses / Expenditure

0

419,000

0

419,000

0

0

0

0

55290 - Contracted Services Expenses / Expenditure

0

803,800

10,800

793,000

0

0

0

0

58001 - Internal Equipment

0

89,500

0

89,500

0

0

0

0

0

1,362,500

10,800

1,351,700

0

0

0

0

Total

Expenses / Expenditure

Page 109 of 158

Capital Project Detail Sheet

28

Project Information Project Name: Florida Road

Type of Project: Local Roadway

Project Number: 24-41C

Basis for Activity: Asset Renewal

Department: 3300 - Hardtop

Relationship to Strategic Plan: N/A

Description: ASSET # 49375

Rationale: The reconstruction of Florida Road has been identified as a priority road project for 2025 within the 5 year plan received by Council on May 2, 2023.

Road Reconstruction - Double Surface Treatment Reconstruction of 1.3km section of Florida Road from Henderson Road to the Township boundary.

This is the same horizon year that the City of Kingston will be doing their section.

Construction to include full depth reclamation, placement of granular A materials, culvert renewals and double surface treatment (chip seal).

Florida Road was last constructed in 2007. Surface conditions are poor and unplanned maintenance demands continue to be a concern for meeting service levels.

Project will also include roadside drainage improvements. Current AADT is 243 vehicles per year. PCI rating of 33 (very poor) in 2022. Staff Contact: Troy Dunlop (tdunlop)

Project Finances

Actuals Description

Budget

Expensed to Current Year

Total Project

Prior Approved

2025

2026

2027

2028

2029

Expenses / Expenditure

0

29,200

0

29,200

0

0

0

0

53310 - Materials

Expenses / Expenditure

0

70,000

0

70,000

0

0

0

0

55290 - Contracted Services Expenses / Expenditure

0

169,300

9,300

160,000

0

0

0

0

58001 - Internal Equipment

0

31,900

0

31,900

0

0

0

0

0

300,400

9,300

291,100

0

0

0

0

Total

Expenses / Expenditure

Page 110 of 158

50100 - Wages

Capital Project Detail Sheet

29

Project Information Project Name: Surface Treatment (LCB) Preservation

Type of Project: Local Roadway

Project Number: 25-31

Basis for Activity: Asset Renewal

Department: 3300 - Hardtop

Relationship to Strategic Plan: N/A

Description: Rehabilitation of approximately TBD km of surface treated roadways with localized repairs and application of a final Low Class Bituminous (LCB) single surface treatment (chip seal).

Rationale: The application of a single surface treatment (chip seal) is a key maintenance strategy for long term performance of the Township’s road network of LCB roadways.

A priority list has been attached as a project document with additional details on forecasted roadways.

Single surface treatments can add 5 to 7 years of added service life at a low cost and help manage unplanned maintenance expenses (potholes, cracking and edge break-up). The commitment to an annual LCB preservation plan is reflected in the 5 year plan received by Council on May 2, 2023.

Staff Contact: Troy Dunlop (tdunlop)

Project Finances

Actuals Description

Budget

Expensed to Current Year

Total Project

Prior Approved

2025

2026

2027

2028

2029

50100 - Wages

Expenses / Expenditure

0

47,500

0

47,500

0

0

0

0

53310 - Materials

Expenses / Expenditure

0

47,500

0

47,500

0

0

0

0

55290 - Contracted Services Expenses / Expenditure

0

807,500

0

807,500

0

0

0

0

58001 - Internal Equipment

0

47,500

0

47,500

0

0

0

0

0

950,000

0

950,000

0

0

0

0

Total

Expenses / Expenditure

Page 111 of 158

29a

TOWNSHIP OF SOUTH FRONTENAC Surface Treatment (LCB) Preservation Public Services Department

Surface Treatment (LCB) Preservation - 2025 Preliminary Road List Section ID 45340 46420 43600/43585 41230/41245 41905 40615/40630 42640 57900 46735 45985 44800/44815 51575 41335

Street Randy Clark Road Washburn Road Lakefield Drive Centreville Road Devil Lake Road Bradshaw Road Green Bay Road Westport Road Wolfe Lake Road* Stage Coach Road Opinicon Road Bedford Road Clark Road

From Street West End of Road 2562 Washburn Road 1.30km South of Holmes Road Devil Lake Road Centreville Road Road 38 Burns Road New Road Westport Road Railton Road Perth Road 10 Salmon Lake Road McConnell Road

To Street

Length (Km)

Battersea Road Factory Road To End of Road To Rideau Boundary Westport Road Steele Road Burridge Road Garrett Road North End of Road Campbell Road 7.70km East of Perth Road 10 at Petworth Bridge 1.00km North of Salmon Lake Road East End of Road Total :

2.2 1.3 1.3 0.8 1.7 2.2 2.9 1.9 2.2 2.2 7.7 1.2 0.9 28.4

AADT PCI** 201 792 643 226 243 393 199 371 257 1184 550 220 125

82 80 77 70 65 74 65 55 77 73 73 77 82

Page 112 of 158

Capital Project Detail Sheet

30

Project Information Project Name: Pre-Engineering Roads 2026

Type of Project: Plans/Studies

Project Number: 25-32

Basis for Activity: Asset Renewal

Department: 3300 - Hardtop

Relationship to Strategic Plan: N/A

Description: Geotechnical investigations and field survey work to be initiated in 2025 in support of 2026 road construction projects shown within the 5 year plan received by Council on May 2, 2023. Includes the following:

Rationale: The design process for road reconstruction projects requires a 1 to 2 year timeframe to address pre-engineering activiites, topographic surveys, stakeholder engagement, drainage permits, utility relocation and property acquisition (where necessary).

ASSET # 56520 Rutledge Road (2.2km east of Sydenham Road to Perth Road 10) - 5.85km.

The endorsement of the 5 year plan helps refine pre-engineering allocations to be set year over year.

ASSET # 46360 Walker Street (Verona Street to Road 38) 100m. ASSET # 42025 Easy Street (Road 38 to West End of Road) 100m. ASSET # 52495 Desert Lake Road (Road 38 to 0.15km West of High Falls Road) - 2.95km. ASSET # 45595 Round Lake Road (4.1km East of Latimer Road to Battersea Road) - 2.2km. ASSET # 43975 - Loughborough Portland Boundary Road (Harrowsmith Road to Alton Road) - 1.4km. Staff Contact: Troy Dunlop (tdunlop)

Project Finances

Actuals Description

Total

Expensed to Current Year

Total Project

Prior Approved

2025

2026

2027

2028

2029

0

136,400

0

136,400

0

0

0

0

0

136,400

0

136,400

0

0

0

0

Page 113 of 158

55290 - Contracted Services Expenses / Expenditure

Budget

Capital Project Detail Sheet

31

Project Information Project Name: Gravel Road Reconstruction Program 2025

Type of Project: Local Roadway

Project Number: 25-33

Basis for Activity: Asset Renewal

Department: 3100 - Structures

Relationship to Strategic Plan: N/A

Description: ASSET # 42175 First Lake Road (1.7km North of Bellrock Mill Street to Snider Road) - 3.7km.

Rationale: The development of dedicated capital towards gravel road improvements is one of the key findings of the 2022 Road Needs Study.

ASSET # 46585 White Lake Road (Glenford Lane to 2 km east of Glenford Lane) - 2.0km.

Investments in drainage improvements will improve road performance, customer service levels and reduced unplanned maintenance costs over time.

Reconstruction to include extensive rock ditching, rock cut removal (roadside hazards), localized widenings (hills/corners) and placement of new gravel wear surface (100mm) Granular A. Staff Contact: Troy Dunlop (tdunlop)

Project Finances

Actuals Description

Budget

Expensed to Current Year

Total Project

Prior Approved

2025

2026

2027

2028

2029

50100 - Wages

Expenses / Expenditure

0

29,925

0

29,925

0

0

0

0

53310 - Materials

Expenses / Expenditure

0

133,950

0

133,950

0

0

0

0

55290 - Contracted Services Expenses / Expenditure

0

111,430

0

111,430

0

0

0

0

58001 - Internal Equipment

0

64,695

0

64,695

0

0

0

0

0

340,000

0

340,000

0

0

0

0

Total

Expenses / Expenditure

Page 114 of 158

Capital Project Detail Sheet

32

Project Information Project Name: Murvale Creek Culvert (B12) Reconstruction

Type of Project: Bridge

Project Number: 25-34

Basis for Activity: Asset Renewal

Department: 3100 - Structures

Relationship to Strategic Plan: N/A

Description: ASSET # 63110 (OSIM Structure)

Rationale: The reconstruction of the Murvale Creek Culvert has been identified as a priority project for 2025 within the 5 year plan received by Council on May 2, 2023.

The Murvale Creek Culvert is an OSIM structure located on Road 38 just 0.7km north of Murton Road.

The OSIM Structure is believed to have been constructed in the 1980’s and last rehabilitated in the 1990’s.

The structure is a 3.66m diameter Structural Plate Corrugated Steel Pipe (SPCSP) that is approximately 30m long .

The structure was last inspected in 2023 and has a Bridge Condition Index rating of 60.2 (Fair).

The navigable structure is located within a Provincially Significant Westland and will be removed and replaced with a new structure with updated roadside barrier systems.

It is currently recommended that the structure be completed with the Road 38 reconstruction from Kingston Road to Murton Road.

The configuration of the new structure will be confirmed through Detailed Design in consultation with Quinte Conservation and Transport Canada. Staff Contact: Troy Dunlop (tdunlop)

Project Finances

Actuals Description

Budget

Expensed to Current Year

Total Project

Prior Approved

2025

2026

2027

2028

2029

55290 - Contracted Services Expenses / Expenditure

0

1,400,000

0

800,000

600,000

0

0

0

55330 - Consultant

0

56,000

0

31,000

25,000

0

0

0

0

1,456,000

0

831,000

625,000

0

0

0

Total

Expenses / Expenditure

Page 115 of 158

Capital Project Detail Sheet

33

Project Information Project Name: Buck Bay Road - Unnamed Bridge Repair

Type of Project: Bridge

Project Number: 25-35

Basis for Activity: Other

Department: 3100 - Structures

Relationship to Strategic Plan: N/A

Description: ASSET # 63460 (OSIM Structure)

Rationale: The OSIM Structure was damaged as part of an unreported collision in 2024 and requires significant concrete repairs on the deck and abutment wall.

The Buck Bay Road Unnamed Bridge is located on Buck Bay Road approximately 1.5km north of White Lake Road.

The structure was last inspected in 2023 and has a Bridge Condition Index rating of 32.1 (Very Poor).

The bridge structure was built in 1965 and is a rigid frame concrete structure with vertical legs that has as span of 3.8m and a width of 5.1m. Staff Contact: Troy Dunlop (tdunlop)

Project Finances

Actuals Description

Budget

Expensed to Current Year

Total Project

Prior Approved

2025

2026

2027

2028

2029

55290 - Contracted Services Expenses / Expenditure

0

44,000

0

44,000

0

0

0

0

55330 - Consultant

0

5,000

0

5,000

0

0

0

0

0

49,000

0

49,000

0

0

0

0

Total

Expenses / Expenditure

Page 116 of 158

Capital Project Detail Sheet

34

Project Information Project Name: Buck Lake Culvert (OSIM) Design

Type of Project: Bridge

Project Number: 25-36

Basis for Activity: Asset Renewal

Department: 3100 - Structures

Relationship to Strategic Plan: N/A

Description: ASSET # 63040 (OSIM Structure)

Rationale: The reconstruction of the Buck Lake Culvert has been identified as a priority project for replacement in 2027 within the 5 year plan received by Council on May 2, 2023.

The Buck Lake Culvert is an OSIM structure located on Perth Road approximately 7.8km north of Opinicon Road at Buck Lake.

The OSIM Structure is believed to have been constructed in 1970.

The structure is a 3.2m diameter Structural Plate Corrugated Steel Pipe (SPCSP) that is approximately 17.2m long.

The structure was last inspected in 2023 and has a Bridge Condition Index rating of 49.35 (Poor).

The navigable structure is located within the Buck Lake Causeway and will be rehabilitated or replaced with a new structure with updated roadside barrier systems.

It is recommended that designs and consultations for this crossing move forward 2 years in advance of project delivery due to the social impacts (lake access), Federal approvals (Fisheries/Transport Canada) and possible detour considerations.

Staff Contact: Troy Dunlop (tdunlop)

Project Finances

Actuals Description 55330 - Consultant Total

Budget

Expensed to Current Year Expenses / Expenditure

Total Project

Prior Approved

2025

2026

2027

2028

2029

0

52,000

0

35,000

17,000

0

0

0

0

52,000

0

35,000

17,000

0

0

0

Page 117 of 158

Capital Project Detail Sheet

35

Project Information Project Name: Detailed Assessment Petworth Bridge

Type of Project: Bridge

Project Number: 25-37

Basis for Activity: Asset Renewal

Department: 3100 - Structures

Relationship to Strategic Plan: N/A

Description: ASSET # 63561 (OSIM Structure)

Rationale: The structure was last inspected in 2023 and was assigned a Bridge Condition Index rating of 75.2 (Good).

The Petworth Bridge is an OSIM structure located on Petworth Road approximately 100m west of Camden Portland Boundary Road.

The OSIM Inspection completed in 2023 has recommended that a more detailed investigation of all existing steel elements be carried out within 1 to 5 years.

The single lane steel truss bridge is 4.2m wide and 23.3m long.

Completion of this detailed survey in 2025 will provide greater understanding of the future rehabilitation scope and cost.

The OSIM Structure is believed to have been constructed in 1920 and last rehabilitated in 2013.

The Petworth Bridge has been identified as a priority project for rehabilitation in 2027 within the 5 year plan received by Council on May 2, 2023.

Ownership of the bridge was transferred from the County of Lennox & Addington to South Frontenac in 2014 (Bylaw 201430). Staff Contact: Troy Dunlop (tdunlop)

Project Finances

Actuals Description 55330 - Consultant Total

Budget

Expensed to Current Year Expenses / Expenditure

Total Project

Prior Approved

2025

2026

2027

2028

2029

0

19,500

0

19,500

0

0

0

0

0

19,500

0

19,500

0

0

0

0

Page 118 of 158

Capital Project Detail Sheet

36

Project Information Project Name: Detailed Assessment Opinicon Bridge

Type of Project: Bridge

Project Number: 25-38

Basis for Activity: Other

Department: 3100 - Structures

Relationship to Strategic Plan: N/A

Description: ASSET # 63440 (OSIM Structure)

Rationale: The structure was last inspected in 2023 and was assigned a Bridge Condition Index rating of 56.79 (Poor).

The Opinicon Lake Bridge is an OSIM structure located on Opinicon Road approximately 7.6km east of Perth Road. The bridge is comprised of steel I-beams and a concrete deck.

The OSIM Inspection completed in 2023 has recommended that a more detailed structural investigation be carried out on the deck and original abutments be carried out within 1 to 5 years.

Bridge deck is 5.7m wide and 12.0m long. The OSIM Structure is believed to have been constructed in 1928 and the superstructure was replaced in 2002.

Completion of this detailed survey in 2025 will provide greater understanding of the scope of future rehabilitation and anticipated cost.

Staff Contact: Troy Dunlop (tdunlop)

Project Finances

Actuals Description 55330 - Consultant Total

Budget

Expensed to Current Year Expenses / Expenditure

Total Project

Prior Approved

2025

2026

2027

2028

2029

0

14,000

0

14,000

0

0

0

0

0

14,000

0

14,000

0

0

0

0

Page 119 of 158

Capital Project Detail Sheet

37

Project Information Project Name: Pre-Engineering for Bridges 2026

Type of Project: Plans/Studies

Project Number: 25-39

Basis for Activity: Asset Renewal

Department: 3100 - Structures

Relationship to Strategic Plan: N/A

Description: ASSET # 63190

Rationale: The Bedford Mills Bridge was last inspected in 2023 and the bridge received a BCI rating of 63.26 (Fair).

The Bedford Mills Bridge is located on Perth Road approximately 0.3km north of Massassauga Road.

The rehabilitation of the bridge has been identified as a priority for 2026 within the 5 year plan presented to Council on May 2, 2023.

The structure is a T-Beam bridge with a span of 9.9m and an overall bridge length of 19.1m.

Work on the structure will be focused on the rehabilitation and repair of key concrete components of the structure such as the deck, curbs, barrier walls, wing walls, abutments, T-Beams, and soffits.

The structure was originally built in 1962 and records indicate the last rehabilitation was in 1997. Staff Contact: Troy Dunlop (tdunlop)

Project Finances

Actuals Description 55330 - Consultant Total

Budget

Expensed to Current Year Expenses / Expenditure

Total Project

Prior Approved

2025

2026

2027

2028

2029

0

50,000

0

50,000

0

0

0

0

0

50,000

0

50,000

0

0

0

0

Page 120 of 158

Capital Project Detail Sheet

38

Project Information Project Name: Arterial Road Culvert Replacement Program

Type of Project: Culvert

Project Number: 25-40

Basis for Activity: Service Level Change

Department: 3300 - Hardtop

Relationship to Strategic Plan: N/A

Description: The arterial road culvert replacement program targets the renewal of cross culvert assets on the Township’s major roadways that have bear a poor or very poor condition condition rating.

Rationale: Public Services launched a cross culvert assessment program using internal technical staff in the spring of 2024. Records indicate that there has not been a similar broad based program carried out since 2018.

The program has been developed as part of the continued investments in Asset Management planning.

Currently, 490 detailed assessments have been completed using a risk based approach focusing on the major road groups. Data collection indicates that 37% (57 of 153) of the arterial road crossings inventoried to date are in poor or very poor condition. The new program will target approximately 10 crossings per year. The 2025 focus will be directed to Perth Road (north of Rutledge) in the initial year.

Staff Contact: Troy Dunlop (tdunlop)

Project Finances

Actuals Description 55290 - Contracted Services Expenses / Expenditure Total

Budget

Expensed to Current Year

Total Project

Prior Approved

2025

2026

2027

2028

2029

0

250,000

0

250,000

0

0

0

0

0

250,000

0

250,000

0

0

0

0

Page 121 of 158

Capital Project Detail Sheet

39

Project Information Project Name: Replace Serpentine Piping

Type of Project: Other

Project Number: 22-54

Basis for Activity: Other

Department: 4000 - Water Treatment

Relationship to Strategic Plan: N/A

Description: Replacement of Serpentine Piping at the Sydenham Water Treatment Plant - Investing in Canada Infrastructure Green Stream Project which provides 73.33% funding.

Rationale: Stainless steel piping used to achieve chlorine contact time for disinfection in the water treatment process is failing. Piping systems in place continue to experience failures (leaks) at welded connections.

Deadline of March 31, 2026. Staff Contact: Troy Dunlop (tdunlop)

Project Finances

Actuals Description

Budget

Expensed to Current Year

Total Project

Prior Approved

2025

2026

2027

2028

2029

55290 - Contracted Services Expenses / Expenditure

0

600,000

0

600,000

0

0

0

0

55330 - Consultant

0

100,000

0

100,000

0

0

0

0

0

700,000

0

700,000

0

0

0

0

Total

Expenses / Expenditure

Page 122 of 158

Capital Project Detail Sheet

40

Project Information Project Name: Sydenham Drinking Water System - Treatment

Type of Project: Other

Project Number: 25-61

Basis for Activity: Asset Renewal

Department: 4000 - Water Treatment

Relationship to Strategic Plan: N/A

Description: Upgrades to the Sydenham Drinking Water Water Treatment in accordance with capital plan forecast by Utilities Kingston.

Rationale: All of the Capital Works activities are in support of operations, compliance, and asset management needs for the Sydenham Drinking Water System. Projects are identified in the updated 10 year capital forecast from Utilities Kingston and/or the 2023 Core Asset Management Plan.

Projects for 2025 include: Replace exterior door to chemical room with roll-up door for drum handling - $15,000.

Replace exterior door to chemical room - for chemical drum handling - Health and Safety Item.

Replace Ultra Violet Light Bulbs (24 lamps) - $15,000. Rebuild and refurbish High Lift Pump # 3, Low Lift Pump and Backwash Pump - $22,500.

Replace Ultra Violet Light Bulbs (24 lamps) - Change every 12,000 hours - Supports Water Treatment Process / Water Quality Compliance.

Inspection and assessment of Water Plant Intake - Sydenham Lake - $6,000.

Rebuild pumps - extend pump life, efficiency and reliability Asset Management. Inspection and assessment of Water Plant Intake - Sydenham Lake -Assess on 3 to 5 year cycle. - Asset Management.

Staff Contact: Troy Dunlop (tdunlop)

Project Finances

Actuals Description 53310 - Materials

Budget

Expensed to Current Year

Total Project

Prior Approved

2025

2026

2027

2028

2029

0

0

0

0

0

0

0

0

55290 - Contracted Services Expenses / Expenditure

0

6,000

0

6,000

0

0

0

0

80100 - Equipment

Expenses / Expenditure

0

37,500

0

37,500

0

0

0

0

80115 - Building-Renovations Expenses / Expenditure

0

15,000

0

15,000

0

0

0

0

0

58,500

0

58,500

0

0

0

0

Total

Page 123 of 158

Expenses / Expenditure

Capital Project Detail Sheet

41

Project Information Project Name: Sydenham Drinking Water System - Storage

Type of Project: Other

Project Number: 25-62

Basis for Activity: Asset Renewal

Department: 4000 - Water Treatment

Relationship to Strategic Plan: N/A

Description: Upgrades to the Sydenham Drinking Water System in accordance with the long term capital plan forecast by Utilities Kingston.

Rationale: All of the Capital Works activities are in support of operations, compliance, and asset management needs for the Sydenham Drinking Water System.

Projects for 2025 include:

Projects are identified in the 10 year capital forecast from Utilities Kingston.

Water Storage - Process Mechanical (Analyzers x 2) - $7,000. Staff Contact: Troy Dunlop (tdunlop)

Project Finances

Actuals Description 80100 - Equipment Total

Budget

Expensed to Current Year Expenses / Expenditure

Total Project

Prior Approved

2025

2026

2027

2028

2029

0

7,000

0

7,000

0

0

0

0

0

7,000

0

7,000

0

0

0

0

Page 124 of 158

Capital Project Detail Sheet

42

Project Information Project Name: Loughborough WDS - New Waste Transfer Facilities

Type of Project: Facilities

Project Number: 25-86

Basis for Activity: Service Level Change

Department: 3000 - Overhead

Relationship to Strategic Plan: N/A

Description: Site alterations at the Loughborough Waste Disposal site to support service level change to implement new waste transfer operations.

Rationale: On August 13th, 2024, Council provided direction to staff to apply to the MECP for ECA approval to move the waste site into full waste transfer operations. This direction was provided with the understanding that Phase 2A was nearing capacity heading into 2024. Phase 2B landfilling activities are currently on hold pending review from the Ministry on active groundwater and surface water monitoring programs.

Staff Contact: Troy Dunlop (tdunlop)

Project Finances

Actuals Description 53310 - Materials

Budget

Expensed to Current Year

Total Project

Prior Approved

2025

2026

2027

2028

2029

Expenses / Expenditure

0

35,000

0

35,000

0

0

0

0

55290 - Contracted Services Expenses / Expenditure

0

30,000

0

30,000

0

0

0

0

0

65,000

0

65,000

0

0

0

0

Total

Page 125 of 158

Capital Project Detail Sheet

43

Project Information Project Name: Landfill Compactor

Type of Project: Equipment

Project Number: 25-87

Basis for Activity: Service Level Change

Department: 5100 - Garbage

Relationship to Strategic Plan: Priority #1 - Sustainable Long-Term Prosperity

Description: Used landfill compactor for the waste disposal sites.

Rationale: Investment to increase compaction of curbside waste in the landfills to maximize remaining capacity.

Staff Contact: Kyle Bolton (kbolton)

Project Finances

Actuals Description 80100 - Equipment Total

Budget

Expensed to Current Year Expenses / Expenditure

Total Project

Prior Approved

2025

2026

2027

2028

2029

0

350,000

0

350,000

0

0

0

0

0

350,000

0

350,000

0

0

0

0

Page 126 of 158

Capital Project Detail Sheet

44

Project Information Project Name: Town Hall Expansion Design and Construction

Type of Project: Facilities

Project Number: 23-08

Basis for Activity: Growth Related

Department: 1210 - CAO

Relationship to Strategic Plan: Priority #1 - Sustainable Long-Term Prosperity

Description: Design and construction for Townhall renovation.

Rationale: Provide additional space required for administrative staff and updated facilities by integrating existing and new facilities.

2025 budget addition for chattels/furniture - $50,000

Staff Contact: Louise Fragnito (lfragnito)

Project Finances

Actuals Description 53310 - Materials

Budget

Expensed to Current Year

Total Project

Prior Approved

2025

2026

2027

2028

2029

Expenses / Expenditure

0

50,000

0

50,000

0

0

0

0

80115 - Building-Renovations Expenses / Expenditure

182,748

3,825,000

3,825,000

0

0

0

0

0

182,748

3,875,000

3,825,000

50,000

0

0

0

0

Total

Page 127 of 158

Capital Project Detail Sheet

45

Project Information Project Name: Station 7- Washrooms - Cinderella Toilet and Shower

Type of Project: Facilities

Project Number: 25-50

Basis for Activity: Other

Department: 2100 - Fire

Relationship to Strategic Plan: N/A

Description: Creation of washroom with Cinderella toilet and shower for Station 7. There are currently no washrooms available in the building.

Rationale: Provide indoor facilities

Staff Contact: Del Blakney (dblakney)

Project Finances

Actuals Description 80115 - Building-Renovations Expenses / Expenditure Total

Budget

Expensed to Current Year

Total Project

Prior Approved

2025

2026

2027

2028

2029

0

20,000

0

20,000

0

0

0

0

0

20,000

0

20,000

0

0

0

0

Page 128 of 158

Capital Project Detail Sheet

46

Project Information Project Name: Joint Fire Hall & OPP Station

Type of Project: Facilities

Project Number: 25-51

Basis for Activity: Asset Renewal

Department: 1200 - Administrative Facilities

Relationship to Strategic Plan: Priority #1 - Sustainable Long-Term Prosperity

Description: Architectural design for new joint Fire Hall and OPP station on Road 38.

Rationale: Next Fire Hall asset renewal in the long range financial plan. Existing OPP facility does not meet the current or future needs for the department.

Staff Contact: Kyle Bolton (kbolton)

Project Finances

Actuals Description 80110 - Building-New Total

Budget

Expensed to Current Year Expenses / Expenditure

Total Project

Prior Approved

2025

2026

2027

2028

2029

0

400,000

0

250,000

150,000

0

0

0

0

400,000

0

250,000

150,000

0

0

0

Page 129 of 158

Capital Project Detail Sheet

47

Project Information Project Name: Bedford Garage Site Works

Type of Project: Facilities

Project Number: 25-52

Basis for Activity: Asset Renewal

Department: 3010- PS

Relationship to Strategic Plan: Priority #1 - Sustainable Long-Term Prosperity

Description: Multi-year site works project for the Bedford Garage.

Rationale: The site is currently supplied water from the Glendower Hall and required a dedicated water source for that property.

Scope includes the installation of a water service and parking lot drainage work in 2025 and planning for asphalt paving in 2026.

The site is low and requires drainage improvements in advance of a new paved parking lot proposed for 2026. The storm water drainage work will be done in conjunction with the installation of a new oil & grit separator (previously approved project 24-52).

Staff Contact: Tim Laprade (tlaprade)

Project Finances

Actuals Description

Budget

Expensed to Current Year

Total Project

Prior Approved

2025

2026

2027

2028

2029

50100 - Wages

Expenses / Expenditure

0

6,800

0

6,800

0

0

0

0

53310 - Materials

Expenses / Expenditure

0

10,000

0

10,000

0

0

0

0

55290 - Contracted Services Expenses / Expenditure

0

128,000

0

33,000

95,000

0

0

0

55330 - Consultant

Expenses / Expenditure

0

5,000

0

5,000

0

0

0

0

58001 - Internal Equipment

Expenses / Expenditure

0

9,300

0

9,300

0

0

0

0

0

159,100

0

64,100

95,000

0

0

0

Total

Page 130 of 158

Capital Project Detail Sheet

48

Project Information Project Name: Station 2 Burridge Exterior Upgrades

Type of Project: Facilities

Project Number: 25-54

Basis for Activity: Asset Renewal

Department: 2100 Fire

Relationship to Strategic Plan: Priority #2 - Municipal Service Excellence

Description: Replace front of building exterior including exterior front metal cladding, replacement of front entrance door, and repainting eves and facia.

Rationale: Improve the exterior condition of the building including exterior wall replacement and painting of external metal to preserve useful life and decrease pests from entering.

Add additional lighting off building to illuminate parking area.

Provide increased lighting to support safer use of parking areas.

Staff Contact: Tim Laprade (tlaprade)

Project Finances

Actuals Description 80115 - Building-Renovations Expenses / Expenditure Total

Budget

Expensed to Current Year

Total Project

Prior Approved

2025

2026

2027

2028

2029

0

15,000

0

15,000

0

0

0

0

0

15,000

0

15,000

0

0

0

0

Page 131 of 158

Capital Project Detail Sheet

49

Project Information Project Name: Keeley Garage Pressure Washer

Type of Project: Equipment

Project Number: 25-56

Basis for Activity: Other

Department: 3010 - PS

Relationship to Strategic Plan: Priority #2 - Municipal Service Excellence

Description: Keeley Garage Pressure Washer System.

Rationale: Existing pressure washer system due for replacement. The unit has frequent issues/repairs due to its age and amount of use.

Staff Contact: Tim Laprade (tlaprade)

Project Finances

Actuals Description 80100 - Equipment Total

Budget

Expensed to Current Year Expenses / Expenditure

Total Project

Prior Approved

2025

2026

2027

2028

2029

0

20,000

0

20,000

0

0

0

0

0

20,000

0

20,000

0

0

0

0

Page 132 of 158

Capital Project Detail Sheet

50

Project Information Project Name: Portland garage Steel Roof Replacement

Type of Project: Facilities

Project Number: 25-57

Basis for Activity: Asset Renewal

Department: 3010 -PS

Relationship to Strategic Plan: Priority #2 - Municipal Service Excellence

Description: Steel roof replacement on Portland Garage main building.

Rationale: Existing roof leaks and requires replacement as per current Facility Condition Assessment.

Staff Contact: Tim Laprade (tlaprade)

Project Finances

Actuals Description 80115 - Building-Renovations Expenses / Expenditure Total

Budget

Expensed to Current Year

Total Project

Prior Approved

2025

2026

2027

2028

2029

0

60,000

0

60,000

0

0

0

0

0

60,000

0

60,000

0

0

0

0

Page 133 of 158

Capital Project Detail Sheet

51

Project Information Project Name: Storrington Garage Oil/Grit Separator

Type of Project: Facilities

Project Number: 25-58

Basis for Activity: Asset Renewal

Department: 3010 - PS

Relationship to Strategic Plan: Priority #2 - Municipal Service Excellence

Description: Oil & Grit separator for the Storrington Garage.

Rationale: During the 2024 Storrington Centre site works project it was determined there was no existing oil & girt separator for the garage floor drains. The parking lot work design installed new storm sewer that will now require treatment. A new oil & grit separator on the main storm sewer to control the garage floor drains and parking lot storm water is the preferred option.

Staff Contact: Tim Laprade (tlaprade)

Project Finances

Actuals Description 80115 - Building-Renovations Expenses / Expenditure Total

Budget

Expensed to Current Year

Total Project

Prior Approved

2025

2026

2027

2028

2029

0

40,000

0

40,000

0

0

0

0

0

40,000

0

40,000

0

0

0

0

Page 134 of 158

Capital Project Detail Sheet

52

Project Information Project Name: Town Hall - Public EV Charging Stations (2)

Type of Project: Facilities

Project Number: 25-59

Basis for Activity: Other

Department: 1200 - Administrative Facilities

Relationship to Strategic Plan: Priority #1 - Sustainable Long-Term Prosperity

Description: For the purchase and installation of Two (2) Level 3 fast charger port(s) 100 - 199 kW for South Frontenac Township Office and Public Library.

Rationale: Provide EV charging stations in the community.

On January 16, 2024 Council approved applying for grant funding through ChargeON and ZEVIP for Public EV Charging Stations with the Township contribution being $35,000. The Township received funding approval from ChargeON for Town Hall in the amount of $225,000. The ZEVIP funding request for $90,000 remains pending. Staff Contact: Kyle Bolton (kbolton)

Project Finances

Actuals Description 55290 - Contracted Services Expenses / Expenditure Total

Budget

Expensed to Current Year

Total Project

Prior Approved

2025

2026

2027

2028

2029

0

350,000

0

350,000

0

0

0

0

0

350,000

0

350,000

0

0

0

0

Page 135 of 158

Capital Project Detail Sheet

53

Project Information Project Name: Cenotaph landscaping - Sydenham

Type of Project: Land

Project Number: 25-60

Basis for Activity: Other

Department: 8000 - Parks & Recreation

Relationship to Strategic Plan: Priority #3 - People and Partnerships

Description: Request received from the Sydenham Legion for walkway upgrade, replace flag pole, cut down side hill around the monument.

Rationale: Requested improvement will make accessing the monument easier along with improving the visual appeal of the monument area. The legion will be responsible to update the monument.

Staff Contact: Kyle Bolton (kbolton)

Project Finances

Actuals Description 80500 - Non-PSAB Total

Budget

Expensed to Current Year Expenses / Expenditure

Total Project

Prior Approved

2025

2026

2027

2028

2029

0

60,000

0

60,000

0

0

0

0

0

60,000

0

60,000

0

0

0

0

Page 136 of 158

Capital Project Detail Sheet

54

Project Information Project Name: Sydenham Point Accessible Washroom Upgrades

Type of Project: Facilities

Project Number: 24-55

Basis for Activity: Service Level Change

Department: 8000 - Parks & Recreation

Relationship to Strategic Plan: Old Priority #4 - Be a catalyst for the creation of vibrant, complete communities

Description: Complete Accessibility upgrades on Ball Diamond Washrooms.

Rationale: The washroom building in Sydenham Point park will be upgraded to an accessible washroom to meet AODA and building codes.

Increase in budget to reflect actual costs, building permits and results of Facility Condition Assessment.

The para ramp had been previously installed at this location in preparation for future upgrades.

Staff Contact: Tim Laprade (tlaprade)

Project Finances

Actuals Description 80115 - Building-Renovations Expenses / Expenditure Total

Budget

Expensed to Current Year

Total Project

Prior Approved

2025

2026

2027

2028

2029

0

50,000

30,000

20,000

0

0

0

0

0

50,000

30,000

20,000

0

0

0

0

Page 137 of 158

Capital Project Detail Sheet

55

Project Information Project Name: Centennial Park New Accessible Washrooms Design and Build

Type of Project: Facilities

Project Number: 24-56

Basis for Activity: Growth Related

Department: 8000 - Parks & Recreation

Relationship to Strategic Plan: Old Priority #2 - Promote and support growth that meets the community’s needs

Description: New Centennial Park Accessible Washroom and Park Building.

Rationale: Additional washrooms are required at Centennial Park as it is becoming the most frequented park in SFT and a destination location for many events.

AODA compliant Washroom closer to Grand Pavilion. The use of the washrooms would be from attendees at the Pavilion and Soccer Fields where we are currently renting portable toilets. New washroom building would be separate from the existing building to increase the amount of washrooms and provide another location in the park. Staff Contact: Tim Laprade (tlaprade)

Project Finances

Actuals Description 80110 - Building-New Total

Budget

Expensed to Current Year Expenses / Expenditure

Total Project

Prior Approved

2025

2026

2027

2028

2029

0

730,000

30,000

150,000

550,000

0

0

0

0

730,000

30,000

150,000

550,000

0

0

0

Page 138 of 158

Capital Project Detail Sheet

56

Project Information Project Name: Keeley/Bowes Diamond Upgrades

Type of Project: Park

Project Number: 24-68

Basis for Activity: Asset Renewal

Department: 8000 - Parks & Recreation

Relationship to Strategic Plan: Old Priority #4 - Be a catalyst for the creation of vibrant, complete communities

Description: Baseball diamond backstop and fence replacement.

Rationale: The baseball diamonds at this facility are well used but the backstop poles/netting and the diamond fencing are in poor condition and require replacement.

Upgrade Backstop netting and posts or replace with extended fencing (Carry over to 2025)

The backstops are a netting material and the posts are leaning out of plumb. New backstop would be all fencing which would reduce maintenance on the nets.

Replacement of diamond Fencing (new for 2025)

A 2024 project to pave hard surface walkways, replace bleachers, and replace one of the backstops was approved but upon further investigation into the backstop the fence work was put on hold to reconsider both backstops and fencing due to their condition. 2025 funds to replace the remaining fencing would update both diamonds and complete the entire project. Staff Contact: Tim Laprade (tlaprade)

Project Finances

Actuals Description

Budget

Expensed to Current Year

Total Project

Prior Approved

2025

2026

2027

2028

2029

55290 - Contracted Services Expenses / Expenditure

0

37,000

0

37,000

0

0

0

0

80115 - Building-Renovations Expenses / Expenditure

63,121

208,000

208,000

0

0

0

0

0

63,121

245,000

208,000

37,000

0

0

0

0

Total

Page 139 of 158

Capital Project Detail Sheet

57

Project Information Project Name: Bellrock & Petworth Parkette Conceptual Design

Type of Project: Park

Project Number: 24-70

Basis for Activity: Other

Department: 8000 - Parks & Recreation

Relationship to Strategic Plan: Old Priority #4 - Be a catalyst for the creation of vibrant, complete communities

Description: Detailed design for Mill sites.

Rationale: Advancement of detailed design based on conceptual drawings and public consultation to be completed in 2025.

Staff Contact: Tim Laprade (tlaprade)

Project Finances

Actuals Description 80300 - Land Improvements Total

Budget

Expensed to Current Year Expenses / Expenditure

Total Project

Prior Approved

2025

2026

2027

2028

2029

0

30,000

15,000

15,000

0

0

0

0

0

30,000

15,000

15,000

0

0

0

0

Page 140 of 158

Capital Project Detail Sheet

58

Project Information Project Name: Shipyards Boat Ramp Rehabilitation

Type of Project: Land

Project Number: 24-72

Basis for Activity: Growth Related

Department: 8000 - Parks & Recreation

Relationship to Strategic Plan: Old Priority #2 - Promote and support growth that meets the community’s needs

Description: Rehabilitation of the Shipyards boat launch ramp.

Rationale: This boat launch is one of the busiest in SFT. The old metal grate launch failed in 2023 and trailer tires were getting caught on broken pieces of metal off the ramp.

Increase in budget to reflect actual costs, conservation and Federal permits and results of Boat launch Condition Assessment

The ramp was removed in 2023 but could not be welded or repaired. Proposal is to replace with the concrete mat ramp system at this location which should have a long life expectancy and reduce liability and risk.

Staff Contact: Tim Laprade (tlaprade)

Project Finances

Actuals Description 80300 - Land Improvements Total

Budget

Expensed to Current Year Expenses / Expenditure

Total Project

Prior Approved

2025

2026

2027

2028

2029

0

135,000

110,000

25,000

0

0

0

0

0

135,000

110,000

25,000

0

0

0

0

Page 141 of 158

Capital Project Detail Sheet

59

Project Information Project Name: Battersea Ball Park Pavilion

Type of Project: Facilities

Project Number: 25-55

Basis for Activity: Growth Related

Department: 8000 - Parks & Recreation

Relationship to Strategic Plan: Priority #2 - Municipal Service Excellence

Description: Construction of a pavilion to support current user groups, including minor ball, lob ball, and the Battersea Pumpkin Festival.

Rationale: The project has been identified by community members as a desired amenity at the park. The project will use the remaining funds of the Battersea Playground Revitalization community fundraising initiative that took place in 2017, of which there is approximately $5,000.

This will be a bookable space and available for community use on a drop-in basis. Staff Contact: Tim Laprade (tlaprade)

Project Finances

Actuals Description 80110 - Building-New

Expensed to Current Year Expenses / Expenditure

Total 46100 - Fundraising Total

Budget

Revenues / Funding Source

Total Project

Prior Approved

2025

2026

2027

2028

2029

0

95,000

0

95,000

0

0

0

0

0

95,000

0

95,000

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

Page 142 of 158

Capital Project Detail Sheet

60

Project Information Project Name: Centennial Park baseball diamond rehabilitation

Type of Project: Park

Project Number: 25-66

Basis for Activity: Asset Renewal

Department: 8000 - Parks & Recreation

Relationship to Strategic Plan: Priority #2 - Municipal Service Excellence

Description: Centennial Park Large Diamond rehabilitation including grading, new fencing, and backstop.

Rationale: The Centennial Park Large Diamond is in much need of rehabilitation. The outfield is no longer playable for Youth and Adult Ball due to the fact that it drops off on the first base line side. Frontenac Minor Ball has requested to have this diamond brought up to a playable standard in order to use the diamond for Youth and Adult Ball.

Staff Contact: Tim Laprade (tlaprade)

Project Finances

Actuals Description 80300 - Land Improvements Total

Budget

Expensed to Current Year Expenses / Expenditure

Total Project

Prior Approved

2025

2026

2027

2028

2029

0

250,000

0

250,000

0

0

0

0

0

250,000

0

250,000

0

0

0

0

Page 143 of 158

Capital Project Detail Sheet

61

Project Information Project Name: Harris Park Playground rehabilitation and accessibility upgrades

Type of Project: Park

Project Number: 25-67

Basis for Activity: Asset Renewal

Department: 8000 - Parks & Recreation

Relationship to Strategic Plan: Priority #2 - Municipal Service Excellence

Description: Playground rehabilitation including replacement of play structure and upgrading play surface to a rubberized pad.

Rationale: Playground due for asset renewal and upgrade to current standards. In order to meet A.O.D.A Built Environment standards we need to schedule the annual replacement of playground surfaces with the approved rubber material and play structure needs to be replaced as per playground safety standards.

Staff Contact: Tim Laprade (tlaprade)

Project Finances

Actuals Description 55290 - Contracted Services Expenses / Expenditure Total

Budget

Expensed to Current Year

Total Project

Prior Approved

2025

2026

2027

2028

2029

0

104,000

0

104,000

0

0

0

0

0

104,000

0

104,000

0

0

0

0

Page 144 of 158

Capital Project Detail Sheet

62

Project Information Project Name: Bleacher replacements

Type of Project: Park

Project Number: 25-69

Basis for Activity: Asset Renewal

Department: 8000 - Parks & Recreation

Relationship to Strategic Plan: Priority #2 - Municipal Service Excellence

Description: Bleacher replacements at the following locations in the annual bleacher replacement program:

Rationale: Older bleachers have become a hazard and also don’t meet the Building Code requirements.

Gerald Ball Park Soccer field x2.

The new bleachers have a much longer life expectancy and meet the Building Code Requirements.

Sydenham Point Park Diamond x3. Inverary Ball Diamond x2. Staff Contact: Tim Laprade (tlaprade)

Project Finances

Actuals Description 80115 - Building-Renovations Expenses / Expenditure Total

Budget

Expensed to Current Year

Total Project

Prior Approved

2025

2026

2027

2028

2029

0

91,000

0

91,000

0

0

0

0

0

91,000

0

91,000

0

0

0

0

Page 145 of 158

Capital Project Detail Sheet

63

Project Information Project Name: Centennial Park Upgrades

Type of Project: Equipment

Project Number: 25-70

Basis for Activity: Service Level Change

Department: 8000 - Parks & Recreation

Relationship to Strategic Plan: Priority #2 - Municipal Service Excellence

Description: Purchase of two concrete bunkers to be used as storage sheds for both Baseball and Soccer at Centennial park ($8,000).

Rationale: The current storage in the Canteen is being reduced to support the construction of an accessible washroom, therefore Baseball and Soccer will require storage elsewhere at the park.

Creation of new disc golf recreation course ($10,000).

The concrete bunkers are pre-cast and do not require a building permit. They will be located in closer proximity to the fields, thus being more accessible.

Tree planting program ($20,000).

New disc golf recreation amenity for Centennial park due to strong community interest. Over the past few years over 30 trees have had to be removed from Centennial Park as they were a risk to patrons given their condition. The cause was from the health of the tree being compromised due to the Emerald Ash Borer. This replacement also supports the Townships plans for Climate Action. Staff Contact: Tim Laprade (tlaprade)

Project Finances

Actuals Description

Budget

Expensed to Current Year

Total Project

Prior Approved

2025

2026

2027

2028

2029

Expenses / Expenditure

0

8,000

0

8,000

0

0

0

0

80300 - Land Improvements

Expenses / Expenditure

0

30,000

0

30,000

0

0

0

0

0

38,000

0

38,000

0

0

0

0

Total

Page 146 of 158

80100 - Equipment

Capital Project Detail Sheet

64

Project Information Project Name: Collins / Glenvale Creek flood hazard mapping project

Type of Project: Other

Project Number: 25-78

Basis for Activity: Other

Department: 9800 - Development

Relationship to Strategic Plan: Priority #1 - Sustainable Long-Term Prosperity

Description: Collaborative study (City of Kingston, Frontenac County, and CRCA) to provide updated flood hazard mapping. The last flood hazard mapping in this area was in 1981.

Rationale: This project has been initiated and funding requested by CRCA. The Conservation Authority would provide overall project management. Flood hazard mapping identifies areas at risk of flooding and assists with guiding new development away from these areas.

Total Budget $213,500. 50% provincial Grant. Remainder: 22% City of Kingston, 12% CRCA, 11% SF, 6% County Staff Contact: Brad Wright (bwright)

Project Finances

Actuals Description 55290 - Contracted Services Expenses / Expenditure Total

Budget

Expensed to Current Year

Total Project

Prior Approved

2025

2026

2027

2028

2029

0

25,000

0

25,000

0

0

0

0

0

25,000

0

25,000

0

0

0

0

Page 147 of 158

Page 148 of 158 Township of South Frontenac By-Law Number 2024-80 Page 1 of 2 By-Law Number 2024-80 A By-Law to amend By-law 2003-75, as amended, to rezone land from Rural (RU) to Limited Service Residential – Waterfront (RLSW) on lands with Assessment Roll Numbers 102903002094800 and 102903002094802, and further described as Part of Lot 36, Concession 8 and Part of Lot 36, Concession 9, District of Bedford Whereas pursuant to the provisions of Section 34 of the Planning Act, RSO 1990 as amended, the Council of a Municipality may enact by-laws regulating the use of land and the erection, location and use of buildings and structures thereon; and Whereas By-law 2003-75 being the Zoning By-law regulates the use of land and the erection, location and use of buildings and structures within the Township of South Frontenac; and Whereas the Council of the Corporation of the Township of South Frontenac considered all written and oral submissions received on this application, the effect of which helped Council make an informed decision; and Whereas there be no further notice pursuant to Section 34 (17) of the Planning Act; Therefore be it resolved that the Council of the Corporation of the Township of South Frontenac hereby enacts as follows:

  1. That Schedule “D” to Zoning By-law Number 2003-75 as amended, is hereby further amended by changing the zoning from Rural (RU) to Limited Service Residential – Waterfront (RLSW) for lands shown on Schedule “1”.
  2. This By-law shall come into force in accordance with Section 34 of the Planning Act, 1990, as amended, either upon the date of passage or as otherwise provided by said Section 34. Given First and Second Readings: Tuesday, December 17, 2024 Given Third Reading and Passed: Tuesday, December 17, 2024

James Thompson, Clerk

Ron Vandewal, Mayor

Page 149 of 158 Township of South Frontenac By-Law Number 2024-80 Page 2 of 2 Schedule 1 of By-law 2024-80

Page 150 of 158

To:

Council

From:

Office of the Chief Administrative Officer

Date of Meeting:

December 17, 2024

Subject:

2024 Year to Date Financial Report

Report Number:

2024-211

Summary The report provides a summary of the year-to-date financials up to Nov 30, 2024, with a comparison to the year-to-date 2024 budget. Recommendation This Report is for information purposes only. Background Appendix A is a summary of the year-to-date capital financial expenses in comparison to the 2024 budget as of Dec 10, 2024. Appendix B is a summary of the year-to-date operating financials, showing revenues and expenses in comparison to the total 2024 budget as of Nov 30, 2024. Discussion/Analysis Some of the variances within the Revenues can be attributed to: • •

User Charges and Government Grant revenues show that they are lower than expected at this time, however this is related to timing as to when the revenues are realized. Licences, Permits and Rents are lower than expected due to fewer permit applications than anticipated as well as related to timing as to when revenues are realized.

Some of the variances within the Operating Expenses can be attributed to: • Fire – expenses are higher than expected due vehicle maintenance costs as well as the South Frontenac Fire & Rescue revised compensation implementation. • Roadway Maintenance – expenses are higher than expected due to pending reallocation of costs to Winter Control and Capital Projects. • Parks, Recreation, and Cemeteries – expenses appear higher than expected as Committees of Council expenses must be separated from the total and higher cemeteries expenses due to new interment/maintenance contract. www.southfrontenac.net South Frontenac is a welcoming and thriving rural community.

Township of South Frontenac Staff Report Number: 2024-211

Page 151 of 158

Financial Implications It is anticipated that the Township of South Frontenac net revenue and expenditures will be within the 2024 budget overall. Staff continue to monitor the financial status of all operational and capital budgets on an ongoing basis. Relationship to Strategic Plan ☒ Not applicable to this report. ☐ This initiative adheres to the following strategic pillars and directions of the 2023-2026 Strategic Plan. •

Pillars: Choose an item.

Climate Considerations ☒ Not applicable to this report. ☐ This initiative supports climate change mitigation/adaption efforts in South Frontenac; and/or impacts the Township’s resilience to climate change. Notice/Consultation N/A Attachments Appendix A - Council - Financial - Capital to Dec 10, 2024 Appendix B - Council - Financial - Operating to Nov 30, 2024 Approvals Prepared By: Kyle Griese, Financial Analyst Submitted By: Approved By:

Louise Fragnito, Chief Administrative Officer

www.southfrontenac.net South Frontenac is a welcoming and thriving rural community.

Appendix A

Project

Description

23-01 23-22 23-23 23-24 23-25 24-14 24-11 24-12 24-13 24-15 24-16

VFF Recruitment Community Risk Assessment / Master Fire Plan Hose and Appliances Bunker Gear Replacement Ice Water Rescue Equipment Renewal Pumper Replacement Hoses and Appliances Electric Portable Fans Vehicle Replacement - Deputy Fire Chief Gas Detectors & Docking Stations Mobile Gear Racks - Station 5 & 7

Total Project

((REVISED WITH Previous Year CARRYOVERS))

Page 1 of 5 2024 Actuals Dec 10, 2024

Variance

22,021 50,000 16,000 157,680 175,000 80,460 59,123 84,000 220,000 800,000 525,000 33,190 85,000 100,000 200,000 350,000 2,957,473

5,830 10,276 79,615 175,000 33,600 59,123 84,000 166,666 533,334 515,000 33,190 85,000 100,000 200,000 350,000 2,430,633

85,038 2,290 62,045 68,613 12,703 140,886 534,298 20,421 88,785 62,140 100,000 366,269 1,543,487

75,000

75,000

55,051

137,000 55,000 20,000 25,000 54,000 559,675 18,000 30,000 75,000 40,000 18,000

11,245 55,000 1,470 6,325 54,000 18,000 30,000 75,000 40,000 18,000

3,534 3,097 8,928 8,279 16,445 28,411 70,940 31,142 18,844 -

5,830 10,276 79,615 89,962 31,310 2,922 15,387 153,963 392,448 19,298 12,769 3,785 37,860 100,000 16,269 887,147 19,949 7,711 55,000 1,627 2,603 54,000 8,279 1,555 1,589 4,060 8,858 844

Page 152 of 158

22-07

CORPORATE SERVICES Asset Management Software & Document Update Budgeting software incl reporting, self serve and metrics LiDar Imagery Digital Modernization & Workflow Improvement Senior & Affordable Housing - Project Design & Management Payroll Digitization Climate Change Adaption / Mitigation Strategy Audio Visual System - Council Chambers and Backup Gateway Signage -2022 - 2025 Wayfinding Sign Fabrication and Installation - 2023 - 2025 Stage Coach Road Property Website Redesign Cloud Server Records Management 14 Island Lake Dam Refurbishment Road 38 - Hartington Property subtotal FIRE 16ft 40HP Aluminum - Marine Unit

19-06 20-02 22-04 22-05 22-06 22-47 23-03 23-10 22-02 23-12 23-94 24-01 24-03 24-04 24-05 24-85

Township of South Frontenac 2024 Capital Budget Update To December 10, 2024 2024Original Budget

Appendix A

Project 24-17 24-18 24-19

23-71 23-77 24-21 24-22 24-23 24-24 24-25 24-26

Specialized Equipment for Squads Radio Communications Study Tanker 351 Replacement subtotal PUBLIC SERVICES FLEET Tandem Dump Truck/Plow Snow Blower Attachment Tandem Plow Truck

20,000 10,000 100,000 1,236,675

((REVISED WITH Previous Year CARRYOVERS)) 20,000 10,000 100,000 514,040

430,000 40,000 430,000

Tandem Roller-Pro Truck Two (2) 1-Ton Trucks with plow and sander attachments 1-Ton Truck with Dump Box and power lift Front Broom Attachment AVL - Light Duty Installs subtotal ROADS INFRASTRUCTURE Fish Creek Road Bridge Notre Dame Sidewalk Design Road 38/Boyce Road Sidewalk Design Streetlights (includes 18-17/19-14/20-20) / Streetlight Program 12th Con Bridge (B32) Repair Eagle Creek Culvert (B31) Design Opinicon Road Culvert (C12) Buck Lake Accident Shale Road Culvert Design Bracken Culvert Claire Road Culvert Design Transportation Master Plan Bedford Road Greenfield Road Ormsbee Road

Description

Total Project

Page 2 of 5 2024 Actuals Dec 10, 2024

Variance

13,062 257,732

6,938 10,000 100,000 256,308

430,000 40,000 430,000

223,389 223,389

206,611 40,000 206,611

615,000 230,000 120,000 40,000 20,000 1,925,000

615,000 230,000 120,000 40,000 20,000 1,925,000

213,310 152,334 125,531 40,583 17,248 995,785

401,690 77,666 5,531 583 2,752 929,215

1,550,000 29,500 14,800 190,000 88,500 50,000 859,300 106,687 20,000 549,200 18,000 125,000 1,453,600 219,100 828,800

1,476,377 26,810 13,331 121,545 84,277 32,739 829,212 106,687 4,075 528,543 12,658 125,000 1,440,951 216,505 825,371

35,472 10,623 8,442 97,377 805,757 24,336 4,732 432,287 12,194 1,137,405 138,243 630,514

1,440,905 16,187 4,889 121,545 13,100 32,739 23,455 82,351 657 96,256 464 125,000 303,546 78,262 194,857

Page 153 of 158

19-R05 23-91 23-92 21-R08 22-17 22-18 22-19 22-58 23-46A 23-46B 23-46C 23-49 23-50A 23-50B 23-50C

Township of South Frontenac 2024 Capital Budget Update To December 10, 2024 2024Original Budget

Appendix A

Project

Description Perth Road Pleasant Valley Municipal Drain - Drainage Act Maintenance Gravel Road Granular Renewal Road 38 Preliminary Design Arterial Reserve (Road 38 - Reserve Transfer) Microsurfacing - Bellrock Road Orser Road Spooner Road Kerr Road Tom Watson Road Devil Lake Road Surface Treatment (LCB) Preservation Sydenham Lake Bridge and Dam Long Swamp Bridge Study Craig Road Westport Road Florida Road Pavement Condition Assessment Updates subtotal FACILITIES

20-27 23-08 21-01 23-67 23-60 23-66 24-51 24-52 24-54 24-55 24-56

Town Hall - Accessible Entrance Ramp & Front Step Town Hall Expansion Feasibiltiy, Design, Construction New Firehall - Replacing Station 8 Fabric Roof Panels (3) - Keeley Road Sand/Salt Dome Verona Medical Clinic - Construction 2nd floor accessible entrance Building Condition Assessment Update Storrington Centre Roof and Parking Lot Upgrades Bedford Garage Equipment Upgrades Keeley Patrol Yard Waste Oil Disposal Sydenham Point Accessible Washroom Upgrades Centennial Park New Accessible Washrooms Design and Build

530,500 35,250 300,000 220,000 2,450,000 495,000 157,500 39,100 161,500 124,400 346,600 900,000 534,000 35,000 54,900 10,800 9,300 25,000 12,531,337

((REVISED WITH Previous Year CARRYOVERS)) 525,259 30,664 50,504 149,785 2,450,000 495,000 157,500 39,100 161,500 124,400 346,600 900,000 534,000 35,000 54,900 10,800 9,300 25,000 11,943,392

300,000 3,893,528 3,583,547 80,000 30,000 120,479 435,000 48,500 25,000 30,000 30,000

65,617 3,750,367 13,404 31,558 30,000 120,479 435,000 48,500 25,000 30,000 30,000

Total Project

Page 3 of 5 2024 Actuals Dec 10, 2024

Variance

411,955 15,329 50,503 52,179 2,450,000 512,496 137,418 34,288 143,142 104,664 306,450 841,733 418,950 26,356 11,010 7,123 8,860,980

113,304 15,335 0 97,606 17,496 20,082 4,812 18,358 19,736 40,150 58,267 115,050 35,000 28,544 210 2,177 25,000 3,082,412

0 516,154 17,875 45,634 0 48,972 400,957 9,414 0 0 0

65,617 3,234,213 4,471 14,076 30,000 71,507 34,043 39,086 25,000 30,000 30,000

Page 154 of 158

23-50D 23-51 23-52 23-56 21-R09 24-32 24-33 24-34 24-38 24-39 24-43 24-40 24-44 24-46 24-41A 24-41B 24-41C 24-42

Township of South Frontenac 2024 Capital Budget Update To December 10, 2024 2024Original Budget

Appendix A

Project 24-57 24-58 24-59 24-82 24-83 24-84 24-86 24-87 24-89

Description

22-38 22-43 22-44 23-80 23-83 23-84 23-86 23-103 24-60 24-66 24-80 24-67

McMullen - Verona Court Project Consulting Fee - User Fee & Facility Allocation Policy Recreation Software Boat Launch/Water Access Review Glendower Heritage Garden Storrington Centre Audio Equipment Centennial Park Accessible Washrooms - Design work Princess Anne Repairs Sydenham Point Field Score clock Power Centennial Park Walkway Connections Centennial Park Courts and Electrical Improvements McMullen Park - Parking Lot paving & storage bunker

18-18 22-53 22-54 24-61

150,000 29,000 20,000 15,000 8,000 30,000 100,000 40,000 16,500 8,984,554

((REVISED WITH Previous Year CARRYOVERS)) 150,000 29,000 20,000 15,000 8,000 30,000 100,000 40,000 16,500 4,988,425

95,000 275,000 700,000 37,500 1,107,500

Total Project

Page 4 of 5 2024 Actuals Dec 10, 2024

Variance

19,141 16,176 0 0 0 27,054 59,080 47,486 0 1,207,942

130,859 12,824 20,000 15,000 8,000 2,946 40,920 7,486 16,500 3,780,482

10,210 206,418 700,000 37,500 954,128

5,220 65,642 1,649 72,511

4,990 140,776 700,000 35,851 881,617

50,000 822,309

50,000 39,759

50,000 39,759

486,323 49,720 39,554 25,000 20,000 19,119 5,000 15,000 10,000 240,000 49,000 56,758

6,009 4,235 16,184 25,000 9,843 5,000 8,152 10,000 240,000 49,000 56,758

2,155 6,476 5,495 4,845 1,517 2,748 2,798 13,306 15,136 9,066 64,869 -

3,854 2,240 10,689 20,155 8,326 2,748 2,202 8,152 3,306 224,864 39,934 8,111

Page 155 of 158

20-41 19-54

Centennial Park Renovations to existing Canteen/Washrooms Harris Park Hall Flooring Replacement Glendower Hall Interior Design Plans Station 5 Exterior Upgrades Station 4 Flooring Demo Pic Sand/Salt Storage Facility Stage Coach Demolition Storrington Renovations Admin Offices Green Bay Waste Disposal Site subtotal SYDENHAM WATER Water Hauling Station & Mill Pond Drinking Station SCADA & PLC (2023-2024) Serpentine Piping (2024-2025) Sydenham Drinking Water System Upgrades subtotal RECREATION Davidson Beach - Access Road to swim area Storrington Centre Upgrades

Township of South Frontenac 2024 Capital Budget Update To December 10, 2024 2024Original Budget

Appendix A

Project 24-75 24-68 24-69 24-70 24-71 24-72 24-74

19-60 21-16 21-17 22-60 23-04 23-90 23-06 23-07 24-76 24-77 24-78

Description McMullen Park Beach and Washroom Building Upgrades Keeley/Bowes Diamond Upgrades Glendower Court Basketball nets Bellrock & Petworth Parkette Conceptual Design Petworth Mill wall cap and repairs Shipyards Boat Ramp Rehabilitation New Picnic Tables subtotal DEVELOPMENT SERVICES Official Plan Development of Subdivision / Condo Standards Servicing Options Study (Verona) Napanee River Lakes Study Updated Floodplain Mapping New Building Vehicle New Building Vehicle Zoning Bylaw Update Community Planning Permit System Economic Development Strategy Replacement Building Vehicle Development Charge Study and Population Study subtotal Total

Township of South Frontenac 2024 Capital Budget Update To December 10, 2024 2024Original Budget 46,242 208,000 11,000 15,000 200,000 110,000 10,000 2,488,024

((REVISED WITH Previous Year CARRYOVERS)) 41,078 208,000 11,000 15,000 200,000 110,000 10,000 1,115,018

176,000 15,000 100,000 79,900 45,000 65,000 125,000 25,000 50,000 50,000 95,000 825,900 32,056,464

6,580 15,000 16,127 19,975 45,000 65,000 125,000 25,000 50,000 50,000 95,000 512,682 24,383,318

Total Project

Page 5 of 5 2024 Actuals Dec 10, 2024 41,926 155,615 9,066 6,251 341,270 311 3,920 41,876 41,876 9,143 70,180 167,307 13,447,014

Variance 849 52,385 1,934 15,000 200,000 110,000 3,749 773,748 6,269 15,000 12,207 19,975 3,124 23,124 125,000 15,857 50,000 50,000 24,820 345,375 10,936,305

Page 156 of 158

Appendix B

REVENUE

Property Taxation User Charges Licenses, Permits and Rents Government Grants Investment Income Penalties and Interest on taxes Donations Other Transfer from Reserves/Reserve Funds Total Revenues

TOWNSHIP OF SOUTH FRONTENAC For the Eleven Months Ending November 30, 2024 2024 Year Budget

2024 YTD Actuals

YTD Actual vs Budget Variance

22,723,775 1,612,492 1,563,678 2,132,602 649,000 370,000 2,100 0 277,661 29,331,308

22,733,465 1,274,210 1,235,659 1,864,201 650,872 377,158 27,595 53,867 313,578 28,530,607

9,690 (338,282) (328,020) (268,401) 1,872 7,158 25,495 53,867 35,917 (800,702)

6,296,571

5,983,833

(312,738)

2,100,333 2,873,290 321,876 148,753 3,500 1,293,983

2,101,488 2,604,287 320,327 130,509 33 1,074,832

1,156 (269,003) (1,549) (18,244) (3,467) (219,151)

5,556,155 2,361,009

5,955,064 1,494,055

398,909 (866,954)

419,430 3,110,649 1,429,046 877,964 26,792,558 (2,538,750)

245,274 3,077,880 1,614,546 752,560 25,354,687 (3,175,919)

(174,157) (32,769) 185,500 (125,404) (1,437,871) (637,169)

OPERATING EXPENSE

2024-11-30 1 of 1

Page 157 of 158

General Government Protection to Persons and Property Fire Police Conservation Authorities Protective Inspections and Control Emergency Measures Building Department Transportation Services Roadway Maintenance Winter Control Environmental Services Water System Solid Waste Management Parks, Recreation and Cemeteries Planning and Development Total Expenses TOTAL

Page 158 of 158 Township of South Frontenac By-Law Number 2024-81 Page 1 of 1 By-Law Number 2024-81 A By-Law to Confirm generally all actions and proceedings of the Council meeting of the corporation of the Township of South Frontenac on December 17, 2024 Whereas Section 8 of the Municipal Act, S.O. 2001 c. 25 and amendments thereto provides that a municipality has the capacity, rights powers and privileges of a natural person for the purpose of exercising its authority under the Municipal Act of any other Act and; Whereas Subsection 2 of Section 11 of the Municipal Act S.O. 2001, c. 25 and amendments thereto provides that a lower-tier municipality and an upper-tier municipality may pass by-laws respecting matters within the spheres of the jurisdiction described in the Table to Subsection 2, subject to certain provisions, and; Whereas Section 5 of the Municipal Act, S.O 2001 c. 25 and amendments thereto provides that a municipal power, including a municipality’s capacity, rights, powers and privileges under Section 8 shall be exercised by its council and by by-law unless the municipality is specifically authorized to do otherwise, and; Whereas the Council of the Township of South Frontenac deems it expedient to confirm its actions and proceedings; Therefore, be it resolved that the Council of the Corporation of the Township of South Frontenac hereby enacts as follows:

  1. The all actions and proceedings of the Council of the Corporation of the Township of South Frontenac taken at its regular meeting held on December 17, 2024, be confirmed as actions for which the municipality has the capacity, rights, powers and privileges of a natural person.
  2. That all actions and proceedings of the Council of the Corporation of the Township of South Frontenac held December 17, 2024, be confirmed as being matters within the spheres of jurisdiction described in Subsection 2 of Section 11 of the Municipal Act, S.O. 2001, c.25 and amendments thereto.
  3. That all actions and proceedings of the Council of the Corporation of the Township of South Frontenac taken at its regular meeting held on December 17, 2024, except those taken by by-law and those required by bylaw to be done by resolution are hereby sanctioned, ratified and confirmed as though set out within and forming part of this bylaw.
  4. Execution by the Mayor and the Clerk of all Deeds, Instruments and other Documents necessary to give effect to any such Resolution, Motion or other action and the affixing of the Corporate Seal to any such Deed, Instruments or other Documents is hereby authorized and confirmed.
  5. This By-law shall come into force and take effect on the date of its passage. Given First and Second Readings: Tuesday, December 17, 2024 Given Third Reading and Passed: Tuesday, December 17, 2024

James Thompson, Clerk

Ron Vandewal, Mayor

Help support independent journalism
If NFNM’s reporting matters to you, Buy Me a Coffee is a simple way to help keep local watchdog coverage going.
Buy Me a Coffee